CN102444408A - Secondary lining split mounting type stop device for underground excavation tunnel of subway - Google Patents
Secondary lining split mounting type stop device for underground excavation tunnel of subway Download PDFInfo
- Publication number
- CN102444408A CN102444408A CN2011103678287A CN201110367828A CN102444408A CN 102444408 A CN102444408 A CN 102444408A CN 2011103678287 A CN2011103678287 A CN 2011103678287A CN 201110367828 A CN201110367828 A CN 201110367828A CN 102444408 A CN102444408 A CN 102444408A
- Authority
- CN
- China
- Prior art keywords
- steel plate
- steel
- reinforcing
- retaining head
- retaining
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000009412 basement excavation Methods 0.000 title description 2
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 59
- 239000010959 steel Substances 0.000 claims abstract description 59
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 17
- 238000000034 method Methods 0.000 claims abstract description 14
- 229910001294 Reinforcing steel Inorganic materials 0.000 claims abstract description 9
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 8
- 230000002787 reinforcement Effects 0.000 claims description 13
- 239000011159 matrix material Substances 0.000 claims description 11
- 238000005065 mining Methods 0.000 claims description 7
- 238000007789 sealing Methods 0.000 claims description 7
- 238000010276 construction Methods 0.000 abstract description 6
- 239000000463 material Substances 0.000 abstract description 5
- 230000000694 effects Effects 0.000 abstract description 2
- 239000002023 wood Substances 0.000 abstract description 2
- 241001391944 Commicarpus scandens Species 0.000 abstract 1
- 239000000872 buffer Substances 0.000 abstract 1
- 238000004078 waterproofing Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000002950 deficient Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000010410 layer Substances 0.000 description 1
- 238000012856 packing Methods 0.000 description 1
- 239000011241 protective layer Substances 0.000 description 1
- 230000005641 tunneling Effects 0.000 description 1
- 238000009424 underpinning Methods 0.000 description 1
- 238000011144 upstream manufacturing Methods 0.000 description 1
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The invention particularly relates to a secondary lining assembled retaining head device for a subway underground excavated tunnel, which solves the problems that reinforcing steel bars at construction joints are easy to break and waterproof materials are not installed in place due to unreasonable structure of the conventional secondary lining retaining head device. The steel plate comprises an arc-shaped retaining head steel plate, the retaining head steel plate is composed of a plurality of steel plate base bodies, longitudinal steel bar clamping grooves are formed in the outer arc edges of the steel plate base bodies, key groove-shaped bolt holes are formed in one sides of the inner arcs of the steel plate base bodies, bolts are screwed in the bolt holes, arc-shaped steel bars fixed to the sections of two lining trolleys are arranged on the inner sides of the retaining head steel plate, radially arranged reinforcing sleeves are uniformly distributed and fixed on the steel bars, reinforcing steel pipes are arranged in the reinforcing sleeves, wood wedges are plugged between the reinforcing steel pipes and the rear surface of the retaining head steel plate, and galvanized water stop steel plates are welded to the. The invention has reasonable and reliable structural design, buffers the stress deformation, is supported and fixed by the reinforced steel pipe, has better waterproof effect, and has the advantages of simple process, simple and convenient operation and cost saving.
Description
Technical field
The present invention relates to metro built by mining method retaining head unit, be specially a kind of metro built by mining method secondary lining pin-connected panel retaining head unit.
Background technology
Subway tunneling running tunnel is selected shield method more and more.But, because shield method is not suitable in uneven strata, constructing; Can not be applicable to the line of turning back, the complicated section construction of branch-cut bridge equal section; Distance between centers of tracks location less than normal, the construction of pile foundation underpinning section.And Mine Method in, uneven, the shallow buried covered excavation section of little weathered layer, distribution of strata and be inappropriate for worker's method that the shield construction location is still frequent selection.Two lining construction natures become an important step in the Mine Method construction.
When yet existing secondary lining retaining head unit is constructed, exist easy disconnection of constuction joint place reinforcing bar and waterproofing materials that defectives such as not in place are installed, can not guarantee that vertical differential settlement of underground structure is controlled at the requirement that allows deformation range, hoop water-tight.
Summary of the invention
The present invention because unreasonable structure causes constuction joint place reinforcing bar to be prone to break off and waterproofing materials is installed problem not in place, provides a kind of metro built by mining method secondary lining pin-connected panel retaining head unit in order to solve existing secondary lining retaining head unit.
