CN206942159U - A kind of construction site boom hoisting - Google Patents

A kind of construction site boom hoisting Download PDF

Info

Publication number
CN206942159U
CN206942159U CN201720564428.8U CN201720564428U CN206942159U CN 206942159 U CN206942159 U CN 206942159U CN 201720564428 U CN201720564428 U CN 201720564428U CN 206942159 U CN206942159 U CN 206942159U
Authority
CN
China
Prior art keywords
fixedly connected
vertical beam
boom hoisting
construction site
hawser
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720564428.8U
Other languages
Chinese (zh)
Inventor
吕旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720564428.8U priority Critical patent/CN206942159U/en
Application granted granted Critical
Publication of CN206942159U publication Critical patent/CN206942159U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of construction site boom hoisting, including base, the both sides of base top are installed with vertical beam, damping spring is fixedly connected with the top of vertical beam, vibration damper plate is fixedly connected with the top of damping spring, and the both ends of vibration damper plate are fixedly connected with vertical beam, and sliding block is slidably connected on vertical beam, the side of sliding block has been fixedly mounted on box, is risen and is installed with boatswain chair at the top of box.The utility model is by setting damping spring, rope sling and gag lever post, the construction site is with boom hoisting by the way of double hawser liftings, solves the defects of traditional boom hoisting operation is unstable, open motor, conveyer belt is driven to rotate, so as to drive axis of rotation, so as to drive hawser to rise or fall, so as to drive box to rise or fall, by setting double hawsers, and gag lever post is set between hawser, prevents hawser from knotting or being intertwined, so as to reduce the abrasion of box, so as to improve the service life of lifting appliance.

Description

A kind of construction site boom hoisting
Technical field
Architectural Equipment technical field is the utility model is related to, specially a kind of construction site boom hoisting.
Background technology
With the huge achievement that China's reform and opening-up obtains, in the last few years, the real estate industry in China has also obtained huge Development, while also driven the rise of building trade.
On building sites, lifting appliance is a kind of important equipment, and in general fragment of brick, reinforcing bar and other building materials are all logical Cross lifting appliance and be transported to height in the air, so as to alleviate the work load of worker, but existing lifting appliance is usually to use What single hawser was lifted by crane, therefore the phenomenon that operation shakiness causes to rock be present, play box and rocked once producing, be easy for making Into abrasion, so as to reduce the service life of lifting appliance.
The content of the invention
In view of the shortcomings of the prior art, the utility model provides a kind of construction site boom hoisting, solves existing The problem of boom hoisting easily rocks.
To achieve the above object, the utility model provides following technical scheme:A kind of construction site boom hoisting, including Base, the both sides of the base top are installed with vertical beam, damping spring are fixedly connected with the top of the vertical beam, described to subtract Vibration damper plate is fixedly connected with the top of shake spring, and the both ends of vibration damper plate are fixedly connected with vertical beam, the company of slip on the vertical beam Sliding block is connected to, the side of the sliding block has been fixedly mounted on box, and boatswain chair is installed with the top of described box, described Lock tube is installed with the top of boatswain chair, hawser is fixedly connected with the lock tube, rope sling, the rope sling are socketed on the hawser Between be fixedly connected by gag lever post, one end of the hawser is fixedly connected on bobbin winder bracket, at the axle center of the bobbin winder bracket cover It is connected in rotating shaft, the equal activity in both ends of the rotating shaft is plugged on vertical beam, and conveyer belt, the conveyer belt are socketed with the rotating shaft One end be connected in the output end of servomotor, the bottom of the servomotor is fixedly mounted on transverse slat, the horizontal stroke The side of plate is fixedly connected on vertical beam.
Preferably, the bottom of the transverse slat is fixedly connected with securing plate, and the side of the securing plate is fixedly connected on vertical beam On.
Preferably, the bottom of the lifting chamber interior wall is provided with moistureproof cushion.
Preferably, it is fixedly connected with cushion pad at the top of the moistureproof cushion.
Preferably, it is installed with fastening bolt on the base.
Preferably, the bottom of described box is installed with buffer board.
The utility model provides a kind of construction site boom hoisting.Possesses following beneficial effect:
(1), the utility model by set damping spring, vibration damper plate, rise box, sliding block, boatswain chair, lock tube, hawser, rope sling and Gag lever post, the construction site by the way of double hawsers lift, solve traditional boom hoisting operation shakiness with boom hoisting Defect, motor is opened, drive conveyer belt to rotate, so as to drive axis of rotation, so as to drive hawser to rise or fall, so as to drive Play box to rise or fall, by setting double hawsers, and gag lever post is set between hawser, prevents hawser from knotting or being wrapped in Together, box normal operation has been influenceed, has been slidably connected by the way that box will be played by sliding block with vertical beam, so that playing box in vertical beam Upper smoothly operation, so as to reduce the abrasion of box, so as to improve the service life of lifting appliance.
Brief description of the drawings
Fig. 1 is the utility model structural profile illustration;
Fig. 2 is the utility model vertical beam structure top view;
Fig. 3 is that the utility model lifts by crane box structure top view.
In figure:1 base, 2 vertical beams, 3 damping springs, 4 vibration damper plates, 5 boxes, 6 sliding blocks, 7 boatswain chairs, 8 lock tubes, 9 hawsers, 10 ropes Set, 11 gag lever posts, 12 rotating shafts, 13 bobbin winder brackets, 14 conveyer belts, 15 servomotors, 16 transverse slats, 17 securing plates, 18 moistureproof cushions, 19 are delayed Rush pad, 20 fastening bolts, 21 buffer boards.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
As Figure 1-3, the utility model provides a kind of technical scheme:A kind of construction site boom hoisting, the building Building site by the way of double hawsers 9 lift, solves the defects of traditional boom hoisting operation is unstable, including base with boom hoisting 1, fastening bolt 20 is installed with base 1, fastening bolt 20 is set, base 1 can be fastened on the ground, base 1 pushes up The both sides in portion are installed with vertical beam 2, and the top of vertical beam 2 is fixedly connected with damping spring 3, and the top of damping spring 3 is fixedly connected There is vibration damper plate 4, and the both ends of vibration damper plate 4 are fixedly connected with vertical beam 2, can be with by the cooperation of damping spring 3 and vibration damper plate 4 Vibrations are reduced when playing box 5 and landing, rocking for box 5 has been reduced, sliding block 6 is slidably connected on vertical beam 2, sliding block 6 Side has been fixedly mounted on box 5, and the bottom for playing the inwall of box 5 is provided with moistureproof cushion 18, and the top of moistureproof cushion 18, which is fixed, to be connected Cushion pad 19 is connected to, moistureproof cushion 18 and cushion pad 19 are set, moistureproof and buffering can be played a part of, the bottom for playing box 5 is consolidated Dingan County is equipped with buffer board 21, sets buffer board 21, can play a part of buffering, and the top for playing box 5 is installed with boatswain chair 7, the top of boatswain chair 7 is installed with lock tube 8, and hawser 9 is fixedly connected with lock tube 8, rope sling 10, rope sling 10 are socketed on hawser 9 Between be fixedly connected by gag lever post 11, one end of hawser 9 is fixedly connected on bobbin winder bracket 13, at the axle center of bobbin winder bracket 13 be socketed In rotating shaft 12, the equal activity in both ends of rotating shaft 12 is plugged on vertical beam 2, opens motor 15, drives conveyer belt 14 to rotate, so as to band Turn axle 12 rotates, so as to drive hawser 9 to rise or fall, so as to drive box 5 to rise or fall, by setting double hawsers 9, and gag lever post 11 is set between hawser 9, prevent hawser 9 from knotting or being intertwined, influence the normal operation of box 5, It is slidably connected, is smoothly run on vertical beam 2 so that playing box 5, so as to subtract with vertical beam 2 by sliding block 6 by the way that box 5 will be played The abrasion of a box 5 is lacked, so as to improve the service life of lifting appliance, conveyer belt 14, conveyer belt is socketed with rotating shaft 12 14 one end is connected in the output end of servomotor 15, and the bottom of servomotor 15 is fixedly mounted on transverse slat 16, horizontal The side of plate 16 is fixedly connected on vertical beam 2, and the bottom of transverse slat 16 is fixedly connected with securing plate 17, and the side of securing plate 17 is fixed It is connected on vertical beam 2, securing plate 17 is set, plays a part of reinforcing transverse slat 16.
In use, the construction site with boom hoisting by the way of double hawsers 9 lift, solve traditional boom hoisting fortune The defects of row is unstable, motor 15 is opened, drive conveyer belt 14 to rotate, so as to drive rotating shaft 12 to rotate, so as to drive hawser 9 to rise Or decline, so as to drive box 5 to rise or fall, by setting double hawsers 9, and gag lever post 11 is set between hawser 9, Prevent hawser 9 from knotting or being intertwined, influenceed the normal operation of box 5, slided by the way that box 5 will be played by sliding block 6 and vertical beam 2 Dynamic connection, smoothly run on vertical beam 2 so that playing box 5, so as to reduce the abrasion of box 5, so as to improve Hang the service life of equipment.
Can to sum up obtain, the construction site boom hoisting, by set damping spring 3, vibration damper plate 4, rise box 5, sliding block 6, Boatswain chair 7, lock tube 8, hawser 9, rope sling 10 and gag lever post 11, solve the problems, such as that existing boom hoisting easily rocks.
It should be noted that the electric elements occurred in this article electrically connect with the main controller and 220V civil powers in the external world, and And main controller can be the conventionally known equipment that computer etc. plays control, herein, such as first and second or the like pass It is that term is used merely to make a distinction an entity or operation and another entity or operate, and not necessarily requires or secretly Show between these entities or operation any this actual relation or order be present.Moreover, term " comprising ", "comprising" or Any other variant thereof is intended to cover non-exclusive inclusion so that process, method, article including a series of elements or Person's equipment not only includes those key elements, but also the other element including being not expressly set out, or it is this mistake also to include Journey, method, article or the intrinsic key element of equipment.In the absence of more restrictions, by sentence "including a ..." The key element of restriction, it is not excluded that in addition identical also be present in the process including the key element, method, article or equipment will Element.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from principle of the present utility model and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of construction site boom hoisting, including base(1), it is characterised in that:The base(1)The both sides at top are solid Dingan County is equipped with vertical beam(2), the vertical beam(2)Top be fixedly connected with damping spring(3), the damping spring(3)Top fix It is connected with vibration damper plate(4), and vibration damper plate(4)Both ends be fixedly connected with vertical beam(2)On, the vertical beam(2)On be slidably connected There is sliding block(6), the sliding block(6)Side be fixedly mounted on box(5)On, described box(5)Top be fixedly mounted There is boatswain chair(7), the boatswain chair(7)Top be installed with lock tube(8), the lock tube(8)On be fixedly connected with hawser(9), The hawser(9)Upper socket rope sling(10), the rope sling(10)Between pass through gag lever post(11)It is fixedly connected, the hawser(9) One end be fixedly connected on bobbin winder bracket(13)On, the bobbin winder bracket(13)Axle center at be socketed in rotating shaft(12)On, the rotating shaft (12)The equal activity in both ends be plugged on vertical beam(2)On, the rotating shaft(12)On be socketed with conveyer belt(14), the conveyer belt(14) One end be connected in servomotor(15)Output end on, the servomotor(15)Bottom be fixedly mounted on transverse slat (16)On, the transverse slat(16)Side be fixedly connected on vertical beam(2)On.
A kind of 2. construction site boom hoisting according to claim 1, it is characterised in that:The transverse slat(16)Bottom It is fixedly connected with securing plate(17), the securing plate(17)Side be fixedly connected on vertical beam(2)On.
A kind of 3. construction site boom hoisting according to claim 1, it is characterised in that:Described box(5)Inwall Bottom be provided with moistureproof cushion(18).
A kind of 4. construction site boom hoisting according to claim 3, it is characterised in that:The moistureproof cushion(18)Top Portion is fixedly connected with cushion pad(19).
A kind of 5. construction site boom hoisting according to claim 1, it is characterised in that:The base(1)Upper fixation Fastening bolt is installed(20).
A kind of 6. construction site boom hoisting according to claim 1, it is characterised in that:Described box(5)Bottom Portion is installed with buffer board(21).
CN201720564428.8U 2017-05-20 2017-05-20 A kind of construction site boom hoisting Expired - Fee Related CN206942159U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720564428.8U CN206942159U (en) 2017-05-20 2017-05-20 A kind of construction site boom hoisting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720564428.8U CN206942159U (en) 2017-05-20 2017-05-20 A kind of construction site boom hoisting

Publications (1)

Publication Number Publication Date
CN206942159U true CN206942159U (en) 2018-01-30

Family

ID=61360164

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720564428.8U Expired - Fee Related CN206942159U (en) 2017-05-20 2017-05-20 A kind of construction site boom hoisting

Country Status (1)

Country Link
CN (1) CN206942159U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108502731A (en) * 2018-04-26 2018-09-07 中冶天工集团天津有限公司 A kind of promotion hoisting device having position detecting function and method
CN108792915A (en) * 2018-08-30 2018-11-13 苏州胜璟电磁科技有限公司 A kind of electromagnet sucker lifting gear
CN108797367A (en) * 2018-08-20 2018-11-13 滁州市棋然装饰工程有限公司 The special hoisting sling of prefabricated bridge in a kind of engineering construction
CN109750604A (en) * 2019-02-14 2019-05-14 襄阳协利成机车车辆工程设备有限公司 A kind of Bridge Erector easy to use
CN112591636A (en) * 2020-12-10 2021-04-02 天长市飞龙金属制品有限公司 High-strength hanger platform based on steel grating
CN112681766A (en) * 2020-12-15 2021-04-20 安徽晶宫绿建集团有限公司 Construction device and method for water seepage prevention prefabricated slab

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108502731A (en) * 2018-04-26 2018-09-07 中冶天工集团天津有限公司 A kind of promotion hoisting device having position detecting function and method
CN108797367A (en) * 2018-08-20 2018-11-13 滁州市棋然装饰工程有限公司 The special hoisting sling of prefabricated bridge in a kind of engineering construction
CN108792915A (en) * 2018-08-30 2018-11-13 苏州胜璟电磁科技有限公司 A kind of electromagnet sucker lifting gear
CN109750604A (en) * 2019-02-14 2019-05-14 襄阳协利成机车车辆工程设备有限公司 A kind of Bridge Erector easy to use
CN112591636A (en) * 2020-12-10 2021-04-02 天长市飞龙金属制品有限公司 High-strength hanger platform based on steel grating
CN112681766A (en) * 2020-12-15 2021-04-20 安徽晶宫绿建集团有限公司 Construction device and method for water seepage prevention prefabricated slab

Similar Documents

Publication Publication Date Title
CN206942159U (en) A kind of construction site boom hoisting
CN205613693U (en) Vibration screening equipment for ore
CN109826401B (en) External elevartor shaft system of pendulum-type with multistage frequency modulation function
CN105484503B (en) One kind tilts fusiformis space truss hanging method
CN111285239A (en) Object hoisting and damping device for assembly type building construction
CN102241353A (en) Home elevator
CN202099742U (en) Sling structure of bridge erecting machine
CN206999277U (en) A kind of wallboard turning device
CN208932801U (en) Tower crane stake bracing means
CN104803303B (en) A kind of single movable-arm floor mast with rock type counter-jib
CN207277205U (en) Arch rib turns over pedestal
CN203976182U (en) A kind of integrated elevator sedan-chair roof construction
CN206915593U (en) A kind of multifunctional building hanging basket
CN109879154A (en) A kind of automated machine equipment boom hoisting
CN205743060U (en) A kind of protection mechanism being suitable to different size elevator
CN206245831U (en) A kind of superelevation steel megastructure vibration damping integrated system
CN106882709B (en) A kind of electric single beam crane of anti-knotting
CN210366631U (en) Superimposed sheet hoist that facilitates use
CN212269244U (en) Crane hook suspension safety limiting device
CN108100900A (en) A kind of high maneuverability stable type loop wheel machine equipment
CN212101833U (en) Lifter for building
CN103193152A (en) Hoisting device and method of chain bucket ship unloader
CN209161316U (en) A kind of modified grab bucket
CN205873668U (en) It covers structure of hoisting to keep warm to cheat
CN208206655U (en) A kind of new equipment adjusted for the limit of Rock Joint Plane charges shear test block

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180130

Termination date: 20180520

CF01 Termination of patent right due to non-payment of annual fee