CN206971353U - A kind of ruggedized construction for receiving well walling crib - Google Patents

A kind of ruggedized construction for receiving well walling crib Download PDF

Info

Publication number
CN206971353U
CN206971353U CN201720850584.0U CN201720850584U CN206971353U CN 206971353 U CN206971353 U CN 206971353U CN 201720850584 U CN201720850584 U CN 201720850584U CN 206971353 U CN206971353 U CN 206971353U
Authority
CN
China
Prior art keywords
well
walling crib
layer
reinforced concrete
seepage flow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720850584.0U
Other languages
Chinese (zh)
Inventor
毕国泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Road Construction Engineering Co Ltd
Original Assignee
Tianjin Road Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Road Construction Engineering Co Ltd filed Critical Tianjin Road Construction Engineering Co Ltd
Priority to CN201720850584.0U priority Critical patent/CN206971353U/en
Application granted granted Critical
Publication of CN206971353U publication Critical patent/CN206971353U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Sewage (AREA)

Abstract

It the utility model is related to building field, a kind of more particularly to ruggedized construction for receiving well walling crib, including the concrete foundation layer located at bottom, receipts water pipe on concrete foundation layer, located at the Jing Qiang for receiving water pipe both sides, reinforced concrete layer located at well wall top portion and the walling crib and well double-edged fine-toothed comb located at reinforced concrete layer top, by setting reinforced concrete layer to reinforce Jing Qiang tops or even whole well of receiving, support walling crib and well double-edged fine-toothed comb simultaneously, inspection shaft well head is enabled to bear stronger pressure, percolation Structure is set in walling crib and well double-edged fine-toothed comb surface in addition, it is easy to preferably carry out receipts water.

