CN206956722U CN201720889754.6U CN201720889754U CN206956722U CN 206956722 U CN206956722 U CN 206956722U CN 201720889754 U CN201720889754 U CN 201720889754U CN 206956722 U CN206956722 U CN 206956722U
Authority
CN
China
Prior art keywords
steel plate
pile crown
screw rod
meet
enough
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720889754.6U
Other languages
Chinese (zh)
Inventor
赵强
刘浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Group Co Ltd
Tianjin Engineering Co Ltd of China Railway Construction Group Co Ltd
Original Assignee
China Railway Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Group Co Ltd filed Critical China Railway Construction Group Co Ltd
Priority to CN201720889754.6U priority Critical patent/CN206956722U/en
Application granted granted Critical
Publication of CN206956722U publication Critical patent/CN206956722U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses one kind can have enough to meet the need pile crown repairing card,Steel plate including strip,Screw rod is fixedly connected with the left of the steel plate,The screw rod is mutually perpendicular to the steel plate,It is furnished with nut on the screw rod,Some bolts hole are interval with the right side of the steel plate,The aperture of the bolt hole is engaged with the screw rod,A set of bolt is fixedly connected with the side of steel plate,The bolt hole being engaged with bolt is combined with the opposite side of steel plate,Make simple,It is easy to machine-shaping,After blinding layer pours,It is fixedly installed on pile crown,And inner side brushing releasing agent,The microdilatancy water-proof concrete for exceeding one label of pile concrete is filled on tangible pile crown,Reach smooth in stake top,Top mark is high consistent,The smooth-going of pile crown facade circular arc is closely knit,Remove pile crown repairing card,To be repeatedly used in turn,Steel plate is provided with some bolts hole,It is adapted to the pile crown in piles with different footpath.

Description

One kind can have enough to meet the need pile crown repairing card
Technical field
Technical field of building construction is the utility model is related to, it particularly relates to which one kind can have enough to meet the need pile crown repairing card.
Background technology
In the foundation basic construction stage, due to picking stake in construction, what section stake all can be in various degree occurs not at pile crown Smooth and incomplete pile crown phenomenon, some wooden template constructs of use repair pile crown into hexagon or octagon.But wooden stake Head repairing card, there are two drawbacks after a real high concrete is filled, during form removal:1st, can be to the different degrees of destruction of pile crown.2、 Although wooden model amount is small, multiple turnover can not be realized, inadequate energy-conserving and environment-protective, consumption is big.
The problem of in correlation technique, effective solution is not yet proposed at present.
Utility model content
For the above-mentioned technical problem in correlation technique, the utility model proposes one kind can have enough to meet the need pile crown repairing card, can Solve the problems, such as that pile crown is complete and control stake top is in unified absolute altitude, and be adapted to the pile crown in piles with different footpath.
To realize above-mentioned technical purpose, what the technical solution of the utility model was realized in:
One kind can have enough to meet the need pile crown repairing card, include the steel plate of strip, screw rod is fixedly connected with the left of the steel plate, described Screw rod is mutually perpendicular to the steel plate, is furnished with nut on the screw rod, some bolts hole, institute are interval with the right side of the steel plate The aperture for stating bolt hole is engaged with the screw rod.
Further, the quantity of the bolt hole is 4.
Further, 4 bolts hole correspond to 500mm stakes footpath, 600mm stakes footpath, 700mm stakes footpath and 800mm stakes respectively Footpath.
Further, the thickness of the steel plate is 5mm.
Further, the height of the steel plate is 150mm-180mm.
The beneficial effects of the utility model:By being fixedly connected with a set of bolt in the side of steel plate, in the opposite side of steel plate The bolt hole being engaged with bolt is combined with, makes simply, is easy to machine-shaping, after blinding layer pours, fixed peace Loaded on pile crown, and inner side brushing releasing agent, the microdilatancy water-proof concrete that will exceed one label of pile concrete fill tangible On pile crown, reach in stake top is smooth, top mark is high consistent, the smooth-going of pile crown facade circular arc is closely knit, pile crown repairing card is removed, so as to multiple It is used in turn, steel plate is provided with some bolts hole, is adapted to the pile crown in piles with different footpath.
Brief description of the drawings
, below will be to embodiment in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art In the required accompanying drawing used be briefly described, it should be apparent that, drawings in the following description are only of the present utility model Some embodiments, for those of ordinary skill in the art, on the premise of not paying creative work, can also be according to this A little accompanying drawings obtain other accompanying drawings.
Fig. 1 is a kind of front view for having enough to meet the need pile crown repairing card according to the utility model embodiment.
Fig. 2 is a kind of top view for having enough to meet the need pile crown repairing card according to the utility model embodiment.
In figure:1. steel plate;2. screw rod;3. nut;4. bolt hole.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, every other embodiment that those of ordinary skill in the art are obtained all belongs to In the scope of the utility model protection.
As shown in Figure 1-2, one kind according to the utility model embodiment can have enough to meet the need pile crown repairing and block, including strip Steel plate 1, the left side of the steel plate 1 are fixedly connected with screw rod 2, and the screw rod 2 is mutually perpendicular to the steel plate 1, on the screw rod 2 Equipped with nut 3, the right side of the steel plate 1 is interval with some bolts hole 4, and the aperture of the bolt hole 4 matches with the screw rod 2 Close.
The quantity of the bolt hole 4 is 4.
4 bolts hole 4 correspond to 500mm stakes footpath, 600mm stakes footpath, 700mm stakes footpath and 800mm stakes footpath respectively.
The thickness of the steel plate 1 is 5mm.
The height of the steel plate 1 is 150mm-180mm.
When specifically used, pile crown repairing card can be had enough to meet the need according to one kind described in the utility model, include the steel plate of strip 1, the thickness of steel plate 1 is 5mm, and the height of steel plate 1 is according to depending on on-site actual situations, generally bed course top to pile crown top 150mm- 180mm, the left side of steel plate 1 are fixedly connected with screw rod 2, and screw rod 2 is mutually perpendicular to steel plate 1, steel plate 1 and the integral solder of screw rod 2, are Integral structure, it is furnished with nut 3 on screw rod 2, the right side of steel plate 1 is interval with some bolts hole 4, the aperture of bolt hole 4 and spiral shell Bar 2 is engaged, it is preferred that reserved 4 bolts hole 4 for being applied to piles with different footpath in the right side of steel plate 1, install rear bolt hole 4 with Screw rod 2 fits like a glove.Pile crown repairing card can be had enough to meet the need stake week is fixed on by nut 2, periphery can combine operating mode steel bar end Reinforce, prevent concreting process from being disturbed, and in the inner side brushing releasing agent of steel plate 1, one mark of pile concrete will be exceeded Number microdilatancy water-proof concrete fill on tangible pile crown, reach in stake top is smooth, top mark is high consistent, the smooth-going of pile crown facade circular arc is close Real, installation is firm, examination can carry out concrete pouring construction after passing through., can after pile crown concrete strength reaches requirement Remove, periodically can have enough to meet the need pile crown repairing card maintenance, in case corrosion, works well to be used in turn next time.
In summary, it is a set of by being fixedly connected in the side of steel plate by means of above-mentioned technical proposal of the present utility model Bolt, the bolt hole being engaged with bolt is combined with the opposite side of steel plate, makes simply, be easy to machine-shaping, work as base mat After layer pours, it is fixedly installed on pile crown, and inner side brushing releasing agent, the micro- swollen of one label of pile concrete will be exceeded Swollen water-proof concrete is filled on tangible pile crown, is reached in stake top is smooth, top mark is high consistent, the smooth-going of pile crown facade circular arc is closely knit, removes Pile crown repairing card, to be repeatedly used in turn, steel plate is provided with some bolts hole, is adapted to the pile crown in piles with different footpath.
Preferred embodiment of the present utility model is the foregoing is only, it is all at this not to limit the utility model Within the spirit and principle of utility model, any modification, equivalent substitution and improvements made etc., the utility model should be included in Protection domain within.

Claims (5)

1. one kind can have enough to meet the need pile crown repairing card, it is characterised in that the steel plate including strip(1), the steel plate(1)Left side fix It is connected with screw rod(2), the screw rod(2)With the steel plate(1)It is mutually perpendicular to, the screw rod(2)It is upper to be furnished with nut(3), it is described Steel plate(1)Right side be interval with some bolts hole(4), the bolt hole(4)Aperture and the screw rod(2)It is engaged.
2. one kind can have enough to meet the need pile crown repairing card according to claim 1, it is characterised in that the bolt hole(4)Quantity be 4 It is individual.
3. one kind can have enough to meet the need pile crown repairing card according to claim 2, it is characterised in that 4 bolts hole(4)It is right respectively Answer 500mm stakes footpath, 600mm stakes footpath, 700mm stakes footpath and 800mm stakes footpath.
4. one kind can have enough to meet the need pile crown repairing card according to claim 1, it is characterised in that the steel plate(1)Thickness be 5mm。
5. one kind can have enough to meet the need pile crown repairing card according to claim 1, it is characterised in that the steel plate(1)Height be 150mm-180mm。
CN201720889754.6U 2017-07-21 2017-07-21 One kind can have enough to meet the need pile crown repairing card Active CN206956722U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720889754.6U CN206956722U (en) 2017-07-21 2017-07-21 One kind can have enough to meet the need pile crown repairing card

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720889754.6U CN206956722U (en) 2017-07-21 2017-07-21 One kind can have enough to meet the need pile crown repairing card

Publications (1)

Publication Number Publication Date
CN206956722U true CN206956722U (en) 2018-02-02

Family

ID=61381150

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720889754.6U Active CN206956722U (en) 2017-07-21 2017-07-21 One kind can have enough to meet the need pile crown repairing card

Country Status (1)

Country Link
CN (1) CN206956722U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109403397A (en) * 2018-09-04 2019-03-01 中国二十冶集团有限公司 Repairing mould and construction method is isolated in filling pile head concrete

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109403397A (en) * 2018-09-04 2019-03-01 中国二十冶集团有限公司 Repairing mould and construction method is isolated in filling pile head concrete

Similar Documents

Publication Publication Date Title
CN206956722U (en) One kind can have enough to meet the need pile crown repairing card
CN206468008U (en) Outer wall of basement one side formwork support system
CN108412087A (en) Improve the prefabricated reinforcement structure and loam wall of loam wall globality
CN208534081U (en) A kind of reconstruction structure of old building constructional column
CN201512949U (en) Reversed conical prepared hole forming device for foundation of concrete device
CN204370573U (en) Matrix pattern Rebar anchor
CN206800791U (en) A kind of multi-cavity steel tube concrete post with tie hoop and pull bar
CN206397264U (en) One kind is used for the corrosion-resistant enclosing of typhoon prone areas assembled wind resistance
CN204282860U (en) Interim board house bracing means
CN204920255U (en) Stairwell alternates to be under construction uses regularization antipriming
CN206173971U (en) Can have enough to meet need unilateral form tie system of use
CN206289786U (en) The prefabricated overlapping built-in prestressed steel reinforced concrete wall of formwork
CN203905039U (en) Foot binding structure of column foot of outdoor steel pipe
CN204386140U (en) A kind of recoverable suspension scaffold shaped steel anchor device
CN204098519U (en) Do not register one's residence balcony rapid reinforcement structure in old community
CN206289778U (en) Prefabricated overlapping formwork built-in profile steel concrete walls
CN206512893U (en) A kind of prefabricated assembled board wall I-steel bolt joint construction
CN205976148U (en) Side fascia installation node
CN205894732U (en) Reinforced structure of rowlock wall body
CN205976151U (en) Side fascia installation node
CN206052571U (en) A kind of prestress rope Shear Strengthening concrete box girder
CN205976145U (en) Side fascia installation node
CN203782759U (en) Construction elevator foundation reinforcing device
CN107989183A (en) A kind of adaptive intelligent reinforced concrete frame structure of energy consumption mechanism
CN204139634U (en) The safe enclosed construction in a kind of fast-type hole

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200507

Address after: 100043 No. 20, Shijingshan Road, Beijing, Shijingshan District

Co-patentee after: China Railway Construction Group Tianjin Engineering Co., Ltd

Patentee after: CHINA RAILWAY CONSTRUCTION GROUP Co.,Ltd.

Address before: 100131 No. 20, Shijingshan Road, Beijing, Shijingshan District

Patentee before: CHINA RAILWAY CONSTRUCTION GROUP Co.,Ltd.