The present invention adopts following technical scheme to realize: metro built by mining method secondary lining pin-connected panel retaining head unit; Comprise an arcuation retaining steel plate; A retaining steel plate is made up of some block plate matrixes, and the outer arc limit of steel matrix has longitudinal reinforcement draw-in groove radially, and inner arc one side of steel matrix has keyway shape bolt hole; Bolt hole is screwed with the bolt that is connected with two lining chassis external arc sections; A retaining steel plate inboard is provided with and the fixing arcuation reinforcing bar of two lining chassis sections, is uniformly distributed with on the reinforcing bar and is fixed with the reinforcing sleeve that radially is provided with, and reinforces and is provided with the reinforcing steel pipe that is positioned at a surperficial side behind the retaining steel plate in the sleeve; Be plugged with timber wedge between the surface after reinforcing steel pipe and keeping off a steel plate, a retaining steel plate external arc end face point is welded with zinc-plated steel plate for sealing water.During operation, all by the elongated overlap joint of code requirement, longitudinal reinforcement spacing, topping adhere to specification every plate two lining longitudinal reinforcements except that deformation joint, and the zinc-plated steel plate for sealing water of hoop accurately is in place by designing requirement simultaneously.
Reasonable in design of the present invention is reliable; Overcome existing secondary lining retaining head unit because unreasonable structure causes constuction joint place reinforcing bar to be prone to break off and waterproofing materials is installed problem not in place; The structure design of steel matrix has cushioned its stress deformation; And through reinforcing the steel pipe support fixation, waterproof effect is better, has that technology is simple, easy and simple to handle, recyclable material utilization and an advantage of practicing thrift cost.
Description of drawings
Fig. 1 is a structural representation of the present invention.
Among the figure: the 1-steel matrix, 2-longitudinal reinforcement draw-in groove, the 3-bolt hole, the 4-reinforcing bar, 5-reinforces sleeve, and 6-reinforces steel pipe, the zinc-plated steel plate for sealing water of 7-.
The specific embodiment
Metro built by mining method secondary lining pin-connected panel retaining head unit; Comprise an arcuation retaining steel plate; A retaining steel plate is made up of some block plate matrixes 1, and the outer arc limit of steel matrix 1 has longitudinal reinforcement draw-in groove 2 radially, and inner arc one side of steel matrix 1 has keyway shape bolt hole 3; Bolt hole 3 is screwed with the bolt that is connected with two lining chassis external arc sections; A retaining steel plate inboard is provided with and the fixing arcuation reinforcing bar 4 of two lining chassis sections, is uniformly distributed with on the reinforcing bar 4 and is fixed with the reinforcing sleeve 5 that radially is provided with, and reinforces and is provided with the reinforcing steel pipe 6 that is positioned at a surperficial side behind the retaining steel plate in the sleeve 5; Be plugged with timber wedge between the surface after reinforcing steel pipe 6 and keeping off a steel plate, a retaining steel plate external arc end face point is welded with zinc-plated steel plate for sealing water 7.In the practical implementation process; The two lining chassis terminations preset Φ 50 of 50cm at interval reinforce sleeve 5 and adopt Φ 42 to reinforce steel pipe 6 and reinforce; Reinforce sleeve 5 and adopt 4 connections of Φ 22 reinforcing bars to keep the 30mm spacing with chassis termination steel plate, keep off a steel plate and adopt Φ 22 bolts and two lining chassis termination steel plates to be connected fixing so that timber wedge is auxiliary to be reinforced.During use, two lining chassis are in place and check indexs such as center line, vault absolute altitude, lining cutting section, and qualified back block-by-block is installed steel matrix; Longitudinal reinforcement is accurately put into longitudinal reinforcement draw-in groove 2 can guarantee longitudinal reinforcement spacing and protective layer thickness; Bolt hole 3 is designed to prolate type structure, is beneficial to steel matrix 1 fine setting, with the suitably adjustment in allowed band of reply longitudinal reinforcement; Φ 22 bolts add packing ring fixation steel plate matrix 1, prevent that bolt occurs becoming flexible to collapse taking off phenomenon in the work progress; In the installation during buried zinc-plated steel plate for sealing water 7, with the zinc-plated steel plate for sealing water hoop of straight-plate-type of every joint 2m along a retaining steel plate crooked from bottom to up and at interval 50cm be spot welded on the retaining steel plate, guarantee arc and in divide and meet design requirement; Adopt 5cm plank piecemeal to open between longitudinal reinforcement, upstream face utilizes circumferential reinforcement to reinforce, and hoop cushioning lumps of wood overall fixed guarantees that longitudinal reinforcement and ectonexine rebar spacing meet design requirement; Utilize and reinforce a steel pipe and a timber wedge integral reinforcing retaining steel plate, guarantee not take place in the concrete work progress problem of phenomenons such as spillage, race mould, fried mould.
Claims (1)
1. a metro built by mining method secondary lining pin-connected panel is kept off head unit; It is characterized in that: comprise an arcuation retaining steel plate; A retaining steel plate is made up of some block plate matrixes (1), and the outer arc limit of steel matrix (1) has longitudinal reinforcement draw-in groove (2) radially, and inner arc one side of steel matrix (1) has keyway shape bolt hole (3); Bolt hole (3) is screwed with the bolt that is connected with two lining chassis external arc sections; A retaining steel plate inboard is provided with and the fixing arcuation reinforcing bar (4) of two lining chassis sections, is uniformly distributed with on the reinforcing bar (4) and is fixed with the reinforcing sleeve (5) that radially is provided with, and reinforces and is provided with the reinforcing steel pipe (6) that is positioned at a surperficial side behind the retaining steel plate in the sleeve (5); Be plugged with timber wedge between the surface after reinforcing steel pipe (6) and keeping off a steel plate, a retaining steel plate external arc end face point is welded with zinc-plated steel plate for sealing water (7).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201110367828.7A CN102444408B (en) | 2011-11-18 | 2011-11-18 | Secondary lining split mounting type blocking head device for metro underground excavation tunnel |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201110367828.7A CN102444408B (en) | 2011-11-18 | 2011-11-18 | Secondary lining split mounting type blocking head device for metro underground excavation tunnel |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN102444408A true CN102444408A (en) | 2012-05-09 |
| CN102444408B CN102444408B (en) | 2014-05-07 |
Family
ID=46007300
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201110367828.7A Active CN102444408B (en) | 2011-11-18 | 2011-11-18 | Secondary lining split mounting type blocking head device for metro underground excavation tunnel |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN102444408B (en) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104061004A (en) * | 2014-07-10 | 2014-09-24 | 招商局重庆交通科研设计院有限公司 | Steel bar construction for secondary lining of tunnel |
| CN104632253A (en) * | 2014-12-31 | 2015-05-20 | 中铁大桥局集团第四工程有限公司 | Positioning device for tunnel lining construction and construction method |
| CN107313787A (en) * | 2017-07-12 | 2017-11-03 | 济南城建集团有限公司 | A kind of tunnel lining trolley end mould and construction method |
| CN109667605A (en) * | 2019-02-20 | 2019-04-23 | 中铁隧道集团三处有限公司 | A kind of manual imitation is laid with the construction method and laying rack of tunnel double-lining steel mesh |
| CN113027492A (en) * | 2021-03-31 | 2021-06-25 | 中铁十五局集团第一工程有限公司 | Steel bar connection method for rapid construction of tunnel secondary lining steel bar |
Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101338681A (en) * | 2008-08-08 | 2009-01-07 | 上海市隧道工程轨道交通设计研究院 | Shield Tunnel Segment Hole Entry Pretensioning Device |
| CN101457648A (en) * | 2008-12-30 | 2009-06-17 | 中铁隧道勘测设计院有限公司 | Full-ring steel tunnel segment structure with seal protection door |
| CN201351498Y (en) * | 2008-12-30 | 2009-11-25 | 中铁隧道勘测设计院有限公司 | Full circular steel segment structure with closed protective door |
| CN101705829A (en) * | 2009-10-21 | 2010-05-12 | 上海隧道工程股份有限公司 | Method for controlling quality of tunnel pipe sheet built by using shield method and pipe sheet structure |
| CN201599040U (en) * | 2010-01-14 | 2010-10-06 | 广州市市政集团有限公司 | Prefabricated segments for shield tunneling |
| CN201771515U (en) * | 2010-06-18 | 2011-03-23 | 中铁第四勘察设计院集团有限公司 | Shield tunnel liner ring in 7+1 partitioned mode |
| CN201953383U (en) * | 2010-11-30 | 2011-08-31 | 中铁十八局集团有限公司 | Stopper hinged type template trolley |
| CN202325550U (en) * | 2011-11-18 | 2012-07-11 | 中铁十二局集团有限公司 | Secondary lining assembled head blocking device for subway mined tunnel |
-
2011
- 2011-11-18 CN CN201110367828.7A patent/CN102444408B/en active Active
Patent Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101338681A (en) * | 2008-08-08 | 2009-01-07 | 上海市隧道工程轨道交通设计研究院 | Shield Tunnel Segment Hole Entry Pretensioning Device |
| CN101457648A (en) * | 2008-12-30 | 2009-06-17 | 中铁隧道勘测设计院有限公司 | Full-ring steel tunnel segment structure with seal protection door |
| CN201351498Y (en) * | 2008-12-30 | 2009-11-25 | 中铁隧道勘测设计院有限公司 | Full circular steel segment structure with closed protective door |
| CN101705829A (en) * | 2009-10-21 | 2010-05-12 | 上海隧道工程股份有限公司 | Method for controlling quality of tunnel pipe sheet built by using shield method and pipe sheet structure |
| CN201599040U (en) * | 2010-01-14 | 2010-10-06 | 广州市市政集团有限公司 | Prefabricated segments for shield tunneling |
| CN201771515U (en) * | 2010-06-18 | 2011-03-23 | 中铁第四勘察设计院集团有限公司 | Shield tunnel liner ring in 7+1 partitioned mode |
| CN201953383U (en) * | 2010-11-30 | 2011-08-31 | 中铁十八局集团有限公司 | Stopper hinged type template trolley |
| CN202325550U (en) * | 2011-11-18 | 2012-07-11 | 中铁十二局集团有限公司 | Secondary lining assembled head blocking device for subway mined tunnel |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104061004A (en) * | 2014-07-10 | 2014-09-24 | 招商局重庆交通科研设计院有限公司 | Steel bar construction for secondary lining of tunnel |
| CN104061004B (en) * | 2014-07-10 | 2016-07-13 | 招商局重庆交通科研设计院有限公司 | Tunnel secondary lining reinforced structure |
| CN104632253A (en) * | 2014-12-31 | 2015-05-20 | 中铁大桥局集团第四工程有限公司 | Positioning device for tunnel lining construction and construction method |
| CN107313787A (en) * | 2017-07-12 | 2017-11-03 | 济南城建集团有限公司 | A kind of tunnel lining trolley end mould and construction method |
| CN107313787B (en) * | 2017-07-12 | 2024-02-06 | 济南城建集团有限公司 | Tunnel lining trolley end die and construction method |
| CN109667605A (en) * | 2019-02-20 | 2019-04-23 | 中铁隧道集团三处有限公司 | A kind of manual imitation is laid with the construction method and laying rack of tunnel double-lining steel mesh |
| CN113027492A (en) * | 2021-03-31 | 2021-06-25 | 中铁十五局集团第一工程有限公司 | Steel bar connection method for rapid construction of tunnel secondary lining steel bar |
Also Published As
| Publication number | Publication date |
|---|---|
| CN102444408B (en) | 2014-05-07 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102425427B (en) | Method for constructing tunnel by utilizing shield empty-pushing crossing mine method | |
| CN204984441U (en) | It backfills novel section of jurisdiction of quality behind one's back to change single shield TBM section of jurisdiction | |
| CN110469341B (en) | Subway underground excavation station assembling and pouring combined integrated structure and construction method | |
| CN202325550U (en) | Secondary lining assembled head blocking device for subway mined tunnel | |
| CN108266191B (en) | An optimized construction method for multi-arch tunnels | |
| US11821316B1 (en) | System and construction method of single-layer lining tunnel structure based on mine-tunnelling method | |
| CN102650212B (en) | Construction method for protecting partition wall in double-arch tunnel through temporary support of middle pilot tunnel | |
| CN103670446B (en) | Circular diversion tunnel 2/3 circle concrete-liner construction method | |
| CN205503146U (en) | Novel supporting construction of shallow tunnel suitable for city sensitizing range | |
| CN104818728A (en) | Permanent supporting system with basement floor and supporting piles capable of working together | |
| CN105569726A (en) | Gob-side entry retaining method for GFRP (Glass Fiber Reinforced Polymer) tube concrete pier stud and gangue concrete wall | |
| CN108868834B (en) | Temporary support device for tunnel arch wall primary support intrusion limit arch changing construction | |
| CN110242334A (en) | An assembled FRP high-water material mine composite pillar and its construction method | |
| CN109914474A (en) | A kind of pipe gallery U-type groove, which is excavated, presses push construction method | |
| CN209780920U (en) | Supporting construction in subway tunnel construction in-process field entrance and exit secretly dig tunnel | |
| CN102444408B (en) | Secondary lining split mounting type blocking head device for metro underground excavation tunnel | |
| CN104947681A (en) | Super large super deep basement ground pit construction method | |
| CN203547753U (en) | Profile steel concrete shaft wall base | |
| CN103711056B (en) | Steel tool-type temporary construction road and construction method thereof | |
| CN110438988A (en) | A kind of prefabricated bulkhead and pore digging method | |
| CN106014443A (en) | Method for preventing roadway floor heaving and wall sliding of gob-side entry retaining | |
| CN116066130A (en) | Rectangular jacking pipe construction method for long-distance full-section rock stratum condition | |
| CN208472763U (en) | A kind of rear parados of jacking construction | |
| US12331642B1 (en) | Composite supporting structure combining fabric-form bag-behind-wall grouting and high-strength support frames, and construction method thereof | |
| CN203160254U (en) | Pit support structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant |