CN206960198U - A kind of liner supporting mould suitable for indoor tunnel model test - Google Patents

A kind of liner supporting mould suitable for indoor tunnel model test Download PDF

Info

Publication number
CN206960198U
CN206960198U CN201720887143.8U CN201720887143U CN206960198U CN 206960198 U CN206960198 U CN 206960198U CN 201720887143 U CN201720887143 U CN 201720887143U CN 206960198 U CN206960198 U CN 206960198U
Authority
CN
China
Prior art keywords
module
haunch
inverted arch
arch module
model test
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720887143.8U
Other languages
Chinese (zh)
Inventor
李又云
李佳
王会涛
刘黎明
安鑫厚
程振威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changan University
Original Assignee
Changan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changan University filed Critical Changan University
Priority to CN201720887143.8U priority Critical patent/CN206960198U/en
Application granted granted Critical
Publication of CN206960198U publication Critical patent/CN206960198U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a kind of liner supporting mould suitable for indoor tunnel model test, including vault module, haunch module two, haunch module three, inverted arch module four, inverted arch module five, inverted arch module six, vault module is connected with haunch module two, haunch module three, haunch module two, haunch module three and inverted arch module four, inverted arch module five, inverted arch module six are connected, reach closing cyclization, form an integral unit;The integral unit is that three-core justifies structure.The utility model construction is fairly simple, market materials processing and fabricating is quick, test operation is easy, Assembling dismounting can be carried out, it is also reusable, more meet practice of construction and excavate situation, eliminate the situation that built-in type tester wrecks, the accuracy of test data is substantially increased, test construction difficulty is reduced, saves time and fund.

Description

A kind of liner supporting mould suitable for indoor tunnel model test
Technical field
The utility model belongs to Tunnel Engineering, underground engineering field, and in particular to one kind is applied to indoor tunnel model and tried The new-type tunnel lining supporting mould tested.
Background technology
In the last few years, due to the implementation of strategy to develop western regions decision-making, west area high-grade highway and railway are promoted Development, pass through that the tunnel of Canal in Loess Area is more and more, the construction scale of Tunnel Engineering also unprecedentedly expands, the correlation such as Tunnel Engineering The research in field is also more and more.Although the technology both at home and abroad in terms of Tunnel Engineering has tended to be ripe, practice of construction warp Often occur some lining cutting leaks, crack, the problems such as local collapse.Indoor tunnel model test provides for actual tunnel construction Stronger reference, the making of tunnel-liner model are most important in tunnel model test indoors.Tunnel common at present Lining model is built-in type tunnel-liner model, but this method is not consistent with practice of construction method, and advance cloth in mould If tester easily destroyed during preloading and tunnel excavation.Therefore making one kind is easy to operate, quick, is easy to Promote, the tunnel-liner support mould of more fitting practice of construction method is vital.
The content of the invention
The utility model aims to overcome that problem present in existing indoor tunnel-liner support model test, there is provided one Kind can recycle, conveniently, safely, the mould of more realistically simulation actual tunnel liner supporting.
To reach above-mentioned purpose, the utility model adopts the following technical scheme that:
A kind of new-type tunnel lining supporting mould suitable for indoor tunnel model test, including vault module, haunch module two, Haunch module three, inverted arch module four, inverted arch module five, inverted arch module six, vault module and haunch module two, haunch module three-phase Even, haunch module two, haunch module three and inverted arch module four, inverted arch module five, inverted arch module six are connected, and reach closing cyclization, Form an integral unit;The integral unit is that three-core justifies structure.
Vault module and the plastics gemel connection of haunch module two, one combination of formation, haunch module three and inverted arch module four, Inverted arch module four and inverted arch module five use plastics gemel connection respectively, form a combination, wherein, haunch module two and haunch module Three are connected by tenon, and inverted arch module five is connected with inverted arch module six by tenon.
Vault module is made up of three-core circular portion circular arc, and outline angle is about 160 °, and inverted arch module four is also justified by three-core Partial arc forms, and outline total angle is about 80 °, wherein, Internal periphery radius is respectively less than outline radius, between the two thickness About 15mm.
Haunch module two, haunch module three and inverted arch module five, inverted arch module six combine for rectangular block, and centre connection is Tenon structure is formed by groove and convex stupefied overlap joint.
Each integral unit overlap to form tunnel-liner mould, and each integral unit is strip circular arc.
Compared with existing test mould, the utility model has technique effect beneficial below:
Compared with existing indoor tunnel-liner support mould, it is by the mould of acrylic plastic slabs processing and fabricating arc-shaped Tool and the tenon made by 3D printer are formed.It is connected with each other between the two by plastic cement, then is spliced one by tenon Individual complete tunnel-liner support model unit.
This indoor tunnel-liner support mold structure is fairly simple, and market materials processing and fabricating is quick, test operation letter Just, Assembling dismounting can be carried out, it is also reusable, more meet practice of construction and excavate situation, eliminate built-in type tester The situation that device wrecks, the accuracy of test data is substantially increased, reduce test construction difficulty, save time and fund.
Brief description of the drawings
Fig. 1 is the utility model tunnel-liner support mold plane schematic diagram;
Fig. 2 is the utility model tunnel-liner support mould structure schematic diagram;
Fig. 3 is the utility model vault module, the structural representation of inverted arch module;
Fig. 4 is the utility model haunch module, the structural representation of haunch module;
Fig. 5 is the utility model inverted arch module, the structural representation of inverted arch module.
Embodiment
The utility model is described in further details below in conjunction with the accompanying drawings.
With reference to figure 1, the utility model include liner supporting mould vault module 1, haunch module 22, haunch module 33, Inverted arch module 44, inverted arch module 55, inverted arch module 66, liner supporting mould vault module 1 and haunch module 22, haunch mould Block 33 is connected, and haunch module 22, haunch module 33 and inverted arch module 44, inverted arch module 55, inverted arch module 66 are connected, its In, haunch module 22 is connected with haunch module 33 by tenon, and inverted arch module 55 is connected with inverted arch module 66 by tenon, Make its closing cyclization, form a complete tunnel-liner support model unit, cyclization is closed with site operation lining cutting to reach The purpose being consistent.
The utility model main operation principle and process:In use, vault module 1 and haunch module 22 are led to first Cross plastic cement to be connected, inverted arch module 44 is connected with haunch module 33 and inverted arch module 55 by plastic cement respectively, is then excavated Tunnel.The first step, upper side position is excavated, form a step, vault module 1 and haunch module 22 are fixed in tunnel;The Two steps, lower left side tunnel location is excavated, is connected by left side haunch module 22 with the tenon that haunch module 33 is formed, by lower-left Side inverted arch module 44, inverted arch module 55, haunch module 33 are fixed in tunnel;3rd step, lower right side tunnel location is excavated, It is connected by right side haunch module 22 with the tenon that haunch module 33 is formed, by lower right side inverted arch module 44, inverted arch module five 5th, haunch module 33 is fixed in tunnel.Finally, a complete tunnel-liner support can be formed by inserting inverted arch module 66 Model unit;By that analogy, can be extended according to test requirements document.
This mould structure becames one with tunnel surrounding analog material, as the tunnel structure system of common bearing load, Behind load mainly excavation cavern as produced by the deadweight of the analog material country rock loosened, liner supporting model is that direct carrying is single Member, it is deformation and displacement for constraining country rock analog material.In the pre- embedded testing element in lining cutting periphery, lining cutting stress can be become Shape is analyzed, and tunnel stress deformation rule is drawn so as to simulate, and strong foundation is provided to constructing tunnel.

Claims (5)

1. a kind of liner supporting mould suitable for indoor tunnel model test, including vault module (1), haunch module two (2), Haunch module three (3), inverted arch module four (4), inverted arch module five (5), inverted arch module six (6), it is characterised in that vault module (1) it is connected with haunch module two (2), haunch module three (3), haunch module two (2), haunch module three (3) and inverted arch module four (4), inverted arch module five (5), inverted arch module six (6) are connected, and reach closing cyclization, form an integral unit;The integral unit Justify structure for three-core.
A kind of 2. liner supporting mould suitable for indoor tunnel model test according to claim 1, it is characterised in that: Vault module (1) and haunch module two (2) plastics gemel connection, form a combination, haunch module three (3) and inverted arch module four (4), inverted arch module four (4) and inverted arch module five (5) use plastics gemel connection respectively, form a combination, wherein, haunch module two (2) it is connected with haunch module three (3) by tenon, inverted arch module five (5) is connected with inverted arch module six (6) by tenon.
A kind of 3. liner supporting mould suitable for indoor tunnel model test according to claim 1, it is characterised in that: Vault module (1) is made up of three-core circular portion circular arc, and outline angle is about 160 °, and inverted arch module four (4) also justifies portion by three-core Cyclotomy arc forms, and outline total angle is about 80 °, wherein, Internal periphery radius is respectively less than outline radius, and thickness is about between the two For 15mm.
A kind of 4. liner supporting mould suitable for indoor tunnel model test according to claim 2, it is characterised in that: Haunch module two (2), haunch module three (3) and inverted arch module five (5), inverted arch module six (6) combine for rectangular block, and centre connects Connect is to form tenon structure by groove and convex stupefied overlap joint.
A kind of 5. liner supporting mould suitable for indoor tunnel model test according to claim 1, it is characterised in that: The modules of integral unit are strip circular arc.
CN201720887143.8U 2017-07-20 2017-07-20 A kind of liner supporting mould suitable for indoor tunnel model test Expired - Fee Related CN206960198U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720887143.8U CN206960198U (en) 2017-07-20 2017-07-20 A kind of liner supporting mould suitable for indoor tunnel model test

