CN206963460U - Dragon fruit plants T-shaped built - Google Patents

Dragon fruit plants T-shaped built Download PDF

Info

Publication number
CN206963460U
CN206963460U CN201720763765.XU CN201720763765U CN206963460U CN 206963460 U CN206963460 U CN 206963460U CN 201720763765 U CN201720763765 U CN 201720763765U CN 206963460 U CN206963460 U CN 206963460U
Authority
CN
China
Prior art keywords
shaped
dragon fruit
built
concrete column
plants
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720763765.XU
Other languages
Chinese (zh)
Inventor
刘友接
熊月明
王建超
沈朝贵
杨凌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pomology Research Institute Fujian Academy of Agricultural Sciences
Original Assignee
Pomology Research Institute Fujian Academy of Agricultural Sciences
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pomology Research Institute Fujian Academy of Agricultural Sciences filed Critical Pomology Research Institute Fujian Academy of Agricultural Sciences
Priority to CN201720763765.XU priority Critical patent/CN206963460U/en
Application granted granted Critical
Publication of CN206963460U publication Critical patent/CN206963460U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

It the utility model is related to a kind of dragon fruit and plant T-shaped built, T-shaped frame including several longitudinal arrangements, the crown center of two adjacent T-shaped framves is welded as a whole through coating steel pipe, the top both ends of the T-shaped frame are symmetrically welded with steel wire clamp, the homonymy of several T-shaped framves is equipped with the steel wire rope wrung on steel wire clamp, wherein, also it is integrated between the top of the two T-shaped framves at T-shaped built head and the tail both ends through steel-pipe welding.Dragon fruit plantation is T-shaped set in brickwork simple in construction, and easy to make, cost is low.

Description

Dragon fruit plants T-shaped built
Technical field
It the utility model is related to a kind of dragon fruit and plant T-shaped built.
Background technology
Dragon fruit is the meat fruit tree of perennial the climbing up by holding on to property of Cactaceae hylocereus category, grows vigorous, branch rudiment power By force, multiple batches of can yield positive results within 1 year, branch is in meat triangular prism or quadrangular shape, and branch is aging dark green, sturdy, has light Action function is closed, fruitful branch is based on aging branch, and stipes recess pierces 2-4 pieces with short, the gas that eustipes part does not wait with quantity Take root, branch is adsorbed in support by aerial root and grown up.Therefore, built is needed to supply dragon fruit bough branch in dragon fruit production Support and by growth, traditional dragon fruit trellising is not only complicated, and poor rigidity, and ventilative property and translucency are poor, cost It is high.
Utility model content
In view of the deficiencies in the prior art, technical problem to be solved in the utility model is to provide a kind of dragon fruit plantation T Type built, is not only simple in structure, and convenient and efficient.
In order to solve the above-mentioned technical problem, the technical solution of the utility model is:A kind of dragon fruit plants T-shaped built, bag The T-shaped frame of several longitudinal arrangements is included, the crown center of two adjacent T-shaped framves is welded as a whole through coating steel pipe, the T-shaped frame Top both ends are symmetrically welded with steel wire clamp, and the homonymy of several T-shaped framves is equipped with the steel wrung on steel wire clamp Cord, wherein, also it is integrated between the top of the two T-shaped framves at T-shaped built head and the tail both ends through steel-pipe welding.
Preferably, the T-shaped frame includes the concrete column for being inserted vertically into the soil body, and the top of the concrete column laterally offers Cross-drilled hole, the top of the concrete column are provided with the spiral for passing across cross-drilled hole, the spiral and concrete column composition T-shaped.
Preferably, the both ends of the coating steel pipe are welded on the crossover location of spiral and concrete column.
Preferably, the cross-section lengths of the concrete column and width are 10cm, and the height of the concrete column is 230cm, Wherein concrete column insertion the distance between inside soil body 100cm, the top of the spiral and concrete column is 10cm, the horizontal stroke The aperture in hole is 2.5cm, and the length of the spiral is 70cm, diameter 20mm.
Preferably, the distance between two adjacent T-shaped framves are 150cm, and the pipe thickness of the coating steel pipe is 0.12cm, outside Footpath is 1 cun.
Preferably, the steel wire clamp includes U-shaped bar U-shaped opening upward, and the bottom of the U-shaped bar is welded on T-shaped The top both ends of frame, the top both ends of the U-shaped bar are equipped with external screw thread, and the U-shaped bar is provided with fixture block, and the two of the fixture block Side is arranged with the through hole passed through for the both ends of U-shaped bar, and nut is bolted with the external screw thread of the U-shaped bar.
Preferably, the V-notch for being used for blocking steel wire rope is provided among the bottom of the fixture block.
Preferably, the steel pipe quantity positioned at T-shaped built head and the tail both ends is two, one end welding of the steel pipe at head and the tail both ends In the end of spiral, the other end is welded at the nearly middle part 10cm of the spiral of T-shaped frame adjacent thereto, positioned at end Two steel pipes are symmetrically welded by symmetry axis of coating steel pipe.
Preferably, the coating steel pipe is provided with some bamboo poles for being inserted vertically into the soil body, the top of the bamboo pole and plating The colligation of zinc steel pipe connects.
Preferably, a diameter of 3cm-4cm of the bamboo pole, length 150cm, bamboo pole insertion inside soil body 20 cm.
Compared with prior art, the utility model has the advantages that:The T-shaped set in brickwork structure letter of dragon fruit plantation Single, easy to make, cost is low, and ventilation and penetrating light effect is good, and the homonymy of several T-shaped framves, which is equipped with, to be wrung on steel wire clamp Steel wire rope, overall structure are stable, it is not easy to collapse.
The utility model is described in more detail with reference to the accompanying drawings and detailed description.
Brief description of the drawings
Fig. 1 is the organigram of the utility model embodiment.
Fig. 2 is Fig. 1 A partial enlarged views.
Fig. 3 is Fig. 1 B partial enlarged views.
Fig. 4 is the side view of the utility model embodiment.
Embodiment
For features described above and advantage of the present utility model can be become apparent, special embodiment below, and coordinate accompanying drawing, It is described in detail below.
As shown in Fig. 1 ~ 4, a kind of dragon fruit plants T-shaped built, includes the T-shaped frame of several longitudinal arrangements, two adjacent T-shaped The crown center of frame is welded as a whole through coating steel pipe 1, and the top both ends of the T-shaped frame are symmetrically welded with steel wire clamp 2, The homonymy of several T-shaped framves is equipped with the steel wire rope 3 wrung on steel wire clamp, wherein, positioned at T-shaped built head and the tail both ends Also it is welded as a whole between the top of two T-shaped framves through steel pipe 4.
In the utility model embodiment, the T-shaped frame includes the concrete column 5 for being inserted vertically into the soil body, the cement to bury Post periphery stone and soil landfill are fixed, and the top of the concrete column laterally offers cross-drilled hole, and the top of the concrete column is provided with Pass across the spiral 6 of cross-drilled hole, the spiral and concrete column composition T-shaped.
In the utility model embodiment, what the both ends of the coating steel pipe were welded on spiral and concrete column intersects position Put.
In the utility model embodiment, cross-section lengths and the width of the concrete column are 10cm, the concrete column Height be 230cm, the wherein concrete column insertion inside 100cm of the soil body 7, between the top of the spiral and concrete column away from From for 10cm, the distance between concrete column and spiral outside the soil body H1 are 120 cm, and the aperture of the cross-drilled hole is 2.5cm, the length of the spiral is 70cm, diameter 20mm, and the spiral length H3 of concrete column both sides is 30 cm, The filling of the packing materials such as the gap cement between spiral and cross-drilled hole stoppers.
In the utility model embodiment, the distance between two adjacent T-shaped framves H2 is 150cm, the pipe of the coating steel pipe Wall thickness is 0.12cm, external diameter is 1 cun.
In the utility model embodiment, the steel wire clamp includes the U-shaped bar 8 U-shaped opening upward, the U-shaped bar Bottom be welded on the top both ends of T-shaped frame, the top both ends of the U-shaped bar are equipped with external screw thread, and the U-shaped bar is provided with card Block 9, the both sides of the fixture block are arranged with the through hole passed through for the both ends of U-shaped bar, are bolted with the external screw thread of the U-shaped bar Nut 10.
The V-notch 11 for being used for blocking steel wire rope is provided with the utility model embodiment, among the bottom of the fixture block.
In the utility model embodiment, the steel pipe quantity positioned at T-shaped built head and the tail both ends is two, head and the tail both ends One end of steel pipe is welded on the end of spiral, and the other end is welded on the nearly middle part of the spiral of T-shaped frame adjacent thereto At 10cm, it is symmetrically welded positioned at two steel pipes with end by symmetry axis of coating steel pipe.
In the utility model embodiment, the coating steel pipe is provided with some bamboo poles 12 for being inserted vertically into the soil body, institute The top for stating bamboo pole is connected with coating steel pipe colligation.
In the utility model embodiment, a diameter of 3cm-4cm of the bamboo pole, length 150cm, the bamboo pole insertion Inside soil body 20cm.
In the utility model embodiment, when planting dragon fruit, dragon fruit plant trunk is bundled on bamboo pole with cloth, When trunk growth exceedes upper end coating steel pipe, trunk top is bent towards into same direction along coating steel pipe and grown, and by trunk branch Bar is bundled on coating steel pipe with cloth, when trunk top length to adjacent plant, destroys trunk top, promotes side shoot life It is long, and allow side shoot to be evenly distributed in coating steel pipe both sides and be grown across both sides steel wire rope sag, when descending branch bar grow to Topping promotes branch aging during 80cm.
The utility model is not limited to above-mentioned preferred forms, and anyone can obtain under enlightenment of the present utility model Go out other various forms of dragon fruits and plant T-shaped built.All equivalent changes done according to present utility model application the scope of the claims with Modification, should all belong to covering scope of the present utility model.

Claims (10)

1. a kind of dragon fruit plants T-shaped built, it is characterised in that:T-shaped frame including several longitudinal arrangements, two adjacent T-shaped framves Crown center be welded as a whole through coating steel pipe, the top both ends of the T-shaped frame are symmetrically welded with steel wire clamp, some The homonymy of individual T-shaped frame is equipped with the steel wire rope wrung on steel wire clamp, wherein, two T-shaped positioned at T-shaped built head and the tail both ends Also it is integrated between the top of frame through steel-pipe welding.
2. dragon fruit according to claim 1 plants T-shaped built, it is characterised in that:The T-shaped frame includes being inserted vertically into The concrete column of the soil body, the top of the concrete column laterally offer cross-drilled hole, and the top of the concrete column, which is provided with, passes across cross-drilled hole Spiral, the spiral and concrete column composition T-shaped.
3. dragon fruit according to claim 2 plants T-shaped built, it is characterised in that:The both ends welding of the coating steel pipe In spiral and the crossover location of concrete column.
4. dragon fruit according to claim 2 plants T-shaped built, it is characterised in that:The cross-section lengths of the concrete column It is 10cm with width, the height of the concrete column is 230cm, wherein concrete column insertion inside soil body 100cm, the screw-thread steel The distance between top of muscle and concrete column is 10cm, and the aperture of the cross-drilled hole is 2.5cm, and the length of the spiral is 70cm, diameter 20mm.
5. dragon fruit according to claim 1 plants T-shaped built, it is characterised in that:The distance between two adjacent T-shaped framves are 150cm, the pipe thickness of the coating steel pipe is 0.12cm, external diameter is 1 cun.
6. dragon fruit according to claim 1 plants T-shaped built, it is characterised in that:The steel wire clamp is opened including U-shaped The U-shaped bar of mouth upward, the bottom of the U-shaped bar are welded on the top both ends of T-shaped frame, and the top both ends of the U-shaped bar are equipped with External screw thread, the U-shaped bar are provided with fixture block, and the both sides of the fixture block are arranged with the through hole passed through for the both ends of U-shaped bar, institute State and be bolted with nut on the external screw thread of U-shaped bar.
7. dragon fruit according to claim 6 plants T-shaped built, it is characterised in that:It is provided among the bottom of the fixture block For blocking the V-notch of steel wire rope.
8. dragon fruit according to claim 2 plants T-shaped built, it is characterised in that:Steel positioned at T-shaped built head and the tail both ends Pipe quantity is two, and one end of the steel pipe at head and the tail both ends is welded on the end of spiral, and the other end is welded on T adjacent thereto At the nearly middle part 10cm of the spiral of shape frame, it is symmetrically welded positioned at two steel pipes with end by symmetry axis of coating steel pipe.
9. dragon fruit according to claim 1 plants T-shaped built, it is characterised in that:The coating steel pipe is provided with some Root is inserted vertically into the bamboo pole of the soil body, and the top of the bamboo pole is connected with coating steel pipe colligation.
10. dragon fruit according to claim 9 plants T-shaped built, it is characterised in that:A diameter of 3cm- of the bamboo pole 4cm, length 150cm, bamboo pole insertion inside soil body 20 cm.
CN201720763765.XU 2017-06-28 2017-06-28 Dragon fruit plants T-shaped built Expired - Fee Related CN206963460U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720763765.XU CN206963460U (en) 2017-06-28 2017-06-28 Dragon fruit plants T-shaped built

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720763765.XU CN206963460U (en) 2017-06-28 2017-06-28 Dragon fruit plants T-shaped built

Publications (1)

Publication Number Publication Date
CN206963460U true CN206963460U (en) 2018-02-06

Family

ID=61405880

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720763765.XU Expired - Fee Related CN206963460U (en) 2017-06-28 2017-06-28 Dragon fruit plants T-shaped built

Country Status (1)

Country Link
CN (1) CN206963460U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108934836A (en) * 2018-09-21 2018-12-07 福建省农业科学院果树研究所 A kind of method of dragon fruit A type pipe support bilayer planting culture

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108934836A (en) * 2018-09-21 2018-12-07 福建省农业科学院果树研究所 A kind of method of dragon fruit A type pipe support bilayer planting culture
CN108934836B (en) * 2018-09-21 2020-10-16 福建省农业科学院果树研究所 Dragon fruit A-shaped pipe frame double-layer close planting cultivation method

Similar Documents

Publication Publication Date Title
CN206909248U (en) A kind of double-deck dragon fruit plantation frame
CN204929849U (en) For the branch draw-gear of kiwi fruit tree planting
CN206963460U (en) Dragon fruit plants T-shaped built
CN205902538U (en) Novel ornamental trees and shrubs support fixedly device
AU2020103589A4 (en) An Actinidia chinensis Planch cultivation model
CN206149995U (en) Canopy is planted to fruit vegetables
CN203226098U (en) Spiral vine climbing rod combination rack
CN210695264U (en) Vine fruit tree cultivation support
CN207235649U (en) A kind of wine-growing grape trellis easy to multi-faceted installation
CN209609402U (en) A kind of wine-growing support frame
CN206452895U (en) Forestry plantation fosters support with trees
CN203788826U (en) Grape trellis for wide- and narrow-row planting
CN201238518Y (en) Auxiliary canopy frame for upgrowth of fruit tree
CN212753537U (en) Kiwi fruit trapezoidal three-dimensional shed frame
CN204796323U (en) Dragon fruit cultivation frame
CN204466377U (en) A kind of wicker plaiting article flowerpot be convenient to plant and sought connections with
CN207948317U (en) A kind of guide device of climbing vine kind vegetable cultivation
CN209710854U (en) A kind of garden landscape is green to plant the drawing anchor pole fixing piece that hangs down
CN203353317U (en) Grape climbing lap-joint frame
CN206776307U (en) The double-deck flat frame of vinegrowing
CN206963461U (en) A kind of dragon fruit plants double rod type built
CN204948917U (en) Climing support device of vegetables stem that can freely fold up and recycle
CN106954521B (en) Support device for traction planting and branch traction system
CN112042434A (en) Vegetable thread hanging device and thread hanging method
CN208987414U (en) Tendril vegetables climbing frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180206

Termination date: 20180628

CF01 Termination of patent right due to non-payment of annual fee