Description

A kind of ruggedized construction for receiving well walling crib
Technical field
It the utility model is related to building field, more particularly to a kind of ruggedized construction for receiving well walling crib.
Background technology
It is the small Fang Jing for being used for collecting surface gathered water on roadside to receive well, receives well by receiving water pipe and inspection shaft phase Even, the rainwater of collection is discharged into inspection shaft, though conventional receipts water can not tackle stronger with certain bearing capacity Compression situation, once strong compression situation occurs, then the damage of inspection shaft is easily caused, be not easy to repair.
Utility model content
Technical problem to be solved in the utility model is to overcome the deficiencies in the prior art, there is provided one kind receives well The ruggedized construction of walling crib.
The utility model is to be achieved by the following technical programs:
A kind of ruggedized construction for receiving well walling crib, including the concrete foundation layer located at bottom, located at concrete foundation layer On receipts water pipe, located at the Jing Qiang for receiving water pipe both sides, located at the reinforced concrete layer in well wall top portion and located at reinforced concrete layer The walling crib and well double-edged fine-toothed comb on top, wherein,
The walling crib includes base and is connected to the back-up ring of middle side part, and the base presses close to the setting of well wall top inner side, The well double-edged fine-toothed comb is placed in the ladder platform formed on the inside of base with back-up ring;
The well wall top outer is slotted provided with concrete, and reinforced concrete layer is filled in concrete fluting and covered Well wall top portion on the outside of back-up ring;
The well double-edged fine-toothed comb includes the inclination diversion division for being located at the seepage flow hole portion at middle part and being connected with seepage flow hole portion, the seepage flow Hole portion is provided with multiple seepage flow holes, and the seepage flow hole portion is highly less than back-up ring, and the inclination diversion division tilts towards seepage flow hole portion.
The reinforced concrete layer top is equal with the substructure height of walling crib, and the bottom on the outside of reinforced concrete layer and back-up ring Seat top oversite concrete asphalt surface course.
The well wall apical lateral of side is slotted provided with Jing Qiang, and kerbstone is fixed in Jing Qiang flutings, people is set on the outside of kerbstone Trade pave-load layer.
The receipts water pipe is concrete water pipe.
The beneficial effects of the utility model are:
By setting reinforced concrete layer to reinforce Jing Qiang tops or even whole well of receiving, while support walling crib and well are combed Son so that inspection shaft well head can bear stronger pressure, set percolation Structure in walling crib and well double-edged fine-toothed comb surface in addition, just In preferably carrying out receipts water.
Brief description of the drawings
Fig. 1 is main structure diagram of the present utility model.
Fig. 2 is the structural representation that the utility model presses close to roadside setting.
Fig. 3 is walling crib of the present utility model and well double-edged fine-toothed comb surface texture schematic diagram.
In figure:1. concrete foundation layer, 2. receipts water pipes, 3. Jing Qiang, 4. reinforced concrete layers, 5. walling cribs, 6. well double-edged fine-toothed combs, 7. Base, 8. back-up rings, 9. seepage flow hole portions, 10. inclination diversion divisions, 11. seepage flow holes, 12. concrete asphalt surface courses, 13. Jing Qiang flutings, 14. kerbstone, 15. pavement pave-load layers.
Embodiment
In order that those skilled in the art more fully understand the technical solution of the utility model, below in conjunction with the accompanying drawings The utility model is described in further detail with most preferred embodiment.
As illustrated, the utility model includes the concrete foundation layer 1 located at bottom, the receipts on concrete foundation layer Water pipe 2, located at the well wall 3 for receiving water pipe both sides, located at the reinforced concrete layer 4 in well wall top portion and located at reinforced concrete layer top Walling crib 5 and well double-edged fine-toothed comb 6, wherein,
Well wall can pour fixation with concrete foundation layer;
The walling crib includes base 7 and is connected to the back-up ring 8 of middle side part, and the base is pressed close to well wall top inner side and set Put, the well double-edged fine-toothed comb is placed in the ladder platform formed on the inside of base with back-up ring;
The well wall top outer is slotted provided with concrete, and reinforced concrete layer is filled in concrete fluting and covered Well wall top portion on the outside of back-up ring;
The well double-edged fine-toothed comb includes the inclination diversion division 10 for being located at the seepage flow hole portion 9 at middle part and being connected with seepage flow hole portion, described Seepage flow hole portion is provided with multiple seepage flow holes 11, and the seepage flow hole portion is highly less than back-up ring, and the diversion division that tilts is towards seepage flow hole portion Tilt.
Preferably, the reinforced concrete layer top is equal with the substructure height of walling crib, and reinforced concrete layer and back-up ring Oversite concrete asphalt surface course 12, levelling with the road surface of both sides above the base in outside.
The chassis outer side of walling crib is reinforced concrete layer and its concrete asphalt surface course on top is pushed down, and realizes and fixes, well It is used to place well double-edged fine-toothed comb on the inside of the base of circle;
Reinforced concrete layer is reinforced to Jing Qiang tops or even whole well of receiving, while support walling crib and well double-edged fine-toothed comb so that inspection Stronger pressure can be born by looking into well well head.
When the receipts well side in this example is affixed on roadside, the well wall apical lateral of side sets Jing Qiang flutings 13, Jing Qiang Kerbstone 14 is fixed in fluting, the pavement pave-load layer 15 by ground tile paving is set on the outside of kerbstone.
Preferably, the receipts water pipe is concrete water pipe.
Described above is only preferred embodiment of the present utility model, it is noted that for the common skill of the art For art personnel, on the premise of the utility model principle is not departed from, some improvements and modifications can also be made, these improve and Retouching also should be regarded as the scope of protection of the utility model.

Claims (4)

1. a kind of ruggedized construction for receiving well walling crib, it is characterised in that including the concrete foundation layer located at bottom, located at coagulation Receipts water pipe on earth foundation layer, located at the Jing Qiang for receiving water pipe both sides, located at the reinforced concrete layer in well wall top portion and located at reinforcing The walling crib and well double-edged fine-toothed comb on concrete layer top, wherein,
The walling crib includes base and is connected to the back-up ring of middle side part, and the base presses close to the setting of well wall top inner side, described Well double-edged fine-toothed comb is placed in the ladder platform formed on the inside of base with back-up ring;
The well wall top outer is slotted provided with concrete, and reinforced concrete layer is filled on the outside of concrete fluting and covering back-up ring Well wall top portion;
The well double-edged fine-toothed comb includes the inclination diversion division for being located at the seepage flow hole portion at middle part and being connected with seepage flow hole portion, the seepage flow hole portion Multiple seepage flow holes are provided with, the seepage flow hole portion is highly less than back-up ring, and the inclination diversion division tilts towards seepage flow hole portion.
A kind of 2. ruggedized construction for receiving well walling crib according to claim 1, it is characterised in that the reinforced concrete layer Top is equal with the substructure height of walling crib, and oversite concrete pitch table above the base on the outside of reinforced concrete layer and back-up ring Layer.
A kind of 3. ruggedized construction for receiving well walling crib according to claim 1, it is characterised in that the well wall top of side End outside is provided with Jing Qiang and slotted, and kerbstone is fixed in Jing Qiang flutings, pavement pave-load layer is set on the outside of kerbstone.
4. a kind of ruggedized construction for receiving well walling crib according to claim 1, it is characterised in that the receipts water pipe is coagulation Native water pipe.
CN201720850584.0U 2017-07-13 2017-07-13 A kind of ruggedized construction for receiving well walling crib Expired - Fee Related CN206971353U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720850584.0U CN206971353U (en) 2017-07-13 2017-07-13 A kind of ruggedized construction for receiving well walling crib

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720850584.0U CN206971353U (en) 2017-07-13 2017-07-13 A kind of ruggedized construction for receiving well walling crib

Publications (1)

Publication Number Publication Date
CN206971353U true CN206971353U (en) 2018-02-06

Family

ID=61402452

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720850584.0U Expired - Fee Related CN206971353U (en) 2017-07-13 2017-07-13 A kind of ruggedized construction for receiving well walling crib

Country Status (1)

Country Link
CN (1) CN206971353U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109024847A (en) * 2018-07-17 2018-12-18 芜湖芬特勘测服务有限公司 A kind of gutter structure of municipal works

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109024847A (en) * 2018-07-17 2018-12-18 芜湖芬特勘测服务有限公司 A kind of gutter structure of municipal works

Similar Documents

Publication Publication Date Title
CN106758638A (en) A kind of city sponge brick and its construction technology
CN106988184A (en) Porous pavement
CN207812221U (en) A kind of pervious floor tile with rapid infiltrated structure
CN206971353U (en) A kind of ruggedized construction for receiving well walling crib
CN206728751U (en) A kind of permeable planting technique structure of high load
CN203361233U (en) Solar greenhouse surface rainwater collection, filtration and storage facility
CN109826065A (en) A kind of high-fill roadbed guard system and its construction method
CN209602912U (en) A kind of asphalt pavement road surface
CN207079614U (en) A kind of building pile structure
CN205934699U (en) Main arch circle support structure of arched bridge structure
CN206815480U (en) City sponge greenery patches structure
CN206189446U (en) Retaining wall with plant groove
CN103590301B (en) The construction method of Cushion-layer-free permeable ecological grassing terrace
CN206529881U (en) The constructing device of cushion cap and ground girder construction
CN207091874U (en) Landscape pavement water-permeable brick paving structure
CN213979026U (en) Reinforcing structure of wisdom building site tower crane basis
CN204691123U (en) Balcony greening fence
CN204898645U (en) Building rubbish regeneration drainage CFG stake ground
CN209010890U (en) A kind of triangular concrete gutter structure for highway drainage
CN205875876U (en) Triangle angle steel communication steel tower mast prevent wind fixing base
CN207047868U (en) A kind of pattern foundation pit supporting structure barricade
CN207244446U (en) Bridge water-bound under concrete sidewalk
CN206477346U (en) A kind of expressway slope reinforcement structure
CN206396570U (en) A kind of garden road pile foundation type spit of fland walks structure
CN206736666U (en) A kind of base course suitable for porous pavement and the basic road surface using the brick

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant