CN206942670U - Large cross-section tunnel excavates periphery hole fast positioning mould - Google Patents

Large cross-section tunnel excavates periphery hole fast positioning mould Download PDF

Info

Publication number
CN206942670U
CN206942670U CN201720950095.2U CN201720950095U CN206942670U CN 206942670 U CN206942670 U CN 206942670U CN 201720950095 U CN201720950095 U CN 201720950095U CN 206942670 U CN206942670 U CN 206942670U
Authority
CN
China
Prior art keywords
mould
moulds
periphery hole
large cross
semiarch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720950095.2U
Other languages
Chinese (zh)
Inventor
解畅
王圣涛
姚大闯
余诚
邓稀肥
叶波
徐鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Original Assignee
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Tiesiju Civil Engineering Group Co Ltd CTCE Group filed Critical China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Priority to CN201720950095.2U priority Critical patent/CN206942670U/en
Application granted granted Critical
Publication of CN206942670U publication Critical patent/CN206942670U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of large cross-section tunnel to excavate periphery hole fast positioning mould, it is characterized in that:Three unit moulds of subsection setup, and three unit moulds are sequentially connected composition semiarch mould through assembly, two groups of semiarch moulds are in top phase spell shape into vault, the bottom of two groups of semiarch moulds is propped up respectively stands in both sides arch springing position, it is provided with the eyelet of break-through by the spacing of periphery hole respectively on three unit moulds, forms periphery hole arched mold.The utility model uses mould direct setting-out at the scene, and polyvinyl chloride, accurate positioning, using effect is splendid, effectively improves efficiency of construction, and ensure construction quality.

Description

Large cross-section tunnel excavates periphery hole fast positioning mould
Technical field
It the utility model is related to large cross-section tunnel and excavate periphery hole fast positioning mould, applied to the tunnel in constructing tunnel Excavate periphery hole positioning.
Background technology
In constructing tunnel, because the narrow procedure connection of construction surface is extremely important, in order to save the time, tunnel excavation periphery hole It must quickly be accurately positioned, out break occur if inaccurate, increase construction cost also influences construction speed, if single In order to accurate positioning then the setting-out time it is oversize also influence construction speed, at present in tunnel tunnel face setting-out mainly using traditional Five inch station method and coordinate method, but operation process speed is very slow, also there is the big gun built in using instruments such as total powerstation or laser cross section instruments Eye Setting-out procedures positioned, but due on face ride comfort it is poor, cause positioning precision low.
Utility model content
The utility model is to avoid the deficiency present in above-mentioned prior art, there is provided a kind of large cross-section tunnel excavates periphery It is sharp-eyed fast jig, large cross-section tunnel is excavated periphery hole and obtain quick accurate positioning, to improve efficiency of construction, ensure Construction quality.
The utility model adopts the following technical scheme that to solve technical problem:
The utility model large cross-section tunnel excavates being structurally characterized in that for periphery hole fast positioning mould:Three lists of subsection setup First mould, and by three unit moulds through assembly be sequentially connected composition semiarch mould, two groups of semiarch moulds top phase spell shape into Vault, the bottom of two groups of semiarch moulds is propped up respectively stands in both sides arch springing position, by the spacing of setting on three unit moulds The eyelet of insertion is provided with, forms periphery hole arched mold.
The design feature that the utility model large cross-section tunnel excavates periphery hole fast positioning mould is lain also in:Three lists The die width of first mould is 6cm, thickness 5cm, forms overlap joint with the step surface of mutual cooperation between adjacent cells mould, takes Spreading degree is 10cm.
The design feature that the utility model large cross-section tunnel excavates periphery hole fast positioning mould is lain also in:Three lists A diameter of 2cm of eyelet on first mould.
The design feature that the utility model large cross-section tunnel excavates periphery hole fast positioning mould is lain also in:Three lists First mould is using high intensity, lightweight plastic plate as material.
Compared with the prior art, the utility model has the beneficial effect that:
1st, the utility model uses mould direct setting-out at the scene, and polyvinyl chloride, accurate positioning, using effect is splendid, has Effect improves efficiency of construction, and ensures construction quality.
2nd, the utility model in actual applications, by adjusting the radian and size of three unit moulds, is applicable to appoint The positioning operation of the tunnel perimeter eye of what section type.
Brief description of the drawings
Fig. 1 is the utility model structure diagram;
Fig. 2 a are first module main structure diagram in the utility model;
Fig. 2 b are first module A-A views in the utility model;
Fig. 3 a are second unit main structure diagram in the utility model;
Fig. 3 b are second unit B-B views in the utility model;
Fig. 4 a are third unit main structure diagram in the utility model;
Fig. 4 b are third unit C-C views in the utility model;
Embodiment
Large cross-section tunnel excavates periphery hole fast positioning mould in the present embodiment, it is characterized in that:Three units of subsection setup Mould, and three unit moulds are sequentially connected composition semiarch mould through assembly, two groups of semiarch moulds are in top phase spell shape arching Top, the bottom of two groups of semiarch moulds is propped up respectively stands in both sides arch springing position, is set on three unit moulds by the spacing of setting The eyelet of insertion is equipped with, forms periphery hole arched mold;The die width of three unit moulds is 6cm, thickness 5cm, adjacent list Overlap joint, lap of splice 10cm are formed with the step surface of mutual cooperation between first mould;Eyelet on three unit moulds it is straight Footpath is 2cm;Three unit moulds are using high intensity, lightweight plastic plate as material.
In specific implementation, as shown in figure 1, three units are from bottom to top followed successively by the list of first module 1, second in semiarch mould Member 2 and third unit 3, three units press each position arching, and set eyelet 4 by the blasthole spacing of setting.
Shown in Fig. 2 a and Fig. 2 b, the lap segment of first module 1 is arranged on top, and through hole 5 is provided with lap segment, for The phase of second unit 2 is spliced, and the spacing for setting two eyelets in bottom in first module is 30cm, and the spacing of other each adjacent eyelets is 50cm。
Shown in Fig. 3 a and Fig. 3 b, the lap segment of second unit 2 is arranged on upper and lower ends, is all provided with the lap segment of upper and lower ends It is equipped with through hole 5, the upper and lower ends lap segment in second unit 2 is respectively used to mutually splice with third unit 3 and first module 1, The interval for setting each adjacent eyelet in second unit 2 is 50cm;
Shown in Fig. 4 a and Fig. 4 b, the lap segment of third unit 3 is arranged on bottom, and through hole 5 is again provided with lap segment, uses In with mutually splice in second unit 2, the spacing for setting two eyelets for being in top in third unit is 59cm, other each phases The spacing of adjacent eyelet is 50cm.
In Specific construction, as shown in figure 1, four anchor points are gone out using total powerstation setting-out according to explosion design drawing first, It is respectively:First module mold bottom anchor point P1, first module mould and second unit mould stitching portion anchor point P2, second Unit mould and third unit mould stitching portion anchor point P3, and third unit die tip anchor point P4;In each anchor point Place's implantation φ 18 reinforcing bars are used to fix three unit moulds, and the protruded length of reinforcing bar is not less than 20cm, to avoid because of face not It is smooth to cause mould not laid;Segmentation installation each unit mould, recycling penetrate rifle and pass through the eyelet thenad on each unit mould Nailing is injected in sub- face, and nailing should carry color, and to check, nailing position is periphery hole trip-out position;Position periphery hole eye Position sectional is carried out, and can also unify positioning after integral installation again, same method can fast positioning go out half side periphery hole in addition and pull out of hole Position.
Inventive die can quickly, be accurately positioned out Tunnel Blasting construction in periphery hole position so that after Tunnel Blasting Excavation face is smooth, smooth-going, and out break is more preferably controlled, and improves efficiency of construction.
The utility model is applied to Beijing-Shanghai high speed Jinan connecting line project pulp-water spring Smooth Blasting at Changle Tunnel, and effect shows Write.