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720887143.8U CN206960198U (en) 2017-07-20 2017-07-20 A kind of liner supporting mould suitable for indoor tunnel model test

Publications (1)

Publication Number Publication Date
CN206960198U true CN206960198U (en) 2018-02-02

Family

ID=61381989

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720887143.8U Expired - Fee Related CN206960198U (en) 2017-07-20 2017-07-20 A kind of liner supporting mould suitable for indoor tunnel model test

Country Status (1)

Country Link
CN (1) CN206960198U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107167355A (en) * 2017-07-20 2017-09-15 长安大学 A kind of liner supporting mould for being applied to indoor tunnel model test
CN108776726A (en) * 2018-05-25 2018-11-09 浙江大学城市学院 It is a kind of bias Loading under the lateral stressed computational methods of shield tunnel

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107167355A (en) * 2017-07-20 2017-09-15 长安大学 A kind of liner supporting mould for being applied to indoor tunnel model test
CN107167355B (en) * 2017-07-20 2024-05-07 长安大学 Lining support die suitable for indoor tunnel model test
CN108776726A (en) * 2018-05-25 2018-11-09 浙江大学城市学院 It is a kind of bias Loading under the lateral stressed computational methods of shield tunnel
CN108776726B (en) * 2018-05-25 2022-03-15 浙江大学城市学院 Method for calculating transverse stress of shield tunnel under eccentric loading effect

Similar Documents

Publication Publication Date Title
CN101864959B (en) Method for tunneling construction of main structure of underground station
WO2021142683A1 (en) Stabilization and support model test system for surrounding rock of large, buried, and deep tunnel under complex conditions
CN201650298U (en) Plane strain type model testing device capable of simulating the tunnel full-face excavation
CN107192810B (en) The three-dimensional multi-functional experiment porch and test method of mining overburden fracture pattern and motion feature
CN106869944A (en) The extra small clear-distance tunnel construction method in underground interchange intersection under complex environment
CN105181252B (en) Test specimen is used in a kind of test of duct pieces of shield tunnel circumferential weld anti-permeability performance
CN206960198U (en) A kind of liner supporting mould suitable for indoor tunnel model test
CN103616287A (en) Laboratory model testing device for tunnel excavation
CN105403366A (en) Anti-permeability performance test system for shield tunnel segment circumferential seams
CN103669562A (en) Cantilever bay window board concrete overall pouring structure and construction method thereof
CN204530633U (en) The soft rock that a kind of subregion is arranged builds rock dam body
CN107101788A (en) Shield tunnel lining segment T words stitch two seals pad waterproof test device and method
Liu et al. Model test study on spatial deformation law of surrounding rock for super-large section and shallow buried tunnels
CN103061774A (en) Shield tunnel construction environment simulation unit
CN107167355A (en) A kind of liner supporting mould for being applied to indoor tunnel model test
CN109826633A (en) Device and method for simulating shield machine to penetrate existing shield tunnel downwards
CN103088843B (en) Pipe gallery embedded iron parts construction method of installation
CN104196246B (en) A kind of multidirectional stressed structure partial of continuous trusse evacuates lifting construction method in situ
CN207882085U (en) Deep-lying tunnel model test apparatus system
CN110055952A (en) A kind of underground continuous wall connector structure and its construction method
CN201933514U (en) Leakage-prevention structure for 500KV underground substation
CN205091090U (en) Experimental test piece of using of shield tunnel section of jurisdiction circumferential weld impervious performance
CN102518458B (en) Construction method of top beam part of underground bus stop
CN104900132A (en) Simulated test device of shield method construction inclined well tube sheet filling behind lining
CN205580337U (en) Shield constructs section of jurisdiction mould arc length measuring tool

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180202

Termination date: 20180720