CN206232583U - Harbour sludge treatment solidification brick making device - Google Patents

Harbour sludge treatment solidification brick making device Download PDF

Info

Publication number
CN206232583U
CN206232583U CN201621260322.0U CN201621260322U CN206232583U CN 206232583 U CN206232583 U CN 206232583U CN 201621260322 U CN201621260322 U CN 201621260322U CN 206232583 U CN206232583 U CN 206232583U
Authority
CN
China
Prior art keywords
mud
suction nozzle
making device
brick making
slide rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621260322.0U
Other languages
Chinese (zh)
Inventor
沈良朵
陈维
赵西增
王晋宝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Ocean University ZJOU
Original Assignee
Zhejiang Ocean University ZJOU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Ocean University ZJOU filed Critical Zhejiang Ocean University ZJOU
Priority to CN201621260322.0U priority Critical patent/CN206232583U/en
Application granted granted Critical
Publication of CN206232583U publication Critical patent/CN206232583U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Treatment Of Sludge (AREA)

Abstract

Harbour sludge treatment solidification brick making device, hold cabin (6), hydraulic pressure moving platform (8) and middle roll-over (40) including hydraulic lifting slide rail (4), deposition, it is characterized in that, the hydraulic lifting slide rail (4) installed in elevating control platform (5) above, suction nozzle (1) is installed on hydraulic lifting slide rail (4), the suction nozzle (1) and deposition are connected with mud-water conveying pipe (3) between holding cabin (6), and suction nozzle (1) is provided with rubber and is connected overcoat (2) with the junction of mud-water conveying pipe (3);The beneficial effects of the utility model:The utility model device is processed by absorbing and directly carrying out being sent directly into brickmaking after curing process the mud at harbour, is changed into construction material, while can produce in enormous quantities, meet technically and in the market production in enormous quantities demand, be adapted to promote the use of.

Description

Harbour sludge treatment solidification brick making device
Technical field
The utility model is related to a kind of harbour sludge treatment solidification brick making device, belongs to port and pier field.
Background technology
Harbor approach is desilted and dredged can all produce substantial amounts of dredged mud, the various methods for the treatment of dredged mud, including sea at present Facture, drainage position logos, curing process method, heating method, vacuum electroosmosis and the compacted Combined Treatment method of power are toppled in ocean, and Analyze its feature ocean dumping factures simple and convenient, but be negatively affected drainage position logos to the marine eco-environment can To reduce the water content of dredged mud, but pollutant therein can not be removed, secondary pollution curing process methods can be caused to exist to environment The dissolution rate of pollutant is slow down while solidification dredged mud, can be reduced and method is heated to the secondary pollution of surrounding environment Dredged mud is dehydrated, construction material is changed into, the regenerated resources of dredged mud can be realized, but process the energy of extensive dredged mud Power can fast and efficiently discharge large quantity of moisture and pollutant in dredged mud less than the true electric osmoses of and the compacted Combined Treatment method of power, And it is cheap, have broad application prospects and larger promotional value.
Notification number is for mixing cured method, control device in a kind of CN105401569A is disclosed dredging mud pipe and its is System.Dredged mud curing of the present utility model, control device and its system by obtaining the dredged mud in whipping process in real time Density value, so as to according to the density value come control to adjust injection dredged mud in water injection rate;By obtaining air pressure in real time Value, and the size of input air pressure is controlled to adjust according to it, so as to ensure optimal mixed effect;By obtaining gas-solid-liquid in real time The mass flow parameter of three-phase mixed flow, with the mass flow of the curing agent according to its control addition, so as to ensure further guarantor Card mixed effect, whole dredged mud solidification process all automatically controls completion, it is not necessary to the intervention of staff, not only reduces The labour intensity of staff, it also avoid causing solidification process to fail because of human factor, improve operating efficiency.
Another notification number for CN105951908A is disclosed, deepen by dredging device, including defeated mud hose by a kind of wharf apron, described Defeated mud hose one end connection is laid in the silt collecting box above sludge treatment platform;The silt trap includes fixed branch Frame, horizontal turbine propulsion device and vertical turbine buoyancy device are laid in fixed support, and mud is collected frame and is movably arranged on admittedly On fixed rack, rear side is connected with rocker, and hydraulic cylinder is fixed on rocker by alignment pin and drives mud collection frame to swing up and down; The beneficial effects of the utility model:The utility model can be rapidly and efficiently the mud to navigation channel dredge, while dredging Treatment recycling can be carried out to mud simultaneously, speed is fast, and low cost is adapted to promote the use of.
At present, the sludge treatment to harbour is all in resting on experiment and envisioning, not set accordingly as construction material It is standby that batch production batch operation is carried out to it.
Utility model content
The utility model overcomes the problem of prior art presence, it is proposed that a kind of harbour sludge treatment solidifies brick making device And its construction method, the device carries out by absorbing and directly carrying out being sent directly into brickmaking after curing process the mud at harbour Processing, is changed into construction material, low-carbon environment-friendly.
Concrete technical scheme of the present utility model is as follows:
Harbour sludge treatment solidification brick making device, including hydraulic lifting slide rail, deposition hold cabin, hydraulic pressure moving platform and middle roll-over, Characterized in that, the hydraulic lifting slide rail is arranged on above elevating control platform, suction nozzle is installed on hydraulic lifting slide rail, it is described Suction nozzle and deposition are connected with mud-water conveying pipe between holding cabin, and suction nozzle is provided with rubber and is connected outer with the junction of mud-water conveying pipe Set;
The hydraulic pressure moving platform is rack-mount, and the side of support is provided with rollover stand, and tempering tank is arranged on the rollover stand On, drainage bucket is installed in the tempering tank, rotating disk is installed between the bottom of the drainage bucket and tempering tank;The top of drainage bucket Portion is uniformly provided with fixture block, and the draw-in groove snapped in for fixture block is provided with bung, and up and down motion is provided with the hydraulic pressure moving platform Hydraulic cylinder, is provided with the rotating extensible arm being connected with bung on the sliding block;It is provided with the bung for the recessed of bayonet lock insertion Groove;The motor two of the rotation batch turning for driving tempering tank is installed on the rollover stand, curing agent adding tube is connected with bung;
Delivery pipe is connected between the deposition appearance cabin and middle roll-over, preliminary drainage is connected between drainage bucket and middle roll-over Mud delivery pipe, the drainage bucket is equipped with drainpipe and is connected with filter water buffer storage with middle roll-over;Under the rollover stand Portion is ramp structure, and its discharge end is provided with filter mud and topples over funnel;The discharging opening that the mud topples over funnel is provided with module brickmaking dress Put.
Preferentially, the universal bar that motor is rotated is installed, filtering head is arranged on the top of universal bar inside the suction nozzle Portion, is provided with that trowel is scraped in inside and trowel is scraped in outside on the universal bar, the inner side edge that trowel extends to suction nozzle is scraped in the inside The outside that trowel extends to suction nozzle is scraped in edge, outside, and impurity buffer area is provided between suction nozzle and rubber connection overcoat.
Preferentially, the suction nozzle top is also equipped with high pressure and rushes injection device, and the high-pressure injection device is cached with filter water Water-supply-pipe is connected between device.
Based on said apparatus, the utility model additionally provides a kind of harbour sludge treatment solidification brickmaking construction method, and it is special Levy and be, comprise the following steps:
1) suction nozzle is placed at the mud of harbour bottom, starts high pressure sucking pump and drive suction nozzle to start to inhale silt operation, together When inside scrape trowel and it is outside scrape trowel ceaselessly mud operation cut in rotation under the drive of universal bar, prevent suction nozzle to be plugged, Stirring simultaneously makes the mud being inhaled into uniform;
2) mud being inhaled into is sent into after deposition appearance cabin by mud-water conveying pipe, is sensed by depositing the weight held in cabin Device is sensed, reach after constant weight by sucking pump drive along delivery pipe send into deposit in roll-over, part water body leads to Drainpipe is crossed to be drained into filter water buffer storage;
3) mud in roll-over is again by sucking pump in preliminary drainage mud delivery pipe feeding drainage bucket;First Step:Hydraulic cylinder is rotated expansion link decline to be made to make the draw-in groove on bung clasp fixture block first;Second step:Hydraulic cylinder constantly declines Rotating extensible arm is set to be under pressure rotation so as to drive drainage bucket that water dumping is rotated in tempering tank, water body is drained into by drainpipe In filter water buffer storage;3rd step:When hydraulic cylinder drops to bottommost, i.e., rotating extensible arm be punctured into it is most short, now In the groove of bayonet lock insertion, hydraulic cylinder last time starts to return, and now bung is driven and leaves, and tempering tank is opened, tempering tank quilt Motor on rollover stand drives Tilting;At the same time, hydraulic cylinder continues last time, and rotating extensible arm elongation in the process is Most long, rotating extensible arm turns again to the reset condition of the first step;Continuous repeat step one, two and three, by the silt after dehydration Mud is poured on the slope of rollover stand;
4) mud falls into filter mud and topples over and be admitted to module brick making device after funnel and carry out brickmaking along slope, has constructed Into.
The beneficial effects of the utility model:The utility model device is by the way that the mud at harbour is absorbed and is directly consolidated Brickmaking is sent directly into after change treatment to be processed, is changed into construction material, while can produce in enormous quantities, meet technical and city The demand produced in enormous quantities on field, is adapted to promote the use of.
Brief description of the drawings
Fig. 1 is the structural representation that the utility model harbour sludge treatment solidifies brick making device;
Fig. 2 is the structural representation of suction nozzle;
Fig. 3 is the structural representation of drainage bucket;
Fig. 4 snaps in the structural representation of draw-in groove for the fixture block of bung.
Specific embodiment
Embodiment 1
As illustrated, harbour sludge treatment solidification brick making device, including hydraulic lifting slide rail 4, deposition hold cabin 6, hydraulic pressure cunning Platform 8 and middle roll-over 40, the hydraulic lifting slide rail 4 are arranged on above elevating control platform 5, and suction is provided with hydraulic lifting slide rail 4 First 1, mud-water conveying pipe 3 is connected between the suction nozzle 1 and deposition appearance cabin 6, suction nozzle 1 is set with the junction of mud-water conveying pipe 3 There is rubber to connect overcoat 2.The universal bar 16 that motor is rotated is installed, filtering head is arranged on universal bar 16 inside suction nozzle 1 Top, is provided with that trowel 18 is scraped in inside and trowel 17 is scraped in outside on the universal bar 16, the inside is scraped trowel 18 and extends to suction The outside that trowel 17 extends to suction nozzle 1 is scraped in first 1 inside edge, outside, and impurity is provided between suction nozzle 1 and rubber connection overcoat 2 Buffer area 30 is used for depositing the debris for getting lodged in suction nozzle.
Additionally, the top of suction nozzle 1 is also equipped with high pressure rushes injection device 19, the high-pressure injection device 19 caches dress with filter water Water-supply-pipe 15 is connected between putting 12.When suction nozzle 1 dredges mud layer into deep layer because moisture content less (can according to pipeline flow, Flow rate detection feed back and obtain), device cannot silt dredging when, high-pressure injection device 19 carries out injection high-pressure water body by setting opening, Mud is washed open, the effect that special status aids in silt dredging operation is reached.Additionally, high-pressure injection device 19 can also connect high pressure Air pump, is washed open by gas
Hydraulic pressure moving platform 8 is rack-mount, and the side of support is provided with rollover stand 11, and tempering tank is arranged on the rollover stand 11 On, drainage bucket 31 is installed in the tempering tank, rotating disk 26 is installed between the bottom of the drainage bucket 31 and tempering tank, so When drainage bucket 31 rotates, tempering tank is motionless, and drainage bucket 31 is provided with and has been uniformly arranged apopore, is rotated when drainage bucket 31 When, the water being thrown out of is discharged by drainpipe 33 again after initially entering tempering tank.
The top of drainage bucket 31 is uniformly provided with fixture block 25, and the draw-in groove 29 snapped in for fixture block 25, institute are provided with bung 27 The hydraulic cylinder 20 that up and down motion is provided with hydraulic pressure moving platform 8 is stated, the rotation being connected with bung 27 is installed on the sliding block 20 and is stretched Contracting bar 21;When sliding block 20 is moved downward applies pressure to rotating extensible arm 21, rotating extensible arm 21 shrinks rotation, when sliding block 20 Rotating extensible arm 21 can again be elongated and return to initial position by motion upwards, the knot of this structural principle and hand-pressing rotary mop Structure principle is identical, belongs to prior art, will not be repeated here.Groove 24 for the insertion of bayonet lock 28 is installed on bung 27;It is described The motor two of the rotation batch turning for driving tempering tank is installed on rollover stand 11, curing agent adding tube 23 is connected with bung 27.
Delivery pipe 13 is connected between the deposition appearance cabin 6 and middle roll-over 40, is connected between drainage bucket 31 and middle roll-over 40 Have preliminary drainage mud delivery pipe 7, preliminary drainage mud delivery pipe 7 is installed above flowmeter, by flow, flow velocity it is right Than feedback, the moisture content of dredged mud can be analyzed, so that control platform is adjusted is input into the defeated of curing agent in drainage bucket 31 The amount of sending.The drainage bucket 31 is equipped with drainpipe 33 and is connected with filter water buffer storage 12 with middle roll-over 40;The rollover stand 11 Bottom be ramp structure, its discharge end is provided with filter mud and topples over funnel 9;The discharging opening that the mud topples over funnel 9 is provided with module Brick making device 10.
Based on said apparatus, the utility model additionally provides a kind of harbour sludge treatment solidification brickmaking construction method, and it is special Levy and be, comprise the following steps:
1) suction nozzle 1 is placed at the mud of harbour bottom, starts high pressure sucking pump and drive suction nozzle 1 to start to inhale silt operation, It is simultaneously internal scrape trowel 18 and it is outside scrape trowel 17 ceaselessly mud operation cut in rotation under the drive of universal bar 16, prevent suction nozzle 1 is plugged, while stirring makes the mud being inhaled into uniform;
2) mud being inhaled into is sent into after deposition appearance cabin 6 by mud-water conveying pipe 3, by depositing the weight held in cabin 6 Sensor is sensed, reach after constant weight by sucking pump drive along delivery pipe 13 send into deposition, portion in roll-over 40 Water body is divided to be drained into filter water buffer storage 12 by drainpipe;
3) mud in roll-over 40 is again by sucking pump in preliminary drainage mud delivery pipe 7 feeding drainage bucket 31; The first step:Hydraulic cylinder 20 is rotated the decline of expansion link 21 makes to make first the draw-in groove 29 on bung 27 to clasp fixture block 25;Second step: Hydraulic cylinder 20 constantly declines makes rotating extensible arm 21 be under pressure rotation so as to drive drainage bucket 31 that water dumping is rotated in tempering tank, Water body is drained into filter water buffer storage 12 by drainpipe;3rd step:When hydraulic cylinder 20 drops to bottommost, that is, rotate Being punctured into for expansion link 21 is most short, and in the groove 24 of the now insertion of bayonet lock 28, the last time of hydraulic cylinder 20 starts to return, now bung 27 It is driven and leaves, tempering tank is opened, the motor that tempering tank is reversed on frame 11 drives Tilting;At the same time, hydraulic cylinder 20 continue last time, and the elongation of rotating extensible arm 21 in the process is most long, and rotating extensible arm 21 turns again to the original of the first step State;Continuous repeat step one, two and three, the mud after dehydration is poured on the slope of rollover stand 11;
4) mud falls into filter mud and topples over and be admitted to module brick making device 10 after funnel 9 and carry out brickmaking along slope, constructs Complete.
In addition to the implementation, the utility model can also have other embodiment.All use equivalents or equivalent change The technical scheme to be formed is changed, the protection domain of the utility model requirement is all fallen within.

