CN206232583U - Harbour sludge treatment solidification brick making device - Google Patents
Harbour sludge treatment solidification brick making device Download PDFInfo
- Publication number
- CN206232583U CN206232583U CN201621260322.0U CN201621260322U CN206232583U CN 206232583 U CN206232583 U CN 206232583U CN 201621260322 U CN201621260322 U CN 201621260322U CN 206232583 U CN206232583 U CN 206232583U
- Authority
- CN
- China
- Prior art keywords
- mud
- suction nozzle
- making device
- brick making
- slide rail
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Treatment Of Sludge (AREA)
Abstract
Harbour sludge treatment solidification brick making device, hold cabin (6), hydraulic pressure moving platform (8) and middle roll-over (40) including hydraulic lifting slide rail (4), deposition, it is characterized in that, the hydraulic lifting slide rail (4) installed in elevating control platform (5) above, suction nozzle (1) is installed on hydraulic lifting slide rail (4), the suction nozzle (1) and deposition are connected with mud-water conveying pipe (3) between holding cabin (6), and suction nozzle (1) is provided with rubber and is connected overcoat (2) with the junction of mud-water conveying pipe (3);The beneficial effects of the utility model:The utility model device is processed by absorbing and directly carrying out being sent directly into brickmaking after curing process the mud at harbour, is changed into construction material, while can produce in enormous quantities, meet technically and in the market production in enormous quantities demand, be adapted to promote the use of.
Description
Technical field
The utility model is related to a kind of harbour sludge treatment solidification brick making device, belongs to port and pier field.
Background technology
Harbor approach is desilted and dredged can all produce substantial amounts of dredged mud, the various methods for the treatment of dredged mud, including sea at present
Facture, drainage position logos, curing process method, heating method, vacuum electroosmosis and the compacted Combined Treatment method of power are toppled in ocean, and
Analyze its feature ocean dumping factures simple and convenient, but be negatively affected drainage position logos to the marine eco-environment can
To reduce the water content of dredged mud, but pollutant therein can not be removed, secondary pollution curing process methods can be caused to exist to environment
The dissolution rate of pollutant is slow down while solidification dredged mud, can be reduced and method is heated to the secondary pollution of surrounding environment
Dredged mud is dehydrated, construction material is changed into, the regenerated resources of dredged mud can be realized, but process the energy of extensive dredged mud
Power can fast and efficiently discharge large quantity of moisture and pollutant in dredged mud less than the true electric osmoses of and the compacted Combined Treatment method of power,
And it is cheap, have broad application prospects and larger promotional value.
Notification number is for mixing cured method, control device in a kind of CN105401569A is disclosed dredging mud pipe and its is
System.Dredged mud curing of the present utility model, control device and its system by obtaining the dredged mud in whipping process in real time
Density value, so as to according to the density value come control to adjust injection dredged mud in water injection rate;By obtaining air pressure in real time
Value, and the size of input air pressure is controlled to adjust according to it, so as to ensure optimal mixed effect;By obtaining gas-solid-liquid in real time
The mass flow parameter of three-phase mixed flow, with the mass flow of the curing agent according to its control addition, so as to ensure further guarantor
Card mixed effect, whole dredged mud solidification process all automatically controls completion, it is not necessary to the intervention of staff, not only reduces
The labour intensity of staff, it also avoid causing solidification process to fail because of human factor, improve operating efficiency.
Another notification number for CN105951908A is disclosed, deepen by dredging device, including defeated mud hose by a kind of wharf apron, described
Defeated mud hose one end connection is laid in the silt collecting box above sludge treatment platform;The silt trap includes fixed branch
Frame, horizontal turbine propulsion device and vertical turbine buoyancy device are laid in fixed support, and mud is collected frame and is movably arranged on admittedly
On fixed rack, rear side is connected with rocker, and hydraulic cylinder is fixed on rocker by alignment pin and drives mud collection frame to swing up and down;
The beneficial effects of the utility model:The utility model can be rapidly and efficiently the mud to navigation channel dredge, while dredging
Treatment recycling can be carried out to mud simultaneously, speed is fast, and low cost is adapted to promote the use of.
At present, the sludge treatment to harbour is all in resting on experiment and envisioning, not set accordingly as construction material
It is standby that batch production batch operation is carried out to it.
Utility model content
The utility model overcomes the problem of prior art presence, it is proposed that a kind of harbour sludge treatment solidifies brick making device
And its construction method, the device carries out by absorbing and directly carrying out being sent directly into brickmaking after curing process the mud at harbour
Processing, is changed into construction material, low-carbon environment-friendly.
Concrete technical scheme of the present utility model is as follows:
Harbour sludge treatment solidification brick making device, including hydraulic lifting slide rail, deposition hold cabin, hydraulic pressure moving platform and middle roll-over,
Characterized in that, the hydraulic lifting slide rail is arranged on above elevating control platform, suction nozzle is installed on hydraulic lifting slide rail, it is described
Suction nozzle and deposition are connected with mud-water conveying pipe between holding cabin, and suction nozzle is provided with rubber and is connected outer with the junction of mud-water conveying pipe
Set;
The hydraulic pressure moving platform is rack-mount, and the side of support is provided with rollover stand, and tempering tank is arranged on the rollover stand
On, drainage bucket is installed in the tempering tank, rotating disk is installed between the bottom of the drainage bucket and tempering tank;The top of drainage bucket
Portion is uniformly provided with fixture block, and the draw-in groove snapped in for fixture block is provided with bung, and up and down motion is provided with the hydraulic pressure moving platform
Hydraulic cylinder, is provided with the rotating extensible arm being connected with bung on the sliding block;It is provided with the bung for the recessed of bayonet lock insertion
Groove;The motor two of the rotation batch turning for driving tempering tank is installed on the rollover stand, curing agent adding tube is connected with bung;
Delivery pipe is connected between the deposition appearance cabin and middle roll-over, preliminary drainage is connected between drainage bucket and middle roll-over
Mud delivery pipe, the drainage bucket is equipped with drainpipe and is connected with filter water buffer storage with middle roll-over;Under the rollover stand
Portion is ramp structure, and its discharge end is provided with filter mud and topples over funnel;The discharging opening that the mud topples over funnel is provided with module brickmaking dress
Put.
Preferentially, the universal bar that motor is rotated is installed, filtering head is arranged on the top of universal bar inside the suction nozzle
Portion, is provided with that trowel is scraped in inside and trowel is scraped in outside on the universal bar, the inner side edge that trowel extends to suction nozzle is scraped in the inside
The outside that trowel extends to suction nozzle is scraped in edge, outside, and impurity buffer area is provided between suction nozzle and rubber connection overcoat.
Preferentially, the suction nozzle top is also equipped with high pressure and rushes injection device, and the high-pressure injection device is cached with filter water
Water-supply-pipe is connected between device.
Based on said apparatus, the utility model additionally provides a kind of harbour sludge treatment solidification brickmaking construction method, and it is special
Levy and be, comprise the following steps:
1) suction nozzle is placed at the mud of harbour bottom, starts high pressure sucking pump and drive suction nozzle to start to inhale silt operation, together
When inside scrape trowel and it is outside scrape trowel ceaselessly mud operation cut in rotation under the drive of universal bar, prevent suction nozzle to be plugged,
Stirring simultaneously makes the mud being inhaled into uniform;
2) mud being inhaled into is sent into after deposition appearance cabin by mud-water conveying pipe, is sensed by depositing the weight held in cabin
Device is sensed, reach after constant weight by sucking pump drive along delivery pipe send into deposit in roll-over, part water body leads to
Drainpipe is crossed to be drained into filter water buffer storage;
3) mud in roll-over is again by sucking pump in preliminary drainage mud delivery pipe feeding drainage bucket;First
Step:Hydraulic cylinder is rotated expansion link decline to be made to make the draw-in groove on bung clasp fixture block first;Second step:Hydraulic cylinder constantly declines
Rotating extensible arm is set to be under pressure rotation so as to drive drainage bucket that water dumping is rotated in tempering tank, water body is drained into by drainpipe
In filter water buffer storage;3rd step:When hydraulic cylinder drops to bottommost, i.e., rotating extensible arm be punctured into it is most short, now
In the groove of bayonet lock insertion, hydraulic cylinder last time starts to return, and now bung is driven and leaves, and tempering tank is opened, tempering tank quilt
Motor on rollover stand drives Tilting;At the same time, hydraulic cylinder continues last time, and rotating extensible arm elongation in the process is
Most long, rotating extensible arm turns again to the reset condition of the first step;Continuous repeat step one, two and three, by the silt after dehydration
Mud is poured on the slope of rollover stand;
4) mud falls into filter mud and topples over and be admitted to module brick making device after funnel and carry out brickmaking along slope, has constructed
Into.
The beneficial effects of the utility model:The utility model device is by the way that the mud at harbour is absorbed and is directly consolidated
Brickmaking is sent directly into after change treatment to be processed, is changed into construction material, while can produce in enormous quantities, meet technical and city
The demand produced in enormous quantities on field, is adapted to promote the use of.
Brief description of the drawings
Fig. 1 is the structural representation that the utility model harbour sludge treatment solidifies brick making device;
Fig. 2 is the structural representation of suction nozzle;
Fig. 3 is the structural representation of drainage bucket;
Fig. 4 snaps in the structural representation of draw-in groove for the fixture block of bung.
Specific embodiment
Embodiment 1
As illustrated, harbour sludge treatment solidification brick making device, including hydraulic lifting slide rail 4, deposition hold cabin 6, hydraulic pressure cunning
Platform 8 and middle roll-over 40, the hydraulic lifting slide rail 4 are arranged on above elevating control platform 5, and suction is provided with hydraulic lifting slide rail 4
First 1, mud-water conveying pipe 3 is connected between the suction nozzle 1 and deposition appearance cabin 6, suction nozzle 1 is set with the junction of mud-water conveying pipe 3
There is rubber to connect overcoat 2.The universal bar 16 that motor is rotated is installed, filtering head is arranged on universal bar 16 inside suction nozzle 1
Top, is provided with that trowel 18 is scraped in inside and trowel 17 is scraped in outside on the universal bar 16, the inside is scraped trowel 18 and extends to suction
The outside that trowel 17 extends to suction nozzle 1 is scraped in first 1 inside edge, outside, and impurity is provided between suction nozzle 1 and rubber connection overcoat 2
Buffer area 30 is used for depositing the debris for getting lodged in suction nozzle.
Additionally, the top of suction nozzle 1 is also equipped with high pressure rushes injection device 19, the high-pressure injection device 19 caches dress with filter water
Water-supply-pipe 15 is connected between putting 12.When suction nozzle 1 dredges mud layer into deep layer because moisture content less (can according to pipeline flow,
Flow rate detection feed back and obtain), device cannot silt dredging when, high-pressure injection device 19 carries out injection high-pressure water body by setting opening,
Mud is washed open, the effect that special status aids in silt dredging operation is reached.Additionally, high-pressure injection device 19 can also connect high pressure
Air pump, is washed open by gas
Hydraulic pressure moving platform 8 is rack-mount, and the side of support is provided with rollover stand 11, and tempering tank is arranged on the rollover stand 11
On, drainage bucket 31 is installed in the tempering tank, rotating disk 26 is installed between the bottom of the drainage bucket 31 and tempering tank, so
When drainage bucket 31 rotates, tempering tank is motionless, and drainage bucket 31 is provided with and has been uniformly arranged apopore, is rotated when drainage bucket 31
When, the water being thrown out of is discharged by drainpipe 33 again after initially entering tempering tank.
The top of drainage bucket 31 is uniformly provided with fixture block 25, and the draw-in groove 29 snapped in for fixture block 25, institute are provided with bung 27
The hydraulic cylinder 20 that up and down motion is provided with hydraulic pressure moving platform 8 is stated, the rotation being connected with bung 27 is installed on the sliding block 20 and is stretched
Contracting bar 21;When sliding block 20 is moved downward applies pressure to rotating extensible arm 21, rotating extensible arm 21 shrinks rotation, when sliding block 20
Rotating extensible arm 21 can again be elongated and return to initial position by motion upwards, the knot of this structural principle and hand-pressing rotary mop
Structure principle is identical, belongs to prior art, will not be repeated here.Groove 24 for the insertion of bayonet lock 28 is installed on bung 27;It is described
The motor two of the rotation batch turning for driving tempering tank is installed on rollover stand 11, curing agent adding tube 23 is connected with bung 27.
Delivery pipe 13 is connected between the deposition appearance cabin 6 and middle roll-over 40, is connected between drainage bucket 31 and middle roll-over 40
Have preliminary drainage mud delivery pipe 7, preliminary drainage mud delivery pipe 7 is installed above flowmeter, by flow, flow velocity it is right
Than feedback, the moisture content of dredged mud can be analyzed, so that control platform is adjusted is input into the defeated of curing agent in drainage bucket 31
The amount of sending.The drainage bucket 31 is equipped with drainpipe 33 and is connected with filter water buffer storage 12 with middle roll-over 40;The rollover stand 11
Bottom be ramp structure, its discharge end is provided with filter mud and topples over funnel 9;The discharging opening that the mud topples over funnel 9 is provided with module
Brick making device 10.