Claims (4)

1. large cross-section tunnel excavates periphery hole fast positioning mould, it is characterized in that:Three unit moulds of subsection setup, and by described in Three unit moulds are sequentially connected composition semiarch mould through assembly, and two groups of semiarch moulds are in top phase spell shape into vault, two groups of semiarch moulds Bottom prop up stand in both sides arch springing position respectively, the eye of insertion is provided with by the spacing of setting on three unit moulds Hole, form periphery hole arched mold.
2. large cross-section tunnel according to claim 1 excavates periphery hole fast positioning mould, it is characterized in that:Three lists The die width of first mould is 6cm, thickness 5cm, forms overlap joint with the step surface of mutual cooperation between adjacent cells mould, takes Spreading degree is 10cm.
3. large cross-section tunnel according to claim 2 excavates periphery hole fast positioning mould, it is characterized in that:Three lists A diameter of 2cm of eyelet on first mould.
4. large cross-section tunnel according to claim 1 excavates periphery hole fast positioning mould, it is characterized in that:Three lists First mould is using high intensity, lightweight plastic plate as material.
CN201720950095.2U 2017-08-01 2017-08-01 Large cross-section tunnel excavates periphery hole fast positioning mould Active CN206942670U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720950095.2U CN206942670U (en) 2017-08-01 2017-08-01 Large cross-section tunnel excavates periphery hole fast positioning mould

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720950095.2U CN206942670U (en) 2017-08-01 2017-08-01 Large cross-section tunnel excavates periphery hole fast positioning mould

Publications (1)

Publication Number Publication Date
CN206942670U true CN206942670U (en) 2018-01-30

Family

ID=61371951

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720950095.2U Active CN206942670U (en) 2017-08-01 2017-08-01 Large cross-section tunnel excavates periphery hole fast positioning mould

Country Status (1)

Country Link
CN (1) CN206942670U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110345822A (en) * 2019-07-29 2019-10-18 中铁隧道局集团有限公司 Tunnel perimeter eye blasthole positioning device and method
CN110529153A (en) * 2019-08-16 2019-12-03 上海市基础工程集团有限公司 The shield tunnel lining cutting trimming setting-out mold and method of steel loop

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110345822A (en) * 2019-07-29 2019-10-18 中铁隧道局集团有限公司 Tunnel perimeter eye blasthole positioning device and method
CN110529153A (en) * 2019-08-16 2019-12-03 上海市基础工程集团有限公司 The shield tunnel lining cutting trimming setting-out mold and method of steel loop
CN110529153B (en) * 2019-08-16 2021-10-01 上海市基础工程集团有限公司 Laying-out die and method for steel ring for shield tunnel lining renovation

Similar Documents

Publication Publication Date Title
CN206942670U (en) Large cross-section tunnel excavates periphery hole fast positioning mould
CN103465344A (en) Method for utilizing battery mould to manufacture zipper-type building wall board
CN102587936A (en) Fully-enclosed integral assembly grid concrete support method
CN109184704B (en) Small clear distance tunnel excavation and middle rock clamping reinforcement technology
CN112257150A (en) Refined calculation amount method of raft foundation slab band reinforcing ribs based on BIM modeling
CN109341450A (en) A kind of Tunnel Blasting structure and Tunnel Blasting construction method
CN103669648A (en) Pin-connection brick wall
CN203878988U (en) Cylindrical steel moulding plate
CN206960198U (en) A kind of liner supporting mould suitable for indoor tunnel model test
CN204164106U (en) A kind of " L " font connects building materials and discrete thereof
Tamke Designing CNC knit for hybrid membrane and bending active structures
CN104929656B (en) Tunnel first lining structure construction method
CN212957255U (en) Novel T-shaped filler wall constructional column
CN108915248A (en) The continuous construction method of fiber is realized in concrete structure seam crossing using mold
CN106223602A (en) A kind of sectioned wall template
CN103255903A (en) Workshop indoor steel plate concrete composite floor structure and manufacturing method thereof
CN105484202B (en) Manufacturing method for detachable type water-stop cavity die of concrete deformation joint
CN207647024U (en) A kind of prefabricated board for distribution box installation
CN111894642A (en) Continuous alternate tunnel face advance anchor rod laying method
CN110593075A (en) Arch bridge stone arch coupon fixing structure and construction method thereof
CN203161267U (en) Positioning device for construction of prefabricated anchor rods in underground engineer model test
CN208105904U (en) A kind of positioning device of rectangle lattice column
CN206841933U (en) Macromolecule waste plastic recycles the Combined-type plastic material frame of production Christmas ball
CN109098719A (en) A kind of hard rock mechanical drivage construction technology
CN204906547U (en) TV set oblique angle concatenation face frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant