CN206945335U - A kind of construction quality sampling detecting device - Google Patents
A kind of construction quality sampling detecting device Download PDFInfo
- Publication number
- CN206945335U CN206945335U CN201720858856.1U CN201720858856U CN206945335U CN 206945335 U CN206945335 U CN 206945335U CN 201720858856 U CN201720858856 U CN 201720858856U CN 206945335 U CN206945335 U CN 206945335U
- Authority
- CN
- China
- Prior art keywords
- slide rail
- cylinder
- sliding block
- connection
- bolted connection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
It the utility model is related to a kind of detection means, more particularly to a kind of construction quality sampling detecting device.The technical problems to be solved in the utility model is to provide the construction quality sampling detecting device that one kind is time saving and energy saving, labor intensity is small, can be purged to the dust occurred in sampling process, enters without influenceing surrounding environment.In order to solve the above-mentioned technical problem, the utility model provides such a construction quality sampling detecting device, includes bottom plate etc.;Montant is all installed by bolted connection, montant is is symmetrical arranged, and montant bottom is provided with wheel by bolted connection, and bottom plate crown center is provided with elevating mechanism, and the Lift Part of elevating mechanism is provided with sampler at left and right sides of bottom base plate.It is small that the utility model has reached time saving and energy saving, labor intensity, the dust occurred in sampling process can be purged, the effect entered without influenceing surrounding environment.
Description
Technical field
It the utility model is related to a kind of detection means, more particularly to a kind of construction quality sampling detecting device.
Background technology
Engineering is certain application of science and mathematics, by this application, enables the material of nature and the characteristic of the energy
Enough by various structures, machine, product, system and process, be with most short time and minimum human and material resources make efficiently,
The reliable and thing useful to the mankind.The theory of natural science is applied to each subject formed in specific industrial and agricultural production department
General name.
After the completion of engineering, in order to ensure the security in engineering later stage, detection can be all sampled to it, and is manually carried out
During sampling, waste time and energy, labor intensity it is big, easily occur a large amount of dusts in sampling process and carry out influence surrounding environment, therefore urgently
Need to research and develop it is a kind of it is time saving and energy saving, labor intensity is small, and the dust occurred in sampling process can be purged, enter around without influenceing
The construction quality sampling detecting device of environment.
Utility model content
(1)Technical problems to be solved
When the utility model is in order to overcome artificial be sampled, waste time and energy, labor intensity it is big, easily go out in sampling process
Now a large amount of dusts are carried out the shortcomings that influence surrounding environment, and the technical problems to be solved in the utility model is to provide a kind of time saving province
Power, labor intensity are small, and the dust occurred in sampling process can be purged, and enter and are taken without influenceing the construction quality of surrounding environment
Sample detection means.
(2)Technical scheme
In order to solve the above-mentioned technical problem, the utility model provides such a construction quality sampling detecting device, bag
Bottom plate, montant, wheel, elevating mechanism and sampler have been included, has all been pacified by bolted connection at left and right sides of bottom base plate
Equipped with montant, montant is is symmetrical arranged, and montant bottom is provided with wheel by bolted connection, and bottom plate crown center is provided with
Elevating mechanism, the Lift Part of elevating mechanism are provided with sampler.
Preferably, elevating mechanism includes the first slide rail, the first sliding block, head rod, the second connecting rod, the first gas
Cylinder, the second slide rail and the second sliding block, bottom plate crown center are provided with the first slide rail by bolted connection, and the first slide rail is in
Horizontally disposed, the first slide rail is provided with the first sliding block coordinated with it, and the first sliding block is slidably matched with the first slide rail, left side first
Sliding block leading flank is provided with head rod by way of pin connection, and right side the first sliding block right flank is connected by pin
Mode is provided with the second connecting rod, is connected in the middle part of the second connecting rod with head rod middle part by way of pin is connected, the
One connecting rod tail end is provided with multiple head rods by way of pin connection, and the second connecting rod tail end is connected by pin
Mode multiple second connecting rods are installed, head rod interlocks with the second connecting rod, head rod and the second connecting rod
Top is provided with the second slide rail, and for the second slide rail in being horizontally disposed with, the second slide rail is provided with the second sliding block coordinated with it, the second sliding block
It is slidably matched with the second slide rail, is connected in the middle part of the second sliding block leading flank of left side by way of pin connection with the second connecting rod tail end
Connect, be connected in the middle part of the second sliding block leading flank of right side by way of pin connection with head rod tail end, at the top of the second slide rail
Provided with sampler, the first slide rail crown center is provided with the first cylinder by bolted connection, and the first cylinder is in vertical
Set, the expansion link of the first cylinder is connected by way of pin connection with the hinged place of lower section head rod and the second connecting rod
Connect.
Preferably, sampler includes the 3rd slide rail, the second cylinder, the 3rd sliding block, the first motor, cylinder and drilling
Head, the second slide rail top are provided with the 3rd slide rail by bolted connection, and the 3rd slide rail is in horizontally disposed, on the 3rd slide rail
Provided with the 3rd sliding block coordinated with it, the 3rd sliding block is slidably matched with the 3rd slide rail, what the 3rd slider top was bolted
Mode is provided with the first motor, and for the first motor in being horizontally disposed with, the output shaft of the first motor is connected with drill head by shaft coupling,
Cylinder is provided with drill head, the 3rd slide rail top left side is provided with the second cylinder by bolted connection, and the second cylinder is in
Horizontally disposed, the expansion link of the second cylinder in the middle part of the 3rd sliding block left surface by bolted connection with being connected.
