CN206956732U - A kind of discharge structure for building foundation pit construction - Google Patents
A kind of discharge structure for building foundation pit construction Download PDFInfo
- Publication number
- CN206956732U CN206956732U CN201720219979.0U CN201720219979U CN206956732U CN 206956732 U CN206956732 U CN 206956732U CN 201720219979 U CN201720219979 U CN 201720219979U CN 206956732 U CN206956732 U CN 206956732U
- Authority
- CN
- China
- Prior art keywords
- layer
- discharge structure
- supporting plate
- base
- foundation pit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Building Environments (AREA)
Abstract
The utility model belongs to construction engineering technical field and discloses a kind of discharge structure for building foundation pit construction, including basis and play support the discharge structure support column, the basic top layer is provided with one layer of screed-coat made of cement mortar, and it is provided with one layer of enhancement layer made of armored concrete on the top layer of the screed-coat, and one layer of waterproof layer is bonded with the top layer of the enhancement layer, the support column is by connecting cylinder, handle, expansion link, sleeve, base, supporting plate, external screw thread and frictional layer, and the frictional layer is fixed on the side of supporting plate, the supporting plate is hinged with base, the base is arranged on one end of sleeve.The utility model is by setting support column, while support column is made up of connecting cylinder, handle, expansion link, sleeve, base, supporting plate and external screw thread, therefore when in use, by rotary handle, can play a part of supporting discharge structure, make structure more stable.
Description
Technical field
The utility model belongs to architectural engineering technology neck more particularly to a kind of discharge structure for building foundation pit construction
Domain.
Background technology
The development of urban construction, the underground space in city are developed and utilized successively.Foundation ditch is more and more deeper, around builds
Build that thing is more and more nearer, so as to propose higher requirement to deep foundation pit construction.Water drainage of deep foundation pit can freely not cause foundation pit collapse etc.
Construction accident, have a strong impact on construction quality and construction safety.
Utility model content
The technical problems to be solved in the utility model overcomes the defects of existing, there is provided a kind of to be used for what building foundation pit was constructed
Discharge structure, by setting support column, while support column is by connecting cylinder, handle, expansion link, sleeve, base, supporting plate and outer spiral shell
Line is formed, therefore when in use, by rotary handle, can be played a part of supporting discharge structure, be made structure more stable,
Effectively can solve the problems, such as in background technology.
In order to solve the above-mentioned technical problem, the utility model provides following technical scheme:
The utility model provide it is a kind of for building foundation pit construction discharge structure, including basis and play support should
The support column of discharge structure, the basic top layer are provided with one layer of screed-coat made of cement mortar, and in the screed-coat
Top layer is provided with one layer of enhancement layer made of armored concrete, and one layer of waterproof layer, institute are bonded with the top layer of the enhancement layer
Support column is stated by connecting cylinder, handle, expansion link, sleeve, base, supporting plate, external screw thread and frictional layer, and the frictional layer is fixed
In the side of supporting plate, the supporting plate is hinged with base, and the base is arranged on one end of sleeve, and in the sleeve
Portion is provided with internal thread, and the internal thread cooperates and is threadedly coupled with the external screw thread being arranged on expansion link, described flexible
Bar one end is fixedly connected with connecting cylinder, and the connecting cylinder both sides are fixedly connected with handle respectively.
Preferably, the base, supporting plate and frictional layer are made by stainless steel material.
Preferably, the expansion link is provided with the scale value for being easy to check collapsing length.
Preferably, the waterproof layer is SBS waterproof rolls.
The beneficial effect that the utility model is reached is:
1. by setting support column, while support column is by connecting cylinder, handle, expansion link, sleeve, base, supporting plate and outer
Screw thread is formed, therefore when in use, by rotary handle, can be played a part of supporting discharge structure, be made structure more steady
It is fixed.
Brief description of the drawings
Accompanying drawing is used for providing further understanding to of the present utility model, and a part for constitution instruction, with this practicality
New embodiment is used to explain the utility model together, does not form to limitation of the present utility model.
