CN206970574U - White wine cold fermentation equipment - Google Patents

White wine cold fermentation equipment Download PDF

Info

Publication number
CN206970574U
CN206970574U CN201720563136.2U CN201720563136U CN206970574U CN 206970574 U CN206970574 U CN 206970574U CN 201720563136 U CN201720563136 U CN 201720563136U CN 206970574 U CN206970574 U CN 206970574U
Authority
CN
China
Prior art keywords
carbon dioxide
pipe
tank
fermentation
piston
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720563136.2U
Other languages
Chinese (zh)
Inventor
郑国祥
刘清巧
郑勇
郑芹
郑乾
郑健东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Province Renhuan City Maotai Town Zhengshi Brewery Co Ltd
Original Assignee
Guizhou Province Renhuan City Maotai Town Zhengshi Brewery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Province Renhuan City Maotai Town Zhengshi Brewery Co Ltd filed Critical Guizhou Province Renhuan City Maotai Town Zhengshi Brewery Co Ltd
Priority to CN201720563136.2U priority Critical patent/CN206970574U/en
Application granted granted Critical
Publication of CN206970574U publication Critical patent/CN206970574U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Apparatus Associated With Microorganisms And Enzymes (AREA)

Abstract

This patent is related to Zymolysis Equipment, and a kind of white wine cold fermentation equipment includes fermentation cylinder, carbon dioxide storage tank, pressure carbon dioxide tank, blast pipe, communicating pipe, air inlet pipe and compression pump;Fermentation cylinder is connected by blast pipe with carbon dioxide storage tank, and carbon dioxide storage tank is connected by communicating pipe with pressure carbon dioxide tank, and pressure carbon dioxide tank is connected by air inlet pipe with fermentation cylinder;Blast pipe is vertically arranged, and carbon dioxide storage tank slidably connects the first piston made of magnetic material above fermentation cylinder in blast pipe, and when first piston slides into blast pipe top, carbon dioxide storage tank connects with fermentation cylinder;Compression pump was connected on communicating pipe, and the first check valve in communicating pipe;Magnetic valve is provided with air inlet pipe, the pressure sensor being electrically connected with the solenoid valve is provided with fermentation cylinder.By being passed through carbon dioxide into fermentation storage tank repeatedly, the radiating efficiency of fermentation inner barrel can be improved.

Description

White wine cold fermentation equipment
Technical field
It the utility model is related to Zymolysis Equipment, and in particular to a kind of white wine cold fermentation equipment.
Background technology
Functions of the equipments currently used for liquor fermentation are single, structure falls behind, largely use masonry structure painting mud or Do not apply the fermentation pit of mud with ceramic cylinder, it is difficult to be connected with valve, pipeline, Chi Ding using sealing clay top, cylinder sealed with cover plate Top, carbon dioxide caused by fermentation can not be collected and utilized, be allowed to be melt into environment, its quantity is big can be with The tonnage of state's fermentation white wine is compared, and the CO_2 Resource of high-purity caused by wine brewing wastes and caused the deterioration of environment.
Traditional liquor fermentation pit can not carry out good mass-and heat-transfer, therefore during the broiling summer, fermented grain can not cool, Liquor-making Enterprises & production is forced to stop production, the off-time is general between 2~3 months according to the difference of various regions weather, has had a strong impact on white The production intensity and output of wine enterprise industry, cause the waste of substantial amounts of human resources.
Because fermented grain is to add appropriate water and song to combine with rice husk and raw material in traditional liquor fermentation pit, pit is in itself Do not possess good liquid mass transfer and gas mass transfer condition, therefore triggered a series of factor for being unfavorable for liquor fermentation, such as In order to do not make fermentation fever it is too high, can only be to reduce starch concentration to sacrifice, and reducing starch concentration causes the drop of white wine yield Low, the reduction of white wine yield makes liquor production cost too high again, and then causes white wine selling at exorbitant prices, in order that allowing ordinary consumer Rising for consumption, have to mix different substances together edible alcohol, consumer is reduced the degree of belief of white wine, its reason is traditional liquor fermenting cellar eventually Pond is with the demand of far behind society.
In addition to environment temperature can make the fermentation temperature rise of wine body, wine body itself can also produce heat during the fermentation, So that the temperature rise of wine body.During the fermentation, in order that wine temperature can reduce, it is necessary to enter in time to wine body in time Row stirring;It is by manually carrying out to be stirred operation to wine body at present, and cost of labor input is larger;And wine body is stirred When, it is necessary to open fermentation pit, so as to which air can enter fermentation pit, because the wine body fermentation later stage is anaerobic fermentation, therefore sky After gas enters fermentation pit, having on fermentation quality influences.
Utility model content
The purpose of this utility model is the white wine cold fermentation equipment for providing a kind of good heat dissipation effect.
To reach above-mentioned purpose, base case of the present utility model is as follows:
Including the cylinder that ferments, hopper is provided with fermentation cylinder, hopper bottom is provided with material spilling hole, and the bottom for the cylinder that ferments is provided with Collecting tank;Characterized in that, also include carbon dioxide storage tank, pressure carbon dioxide tank, blast pipe, communicating pipe, air inlet pipe, compression Pump and controller;The both ends of the blast pipe connect with fermentation cylinder and carbon dioxide storage tank respectively, the both ends of the communicating pipe Carbon dioxide storage tank connects with pressure carbon dioxide tank respectively, the both ends of the air inlet pipe respectively with pressure carbon dioxide tank and hair Ferment cylinder connects;The blast pipe is vertically arranged, and carbon dioxide storage tank slidably connects above fermentation cylinder in blast pipe The first piston made of magnetic material, blast pipe upper end side wall are provided with the steam vent in carbon dioxide storage tank, exhaust Tube top end closure, the distance of steam vent to blast pipe top are more than the height of first piston, and the top of blast pipe is provided with permanent magnet, The carbon dioxide storage tank is provided with relief valve;The compression pump was connected on communicating pipe, and was provided with import and two in communicating pipe The first check valve that the connection of carbonoxide storage tank, outlet connect with pressure carbon dioxide tank;Magnetic valve is provided with the air inlet pipe, is sent out Pressure sensor is provided with ferment cylinder, the controller electrically connects with magnetic valve and pressure sensor.
The principle of this programme white wine cold fermentation equipment is:
Raw material is positioned in hopper during fermentation, the alcohol stoste for formation of fermenting is flowed into collecting tank by material spilling hole.Hair When ferment is initial, first piston is in the lowermost end of blast pipe under gravity;With the continuous fermentation of raw material, ferment cylinder Interior carbon dioxide will be on the increase, so that the pressure increase in fermentation cylinder.Set when the pressure in fermentation cylinder increases to After definite value, pressure sensor will be to magnetic valve feedback signal, so as to which magnetic valve is opened.The high pressure of storage in pressure carbon dioxide tank Carbon dioxide will enter in fermentation cylinder so that the pressure in fermentation cylinder raises rapidly, so as to promote first piston to exhaust Slide the upper end of pipe.When first piston slides into blast pipe top, the steam vent of blast pipe upper end connects with blast pipe lower end, Carbon dioxide will enter in carbon dioxide storage tank through everfermentation cylinder.When first piston is in blast pipe top, permanent magnet is to One piston has sucking action, the gas pressure and permanent magnet being subject to when first piston to the attraction of first piston make a concerted effort it is big When first piston gravity, carbon dioxide is continued into carbon dioxide storage tank through everfermentation cylinder;With the first work Fill in the gas pressure being subject to be gradually reduced, first piston will slide to discharge duct bottom under gravity, then the cylinder that ferments stops Only it is vented, while the pressure that pressure sensor is subject to is less than setting value, closed electromagnetic valve.
After closed electromagnetic valve, pump startup is compressed, so as to which the carbon dioxide in carbon dioxide storage tank is pressed into carbon dioxide In pressurized tank, until after the pressure in pressure carbon dioxide tank increases to setting value, compression pump is stopped;And the first check valve The carbon dioxide in pressure carbon dioxide tank can be avoided by returning in carbon dioxide storage tank communicating pipe.Until fermentation storage tank Interior pressure is again increased to after setting value, will be circulated next time.Carbon dioxide storage tank, which is provided with relief valve, to be ensured Pressure in carbon dioxide storage tank can only be less than atmospheric pressure, so as to avoid the pressure during the fermentation in carbon dioxide storage tank by It is cumulative to add.
Beneficial effect is caused by this programme:
During the fermentation, as the continuous generation of carbon dioxide, magnetic valve will be opened repeatedly, so as to pressure carbon dioxide The high-pressure carbon dioxide of storage will enter in carbon dioxide storage tank through everfermentation cylinder repeatedly in tank, and will newly be produced in fermentation process Outside raw carbon dioxide discharge fermentation cylinder.After pressurized carbon dioxide is reduced to pressure carbon dioxide tank by compression pump, carbon dioxide temperature Degree can rise, but because fermentation raw material is needed by certain fermentation time, the pressure fermented in cylinder can just increase, therefore two Carbon dioxide in carbon oxide pressure tank needs to enter in fermentation cylinder by one section of stand-by period, in waiting time Interior, the temperature of the carbon dioxide in pressure carbon dioxide tank will be cooled to room temperature;During fermentation raw material ferments, ferment cylinder Internal temperature will gradually be higher than room temperature, therefore have after the carbon dioxide in pressurized carbon dioxide solenoid enters fermentation cylinder pair The effect that fermentation inner barrel is cooled.
The opportunity to be cooled in fermentation cylinder is controlled by the amount of carbon dioxide in fermentation cylinder, it is automatic so as to carry out Cooling, then during the fermentation without opening fermentation cylinder.By carbon dioxide to cooling in fermentation cylinder, due to Gas and the raw material contact area in fermentation cylinder are bigger, therefore can cool evenly.
Preferred scheme one:As the further optimization to base case, in addition to water tank and cooling pipe, the cooling pipe It is vertical to set water storage cavity in water tank in fermentation cylinder, the top and bottom of cooling pipe respectively with the upper end of water storage cavity and under End is connected, and second piston is slidably connected in cooling pipe, and the first piston is fixedly connected with second piston by connecting rod, and second Piston connects with cooling pipe lower end provided with import, exports the second check valve connected with cooling pipe upper end.
In preferred scheme one, when first piston upward sliding in blast pipe, second piston will be relative to cooling pipe Upward sliding, while the water in water tank is sucked in cooling pipe, while the water above second piston is discharged into water tank;When First piston is under gravity in blast pipe during slide downward, the second piston also slide downward in cooling pipe, and now Two check valves are opened, and the water below second piston enters above second piston.
In preferred scheme one, first piston is often slided up and down once, and the water in cooling pipe is then changed once, so as to To cooling in fermentation cylinder, the constant temperature rise for avoiding fermenting in cylinder.And fermentation raw material is deposited in cooling pipe week Enclose, can cool to burying deeper raw material.
Preferred scheme two:As the further optimization to preferred scheme one, the water tank is sheathed on fermentation cylinder periphery, Water storage cavity is located between water storage pot sidewall and fermentation cylinder lateral wall;The radiating of fermentation cylinder can be strengthened, and the specific heat capacity of water will Greatly, temperature is more stable, therefore the temperature fluctuation in fermentation cylinder can be made smaller.
Preferred scheme three:As the further optimization to preferred scheme two, it is provided with the side wall of the hopper and cooling pipe The interlayer cavity of connection, second piston can be by interlayer cavities seals;Then the water in cooling pipe will enter in interlayer cavity, so as to To increase water and the contact area for inner barrel side wall of fermenting, increase cooling efficiency.
Preferred scheme four:As the further optimization to preferred scheme three, the cooling pipe is externally provided with multiple thermally conductive sheets, entered One step improves cooling efficiency.
Preferred scheme five:As the further optimization to preferred scheme four, the pressure carbon dioxide tank is located at water storage cavity In, to cool in time to the carbon dioxide after compression.
Brief description of the drawings
Fig. 1 is the structural representation of the utility model white wine cold fermentation apparatus embodiments;
Fig. 2 is part A enlarged drawing in Fig. 1.
Embodiment
The utility model is described in further detail below by embodiment:
Reference in Figure of description includes:Ferment cylinder 10, cooling pipe 11, hopper 12, interlayer cavity 13, second Piston 14, the second check valve 15, carbon dioxide storage tank 20, blast pipe 21, steam vent 22, magnet 23, first piston 24, titanium dioxide Carbon pressurized tank 30, communicating pipe 31, compression pump 32, the first check valve 33, air inlet pipe 34, magnetic valve 35, water tank 40, water storage cavity 41。
Embodiment is substantially as shown in Figure 1 and Figure 2:
The white wine cold fermentation equipment of the present embodiment, including support, fermentation cylinder 10, the carbon dioxide being fixed on support Storage tank 20 and pressure carbon dioxide tank 30, and blast pipe 21, communicating pipe 31, air inlet pipe 34 and compression pump 32;Ferment cylinder 10 Interior to be provided with hopper 12, the bottom of fermentation cylinder 10 is provided with collecting tank, and hopper 12 is provided with flows into liquid collecting for liquid caused by fermentation Material spilling hole in groove.The both ends of blast pipe 21 connect with fermentation cylinder 10 and carbon dioxide storage tank 20 respectively, and the two of communicating pipe 31 End connects with carbon dioxide storage tank 20 and pressure carbon dioxide tank 30 respectively, the both ends of air inlet pipe 34 respectively with pressure carbon dioxide Tank 30 connects with fermentation cylinder 10.Blast pipe 21 is vertically arranged, and carbon dioxide storage tank 20 is located at the top of fermentation cylinder 10, blast pipe The first piston 24 being made of cast iron is slidably connected in 21, the top of blast pipe 21 is provided with magnet 23.The upper end side of blast pipe 21 Wall is provided with steam vent 22, and when first piston 24 slides into 21 top of blast pipe, carbon dioxide storage tank 20 and fermentation cylinder 10 are logical The steam vent 22 for crossing the upper end of blast pipe 21 connects.Carbon dioxide storage tank 20 is provided with relief valve, and the relief valve in the present embodiment is Check valve, the import of the check valve connect with carbon dioxide storage tank 20, outlet and ft connection, by carbon dioxide storage tank 20 Pressure maintain atmospheric pressure once.Compression pump 32 was connected on communicating pipe 31, and import and carbon dioxide are provided with communicating pipe 31 Storage tank 20 connects, exports the first check valve 33 connected with pressure carbon dioxide tank 30;Magnetic valve 35 is provided with air inlet pipe 34, is sent out The pressure sensor electrically connected with magnetic valve 35 is provided with ferment cylinder 10, by being configured to magnetic valve 35, when fermentation cylinder Pressure in 10 is more than after preset value, and pressure sensor will be to the feedback signal of magnetic valve 35, so that magnetic valve 35 is opened, by two Carbon oxide pressure tank 30 connects with fermentation cylinder 10.
Water tank 40 is arranged with outside fermentation cylinder 10, cooling pipe 11 is provided with fermentation cylinder 10.The side wall of water tank 40 and hair Water storage cavity 41 is provided between the side wall of ferment cylinder 10;Cooling pipe 11 is vertically in fermentation cylinder 10, and the upper end of cooling pipe 11 is with The top and bottom respectively with water storage cavity 41 are held to connect.Second piston 14, the He of first piston 24 are slidably connected in cooling pipe 11 Second piston 14 is fixedly connected by connecting rod, and second piston 14 is connected with the lower end of cooling pipe 11 provided with import, exported and cooling Second check valve 15 of the upper end of pipe 11 connection.In the present embodiment, air inlet pipe 34 and cooling pipe 11 correspond, and air inlet pipe 34 The six roots of sensation is respectively provided with cooling pipe 11.Cooling pipe 11 is fixedly connected with hopper 12, and is provided with and cooling pipe 11 in the side wall of hopper 12 The interlayer cavity 13 of connection, the thickness of interlayer cavity 13 are less than the thickness of second piston 14.Five are further fixed on outside cooling pipe 11 Thermally conductive sheet, to improve cooling efficiency.
The specific work process of the present embodiment white wine cold fermentation equipment is:
When fermenting initial, first piston 24 is in the lowermost end of blast pipe 21 under gravity;With fermentation cylinder Carbon dioxide in 10 will be on the increase, and after the pressure in the cylinder 10 that ferments increases to preset value, pressure sensor will be to electricity The feedback signal of magnet valve 35, magnetic valve 35 are opened.The high-pressure carbon dioxide of storage will enter fermentation cylinder in pressure carbon dioxide tank 30 In body 10 so that the pressure in fermentation cylinder 10 raises rapidly, and promotes first piston 24 to be slided to the top of blast pipe 21.The When one piston 24 is in 21 top of blast pipe, carbon dioxide is continued into carbon dioxide storage tank 20 through everfermentation cylinder 10;This In embodiment, pressure carbon dioxide storage tank, so that the carbon dioxide after compression can cool rapidly, works as dioxy in water storage cavity 41 When changing carbon into fermentation cylinder 10, fermentation cylinder 10 can be cooled.As the gas pressure that first piston 24 is subject to is gradual Reduce, first piston 24 will slide to the bottom of blast pipe 21 under gravity, then the cylinder 10 that ferments stops exhaust, while pressure The pressure that sensor is subject to is less than preset value, and magnetic valve 35 is closed.
When the upward sliding in blast pipe 21 of first piston 24, second piston 14 will slide up relative to cooling pipe 11 It is dynamic, while by the water suction cooling pipe 11 in water tank 40, the water of the top of second piston 14 is discharged into water tank 40;When During one 24 slide downward of piston, the also slide downward in cooling pipe 11 of second piston 14, now the second check valve 15 open, second The water of the lower section of piston 14 enters the top of second piston 14.First piston 24 often slides up and down once, and the water in cooling pipe 11 is then more Change once, so as to which to cooling in fermentation cylinder 10, the constant temperature for avoiding fermenting in cylinder 10 raises.
After magnetic valve 35 is closed, compression pump 32 starts, and the carbon dioxide in carbon dioxide storage tank 20 is pressed into titanium dioxide In carbon pressurized tank 30, until after the pressure in pressure carbon dioxide tank 30 increases to setting value, compression pump 32 is stopped.Until Pressure in fermentation storage tank is again increased to after preset value, will be circulated next time.
Above-described is only embodiment of the present utility model, and the general knowledge such as known concrete structure and characteristic is herein in scheme Do not describe excessively.It should be pointed out that for those skilled in the art, the premise of the utility model structure is not being departed from Under, several modifications and improvements can also be made, these should also be considered as the scope of protection of the utility model, and these are all without influence The effect and practical applicability that the utility model is implemented.This application claims protection domain should be with the content of its claim It is defined, the record such as embodiment in specification can be used for the content for explaining claim.

Claims (6)

1. a kind of white wine cold fermentation equipment, including fermentation cylinder, fermentation cylinder is interior to be provided with hopper, and hopper bottom is provided with material leakage Hole, the bottom for the cylinder that ferments are provided with collecting tank;Characterized in that, also include carbon dioxide storage tank, pressure carbon dioxide tank, exhaust Pipe, communicating pipe, air inlet pipe, compression pump and controller;The both ends of the blast pipe respectively with fermentation cylinder and carbon dioxide storage tank Connection, the both ends difference carbon dioxide storage tank of the communicating pipe connect with pressure carbon dioxide tank, the both ends point of the air inlet pipe Do not connected with pressure carbon dioxide tank and fermentation cylinder;The blast pipe is vertically arranged, and carbon dioxide storage tank is located at fermentation cylinder Top, the first piston made of magnetic material is slidably connected in blast pipe, blast pipe upper end side wall, which is provided with, is located at dioxy Change the steam vent in carbon storage tank, blast pipe top seal, the distance of steam vent to blast pipe top is more than the height of first piston, The top of blast pipe is provided with permanent magnet, and the carbon dioxide storage tank is provided with relief valve;The compression pump was connected on communicating pipe, And connected provided with import with carbon dioxide storage tank in communicating pipe, export the first check valve connected with pressure carbon dioxide tank;Institute State and be provided with magnetic valve in air inlet pipe, fermentation cylinder is interior to be provided with pressure sensor, the controller with magnetic valve and pressure sensing Device electrically connects.
2. white wine cold fermentation equipment according to claim 1, it is characterised in that also including water tank and cooling pipe, institute Cooling pipe is stated vertically in fermentation cylinder, sets water storage cavity in water tank, the top and bottom of cooling pipe respectively with water storage cavity Top and bottom connect, and slidably connect second piston in cooling pipe, the first piston and second piston are fixed by connecting rod Connection, second piston connect with cooling pipe lower end provided with import, export the second check valve connected with cooling pipe upper end.
3. white wine cold fermentation equipment according to claim 2, it is characterised in that the water tank is sheathed on fermentation cylinder Periphery, water storage cavity are located between water storage pot sidewall and fermentation cylinder lateral wall.
4. white wine cold fermentation equipment according to claim 3, it is characterised in that be provided with and drop in the side wall of the hopper The interlayer cavity of warm pipe connection, second piston can be by interlayer cavities seals.
5. white wine cold fermentation equipment according to claim 4, it is characterised in that the cooling pipe is externally provided with multiple heat conduction Piece.
6. white wine cold fermentation equipment according to claim 5, it is characterised in that the pressure carbon dioxide tank is located at storage In water cavity.
CN201720563136.2U 2017-05-19 2017-05-19 White wine cold fermentation equipment Expired - Fee Related CN206970574U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720563136.2U CN206970574U (en) 2017-05-19 2017-05-19 White wine cold fermentation equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720563136.2U CN206970574U (en) 2017-05-19 2017-05-19 White wine cold fermentation equipment

Publications (1)

Publication Number Publication Date
CN206970574U true CN206970574U (en) 2018-02-06

Family

ID=61410457

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720563136.2U Expired - Fee Related CN206970574U (en) 2017-05-19 2017-05-19 White wine cold fermentation equipment

Country Status (1)

Country Link
CN (1) CN206970574U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106978302A (en) * 2017-05-19 2017-07-25 贵州省仁怀市茅台镇郑氏酒业有限公司 White wine cold fermentation equipment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106978302A (en) * 2017-05-19 2017-07-25 贵州省仁怀市茅台镇郑氏酒业有限公司 White wine cold fermentation equipment

Similar Documents

Publication Publication Date Title
CN2880839Y (en) Methane liquid auto-circulating methane tank
CN206173301U (en) But stratified sampling's rice wine fermentation jar
CN204058466U (en) Solid-state fermenter
CN107118942A (en) A kind of biogas generating device
CN206970574U (en) White wine cold fermentation equipment
CN101676380A (en) Giant ethanol fermentation tank
CN104928167A (en) Biogas yield increasing device
CN106978302A (en) White wine cold fermentation equipment
CN208676286U (en) A kind of novel beans sauce rapid fermenting device
CN206970630U (en) A kind of cell culture apparatus of temperature control control light
CN109762724A (en) A kind of percolation type fermentor
CN105272399B (en) Liquid organic fertilizer installation for fermenting
CN101691534A (en) Marsh gas pool
CN206033711U (en) White spirit production is with wine brewing device who has stirring function
CN201952419U (en) Automatic production device for table vinegar
CN205011752U (en) Water system endless new forms of energy methane -generating pit
CN106967557A (en) Liquor fermentation equipment
CN208485870U (en) Fermentation system is used in a kind of production of soy sauce
CN203890330U (en) Novel saccharifying fermentation tank for rice-flavor white spirit production
CN206970572U (en) Liquor fermentation equipment
CN208791606U (en) A kind of pit device used of making wine
CN206956002U (en) A kind of wine fermentation tank
CN205874427U (en) Novel piston biogas fermentation device
CN205710673U (en) A kind of alcohol device for making
CN206219557U (en) A kind of brewing machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180206

Termination date: 20180519