CN202325550U - Secondary lining assembled head blocking device for subway mined tunnel - Google Patents

Secondary lining assembled head blocking device for subway mined tunnel Download PDF

Info

Publication number
CN202325550U
CN202325550U CN201120460153.6U CN201120460153U CN202325550U CN 202325550 U CN202325550 U CN 202325550U CN 201120460153 U CN201120460153 U CN 201120460153U CN 202325550 U CN202325550 U CN 202325550U
Authority
CN
China
Prior art keywords
steel plate
head
secondary lining
steel
arc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201120460153.6U
Other languages
Chinese (zh)
Inventor
刘旭辉
李建军
郝晓康
郭英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 12th Bureau Group Co Ltd
Third Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Original Assignee
China Railway 12th Bureau Group Co Ltd
Third Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 12th Bureau Group Co Ltd, Third Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd filed Critical China Railway 12th Bureau Group Co Ltd
Priority to CN201120460153.6U priority Critical patent/CN202325550U/en
Application granted granted Critical
Publication of CN202325550U publication Critical patent/CN202325550U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

本实用新型具体为一种地铁暗挖隧道二次衬砌拼装式挡头装置,解决了现有二次衬砌挡头装置由于结构不合理导致施工缝处钢筋易断开及防水材料安装不到位的问题。包括弧状挡头钢板,挡头钢板是由若干块钢板基体组成,钢板基体的外弧边开有纵向钢筋卡槽,钢板基体的内弧一侧开有键槽状螺栓孔,螺栓孔拧有螺栓,挡头钢板内侧设有与二衬台车断面固定的弧状钢筋,钢筋上均布固定有径向设置的加固套筒,加固套筒内设有加固钢管,加固钢管与挡头钢板后表面之间塞有木楔,挡头钢板外圆弧端面点焊有镀锌止水钢板。本实用新型结构设计合理可靠,缓冲了其受力变形,并通过加固钢管支撑固定,防水效果较好,具有工艺简单、操作简便、节约成本的优点。

The utility model is specifically a secondary lining assembled head stop device for subway underground excavation tunnels, which solves the problems that the existing secondary lining head stop device is easily disconnected at the construction joint and the waterproof material is not installed properly due to the unreasonable structure of the existing secondary lining head stop device. . Including the arc-shaped head-stop steel plate, the head-stop steel plate is composed of several steel plate substrates, the outer arc edge of the steel plate substrate is provided with a longitudinal reinforcement slot, and the inner arc side of the steel plate substrate is provided with keyway-shaped bolt holes, and the bolt holes are screwed with bolts. The inner side of the head-stop steel plate is provided with an arc-shaped steel bar fixed to the cross-section of the second lining trolley, and radial reinforcement sleeves are uniformly fixed on the steel bars, and a reinforced steel pipe is arranged inside the reinforcement sleeve. A wooden wedge is used for the plug, and a galvanized water-stop steel plate is spot-welded on the outer arc end of the head plate. The utility model has a reasonable and reliable structural design, buffers its stress deformation, and is supported and fixed by a reinforced steel pipe, has good waterproof effect, and has the advantages of simple process, easy operation and cost saving.

Description

Metro built by mining method secondary lining pin-connected panel retaining head unit
Technical field
The utility model relates to metro built by mining method retaining head unit, is specially a kind of metro built by mining method secondary lining pin-connected panel retaining head unit.
Background technology
Subway tunneling running tunnel is selected shield method more and more.But, because shield method is not suitable in uneven strata, constructing; Can not be applicable to the line of turning back, the complicated section construction of branch-cut bridge equal section; Distance between centers of tracks location less than normal, the construction of pile foundation underpinning section.And Mine Method in, uneven, the shallow buried covered excavation section of little weathered layer, distribution of strata and be inappropriate for worker's method that the shield construction location is still frequent selection.Two lining construction natures become an important step in the Mine Method construction.
When yet existing secondary lining retaining head unit is constructed, exist easy disconnection of constuction joint place reinforcing bar and waterproofing materials that defectives such as not in place are installed, can not guarantee that vertical differential settlement of underground structure is controlled at the requirement that allows deformation range, hoop water-tight.
Summary of the invention
The utility model because unreasonable structure causes constuction joint place reinforcing bar to be prone to break off and waterproofing materials is installed problem not in place, provides a kind of metro built by mining method secondary lining pin-connected panel retaining head unit in order to solve existing secondary lining retaining head unit.
The utility model is to adopt following technical scheme to realize: metro built by mining method secondary lining pin-connected panel retaining head unit; Comprise an arcuation retaining steel plate; A retaining steel plate is made up of some block plate matrixes, and the outer arc limit of steel matrix has longitudinal reinforcement draw-in groove radially, and inner arc one side of steel matrix has keyway shape bolt hole; Bolt hole is screwed with the bolt that is connected with two lining chassis external arc sections; A retaining steel plate inboard is provided with and the fixing arcuation reinforcing bar of two lining chassis sections, is uniformly distributed with on the reinforcing bar and is fixed with the reinforcing sleeve that radially is provided with, and reinforces and is provided with the reinforcing steel pipe that is positioned at a surperficial side behind the retaining steel plate in the sleeve; Be plugged with timber wedge between the surface after reinforcing steel pipe and keeping off a steel plate, a retaining steel plate external arc end face point is welded with zinc-plated steel plate for sealing water.During operation, all by the elongated overlap joint of code requirement, longitudinal reinforcement spacing, topping adhere to specification every plate two lining longitudinal reinforcements except that deformation joint, and the zinc-plated steel plate for sealing water of hoop accurately is in place by designing requirement simultaneously.
The utility model reasonable in design is reliable; Overcome existing secondary lining retaining head unit because unreasonable structure causes constuction joint place reinforcing bar to be prone to break off and waterproofing materials is installed problem not in place; The structure design of steel matrix has cushioned its stress deformation; And through reinforcing the steel pipe support fixation, waterproof effect is better, has that technology is simple, easy and simple to handle, recyclable material utilization and an advantage of practicing thrift cost.
Description of drawings
Fig. 1 is the structural representation of the utility model.
Among the figure: the 1-steel matrix, 2-longitudinal reinforcement draw-in groove, the 3-bolt hole, the 4-reinforcing bar, 5-reinforces sleeve, and 6-reinforces steel pipe, the zinc-plated steel plate for sealing water of 7-.
The specific embodiment
Metro built by mining method secondary lining pin-connected panel retaining head unit; Comprise an arcuation retaining steel plate; A retaining steel plate is made up of some block plate matrixes 1, and the outer arc limit of steel matrix 1 has longitudinal reinforcement draw-in groove 2 radially, and inner arc one side of steel matrix 1 has keyway shape bolt hole 3; Bolt hole 3 is screwed with the bolt that is connected with two lining chassis external arc sections; A retaining steel plate inboard is provided with and the fixing arcuation reinforcing bar 4 of two lining chassis sections, is uniformly distributed with on the reinforcing bar 4 and is fixed with the reinforcing sleeve 5 that radially is provided with, and reinforces and is provided with the reinforcing steel pipe 6 that is positioned at a surperficial side behind the retaining steel plate in the sleeve 5; Be plugged with timber wedge between the surface after reinforcing steel pipe 6 and keeping off a steel plate, a retaining steel plate external arc end face point is welded with zinc-plated steel plate for sealing water 7.In the practical implementation process; The two lining chassis terminations preset Φ 50 of 50cm at interval reinforce sleeve 5 and adopt Φ 42 to reinforce steel pipe 6 and reinforce; Reinforce sleeve 5 and adopt 4 connections of Φ 22 reinforcing bars to keep the 30mm spacing with chassis termination steel plate, keep off a steel plate and adopt Φ 22 bolts and two lining chassis termination steel plates to be connected fixing so that timber wedge is auxiliary to be reinforced.During use, two lining chassis are in place and check indexs such as center line, vault absolute altitude, lining cutting section, and qualified back block-by-block is installed steel matrix; Longitudinal reinforcement is accurately put into longitudinal reinforcement draw-in groove 2 can guarantee longitudinal reinforcement spacing and protective layer thickness; Bolt hole 3 is designed to prolate type structure, is beneficial to steel matrix 1 fine setting, with the suitably adjustment in allowed band of reply longitudinal reinforcement; Φ 22 bolts add packing ring fixation steel plate matrix 1, prevent that bolt occurs becoming flexible to collapse taking off phenomenon in the work progress; In the installation during buried zinc-plated steel plate for sealing water 7, with the zinc-plated steel plate for sealing water hoop of straight-plate-type of every joint 2m along a retaining steel plate crooked from bottom to up and at interval 50cm be spot welded on the retaining steel plate, guarantee arc and in divide and meet design requirement; Adopt 5cm plank piecemeal to open between longitudinal reinforcement, upstream face utilizes circumferential reinforcement to reinforce, and hoop cushioning lumps of wood overall fixed guarantees that longitudinal reinforcement and ectonexine rebar spacing meet design requirement; Utilize and reinforce a steel pipe and a timber wedge integral reinforcing retaining steel plate, guarantee not take place in the concrete work progress problem of phenomenons such as spillage, race mould, fried mould.

Claims (1)

1. a metro built by mining method secondary lining pin-connected panel is kept off head unit; It is characterized in that: comprise an arcuation retaining steel plate; A retaining steel plate is made up of some block plate matrixes (1), and the outer arc limit of steel matrix (1) has longitudinal reinforcement draw-in groove (2) radially, and inner arc one side of steel matrix (1) has keyway shape bolt hole (3); Bolt hole (3) is screwed with the bolt that is connected with two lining chassis external arc sections; A retaining steel plate inboard is provided with and the fixing arcuation reinforcing bar (4) of two lining chassis sections, is uniformly distributed with on the reinforcing bar (4) and is fixed with the reinforcing sleeve (5) that radially is provided with, and reinforces and is provided with the reinforcing steel pipe (6) that is positioned at a surperficial side behind the retaining steel plate in the sleeve (5); Be plugged with timber wedge between the surface after reinforcing steel pipe (6) and keeping off a steel plate, a retaining steel plate external arc end face point is welded with zinc-plated steel plate for sealing water (7).
CN201120460153.6U 2011-11-18 2011-11-18 Secondary lining assembled head blocking device for subway mined tunnel Withdrawn - After Issue CN202325550U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201120460153.6U CN202325550U (en) 2011-11-18 2011-11-18 Secondary lining assembled head blocking device for subway mined tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201120460153.6U CN202325550U (en) 2011-11-18 2011-11-18 Secondary lining assembled head blocking device for subway mined tunnel

Publications (1)

Publication Number Publication Date
CN202325550U true CN202325550U (en) 2012-07-11

Family

ID=46437532

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201120460153.6U Withdrawn - After Issue CN202325550U (en) 2011-11-18 2011-11-18 Secondary lining assembled head blocking device for subway mined tunnel

Country Status (1)

Country Link
CN (1) CN202325550U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102444408A (en) * 2011-11-18 2012-05-09 中铁十二局集团有限公司 Secondary lining split mounting type stop device for underground excavation tunnel of subway
CN102758637A (en) * 2012-07-16 2012-10-31 中铁隧道集团有限公司 Tunnel secondary lining structure composed of profiled steel sheets and concrete
CN103147764A (en) * 2013-01-04 2013-06-12 中铁二十二局集团有限公司 Sizing end mould plate for second lining of tunnel arch wall
CN103573277A (en) * 2012-07-19 2014-02-12 中铁十九局集团第二工程有限公司 Separating type water-proof board nail-free hanging method
CN103775105A (en) * 2014-02-20 2014-05-07 中铁十局集团第三建设有限公司 Double hinge joint turnover type tunnel lining trolley steel end mold
CN107524461A (en) * 2017-10-09 2017-12-29 中国十七冶集团有限公司 A kind of device and method for improving Tunnel Second Lining ring waterstop waterproof effect

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102444408A (en) * 2011-11-18 2012-05-09 中铁十二局集团有限公司 Secondary lining split mounting type stop device for underground excavation tunnel of subway
CN102444408B (en) * 2011-11-18 2014-05-07 中铁十二局集团有限公司 Secondary lining split mounting type blocking head device for metro underground excavation tunnel
CN102758637A (en) * 2012-07-16 2012-10-31 中铁隧道集团有限公司 Tunnel secondary lining structure composed of profiled steel sheets and concrete
CN102758637B (en) * 2012-07-16 2014-04-30 中铁隧道集团有限公司 Tunnel secondary lining structure composed of profiled steel sheets and concrete
CN103573277A (en) * 2012-07-19 2014-02-12 中铁十九局集团第二工程有限公司 Separating type water-proof board nail-free hanging method
CN103147764A (en) * 2013-01-04 2013-06-12 中铁二十二局集团有限公司 Sizing end mould plate for second lining of tunnel arch wall
CN103147764B (en) * 2013-01-04 2015-07-01 中铁二十二局集团有限公司 Sizing end mould plate for second lining of tunnel arch wall
CN103775105A (en) * 2014-02-20 2014-05-07 中铁十局集团第三建设有限公司 Double hinge joint turnover type tunnel lining trolley steel end mold
CN107524461A (en) * 2017-10-09 2017-12-29 中国十七冶集团有限公司 A kind of device and method for improving Tunnel Second Lining ring waterstop waterproof effect

Similar Documents

Publication Publication Date Title
CN202325550U (en) Secondary lining assembled head blocking device for subway mined tunnel
CN204984441U (en) It backfills novel section of jurisdiction of quality behind one's back to change single shield TBM section of jurisdiction
CN204060720U (en) A kind of inverted arch structure being applicable to soft rock tunnel
US11821316B1 (en) System and construction method of single-layer lining tunnel structure based on mine-tunnelling method
CN205503146U (en) Novel supporting construction of shallow tunnel suitable for city sensitizing range
CN102650212B (en) Construction method for protecting partition wall in double-arch tunnel through temporary support of middle pilot tunnel
CN114635720A (en) Large-section deep-buried soft rock tunnel combined supporting system and construction method
CN105569726A (en) Gob-side entry retaining method for GFRP (Glass Fiber Reinforced Polymer) tube concrete pier stud and gangue concrete wall
CN110242334A (en) An assembled FRP high-water material mine composite pillar and its construction method
CN112727466A (en) Construction method for support-free prefabricated assembled type shield tunnel air shaft structure
CN102444408B (en) Secondary lining split mounting type blocking head device for metro underground excavation tunnel
CN107939419A (en) A kind of tunnel U-shaped steel covers canopy supporting construction
CN203547753U (en) Profile steel concrete shaft wall base
CN201771514U (en) Concealed tunneling structure with pile foundation
CN104481555A (en) Method of grouting and drilling construction by passing through weak surrounding rock
CN106285775A (en) Cover goaf filling under a kind of structures and expand bag and construction method
CN203160254U (en) Pit support structure
CN105605335A (en) Large-caliber prestressed steel cylinder concrete pipe for jacking construction
CN104047273B (en) Power station dissipation and scouring wall and construction method thereof
CN203247838U (en) Fully-buried basement side wall post-pouring belt advance water stop formwork
CN202673299U (en) Double-layer mold constructing composite lining supporting structure of weak surrounding rock tunnel
CN211144498U (en) Novel shield cutter head
CN209508979U (en) Slip-crack surface bracing means
CN118881378A (en) Construction method of connecting dark excavation tunnel based on existing subway tunnel
CN202788876U (en) Superimposed bearing arched structure of large-span tunnel on stratum soft in upper layer and hard in lower layer

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20120711

Effective date of abandoning: 20140507

AV01 Patent right actively abandoned

Granted publication date: 20120711

Effective date of abandoning: 20140507

RGAV Abandon patent right to avoid regrant