CN109403397A - Repairing mould and construction method is isolated in filling pile head concrete - Google Patents
Repairing mould and construction method is isolated in filling pile head concrete Download PDFInfo
- Publication number
- CN109403397A CN109403397A CN201811026273.8A CN201811026273A CN109403397A CN 109403397 A CN109403397 A CN 109403397A CN 201811026273 A CN201811026273 A CN 201811026273A CN 109403397 A CN109403397 A CN 109403397A
- Authority
- CN
- China
- Prior art keywords
- skeleton ring
- concrete
- pile
- semicircle skeleton
- semicircle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D37/00—Repair of damaged foundations or foundation structures
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Abstract
The present invention relates to a kind of filling pile head concrete isolation repairing mould and construction methods, including the first semicircle skeleton ring and the second semicircle skeleton ring, the first semicircle skeleton ring and the second semicircle skeleton ring, which are connected, surrounds circle, wherein the both ends of the first semicircle skeleton ring are equipped with first sleeve, the both ends of the second semicircle skeleton ring are equipped with the second casing, and the first sleeve is overlapped with the center line of second casing, and bolt is equipped in the first sleeve and second casing.Mounting means of the present invention is simple and fast, is easy to construct;And construction quality is effectively controlled, there is navigability, practicability.
Description
Technical field
The present invention relates to the technical fields of science of bridge building, refer in particular to a kind of filling pile head concrete isolation repairing mould
And construction method.
Background technique
It, generally all can superfilled concrete to guarantee concrete quality at filling pile head when bridge struction pile pile foundation construction
1.0-2.0m, raw material material sources is different, partial size is different and concrete strength require it is different etc. due to, it will configure different cooperations
Than being used with meeting specified mixing plant.Since cast-in-place pile concrete grade ordinary circumstance is designed as C30, the concrete strength when digging stake
Part pile body has more than C50 intensity, and pile crown starts to need before digging stake by just having chisel stake after excavation of foundation pit, pattern foundation pit supporting structure etc.
Condition, it is more difficult to control that the very difficult and pile crown of chisel pile crown construction cuts stake face integrality, it will causes to cut stake face damage or insufficient, now
Some schemes generally use the modes such as simple supporting plank sheathing or brick, it is difficult to ensure that preferable construction quality.
Summary of the invention
For this purpose, technical problem to be solved by the present invention lies in overcoming, to cut a face in the prior art easy to damage to cannot have
Effect guarantees the problem of construction quality, to provide a kind of effectively control construction quality, accelerates inspection of quality program, and improve construction
The filling pile head concrete isolation repairing mould and construction method of production efficiency.
In order to solve the above technical problems, repairing mould is isolated in a kind of filling pile head concrete of the invention, it is located at described
On the pile crown of bored concrete pile, including the first semicircle skeleton ring and the second semicircle skeleton ring, the first semicircle skeleton ring and the second half
Circle skeleton ring, which is connected, surrounds circle, wherein the both ends of the first semicircle skeleton ring are equipped with first sleeve, the second semicircle bone
The both ends of bobbin are equipped with the second casing, and the first sleeve is overlapped with the center line of second casing, the first sleeve
With in second casing be equipped with bolt.
In one embodiment of the invention, the first semicircle skeleton ring is equipped with the first in command, first semicircle
Skeleton ring is equipped with second handle.
In one embodiment of the invention, the first in command and the second handle are U-shaped.
In one embodiment of the invention, the internal diameter of the first semicircle skeleton ring and the second semicircle skeleton ring
It is identical as the outer diameter of the bored concrete pile.
In one embodiment of the invention, the first sleeve is identical with the size of second casing.
In one embodiment of the invention, the first semicircle skeleton ring and the second semicircle skeleton ring are located at bed course
On.
The invention also discloses a kind of filling pile head concrete, and method for repairing and constructing is isolated, and includes the following steps: to base
The foundation pit is excavated after having excavation condition in hole, and carries out supporting to the foundation pit;Pile head is dug after the completion to spread out bed course base
Paving;Above-mentioned filling pile head concrete isolation repairing mould is installed at the pile crown on the bed course;Pour perfusion
Pile concrete removes the filling pile head concrete isolation repairing mould after concrete strength is met the requirements.
In one embodiment of the invention, the method for the filling pile head concrete isolation repairing mould is installed are as follows:
First semicircle skeleton ring and the second semicircle skeleton ring are located at around pile crown, according to grout pile diameter size selection
The internal diameter of first semicircle skeleton ring and the second semicircle skeleton, and by the first semicircle skeleton ring and the second semicircle bone
Frame is fixed on section stake face of the pile crown, and is overlapped first sleeve and the center line of the second casing, in the first sleeve
Bolt is installed in second casing.
In one embodiment of the invention, when carrying out supporting to the foundation pit, according to the foundation depth supporting level-one
Safeguard procedures install second level supporting measure when excavating to bottom.
In one embodiment of the invention, the method for the chisel pile head are as follows: label cuts pile beacon height, according to described section of stake
Absolute altitude cuts extra concrete pile crown, exposes main reinforcement, when pile crown has mobile when top, lifts pile crown.
The above technical solution of the present invention has the following advantages over the prior art:
Filling pile head concrete isolation repairing mould of the present invention and construction method, the two of the first semicircle skeleton ring
End is equipped with first sleeve, and the both ends of the second semicircle skeleton ring are equipped with the second casing, and the first sleeve and described second
The center line of casing is overlapped, thus connect the first semicircle skeleton ring and the second semicircle skeleton ring in dislocation, described first
It is equipped with bolt in casing and second casing, the first semicircle skeleton ring and described the second half are realized by the bolt
Circle skeleton ring is fixedly connected;In addition, after pouring concrete, pass through the disassembly bolt, so that it may make the first semicircle skeleton ring with
Second semicircle skeleton ring separation, demoulding is simpler, conveniently.
Detailed description of the invention
In order to make the content of the present invention more clearly understood, it below according to specific embodiments of the present invention and combines
Attached drawing, the present invention is described in further detail, wherein
Fig. 1 is the main view of filling pile head concrete isolation repairing mould of the present invention;
Fig. 2 is the top view of filling pile head concrete isolation repairing mould of the present invention;
Fig. 3 is the partial enlarged view of Fig. 1.
Figure of description description of symbols: 10- bored concrete pile, 11- the first semicircle skeleton ring, 12- the second semicircle skeleton ring, 13-
First sleeve, the second casing of 14-, 15- bolt, the 16- first in command, 17- second handle, 18- bed course.
Specific embodiment
Embodiment one
As shown in Fig. 1 and Fig. 2 and Fig. 3, the present embodiment provides a kind of filling pile head concrete, and repairing mould is isolated, and is located at institute
On the pile crown for stating bored concrete pile 10, including the first semicircle skeleton ring 11 and the second semicircle skeleton ring 12, the first semicircle skeleton ring
11 are connected with the second semicircle skeleton ring 12 surrounds circle, wherein the both ends of the first semicircle skeleton ring 11 are equipped with first sleeve
13, the both ends of the second semicircle skeleton ring 12 are equipped with the second casing 14, and the first sleeve 13 and second casing 14
Center line be overlapped, bolt 15 is equipped in the first sleeve 13 and second casing 14.
Repairing mould is isolated in filling pile head concrete described in the present embodiment, is located on the filling pile head, including the
One semicircle skeleton ring 11 and the second semicircle skeleton ring 12, the first semicircle skeleton ring 11 is connected with the second semicircle skeleton ring 12 to be enclosed
At circle, wherein the both ends of the first semicircle skeleton ring 11 are equipped with first sleeve 13, the two of the second semicircle skeleton ring 12
End is equipped with the second casing 14, and the first sleeve 13 is overlapped with the center line of second casing 14, to make described first
Semicircle skeleton ring 11 and the second semicircle skeleton ring 12 are connected in dislocation, are equipped in the first sleeve 13 and second casing 14
Bolt 15 realizes the first semicircle skeleton ring 11 by the bolt 15 and connects with the fixed of the second semicircle skeleton ring 12
It connects;In addition, after pouring concrete, by dismantling the bolt 15, so that it may make the first semicircle skeleton ring 11 and second semicircle
Skeleton ring 12 separates, and demoulding is simpler, conveniently.
In order to facilitate demoulding, the first semicircle skeleton ring 11 is equipped with the first in command 16, passes through the first in command 16
The first semicircle skeleton ring 11 easy to disassemble, the first semicircle skeleton ring 12 are equipped with second handle 17, pass through described the
The second semicircle skeleton ring 12 easy to disassemble of second chief 17.Specifically, for operating easily, the first in command 16 with it is described
Second handle 17 is U-shaped.In addition, in order to be coated on the mold on the bored concrete pile 10, the first semicircle skeleton ring
11 and the second semicircle skeleton ring 12 internal diameter it is identical as the outer diameter of the bored concrete pile 10.The first semicircle skeleton ring
11 and the second semicircle skeleton ring 12 be located on bed course, to be conducive to subsequent casting concrete.
In the present embodiment, the first semicircle skeleton ring 11 is identical as the size of the second semicircle skeleton ring 12, height
For 15cm, thickness 1cm, and the first semicircle skeleton ring 11 and the second semicircle skeleton ring 12 are steel ring;For convenience
Processing and fabricating and use, the first sleeve 13 is identical with the size of second casing 14, diameter 20mm, and length is
3cm, and the first sleeve 13 and second casing 14 are steel pipe;The bolt 15 can be bolt, screw etc..
Embodiment two
The present embodiment provides a kind of filling pile head concrete, and method for repairing and constructing is isolated, and includes the following steps: step S1: to base
The foundation pit is excavated after having excavation condition in hole, and carries out supporting to the foundation pit;Step S2: to bed course after the completion of chisel pile head
18 bases pave;Step S3: it is mixed that filling pile head described in embodiment one is installed on the bed course 18 at the pile crown
Solidifying soil isolation repairing mould;Step S4: pouring cast-in-place pile concrete, and the bored concrete pile is removed after concrete strength is met the requirements
Repairing mould is isolated in pile crown concrete.
Method for repairing and constructing is isolated in filling pile head concrete described in the present embodiment, in the step S1, has to foundation pit
The foundation pit is excavated after excavation condition, and supporting is carried out to the foundation pit, to advantageously ensure that the stabilization of the foundation pit;It is described
In step S2, paves after the completion of chisel pile head to 18 base of bed course, so that it is had blinding concrete and pour condition;The step S3
In, on the bed course 18 isolation of filling pile head concrete described in embodiment one is installed at the pile crown and repairs mould
Tool, to be conducive to for different brackets concrete being isolated;In the step S4, cast-in-place pile concrete is poured, to concrete
Intensity removes the filling pile head concrete isolation repairing mould after meeting the requirements, so as to effectively control construction quality,
Accelerate inspection of quality program, and improves construction production efficiency.
In the step S1, excavation pit and when supporting carries out soil with excavator and excavates to remove, according to the foundation pit depth
The measure of supporting primary protection is spent, second level supporting measure is installed, to advantageously ensure that the quality of the construction when excavating to bottom.
In the step S2, the method for the chisel pile head are as follows: label cuts pile beacon height, cuts according to described section of pile beacon height more
Remaining concrete pile crown is specifically carried out bottom surrounding and is cut, exposed main reinforcement, have shifting to top pile crown with pneumatic pick or automatic pulverizing hammer
When dynamic, pile crown is lifted.In practice of construction, when cutting extra concrete pile crown according to described section of pile beacon height, chisel is pile crown quality
Bad concrete, thus expose the fresh concrete face face Ji Jiezhuan, and described section of pile beacon height generally designs in advance, scene is according to a section stake
Absolute altitude cuts extra concrete pile crown, if still unqualified must continue toward following chisel.In addition, when paving to bed course base, pad
Layer material paves, is smooth, so that it is had blinding concrete and pours condition.
In the step S3, the method that repairing mould is isolated in the filling pile head concrete is installed are as follows: by the first semicircle
Skeleton ring 11 and the second semicircle skeleton ring 12 are located at around pile crown, according to 10 diameter size selections described first of the bored concrete pile
The internal diameter of semicircle skeleton ring 11 and the second semicircle skeleton 12, and by the first semicircle skeleton ring 11 and second semicircle
Skeleton 12 is fixed on section stake face of the pile crown, and is overlapped first sleeve 13 and the center line of the second casing 14, described
Bolt 15 is installed, to realize the first semicircle skeleton ring 11 and described second in first sleeve 13 and second casing 14
Semicircle skeleton ring 12 is fixedly connected.
In the step S4, cast-in-place pile concrete is poured, the grout pile is removed after concrete strength is met the requirements
Repairing mould is isolated in head concrete, specifically, removes the first semicircle skeleton ring 11 and the second semicircle skeleton ring 12, into
The construction of row next step.
Obviously, the above embodiments are merely examples for clarifying the description, does not limit the embodiments.For
For those of ordinary skill in the art, other different form variations can also be made on the basis of the above description or are become
It is dynamic.There is no necessity and possibility to exhaust all the enbodiments.And obvious variation extended from this or change
It moves still within the protection scope of the invention.
Claims (10)
1. repairing mould is isolated in a kind of filling pile head concrete, on the pile crown of the bored concrete pile, it is characterised in that: including
First semicircle skeleton ring and the second semicircle skeleton ring, the first semicircle skeleton ring and the second semicircle skeleton ring, which are connected, surrounds circle
Shape, wherein the both ends of the first semicircle skeleton ring are equipped with first sleeve, the both ends of the second semicircle skeleton ring are equipped with second
Casing, and the first sleeve is overlapped with the center line of second casing, is set in the first sleeve and second casing
There is bolt.
2. repairing mould is isolated in filling pile head concrete according to claim 1, it is characterised in that: first semicircle
Skeleton ring is equipped with the first in command, and the first semicircle skeleton ring is equipped with second handle.
3. according to claim 2 filling pile head concrete be isolated repairing mould, it is characterised in that: the first in command with
The second handle is U-shaped.
4. repairing mould is isolated in filling pile head concrete according to claim 1, it is characterised in that: the first semicircle bone
The internal diameter of bobbin and the second semicircle skeleton ring is identical as the outer diameter of the bored concrete pile.
5. according to claim 1 filling pile head concrete be isolated repairing mould, it is characterised in that: the first sleeve and
The size of second casing is identical.
6. repairing mould is isolated in filling pile head concrete according to claim 1, it is characterised in that: the first semicircle bone
Bobbin and the second semicircle skeleton ring are located on bed course.
7. method for repairing and constructing is isolated in a kind of filling pile head concrete, which comprises the steps of:
Step S1: the foundation pit is excavated after foundation pit has excavation condition, and supporting is carried out to the foundation pit;
Step S2: it paves after the completion of chisel pile head to bed course base;
Step S3: filling pile head concrete described in claim 1-6 is installed on the bed course at the pile crown
Repairing mould is isolated;
Step S4: pouring cast-in-place pile concrete, removed after concrete strength is met the requirements the filling pile head concrete every
From repairing mould.
8. repairing mould is isolated in filling pile head concrete according to claim 7, it is characterised in that: install the perfusion
The method of pile head concrete isolation repairing mould are as follows: the first semicircle skeleton ring and the second semicircle skeleton ring are located at pile crown week
It encloses, the internal diameter of the first semicircle skeleton ring and the second semicircle skeleton is selected according to the grout pile diameter size, and will
The first semicircle skeleton ring and the second semicircle skeleton are fixed on the cutting on stake face of the pile crown, and make first sleeve and the
The center line of two casings is overlapped, and installs bolt in the first sleeve and second casing.
9. according to claim 7 filling pile head concrete be isolated repairing mould, it is characterised in that: to the foundation pit into
When row supporting, according to the foundation depth supporting primary protection measure, second level supporting measure is installed when excavating to bottom.
10. repairing mould is isolated in filling pile head concrete according to claim 7, it is characterised in that: the chisel pile head
Method are as follows: it is high that label cuts pile beacon, and extra concrete pile crown is cut according to described section of pile beacon height, exposes main reinforcement, has to top pile crown
When mobile, pile crown is lifted.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811026273.8A CN109403397A (en) | 2018-09-04 | 2018-09-04 | Repairing mould and construction method is isolated in filling pile head concrete |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811026273.8A CN109403397A (en) | 2018-09-04 | 2018-09-04 | Repairing mould and construction method is isolated in filling pile head concrete |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109403397A true CN109403397A (en) | 2019-03-01 |
Family
ID=65463913
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811026273.8A Pending CN109403397A (en) | 2018-09-04 | 2018-09-04 | Repairing mould and construction method is isolated in filling pile head concrete |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109403397A (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202688991U (en) * | 2012-07-25 | 2013-01-23 | 中国建筑第六工程局有限公司 | Specially-made sleeve construction structure used for repairing head of reinforced concrete cast-in-situ pile |
CN203603150U (en) * | 2013-11-25 | 2014-05-21 | 山西四建集团有限公司 | Special mold for repairing pile head |
CN203654278U (en) * | 2014-01-02 | 2014-06-18 | 中建三局第二建设工程有限责任公司 | Convenient pile head repairing device |
CN205171510U (en) * | 2015-11-03 | 2016-04-20 | 天津二十冶建设有限公司 | Bored concrete pile pile head patching device with waterproof function |
CN205653782U (en) * | 2016-05-23 | 2016-10-19 | 中国建筑第八工程局有限公司 | Mould is repaired to bored concrete pile pile head |
CN205742174U (en) * | 2016-08-24 | 2016-11-30 | 陕西建工第六建设集团有限公司 | Deposited reinforced concrete pile pile crown construction mould |
CN206956722U (en) * | 2017-07-21 | 2018-02-02 | 中铁建设集团有限公司 | One kind can have enough to meet the need pile crown repairing card |
-
2018
- 2018-09-04 CN CN201811026273.8A patent/CN109403397A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202688991U (en) * | 2012-07-25 | 2013-01-23 | 中国建筑第六工程局有限公司 | Specially-made sleeve construction structure used for repairing head of reinforced concrete cast-in-situ pile |
CN203603150U (en) * | 2013-11-25 | 2014-05-21 | 山西四建集团有限公司 | Special mold for repairing pile head |
CN203654278U (en) * | 2014-01-02 | 2014-06-18 | 中建三局第二建设工程有限责任公司 | Convenient pile head repairing device |
CN205171510U (en) * | 2015-11-03 | 2016-04-20 | 天津二十冶建设有限公司 | Bored concrete pile pile head patching device with waterproof function |
CN205653782U (en) * | 2016-05-23 | 2016-10-19 | 中国建筑第八工程局有限公司 | Mould is repaired to bored concrete pile pile head |
CN205742174U (en) * | 2016-08-24 | 2016-11-30 | 陕西建工第六建设集团有限公司 | Deposited reinforced concrete pile pile crown construction mould |
CN206956722U (en) * | 2017-07-21 | 2018-02-02 | 中铁建设集团有限公司 | One kind can have enough to meet the need pile crown repairing card |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108560684B (en) | Heavy-load traffic road inspection well ring and construction method thereof | |
CN208917858U (en) | Lumen type open caisson device in precast splice type | |
CN104389608B (en) | The construction method of shield crossing ventilating shaft | |
CN209703525U (en) | A kind of side slope precast assembly lattice girder connected by wet seam | |
CN105909268B (en) | Prestressing combination formula well tunnel modular structure construction method and modular structure | |
CN103696784A (en) | Large-diameter long pipe curtain construction method for shallowly-buried large-span under-tunnel-passing architectural structure | |
JP6543176B2 (en) | Building method | |
CN102505709A (en) | Concrete-formwork-precast foundation construction method | |
JP2019120115A (en) | Method of constructing tunnel lining structure | |
CN112227502A (en) | Drainage inspection well construction method | |
CN110847207A (en) | Structure and construction method for newly-built bridge with subway tunnel passing through existing bridge piles | |
CN104032767A (en) | Tower crane foundation in deep foundation pit and construction method of tower crane foundation | |
JP4611113B2 (en) | Integrated construction method of pile and column | |
CN208966022U (en) | A kind of template poured for large-scale beam column | |
CN208455793U (en) | Heavy Traffic road inspection well walling crib | |
CN107059904A (en) | A kind of underground pipe gallery ponding well excavation method | |
CN110158602A (en) | A kind of Soft Clay deep foundation pit support excavation construction structure and construction method | |
CN212405118U (en) | Pile pouring structure and pile structure based on informatization technology | |
KR101125089B1 (en) | Construction of manholes method | |
CN109403397A (en) | Repairing mould and construction method is isolated in filling pile head concrete | |
CN110184952B (en) | Modification structure of existing bridge abutment and construction method thereof | |
CN105464128B (en) | Prestress anchorage cable assembled pile plate wall protection construction method | |
CN209907541U (en) | Integral pouring template system for trapezoid drainage ditch | |
CN111472363A (en) | Construction method of foundation pit enclosure structure located in underground space of existing building | |
CN116856932A (en) | Large-diameter prestress assembly vertical shaft structure containing glass fiber rib part and construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190301 |