Preferably, also include water tank, filler pipe, valve, water pump, outlet pipe and shower nozzle, pass through spiral shell at the top of the first motor
Tether the mode connect and water tank is installed, filler pipe is connected with the left of tank top, filler pipe is set with being connected in water tank on filler pipe
There is valve, water pump is installed by bolted connection on the right side of water tank inner bottom part, outlet pipe, outlet pipe tail are connected with water pump
Water tank lower right side is run through at end, and outlet pipe tail end is provided with shower nozzle by bolted connection, and shower nozzle is located at drill head upper left
Side.
Preferably, the 3rd cylinder, fixed plate and rubber slab, the side being bolted in the middle part of bottom plate left surface are also included
Formula is provided with the 3rd cylinder, and the 3rd cylinder is inclined to set, and the expansion link of the 3rd cylinder is provided with by way of pin connection
Fixed plate, fixed plate bottom are provided with rubber slab by bolted connection.
Preferably, the material of bottom plate is Q235 steel.
Operation principle:Operating personnel move the present apparatus to the wall side for needing to sample by wheel first, and fill sampling
The sampled part put faces wall, you can and start sampler and concrete within the walls is sampled, meanwhile, lift can be started
Structure, the Lift Part of elevating mechanism drives sampler to move up and down, and then no place within the walls is sampled.When within the walls
Concrete sampling after the completion of, close sampler and elevating mechanism, you can concrete is taken out out of sampler and examined
Survey.
Because elevating mechanism includes the first slide rail, the first sliding block, head rod, the second connecting rod, the first cylinder,
Two slide rails and the second sliding block, bottom plate crown center are provided with the first slide rail by bolted connection, and the first slide rail is in level
Set, the first slide rail is provided with the first sliding block coordinated with it, and the first sliding block is slidably matched with the first slide rail, the sliding block of left side first
Leading flank is provided with head rod by way of pin connection, and right side the first sliding block right flank is by way of pin connection
Second connecting rod is installed, connected in the middle part of the second connecting rod with head rod middle part by way of pin is connected, first connects
Extension bar tail end is provided with multiple head rods, the side that the second connecting rod tail end is connected by pin by way of pin connection
Formula is provided with multiple second connecting rods, and head rod interlocks with the second connecting rod, above head rod and the second connecting rod
Provided with the second slide rail, for the second slide rail in horizontally disposed, the second slide rail is provided with the second sliding block coordinated with it, the second sliding block and the
Two slide rails are slidably matched, and are connected in the middle part of the second sliding block leading flank of left side by way of pin connection with the second connecting rod tail end,
It is connected with head rod tail end by way of pin connection in the middle part of the second sliding block leading flank of right side, is provided with the top of the second slide rail
Sampler, the first slide rail crown center are provided with the first cylinder by bolted connection, and the first cylinder is in be vertically arranged,
The expansion link of first cylinder is connected by way of pin connection with the hinged place of lower section head rod and the second connecting rod, when
Need to when no place is sampled within the walls, the expansion link that operating personnel can start the first cylinder moves up and down, the first gas
The expansion link of cylinder, which moves up and down, drives head rod and the second connecting rod to move left and right, and the first slide rail and the second sliding block rise and be oriented to
Effect, head rod and the second connecting rod fit through the second sliding block and drive the second slide rail to move up and down, and then drive sampling
Device moves up and down, when sampler is moved to the position for needing to sample, you can close the first cylinder, start sampler pair
Concrete within the walls is sampled, and closes sampler, and starting the first cylinder makes sampler recover to original position, you can by coagulation
Soil takes out out of sampler.
Because sampler includes the 3rd slide rail, the second cylinder, the 3rd sliding block, the first motor, cylinder and drill head, the
3rd slide rail is installed by bolted connection, in being horizontally disposed with, the 3rd slide rail is provided with the 3rd slide rail at the top of two slide rails
The 3rd sliding block coordinated with it, the 3rd sliding block are slidably matched with the 3rd slide rail, and the 3rd slider top is by bolted connection
First motor is installed, for the first motor in being horizontally disposed with, the output shaft of the first motor is connected with drill head by shaft coupling, drilling
Cylinder is provided with head, the 3rd slide rail top left side is provided with the second cylinder by bolted connection, and the second cylinder is in level
Set, the expansion link of the second cylinder in the middle part of the 3rd sliding block left surface by bolted connection with being connected, when drill head is located at
When specifying sample position, operating personnel can start the rotation of the first motor, and the first motor, which rotates, drives drill head to rotate, and then band
Dynamic rotary drum, you can the expansion link for starting the second cylinder moves right, and the expansion link of the second cylinder, which moves right, drives the 3rd
Sliding block moves right, and the 3rd sliding block, which moves right, drives the first motor to move right, and then drives drill head to move right, and drills
Head moves right to drill to wall, and then concrete within the walls is fallen in cylinder.Similarly, when concrete is located in cylinder
When, you can the expansion link for starting the second cylinder is moved to the left, and then drives drill head to be moved to the left from departing within the walls, closes second
Cylinder and the first motor, you can the concrete in slurry cylinder, which takes out, to be detected.
Because also including water tank, filler pipe, valve, water pump, outlet pipe and shower nozzle, connected at the top of the first motor by bolt
The mode connect is provided with water tank, filler pipe is connected with the left of tank top, for filler pipe with being connected in water tank, filler pipe is provided with valve
Door, water tank inner bottom part right side are provided with water pump, outlet pipe are connected with water pump, outlet pipe tail end passes through by bolted connection
Water tank lower right side is worn, outlet pipe tail end is provided with shower nozzle by bolted connection, and shower nozzle is located at drill head upper left side, first
First operating personnel open valve, and water is poured into water tank by filler pipe, close valve.When drill head carries out drill hole sampling to wall
While, operating personnel can start water pump, and the water in water tank is pumped into outlet pipe by water pump, and then the water in outlet pipe passes through
Shower nozzle is sprayed, and water sprays to be purged to the dust occurred in sampling process.After the completion of sampling, switch off the pump.In this way,
The dust occurred in sampling process is purged, can prevent dust from influenceing surrounding environment.
Because also including the 3rd cylinder, fixed plate and rubber slab, in the middle part of bottom plate left surface by bolted connection
3rd cylinder is installed, the 3rd cylinder is inclined to set, and the expansion link of the 3rd cylinder is provided with admittedly by way of pin connection
Fixed board, fixed plate bottom are provided with rubber slab by bolted connection, when the present apparatus is moved to beside wall, operating personnel
Start the expansion link elongation of the 3rd cylinder, the expansion link elongation of the 3rd cylinder drives fixed plate to move down, and then drives
Rubber slab is moved down, and rubber slab moves down to be contacted with ground, and then the 3rd cylinder is consolidated by rubber slab to the present apparatus
It is fixed.Similarly, when the present apparatus needs to move, the expansion link for starting the 3rd cylinder shortens.In this way, it can prevent the present apparatus from taking
Moved during sample, influence to sample.
Because the material of bottom plate is Q235 steel, the weight capacity of Q235 steel is strong, acidproof corrosion-resistant, adds the use of bottom plate
Life-span.
(3)Beneficial effect
It is small that the utility model has reached time saving and energy saving, labor intensity, and the dust occurred in sampling process can be purged,
The effect entered without influenceing surrounding environment.
Brief description of the drawings
Fig. 1 is the first main structure diagram of the present utility model.
Fig. 2 is the main structure diagram of the utility model elevating mechanism.
Fig. 3 is the main structure diagram of the utility model sampler.
Fig. 4 is the main structure diagram of the motor of the utility model first.
Fig. 5 is the main structure diagram of the utility model bottom plate.
Mark in accompanying drawing for:1- bottom plates, 2- montants, 3- wheels, 4- elevating mechanisms, the slide rails of 41- first, 42- first are slided
Block, 43- head rods, the connecting rods of 44- second, the cylinders of 45- first, the slide rails of 46- second, the sliding blocks of 47- second, 5- sampling dresses
Put, the slide rails of 51- the 3rd, the cylinders of 52- second, the sliding blocks of 53- the 3rd, the motors of 54- first, 55- cylinders, 56- drill heads, 6- water tanks,
7- filler pipes, 8- valves, 9- water pumps, 10- outlet pipes, 11- shower nozzles, the cylinders of 12- the 3rd, 13- fixed plates, 14- rubber slabs.
Embodiment
The utility model is further described with reference to the accompanying drawings and examples.
Embodiment 1
A kind of construction quality sampling detecting device, as Figure 1-5, include bottom plate 1, montant 2, wheel 3, elevating mechanism
4 and sampler 5, montant 2 is all installed by bolted connection, montant 2 is symmetrically sets at left and right sides of the bottom of bottom plate 1
Put, the bottom of montant 2 is provided with wheel 3 by bolted connection, and the crown center of bottom plate 1 is provided with elevating mechanism 4, elevating mechanism
4 Lift Part is provided with sampler 5.
Embodiment 2
A kind of construction quality sampling detecting device, as Figure 1-5, include bottom plate 1, montant 2, wheel 3, elevating mechanism
4 and sampler 5, montant 2 is all installed by bolted connection, montant 2 is symmetrically sets at left and right sides of the bottom of bottom plate 1
Put, the bottom of montant 2 is provided with wheel 3 by bolted connection, and the crown center of bottom plate 1 is provided with elevating mechanism 4, elevating mechanism
4 Lift Part is provided with sampler 5.
Elevating mechanism 4 includes the first slide rail 41, the first sliding block 42, head rod 43, the second connecting rod 44, the first gas
Cylinder 45, the second slide rail 46 and the second sliding block 47, the crown center of bottom plate 1 are provided with the first slide rail 41 by bolted connection,
For first slide rail 41 in being horizontally disposed with, the first slide rail 41 is provided with the first sliding block 42 coordinated with it, and the first sliding block 42 and first is slided
Rail 41 is slidably matched, and the leading flank of the first sliding block of left side 42 is provided with head rod 43 by way of pin connection, right side the
The right flank of one sliding block 42 is provided with the second connecting rod 44 by way of pin connection, and the middle part of the second connecting rod 44 is connected with first
The middle part of bar 43 is connected by way of pin connection, and the tail end of head rod 43 is provided with multiple the by way of pin connection
One connecting rod 43, the tail end of the second connecting rod 44 are provided with multiple second connecting rods 44, the first connection by way of pin connection
Bar 43 interlocks with the second connecting rod 44, and the top of 43 and second connecting rod of head rod 44 is provided with the second slide rail 46, the second slide rail
46 in being horizontally disposed with, and the second slide rail 46 is provided with the second sliding block 47 coordinated with it, and the second sliding block 47 slides with the second slide rail 46
Coordinate, be connected by way of pin connection with the tail end of the second connecting rod 44 in the middle part of the leading flank of the second sliding block of left side 47, right side the
It is connected in the middle part of the leading flank of two sliding block 47 by way of pin connection with the tail end of head rod 43, the top of the second slide rail 46 is provided with
Sampler 5, the crown center of the first slide rail 41 are provided with the first cylinder 45 by bolted connection, and the first cylinder 45 is in perpendicular
It is straight to set, the expansion link of the first cylinder 45 by way of pin connection with the connecting rod 44 of lower section head rod 43 and second
Hinged place connects.
Embodiment 3
A kind of construction quality sampling detecting device, as Figure 1-5, include bottom plate 1, montant 2, wheel 3, elevating mechanism
4 and sampler 5, montant 2 is all installed by bolted connection, montant 2 is symmetrically sets at left and right sides of the bottom of bottom plate 1
Put, the bottom of montant 2 is provided with wheel 3 by bolted connection, and the crown center of bottom plate 1 is provided with elevating mechanism 4, elevating mechanism
4 Lift Part is provided with sampler 5.
Elevating mechanism 4 includes the first slide rail 41, the first sliding block 42, head rod 43, the second connecting rod 44, the first gas
Cylinder 45, the second slide rail 46 and the second sliding block 47, the crown center of bottom plate 1 are provided with the first slide rail 41 by bolted connection,
For first slide rail 41 in being horizontally disposed with, the first slide rail 41 is provided with the first sliding block 42 coordinated with it, and the first sliding block 42 and first is slided
Rail 41 is slidably matched, and the leading flank of the first sliding block of left side 42 is provided with head rod 43 by way of pin connection, right side the
The right flank of one sliding block 42 is provided with the second connecting rod 44 by way of pin connection, and the middle part of the second connecting rod 44 is connected with first
The middle part of bar 43 is connected by way of pin connection, and the tail end of head rod 43 is provided with multiple the by way of pin connection
One connecting rod 43, the tail end of the second connecting rod 44 are provided with multiple second connecting rods 44, the first connection by way of pin connection
Bar 43 interlocks with the second connecting rod 44, and the top of 43 and second connecting rod of head rod 44 is provided with the second slide rail 46, the second slide rail
46 in being horizontally disposed with, and the second slide rail 46 is provided with the second sliding block 47 coordinated with it, and the second sliding block 47 slides with the second slide rail 46
Coordinate, be connected by way of pin connection with the tail end of the second connecting rod 44 in the middle part of the leading flank of the second sliding block of left side 47, right side the
It is connected in the middle part of the leading flank of two sliding block 47 by way of pin connection with the tail end of head rod 43, the top of the second slide rail 46 is provided with
Sampler 5, the crown center of the first slide rail 41 are provided with the first cylinder 45 by bolted connection, and the first cylinder 45 is in perpendicular
It is straight to set, the expansion link of the first cylinder 45 by way of pin connection with the connecting rod 44 of lower section head rod 43 and second
Hinged place connects.
Sampler 5 includes the 3rd slide rail 51, the second cylinder 52, the 3rd sliding block 53, the first motor 54, cylinder 55 and bored
Hole first 56, the top of the second slide rail 46 are provided with the 3rd slide rail 51 by bolted connection, and the 3rd slide rail 51 is in be horizontally disposed with,
3rd slide rail 51 is provided with the 3rd sliding block 53 coordinated with it, and the 3rd sliding block 53 is slidably matched with the 3rd slide rail 51, the 3rd sliding block
53 tops are provided with the first motor 54 by bolted connection, the first motor 54 in horizontally disposed, the first motor 54 it is defeated
Shaft is connected with drill head 56 by shaft coupling, is provided with cylinder 55 in drill head 56, the top left side of the 3rd slide rail 51 passes through bolt
The mode of connection is provided with the second cylinder 52, and in being horizontally disposed with, the expansion link of the second cylinder 52 is connected the second cylinder 52 by bolt
The mode connect in the middle part of the left surface of the 3rd sliding block 53 with being connected.
Embodiment 4
A kind of construction quality sampling detecting device, as Figure 1-5, include bottom plate 1, montant 2, wheel 3, elevating mechanism
4 and sampler 5, montant 2 is all installed by bolted connection, montant 2 is symmetrically sets at left and right sides of the bottom of bottom plate 1
Put, the bottom of montant 2 is provided with wheel 3 by bolted connection, and the crown center of bottom plate 1 is provided with elevating mechanism 4, elevating mechanism
4 Lift Part is provided with sampler 5.
Elevating mechanism 4 includes the first slide rail 41, the first sliding block 42, head rod 43, the second connecting rod 44, the first gas
Cylinder 45, the second slide rail 46 and the second sliding block 47, the crown center of bottom plate 1 are provided with the first slide rail 41 by bolted connection,
For first slide rail 41 in being horizontally disposed with, the first slide rail 41 is provided with the first sliding block 42 coordinated with it, and the first sliding block 42 and first is slided
Rail 41 is slidably matched, and the leading flank of the first sliding block of left side 42 is provided with head rod 43 by way of pin connection, right side the
The right flank of one sliding block 42 is provided with the second connecting rod 44 by way of pin connection, and the middle part of the second connecting rod 44 is connected with first
The middle part of bar 43 is connected by way of pin connection, and the tail end of head rod 43 is provided with multiple the by way of pin connection
One connecting rod 43, the tail end of the second connecting rod 44 are provided with multiple second connecting rods 44, the first connection by way of pin connection
Bar 43 interlocks with the second connecting rod 44, and the top of 43 and second connecting rod of head rod 44 is provided with the second slide rail 46, the second slide rail
46 in being horizontally disposed with, and the second slide rail 46 is provided with the second sliding block 47 coordinated with it, and the second sliding block 47 slides with the second slide rail 46
Coordinate, be connected by way of pin connection with the tail end of the second connecting rod 44 in the middle part of the leading flank of the second sliding block of left side 47, right side the
It is connected in the middle part of the leading flank of two sliding block 47 by way of pin connection with the tail end of head rod 43, the top of the second slide rail 46 is provided with
Sampler 5, the crown center of the first slide rail 41 are provided with the first cylinder 45 by bolted connection, and the first cylinder 45 is in perpendicular
It is straight to set, the expansion link of the first cylinder 45 by way of pin connection with the connecting rod 44 of lower section head rod 43 and second
Hinged place connects.
Sampler 5 includes the 3rd slide rail 51, the second cylinder 52, the 3rd sliding block 53, the first motor 54, cylinder 55 and bored
Hole first 56, the top of the second slide rail 46 are provided with the 3rd slide rail 51 by bolted connection, and the 3rd slide rail 51 is in be horizontally disposed with,
3rd slide rail 51 is provided with the 3rd sliding block 53 coordinated with it, and the 3rd sliding block 53 is slidably matched with the 3rd slide rail 51, the 3rd sliding block
53 tops are provided with the first motor 54 by bolted connection, the first motor 54 in horizontally disposed, the first motor 54 it is defeated
Shaft is connected with drill head 56 by shaft coupling, is provided with cylinder 55 in drill head 56, the top left side of the 3rd slide rail 51 passes through bolt
The mode of connection is provided with the second cylinder 52, and in being horizontally disposed with, the expansion link of the second cylinder 52 is connected the second cylinder 52 by bolt
The mode connect in the middle part of the left surface of the 3rd sliding block 53 with being connected.
Also include water tank 6, filler pipe 7, valve 8, water pump 9, outlet pipe 10 and shower nozzle 11, the top of the first motor 54 passes through
Bolted mode is provided with water tank 6, and the top left side of water tank 6 is connected with filler pipe 7, and filler pipe 7 adds with being connected in water tank 6
Water pipe 7 is provided with valve 8, is provided with water pump 9 by bolted connection on the right side of the inner bottom part of water tank 6, is connected with out on water pump 9
Water pipe 10, the tail end of outlet pipe 10 run through the lower right side of water tank 6, and the tail end of outlet pipe 10 is provided with shower nozzle by bolted connection
11, shower nozzle 11 is located at the upper left side of drill head 56.
Also include the 3rd cylinder 12, fixed plate 13 and rubber slab 14, the side being bolted in the middle part of the left surface of bottom plate 1
Formula is provided with the 3rd cylinder 12, and the 3rd cylinder 12 is inclined to set, and the expansion link of the 3rd cylinder 12 is by way of pin connection
Fixed plate 13 is installed, the bottom of fixed plate 13 is provided with rubber slab 14 by bolted connection.
The material of bottom plate 1 is Q235 steel.
Operation principle:Operating personnel move the present apparatus to the wall side for needing to sample by wheel 3 first, and fill sampling
The sampled part for putting 5 faces wall, you can and start sampler 5 and concrete within the walls is sampled, meanwhile, lifting can be started
Mechanism 4, the Lift Part of elevating mechanism 4 drives sampler 5 to move up and down, and then no place within the walls is sampled.
After the completion of concrete sampling within the walls, sampler 5 and elevating mechanism 4 are closed, you can take concrete out of sampler 5
Go out to be detected.
Because elevating mechanism 4 includes the first slide rail 41, the first sliding block 42, head rod 43, the second connecting rod 44,
One cylinder 45, the second slide rail 46 and the second sliding block 47, the crown center of bottom plate 1 are provided with the first slide rail by bolted connection
41, for the first slide rail 41 in being horizontally disposed with, the first slide rail 41 is provided with the first sliding block 42 coordinated with it, the first sliding block 42 and first
Slide rail 41 is slidably matched, and the leading flank of the first sliding block of left side 42 is provided with head rod 43, right side by way of pin connection
The right flank of first sliding block 42 is provided with the second connecting rod 44 by way of pin connection, and the middle part of the second connecting rod 44 connects with first
The middle part of extension bar 43 is connected by way of pin connection, and the tail end of head rod 43 is provided with multiple by way of pin connection
Head rod 43, the tail end of the second connecting rod 44 are provided with multiple second connecting rods 44 by way of pin connection, and first connects
Extension bar 43 interlocks with the second connecting rod 44, and the top of 43 and second connecting rod of head rod 44 is provided with the second slide rail 46, and second slides
For rail 46 in being horizontally disposed with, the second slide rail 46 is provided with the second sliding block 47 coordinated with it, and the second sliding block 47 is slided with the second slide rail 46
It is dynamic to coordinate, it is connected in the middle part of the leading flank of the second sliding block of left side 47 by way of pin connection with the tail end of the second connecting rod 44, right side
It is connected in the middle part of the leading flank of second sliding block 47 by way of pin connection with the tail end of head rod 43, the top of the second slide rail 46 is set
There is sampler 5, the crown center of the first slide rail 41 is provided with the first cylinder 45 by bolted connection, and the first cylinder 45 is in
Be vertically arranged, the expansion link of the first cylinder 45 by way of pin connection with the connecting rod 44 of lower section head rod 43 and second
Hinged place connection, when need to no place is sampled within the walls when, operating personnel can start the flexible of the first cylinder 45
Bar moves up and down, and the expansion link of the first cylinder 45, which moves up and down, drives the connecting rod 44 of head rod 43 and second to move left and right,
First slide rail 41 play the guiding role with the second sliding block 47, and the connecting rod 44 of head rod 43 and second fits through the second sliding block 47
Drive the second slide rail 46 to move up and down, and then drive sampler 5 to move up and down, need what is sampled when sampler 5 is moved to
During position, you can the first cylinder 45 is closed, starts sampler 5 and concrete within the walls is sampled, close sampler 5,
Starting the first cylinder 45 makes sampler 5 recover to original position, you can takes out concrete out of sampler 5.
Because sampler 5 includes the 3rd slide rail 51, the second cylinder 52, the 3rd sliding block 53, the first motor 54, cylinder 55
With drill head 56, the top of the second slide rail 46 is provided with the 3rd slide rail 51 by bolted connection, and the 3rd slide rail 51 is in level
Setting, the 3rd slide rail 51 is provided with the 3rd sliding block 53 coordinated with it, and the 3rd sliding block 53 is slidably matched with the 3rd slide rail 51, and the 3rd
The top of sliding block 53 is provided with the first motor 54 by bolted connection, and the first motor 54 is in horizontally disposed, the first motor 54
Output shaft drill head 56 is connected with by shaft coupling, is provided with cylinder 55 in drill head 56, the top left side of the 3rd slide rail 51 passes through
Bolted mode is provided with the second cylinder 52, and for the second cylinder 52 in being horizontally disposed with, the expansion link of the second cylinder 52 passes through spiral shell
The mode connect is tethered with being connected in the middle part of the left surface of the 3rd sliding block 53, when drill head 56, which is located at, specifies sample position, operating personnel
The first motor 54 can be started to rotate, the first motor 54, which rotates, drives drill head 56 to rotate, and then drives cylinder 55 to rotate, you can
The expansion link for starting the second cylinder 52 moves right, and the expansion link of the second cylinder 52, which moves right, drives the 3rd sliding block 53 to move right
Dynamic, the 3rd sliding block 53, which moves right, drives the first motor 54 to move right, and then drives drill head 56 to move right, drill head 56
Move right and wall is drilled, and then concrete within the walls is fallen in cylinder 55.Similarly, when concrete is located at cylinder 55
When interior, you can the expansion link for starting the second cylinder 52 is moved to the left, and then drives drill head 56 to be moved to the left from departing within the walls, is closed
Close the second cylinder 52 and the first motor 54, you can the concrete in slurry cylinder 55, which takes out, to be detected.
Because also including water tank 6, filler pipe 7, valve 8, water pump 9, outlet pipe 10 and shower nozzle 11, the top of the first motor 54
Water tank 6 is installed by bolted connection, the top left side of water tank 6 is connected with filler pipe 7, and filler pipe 7 in water tank 6 with connecting
Logical, filler pipe 7 is provided with valve 8, is provided with water pump 9 by bolted connection on the right side of the inner bottom part of water tank 6, connects on water pump 9
Outlet pipe 10 is connected to, the tail end of outlet pipe 10 runs through the lower right side of water tank 6, and the tail end of outlet pipe 10 is installed by bolted connection
There is shower nozzle 11, shower nozzle 11 is located at the upper left side of drill head 56, and operating personnel first open valve 8, and water is poured into water by filler pipe 7
In case 6, valve 8 is closed.While drill head 56 carries out drill hole sampling to wall, operating personnel can start water pump 9, water pump 9
Water in water tank 6 is pumped into outlet pipe 10, and then the water in outlet pipe 10 is sprayed by shower nozzle 11, water is sprayed to sampling process
The dust of middle appearance is purged.After the completion of sampling, 9 are switched off the pump.In this way, the dust occurred in sampling process is entered
Row is removed, and can prevent dust from influenceing surrounding environment.
Because also including the 3rd cylinder 12, fixed plate 13 and rubber slab 14, it is bolted in the middle part of the left surface of bottom plate 1
Mode the 3rd cylinder 12 is installed, the 3rd cylinder 12 is inclined to set, what the expansion link of the 3rd cylinder 12 was connected by pin
Mode is provided with fixed plate 13, and the bottom of fixed plate 13 is provided with rubber slab 14 by bolted connection, when the present apparatus moves
When beside to wall, operating personnel start the expansion link elongation of the 3rd cylinder 12, and the expansion link elongation of the 3rd cylinder 12 drives
Fixed plate 13 is moved down, and then drives rubber slab 14 to move down, and rubber slab 14 moves down to be contacted with ground, and then the 3rd
The present apparatus is fixed by rubber slab 14 for cylinder 12.Similarly, when the present apparatus needs to move, stretching for the 3rd cylinder 12 is started
Contracting bar shortens.In this way, can prevent the present apparatus from moving in sampling process, influence to sample.
Because the material of bottom plate 1 is Q235 steel, the weight capacity of Q235 steel is strong, acidproof corrosion-resistant, adds making for bottom plate 1
Use the life-span.
Embodiment described above only expresses preferred embodiment of the present utility model, and its description is more specific and detailed,
But therefore it can not be interpreted as the limitation to the utility model patent scope.It should be pointed out that for the common of this area
For technical staff, without departing from the inventive concept of the premise, some deformations can also be made, improves and substitutes, these are all
Belong to the scope of protection of the utility model.Therefore, the protection domain of the utility model patent should be determined by the appended claims.
Claims (6)
1. a kind of construction quality sampling detecting device, it is characterised in that include bottom plate(1), montant(2), wheel(3), lifting
Mechanism(4)And sampler(5), bottom plate(1)Montant is all installed by bolted connection at left and right sides of bottom(2), erect
Bar(2)To be symmetrical arranged, montant(2)Bottom is provided with wheel by bolted connection(3), bottom plate(1)Crown center is set
There is elevating mechanism(4), elevating mechanism(4)Lift Part be provided with sampler(5).
A kind of 2. construction quality sampling detecting device according to claim 1, it is characterised in that elevating mechanism(4)Including
There is the first slide rail(41), the first sliding block(42), head rod(43), the second connecting rod(44), the first cylinder(45), second slide
Rail(46)With the second sliding block(47), bottom plate(1)Crown center is provided with the first slide rail by bolted connection(41), first
Slide rail(41)In horizontally disposed, the first slide rail(41)It is provided with the first sliding block coordinated with it(42), the first sliding block(42)With
One slide rail(41)It is slidably matched, the sliding block of left side first(42)Leading flank is provided with head rod by way of pin connection
(43), the sliding block of right side first(42)Right flank is provided with the second connecting rod by way of pin connection(44), the second connecting rod
(44)Middle part and head rod(43)Middle part is connected by way of pin connection, head rod(43)Tail end passes through pin
The mode of connection is provided with multiple head rods(43), the second connecting rod(44)Tail end is provided with by way of pin connection
Multiple second connecting rods(44), head rod(43)With the second connecting rod(44)Staggeredly, head rod(43)Connect with second
Extension bar(44)Top is provided with the second slide rail(46), the second slide rail(46)In horizontally disposed, the second slide rail(46)It is provided with and matches somebody with somebody with it
The second sliding block closed(47), the second sliding block(47)With the second slide rail(46)It is slidably matched, the sliding block of left side second(47)In leading flank
Portion pin connection by way of with the second connecting rod(44)Tail end connects, the sliding block of right side second(47)Pass through pin in the middle part of leading flank
Follow closely the mode and head rod of connection(43)Tail end connects, the second slide rail(46)Top is provided with sampler(5), the first slide rail
(41)Crown center is provided with the first cylinder by bolted connection(45), the first cylinder(45)In being vertically arranged, first
Cylinder(45)Expansion link pin connection by way of with lower section head rod(43)With the second connecting rod(44)It is be hinged
Place's connection.
A kind of 3. construction quality sampling detecting device according to claim 2, it is characterised in that sampler(5)Including
There is the 3rd slide rail(51), the second cylinder(52), the 3rd sliding block(53), the first motor(54), cylinder(55)And drill head(56), the
Two slide rails(46)Top is provided with the 3rd slide rail by bolted connection(51), the 3rd slide rail(51)In horizontally disposed, the
Three slide rails(51)It is provided with the 3rd sliding block coordinated with it(53), the 3rd sliding block(53)With the 3rd slide rail(51)It is slidably matched, the
Three sliding blocks(53)Top is provided with the first motor by bolted connection(54), the first motor(54)In horizontally disposed, the
One motor(54)Output shaft drill head is connected with by shaft coupling(56), drill head(56)It is interior to be provided with cylinder(55), the 3rd slides
Rail(51)Top left side is provided with the second cylinder by bolted connection(52), the second cylinder(52)In horizontally disposed, the
Two cylinders(52)Expansion link by bolted connection with the 3rd sliding block(53)Connected in the middle part of left surface.