Claims (3)

1. harbour sludge treatment solidification brick making device, including hydraulic lifting slide rail (4), deposition hold cabin (6), hydraulic pressure moving platform (8) and Middle roll-over (40), it is characterised in that the hydraulic lifting slide rail (4) installed in elevating control platform (5) above, hydraulic lifting slide rail (4) suction nozzle (1) is installed, the suction nozzle (1) and deposition are held and be connected between cabin (6) mud-water conveying pipe (3) on, suction nozzle (1) with The junction of mud-water conveying pipe (3) is provided with rubber and connects overcoat (2);
The hydraulic pressure moving platform (8) is rack-mount, and the side of support is provided with rollover stand (11), and tempering tank is arranged on the upset On frame (11), drainage bucket (31) is installed in the tempering tank, is provided between the bottom of drainage bucket (31) and tempering tank Rotating disk (26);The top of drainage bucket (31) is uniformly provided with fixture block, and ((25), confession fixture block is provided with bung (27), and ((25) snap in Draw-in groove (29), the hydraulic cylinder (20) of up and down motion is installed on the hydraulic pressure moving platform (8), be provided with the sliding block (20) with The rotating extensible arm (21) of bung (27) connection;Groove (24) for bayonet lock (28) insertion is installed on the bung (27);Institute The motor two that the rotation batch turning for driving tempering tank is provided with rollover stand (11) is stated, bung is connected with curing agent adding tube on (27) (23);
The deposition is held delivery pipe (13) is connected between cabin (6) and middle roll-over (40), drainage bucket (31) and middle roll-over (40) it Between be connected with preliminary drainage mud delivery pipe (7), drainage bucket (31) is equipped with drainpipe (33) and mistake with middle roll-over (40) Drainage buffer storage (12) is connected;The bottom of the rollover stand (11) is ramp structure, and its discharge end is provided with filter mud and topples over funnel (9);The discharging opening that the mud topples over funnel (9) is provided with module brick making device (10).
2. harbour sludge treatment as claimed in claim 1 solidifies brick making device, it is characterised in that peace inside the suction nozzle (1) The universal bar (16) being rotated equipped with motor, filtering head is arranged on the top of universal bar (16), pacifies on the universal bar (16) Trowel (18) being scraped equipped with inside and trowel (17) being scraped in outside, the inside edge that trowel (18) extends to suction nozzle (1) is scraped in the inside, The outside that trowel (17) extends to suction nozzle (1) is scraped in outside, and suction nozzle (1) is provided with impurity buffer area between overcoat (2) is connected with rubber (30)。
3. harbour sludge treatment as claimed in claim 1 or 2 solidifies brick making device, it is characterised in that suction nozzle (1) top It is also equipped with high pressure and rushes injection device (19), is connected between the high-pressure injection device (19) and filter water buffer storage (12) defeated Water pipe (15).
CN201621260322.0U 2016-11-21 2016-11-21 Harbour sludge treatment solidification brick making device Expired - Fee Related CN206232583U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621260322.0U CN206232583U (en) 2016-11-21 2016-11-21 Harbour sludge treatment solidification brick making device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621260322.0U CN206232583U (en) 2016-11-21 2016-11-21 Harbour sludge treatment solidification brick making device

Publications (1)

Publication Number Publication Date
CN206232583U true CN206232583U (en) 2017-06-09

Family

ID=58979539

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621260322.0U Expired - Fee Related CN206232583U (en) 2016-11-21 2016-11-21 Harbour sludge treatment solidification brick making device

Country Status (1)

Country Link
CN (1) CN206232583U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106430881A (en) * 2016-11-21 2017-02-22 浙江海洋大学 Port sludge treatment curing brickmaking apparatus and construction method thereof
CN113402134A (en) * 2021-06-02 2021-09-17 大连大学 Silt solidification treatment device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106430881A (en) * 2016-11-21 2017-02-22 浙江海洋大学 Port sludge treatment curing brickmaking apparatus and construction method thereof
CN113402134A (en) * 2021-06-02 2021-09-17 大连大学 Silt solidification treatment device

Similar Documents

Publication Publication Date Title
CN105926701B (en) Harbour sludge treatment device and its processing method
CN106930226B (en) A kind of beach rubbish clears up vehicle and its method for cleaning automatically
CN110042914A (en) A kind of canal reactor pipe network dredging robot
CN206232583U (en) Harbour sludge treatment solidification brick making device
CN203546783U (en) Fish-pond dredging device
CN206800494U (en) A kind of negative pressure transportation formula dredging robot
CN106120921A (en) A kind of lake, park underwater sludge cleaning system and method
CN107497742A (en) A kind of suitable fruitlet class Chinese medicine flexible cleaning device and its application
CN206866419U (en) A kind of beach is multi-functional to adopt razor clam car
CN207469202U (en) A kind of algae water filtration device with multistage filtering
CN207538100U (en) A kind of Novel water conservancy project Accrete clearing device
CN105926697B (en) Waterway dredging device and its process for treating sludge
CN105951908B (en) Wharf apron is deepened by dredging device
CN107006439A (en) A kind of beach is multi-functional to adopt razor clam car and its application method
CN107410233A (en) A kind of sea cucumber finishing device
CN205905207U (en) Concrete mixing plant's feed divider
CN108750027B (en) River channel cleaning device and method
CN213680305U (en) Walking type sludge in-situ curing equipment
CN203878636U (en) Spiral sludge sucking head applied to underwater dredging
CN106592551B (en) Water body floating material automatic cleaning method at water conservancy sluice
CN200960518Y (en) Mechanization cleaning device for oil storage tank bottom silting mud
CN106430881A (en) Port sludge treatment curing brickmaking apparatus and construction method thereof
CN206721961U (en) A kind of helical blade type dredging robot
CN205348136U (en) River course clearance ship
CN206941677U (en) A kind of hydraulic engineering Accrete clearing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170609

Termination date: 20211121