CN206941594U CN201720571485.9U CN201720571485U CN206941594U CN 206941594 U CN206941594 U CN 206941594U CN 201720571485 U CN201720571485 U CN 201720571485U CN 206941594 U CN206941594 U CN 206941594U
Authority
CN
China
Prior art keywords
tubing string
steel tubing
rectangle steel
lower support
chute
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720571485.9U
Other languages
Chinese (zh)
Inventor
常玉军
于海鹏
董云飞
孟宪伟
薛在喜
吴海锋
刘辛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Detai Construction Engineering Co Ltd
Qingdao Rui Yuan Engineering Group Co Ltd
Qingdao Ruiyuan Engineering Group Co Ltd
Original Assignee
Qingdao Detai Construction Engineering Co Ltd
Qingdao Rui Yuan Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Detai Construction Engineering Co Ltd, Qingdao Rui Yuan Engineering Group Co Ltd filed Critical Qingdao Detai Construction Engineering Co Ltd
Priority to CN201720571485.9U priority Critical patent/CN206941594U/en
Application granted granted Critical
Publication of CN206941594U publication Critical patent/CN206941594U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a kind of bracket structure for fill concrete in steel column, including portable bracket, it is characterised in that:Connection sets rectangle steel tubing string under superstructure, fill concrete in rectangle steel tubing string, described rectangle steel tubing string upper end or so two sides opening, described portable bracket includes top chute and lower support, the bottom of top chute along be slightly less than with the top of rectangle steel tubing string or so two sides, form one and pour chute, lower support is the bottom for being supported on top chute of ladder shape, and the base of lower support is arranged with wheel, the upper connector fixed along setting with superstructure on two sides before and after rectangle steel tubing string.The utility model has the advantages that:Save substantial amounts of inner support and peace is torn open, investment reduction, improve effect, and recycle.

Description

A kind of bracket structure for fill concrete in steel column
Technical field
The utility model belongs to underground engineering wall body structure technical field, and more particularly to a kind of mixed for filling in steel column Coagulate the bracket structure of soil.
Background technology
In underground engineering construction, generally ground-connecting-wall is general using along the practice added with steel pipe support post, i.e., from bottom surface to On successively construct, inside adds multiple tracks inner support in length and breadth.This mode inner support is more, and completion Hou Xuzhu removes in road support, wave Take substantial amounts of person property.The constructing device of false bracket is pushed out, but can not be reused, and adds operational procedure.
Utility model content
In view of this, the utility model proposes a kind of bracket structure for fill concrete in steel column.
A kind of bracket structure for fill concrete in steel column, including portable bracket, it is characterised in that:Tied on top Connected under structure and rectangle steel tubing string is set, fill concrete, described rectangle steel tubing string upper end or so two sides is opened in rectangle steel tubing string Mouthful, described portable bracket includes top chute and lower support, and the bottom of top chute is left with rectangle steel tubing string along being slightly less than At the top of right two sides, form one and pour chute, lower support is the bottom for being supported on top chute of ladder shape, and lower support Base be arranged with wheel, before and after rectangle steel tubing string two sides it is upper along set with superstructure fix connector.
In construction method, underground, by the use of rectangle steel tubing string as support system, passes through inverse work without using shuttering supporting The concreting technology of method construction, every layer of blanking thickness and poring rate control when concrete is poured into a mould, portable bracket can be with The utilization repeated, after construction, portable bracket need to only be removed, carry out the use of next construction stage, ensure construction Quality.
The utility model has the advantages that:Save substantial amounts of inner support and peace is torn open, investment reduction, improve effect, and circulation makes With.
Brief description of the drawings
Form a part of accompanying drawing of the present utility model to be used for providing further understanding to of the present utility model, this practicality is new The schematic description and description of type is used to explain the utility model, does not form to improper restriction of the present utility model. In accompanying drawing:
Fig. 1 is a kind of portable bracket schematic diagram of the present utility model;
Embodiment
It should be noted that in the case where not conflicting, the feature in embodiment and embodiment in the utility model can To be mutually combined.Describe the utility model in detail below with reference to the accompanying drawings and in conjunction with the embodiments.
A kind of bracket structure for fill concrete in steel column, including portable bracket, it is characterised in that:Tied on top The connection of structure 1 time sets rectangle steel tubing string 2, fill concrete 3, described rectangle steel tubing string upper end or so two sides in rectangle steel tubing string Opening, described portable bracket include top chute 4 and lower support 5, and the bottom edge of top chute is slightly less than and rectangular steel pipe At the top of post or so two sides, form one and pour chute, lower support is the bottom for being supported on top chute of ladder shape, and bottom The base of support is arranged with wheel 6, the upper connection fixed along setting with superstructure on two sides before and after rectangle steel tubing string Part 7.
In construction method, underground, by the use of rectangle steel tubing string as support system, passes through inverse work without using shuttering supporting The concreting technology of method construction, every layer of blanking thickness and poring rate control when concrete is poured into a mould, portable bracket can be with The utilization repeated, after construction, portable bracket need to only be removed, carry out the use of next construction stage, ensure construction Quality.
Preferred embodiment of the present utility model is the foregoing is only, it is all at this not to limit the utility model Within the spirit and principle of utility model, any modification, equivalent substitution and improvements made etc., the utility model should be included in Protection domain within.

Claims (1)

1. a kind of bracket structure for fill concrete in steel column, including portable bracket, it is characterised in that:In superstructure Lower connect sets rectangle steel tubing string, fill concrete, described rectangle steel tubing string upper end or so two sides opening in rectangle steel tubing string, Described portable bracket includes top chute and lower support, and the bottom of top chute is along being slightly less than and rectangle steel tubing string or so two At the top of face, form one and pour chute, lower support is the bottom for being supported on top chute of ladder shape, and the bottom of lower support Seat is arranged with wheel, the upper connector fixed along setting with superstructure on two sides before and after rectangle steel tubing string.
CN201720571485.9U 2017-05-22 2017-05-22 A kind of bracket structure for fill concrete in steel column Expired - Fee Related CN206941594U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720571485.9U CN206941594U (en) 2017-05-22 2017-05-22 A kind of bracket structure for fill concrete in steel column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720571485.9U CN206941594U (en) 2017-05-22 2017-05-22 A kind of bracket structure for fill concrete in steel column

Publications (1)

Publication Number Publication Date
CN206941594U true CN206941594U (en) 2018-01-30

Family

ID=61361968

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720571485.9U Expired - Fee Related CN206941594U (en) 2017-05-22 2017-05-22 A kind of bracket structure for fill concrete in steel column

Country Status (1)

Country Link
CN (1) CN206941594U (en)

Similar Documents

Publication Publication Date Title
CN104809312B (en) Pile In Karst Area supporting course safe thickness computational methods
CN103452328B (en) Post brutal bracing means and method is subtracted for reinforced concrete member
CN207436503U (en) Efficient construction of precast floorslab hangs membrane module
CN103590599A (en) Self-compaction mode locking device and using method
CN206941594U (en) A kind of bracket structure for fill concrete in steel column
CN205804237U (en) A kind of recycling roadbed concrete guardrail
CN108166395A (en) A kind of construction method that beam bridge is built across Business Line
CN208734343U (en) A kind of station tunnel excavation structure with interim middle spacer post support
CN107780418A (en) The rapid constructing method cheated in Deep Foundation Pit
CN106759444A (en) One kind draws digging formula hyollow foundation
CN205976503U (en) Vertical concrete structure's template lacing device
CN110439592A (en) Shield tunnel two serves as a contrast concrete structure and construction method
CN205776259U (en) A kind of deep basal pit retaining wall one side formwork constructing device
CN207032668U (en) A kind of steel corbel device for fill concrete in rectangle steel tubing string
CN107299596A (en) Support beam template system and its construction method under concrete support trestle plate
CN105587053B (en) A kind of industrialization house wall bottom grouting construction method
CN104746507B (en) A kind of construction refuse regenerated draining CFG pile foundation and construction method thereof
CN207813015U (en) Floor slab preformed hole tool-typed formwork support construction
CN206987373U (en) Core column concrete pours mouth mold tool
CN208815562U (en) A kind of capping beam rapid construction device
CN209066442U (en) A kind of inverse construction joint structure for building construction of deep basal pit
CN206752474U (en) A kind of foundation pit steel support bracket pre-embedded device
CN207405498U (en) A kind of high ferro box beam portable awning portal support device
CN206190323U (en) Colliery is fire dam reinforced structure in pit
CN206972258U (en) A kind of tunnel excavation support structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180130

Termination date: 20180522