4. a kind of construction quality sampling detecting device according to claim 3, it is characterised in that also include water tank(6)、
Filler pipe(7), valve(8), water pump(9), outlet pipe(10)And shower nozzle(11), the first motor(54)What top was bolted
Mode is provided with water tank(6), water tank(6)Top left side is connected with filler pipe(7), filler pipe(7)With water tank(6)Interior connection, adds
Water pipe(7)It is provided with valve(8), water tank(6)Water pump is installed by bolted connection on the right side of inner bottom part(9), water pump(9)
On be connected with outlet pipe(10), outlet pipe(10)Tail end runs through water tank(6)Lower right side, outlet pipe(10)Tail end is connected by bolt
The mode connect is provided with shower nozzle(11), shower nozzle(11)Positioned at drill head(56)Upper left side.
5. a kind of construction quality sampling detecting device according to claim 4, it is characterised in that also include the 3rd cylinder
(12), fixed plate(13)And rubber slab(14), bottom plate(1)The 3rd cylinder is installed by bolted connection in the middle part of left surface
(12), the 3rd cylinder(12)It is inclined to set, the 3rd cylinder(12)Expansion link pin connection by way of fixation is installed
Plate(13), fixed plate(13)Bottom is provided with rubber slab by bolted connection(14).
A kind of 6. construction quality sampling detecting device according to claim 5, it is characterised in that bottom plate(1)Material be
Q235 steel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720858856.1U CN206945335U (en) | 2017-07-16 | 2017-07-16 | A kind of construction quality sampling detecting device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720858856.1U CN206945335U (en) | 2017-07-16 | 2017-07-16 | A kind of construction quality sampling detecting device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206945335U true CN206945335U (en) | 2018-01-30 |
Family
ID=61369862
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720858856.1U Expired - Fee Related CN206945335U (en) | 2017-07-16 | 2017-07-16 | A kind of construction quality sampling detecting device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206945335U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108801726A (en) * | 2018-04-13 | 2018-11-13 | 重庆市綦江区建筑工程质量监督站 | A kind of construction engineering test is with cutting core sample making apparatus |
CN108871853A (en) * | 2018-08-28 | 2018-11-23 | 杜鑫 | A kind of construction deep soil sampler |
CN110333099A (en) * | 2019-07-17 | 2019-10-15 | 邓潇俊 | A kind of biological monitoring water sampling unit being convenient for carrying |
-
2017
- 2017-07-16 CN CN201720858856.1U patent/CN206945335U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108801726A (en) * | 2018-04-13 | 2018-11-13 | 重庆市綦江区建筑工程质量监督站 | A kind of construction engineering test is with cutting core sample making apparatus |
CN108871853A (en) * | 2018-08-28 | 2018-11-23 | 杜鑫 | A kind of construction deep soil sampler |
CN110333099A (en) * | 2019-07-17 | 2019-10-15 | 邓潇俊 | A kind of biological monitoring water sampling unit being convenient for carrying |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103016044B (en) | Comprehensive method of drilling, permeability increasing, repairing and gas-driven displacing of drill hole underground coal mine | |
CN206945335U (en) | A kind of construction quality sampling detecting device | |
CN105507927B (en) | Air bag inner model mobile formwork and Tunnel construction of shotcrete method | |
CN106836222A (en) | A kind of high ferro cushion cap pile crown girdling machine | |
CN106994520A (en) | A kind of rapid drilling equipment for handware | |
CN107377436A (en) | A kind of pile foundation construction worker safety helmet purpose-built washing equipment | |
CN107127171A (en) | A kind of traffic bridge roadblock device for high-efficiency cleaning | |
CN107059747A (en) | A kind of quick dust falling device of construction | |
CN104832082A (en) | Pneumatic DTH hammer reverse circulation slagging construction process for rotary drilling rig | |
CN206882361U (en) | A kind of internal medicine inspection test tube cleaning device | |
CN206010594U (en) | A kind of sheet metal drilling hole machine tool | |
CN206570592U (en) | A kind of grey dust remover of energy-saving clothing | |
CN107409501A (en) | A kind of agricultural planting loosening device | |
CN213654762U (en) | Track grouting reinforcement drilling machine | |
CN111962658A (en) | Intelligent municipal road sewer decontamination dredging device and method | |
CN108547638B (en) | A kind of lining concrete adjustable type watering device of constructing tunnel | |
CN214952288U (en) | Ore sample collecting device for geological exploration | |
CN206232583U (en) | Harbour sludge treatment solidification brick making device | |
CN212688729U (en) | Moisturizing device for bridge engineering maintenance | |
CN210264508U (en) | Punching device for coal mining | |
CN106836224A (en) | A kind of railway construction Stake head handling machine | |
CN206233887U (en) | Jumbolter dust arrester | |
CN111101854A (en) | Small-size safe drilling equipment in oil field | |
CN105370236B (en) | Blowout prevention aperture apparatus and drilling rig | |
CN217421060U (en) | Interlocking piece bank protection stock drilling equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180130 Termination date: 20180716 |
|
CF01 | Termination of patent right due to non-payment of annual fee |