In the accompanying drawings:
Fig. 1 is that a kind of discharge structure overall structure for building foundation pit construction described in the utility model embodiment is shown
It is intended to;
Fig. 2 is a kind of discharge structure support column signal for building foundation pit construction described in the utility model embodiment
Figure;
Label in figure:1st, it is basic;2nd, screed-coat;3rd, enhancement layer;4th, waterproof layer;5th, connecting cylinder;6th, handle;7th, expansion link;
8th, sleeve;9th, base;10th, supporting plate;11st, external screw thread;12nd, frictional layer.
Embodiment
Preferred embodiment of the present utility model is illustrated below in conjunction with accompanying drawing, it will be appreciated that described herein excellent
Select embodiment to be merely to illustrate and explain the utility model, be not used to limit the utility model.
Embodiment:
Refer to Fig. 1:The utility model it is a kind of for building foundation pit construction discharge structure, including basis 1 and rise
To the support column for supporting the discharge structure, basic 1 top layer is provided with one layer of screed-coat 2 made of cement mortar, and in institute
The top layer for stating screed-coat 2 is provided with one layer of enhancement layer 3 made of armored concrete, and is bonded with the top layer of the enhancement layer 3
One layer of waterproof layer 4, the waterproof layer 4 are SBS waterproof rolls, and waterproof effect is more preferable, prevents infiltration;
Refer to Fig. 2:The support column is by connecting cylinder 5, handle 6, expansion link 7, sleeve 8, base 9, supporting plate 10, outer spiral shell
Line 11 and frictional layer 12, and the frictional layer 12 is fixed on the side of supporting plate 10, the supporting plate 10 is be hinged with base 9, institute
One end that base 9 is arranged on sleeve 8 is stated, and internal thread is provided with the inside of the sleeve 8, and the internal thread is flexible with being arranged on
External screw thread 11 on bar 7 is cooperated and is threadedly coupled, convenient rotation, and the expansion link 7, which is provided with, to be easy to check flexible length
The scale value 13 of degree, during work, to the support degree of discharge structure, described one end of expansion link 7 is fixed with connecting cylinder 5 for convenient control
Connection, and the both sides of the connecting cylinder 5 are fixedly connected with handle 6 respectively, the base 9, supporting plate 10 and frictional layer 12 by
Stainless steel material is made, firm in structure.
Finally it should be noted that:Preferred embodiment of the present utility model is the foregoing is only, is not limited to this
Utility model, although the utility model is described in detail with reference to the foregoing embodiments, for those skilled in the art
For, it can still modify to the technical scheme described in foregoing embodiments, or to which part technical characteristic
Carry out equivalent substitution.All any modification, equivalent substitution and improvements within the spirit and principles of the utility model, made etc.,
It should be included within the scope of protection of the utility model.
Claims (4)
1. a kind of discharge structure for building foundation pit construction, including basis(1)And play the branch for supporting the discharge structure
Dagger, it is characterised in that the basis(1)Top layer is provided with one layer of screed-coat made of cement mortar(2), and described levelling
Layer(2)Top layer be provided with one layer of enhancement layer made of armored concrete(3), and in the enhancement layer(3)Top layer be bonded with
One layer of waterproof layer(4), the support column is by connecting cylinder(5), handle(6), expansion link(7), sleeve(8), base(9), supporting plate
(10), external screw thread(11)And frictional layer(12), and the frictional layer(12)It is fixed on supporting plate(10)Side, the supporting plate
(10)With base(9)It is be hinged, the base(9)It is arranged on sleeve(8)One end, and in the sleeve(8)Inside be provided with it is interior
Screw thread, and the internal thread is with being arranged on expansion link(7)On external screw thread(11)Cooperate and be threadedly coupled, the expansion link
(7)One end and connecting cylinder(5)It is fixedly connected, and the connecting cylinder(5)Both sides respectively with handle(6)It is fixedly connected.
A kind of 2. discharge structure for building foundation pit construction according to claim 1, it is characterised in that the base
(9), supporting plate(10)And frictional layer(12)It is made by stainless steel material.
3. a kind of discharge structure for building foundation pit construction according to claim 1, it is characterised in that described flexible
Bar(7)It is provided with the scale value for being easy to check collapsing length(13).
A kind of 4. discharge structure for building foundation pit construction according to claim 1, it is characterised in that the waterproof
Layer(4)For SBS waterproof rolls.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720219979.0U CN206956732U (en) | 2017-03-07 | 2017-03-07 | A kind of discharge structure for building foundation pit construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720219979.0U CN206956732U (en) | 2017-03-07 | 2017-03-07 | A kind of discharge structure for building foundation pit construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206956732U true CN206956732U (en) | 2018-02-02 |
Family
ID=61377508
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720219979.0U Expired - Fee Related CN206956732U (en) | 2017-03-07 | 2017-03-07 | A kind of discharge structure for building foundation pit construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206956732U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108385646A (en) * | 2018-03-23 | 2018-08-10 | 中交天津港湾工程研究院有限公司 | A kind of soil pressure cell inbuilt device and its method for embedding |
CN112695766A (en) * | 2020-12-19 | 2021-04-23 | 康慧英 | Foundation pit supporting structure with foundation pit construction parameter measurement function |
-
2017
- 2017-03-07 CN CN201720219979.0U patent/CN206956732U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108385646A (en) * | 2018-03-23 | 2018-08-10 | 中交天津港湾工程研究院有限公司 | A kind of soil pressure cell inbuilt device and its method for embedding |
CN112695766A (en) * | 2020-12-19 | 2021-04-23 | 康慧英 | Foundation pit supporting structure with foundation pit construction parameter measurement function |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206956732U (en) | A kind of discharge structure for building foundation pit construction | |
CN201520969U (en) | Prefabricated hollow diaphragm wall body | |
CN207436069U (en) | A kind of deep foundation pit supporting structure | |
CN110685253B (en) | Flood prevention box for hydraulic engineering | |
CN103015631A (en) | Built-in polyvinyl chloride (PVC) pipe enhanced square steel pipe concrete combined column | |
CN204475379U (en) | Shorten the basement post-pouring zone in Dewatering cycle | |
CN203924338U (en) | A kind of steel house | |
CN207159937U (en) | A kind of concrete watertight wall joint | |
CN206053001U (en) | A kind of tenon joint type self-heat preserving building block of exterior wall | |
CN202627524U (en) | Wall ternary form water-seal opposite-pull screw | |
CN205954618U (en) | Double -walled bellows precast tubular pile pile extension structure | |
CN205776190U (en) | Prestressed concrete support pile for continuous supporting wall | |
CN103758121A (en) | Deep foundation pit built-in profile steel drawable unreinforced filling pile | |
CN207405655U (en) | A kind of outer wall of basement single surface formwork | |
CN206495218U (en) | Foundation pit supporting construction | |
CN206693228U (en) | A kind of anchor pole and ground substrate plate anti-floating system | |
CN201265714Y (en) | Double-layer hollow pipe for inspection shaft | |
CN204940267U (en) | Epoxy isolation piling bar | |
CN206289778U (en) | Prefabricated overlapping formwork built-in profile steel concrete walls | |
CN205134346U (en) | Building pile foundation structure | |
CN205955208U (en) | Multi -functional split bolt sleeve pipe | |
CN202866287U (en) | Novel energy-saving water stopping screw rod | |
CN205777651U (en) | A kind of height-adjustable permanent support self-locking device | |
CN204608796U (en) | Supporting and protection structure | |
CN216586570U (en) | Larsen steel sheet pile supporting structure for foundation pit support in water |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20180307 Address after: 528300 Guangdong Province, Foshan city Shunde District Daliang Xingui Road No. 16 6 floor Patentee after: Guangdong CIS Engineering Survey Co., Ltd. Address before: 528399 Guangdong city of Foshan province Foshan city Shunde District Daliang Xingui Road No. 16 7 floor Patentee before: Guangdong Yao Jian Foundation Engineering Co., Ltd. |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180202 Termination date: 20210307 |