Based on said apparatus, the utility model additionally provides a kind of harbour sludge treatment solidification brickmaking construction method, and it is special
Levy and be, comprise the following steps:
1) suction nozzle 1 is placed at the mud of harbour bottom, starts high pressure sucking pump and drive suction nozzle 1 to start to inhale silt operation,
It is simultaneously internal scrape trowel 18 and it is outside scrape trowel 17 ceaselessly mud operation cut in rotation under the drive of universal bar 16, prevent suction nozzle
1 is plugged, while stirring makes the mud being inhaled into uniform;
2) mud being inhaled into is sent into after deposition appearance cabin 6 by mud-water conveying pipe 3, by depositing the weight held in cabin 6
Sensor is sensed, reach after constant weight by sucking pump drive along delivery pipe 13 send into deposition, portion in roll-over 40
Water body is divided to be drained into filter water buffer storage 12 by drainpipe;
3) mud in roll-over 40 is again by sucking pump in preliminary drainage mud delivery pipe 7 feeding drainage bucket 31;
The first step:Hydraulic cylinder 20 is rotated the decline of expansion link 21 makes to make first the draw-in groove 29 on bung 27 to clasp fixture block 25;Second step:
Hydraulic cylinder 20 constantly declines makes rotating extensible arm 21 be under pressure rotation so as to drive drainage bucket 31 that water dumping is rotated in tempering tank,
Water body is drained into filter water buffer storage 12 by drainpipe;3rd step:When hydraulic cylinder 20 drops to bottommost, that is, rotate
Being punctured into for expansion link 21 is most short, and in the groove 24 of the now insertion of bayonet lock 28, the last time of hydraulic cylinder 20 starts to return, now bung 27
It is driven and leaves, tempering tank is opened, the motor that tempering tank is reversed on frame 11 drives Tilting;At the same time, hydraulic cylinder
20 continue last time, and the elongation of rotating extensible arm 21 in the process is most long, and rotating extensible arm 21 turns again to the original of the first step
State;Continuous repeat step one, two and three, the mud after dehydration is poured on the slope of rollover stand 11;
4) mud falls into filter mud and topples over and be admitted to module brick making device 10 after funnel 9 and carry out brickmaking along slope, constructs
Complete.
In addition to the implementation, the utility model can also have other embodiment.All use equivalents or equivalent change
The technical scheme to be formed is changed, the protection domain of the utility model requirement is all fallen within.
Claims (3)
1. harbour sludge treatment solidification brick making device, including hydraulic lifting slide rail (4), deposition hold cabin (6), hydraulic pressure moving platform (8) and
Middle roll-over (40), it is characterised in that the hydraulic lifting slide rail (4) installed in elevating control platform (5) above, hydraulic lifting slide rail
(4) suction nozzle (1) is installed, the suction nozzle (1) and deposition are held and be connected between cabin (6) mud-water conveying pipe (3) on, suction nozzle (1) with
The junction of mud-water conveying pipe (3) is provided with rubber and connects overcoat (2);
The hydraulic pressure moving platform (8) is rack-mount, and the side of support is provided with rollover stand (11), and tempering tank is arranged on the upset
On frame (11), drainage bucket (31) is installed in the tempering tank, is provided between the bottom of drainage bucket (31) and tempering tank
Rotating disk (26);The top of drainage bucket (31) is uniformly provided with fixture block, and ((25), confession fixture block is provided with bung (27), and ((25) snap in
Draw-in groove (29), the hydraulic cylinder (20) of up and down motion is installed on the hydraulic pressure moving platform (8), be provided with the sliding block (20) with
The rotating extensible arm (21) of bung (27) connection;Groove (24) for bayonet lock (28) insertion is installed on the bung (27);Institute
The motor two that the rotation batch turning for driving tempering tank is provided with rollover stand (11) is stated, bung is connected with curing agent adding tube on (27)
(23);
The deposition is held delivery pipe (13) is connected between cabin (6) and middle roll-over (40), drainage bucket (31) and middle roll-over (40) it
Between be connected with preliminary drainage mud delivery pipe (7), drainage bucket (31) is equipped with drainpipe (33) and mistake with middle roll-over (40)
Drainage buffer storage (12) is connected;The bottom of the rollover stand (11) is ramp structure, and its discharge end is provided with filter mud and topples over funnel
(9);The discharging opening that the mud topples over funnel (9) is provided with module brick making device (10).
2. harbour sludge treatment as claimed in claim 1 solidifies brick making device, it is characterised in that peace inside the suction nozzle (1)
The universal bar (16) being rotated equipped with motor, filtering head is arranged on the top of universal bar (16), pacifies on the universal bar (16)
Trowel (18) being scraped equipped with inside and trowel (17) being scraped in outside, the inside edge that trowel (18) extends to suction nozzle (1) is scraped in the inside,
The outside that trowel (17) extends to suction nozzle (1) is scraped in outside, and suction nozzle (1) is provided with impurity buffer area between overcoat (2) is connected with rubber
(30)。
3. harbour sludge treatment as claimed in claim 1 or 2 solidifies brick making device, it is characterised in that suction nozzle (1) top
It is also equipped with high pressure and rushes injection device (19), is connected between the high-pressure injection device (19) and filter water buffer storage (12) defeated
Water pipe (15).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621260322.0U CN206232583U (en) | 2016-11-21 | 2016-11-21 | Harbour sludge treatment solidification brick making device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621260322.0U CN206232583U (en) | 2016-11-21 | 2016-11-21 | Harbour sludge treatment solidification brick making device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206232583U true CN206232583U (en) | 2017-06-09 |
Family
ID=58979539
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621260322.0U Expired - Fee Related CN206232583U (en) | 2016-11-21 | 2016-11-21 | Harbour sludge treatment solidification brick making device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206232583U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106430881A (en) * | 2016-11-21 | 2017-02-22 | 浙江海洋大学 | Port sludge treatment curing brickmaking apparatus and construction method thereof |
CN113402134A (en) * | 2021-06-02 | 2021-09-17 | 大连大学 | Silt solidification treatment device |
-
2016
- 2016-11-21 CN CN201621260322.0U patent/CN206232583U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106430881A (en) * | 2016-11-21 | 2017-02-22 | 浙江海洋大学 | Port sludge treatment curing brickmaking apparatus and construction method thereof |
CN113402134A (en) * | 2021-06-02 | 2021-09-17 | 大连大学 | Silt solidification treatment device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105926701B (en) | Harbour sludge treatment device and its processing method | |
CN106930226B (en) | A kind of beach rubbish clears up vehicle and its method for cleaning automatically | |
CN110042914A (en) | A kind of canal reactor pipe network dredging robot | |
CN206232583U (en) | Harbour sludge treatment solidification brick making device | |
CN203546783U (en) | Fish-pond dredging device | |
CN206800494U (en) | A kind of negative pressure transportation formula dredging robot | |
CN106120921A (en) | A kind of lake, park underwater sludge cleaning system and method | |
CN107497742A (en) | A kind of suitable fruitlet class Chinese medicine flexible cleaning device and its application | |
CN206866419U (en) | A kind of beach is multi-functional to adopt razor clam car | |
CN207469202U (en) | A kind of algae water filtration device with multistage filtering | |
CN207538100U (en) | A kind of Novel water conservancy project Accrete clearing device | |
CN105926697B (en) | Waterway dredging device and its process for treating sludge | |
CN105951908B (en) | Wharf apron is deepened by dredging device | |
CN107006439A (en) | A kind of beach is multi-functional to adopt razor clam car and its application method | |
CN107410233A (en) | A kind of sea cucumber finishing device | |
CN205905207U (en) | Concrete mixing plant's feed divider | |
CN108750027B (en) | River channel cleaning device and method | |
CN213680305U (en) | Walking type sludge in-situ curing equipment | |
CN203878636U (en) | Spiral sludge sucking head applied to underwater dredging | |
CN106592551B (en) | Water body floating material automatic cleaning method at water conservancy sluice | |
CN200960518Y (en) | Mechanization cleaning device for oil storage tank bottom silting mud | |
CN106430881A (en) | Port sludge treatment curing brickmaking apparatus and construction method thereof | |
CN206721961U (en) | A kind of helical blade type dredging robot | |
CN205348136U (en) | River course clearance ship | |
CN206941677U (en) | A kind of hydraulic engineering Accrete clearing device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170609 Termination date: 20211121 |