CN206928699U - Empty stomach organ timbering system of steel residential structure - Google Patents

Empty stomach organ timbering system of steel residential structure Download PDF

Info

Publication number
CN206928699U
CN206928699U CN201720750323.1U CN201720750323U CN206928699U CN 206928699 U CN206928699 U CN 206928699U CN 201720750323 U CN201720750323 U CN 201720750323U CN 206928699 U CN206928699 U CN 206928699U
Authority
CN
China
Prior art keywords
tubing string
band steel
steel tubing
wall
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720750323.1U
Other languages
Chinese (zh)
Inventor
何金明
喻红霞
王彦超
景亭
樊燕飞
刘重阳
何振宇
范晓新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Timoshenko Architectural Design Firm Ltd
Henan Province Jinhua Summer Construction Group Ltd By Share Ltd
Original Assignee
Hangzhou Timoshenko Architectural Design Firm Ltd
Henan Province Jinhua Summer Construction Group Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Timoshenko Architectural Design Firm Ltd, Henan Province Jinhua Summer Construction Group Ltd By Share Ltd filed Critical Hangzhou Timoshenko Architectural Design Firm Ltd
Priority to CN201720750323.1U priority Critical patent/CN206928699U/en
Application granted granted Critical
Publication of CN206928699U publication Critical patent/CN206928699U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Building Environments (AREA)

Abstract

It the utility model is related to a kind of empty stomach organ timbering system of steel residential structure, including structural framing, heat preserving exterior wall, every family wall and compartment wall, the heat preserving exterior wall is filled in the periphery of the structural framing, the inside that the structural framing is filled in every family wall and the compartment wall, the heat preserving exterior wall and described the empty stomach organ timbering system of steel residential structure is divided into some families every family wall, it is some described per family including multiple by the compartment wall, the heat preserving exterior wall with it is described every family walled into room, the structure dwelling house system can avoid producing projection in corner wall and longitudinal cross wall intersection;And L-type empty stomach organ timbering and T type empty stomaches organ timbering are prefabricated component, convenience in transport, are easy to assemble, can save the engineering time of building-site;Heat preserving exterior wall, between family wall and compartment wall are filled in framework girder steel, it is easy for installation.

Description

Empty stomach organ timbering system of steel residential structure
Technical field
The technical field of steel building is the utility model is related to, more particularly to a kind of empty stomach organ timbering steel house body System.
Background technology
In steel house, conventional Steel Frame Column is in order to meet the bending rigidity of both direction, and often section is larger, Typically no less than 300mm, and the thickness for filling wall is generally no greater than 300mm.After steel column finishes fireproof coating and building coats, A no small external corner projection is had indoors, and the interior for influenceing residential housing uses function, in order to avoid projection, takes into account simultaneously The rigidity of structure of both direction is, it is necessary to handle frame column.
Utility model content
In order to solve the above-mentioned technical problem, the utility model provides a kind of empty stomach organ timbering system of steel residential structure.
The technical solution of the utility model is:Outside a kind of empty stomach organ timbering system of steel residential structure, including structural framing, insulation Wall, every family wall and compartment wall, the heat preserving exterior wall is filled in the periphery of the structural framing, described every family wall and the compartment wall Be filled in the inside of the structural framing, the heat preserving exterior wall and it is described every family wall by the empty stomach organ timbering system of steel residential structure Be divided into some families, it is some it is described include per family it is multiple by the compartment wall, the heat preserving exterior wall with it is described every family walled into room.
Preferably, the structural framing includes framework girder steel, the L-type empty stomach organ timbering positioned at corner and positioned at having a common boundary in length and breadth The T-shaped empty stomach organ timbering at place, it is the heat preserving exterior wall, described between family wall and the compartment wall are filled in the framework girder steel.
Preferably, the L-type empty stomach organ timbering includes vertically arranged vertical band steel tubing string and horizontal band steel tubing string, described perpendicular It is the hollow rectangle structure including long side and short side to band steel tubing string and the horizontal band steel tubing string, the vertical band steel tubing string It is described that at least two uniform companies are vertically provided between band steel tubing string and horizontal band steel tubing string positioned at the left side of horizontal band steel tubing string Girder steel is connect, the right-hand member of the connection girder steel is fixed on the left side short side of horizontal band steel tubing string, and the left end of the connection girder steel is fixed In the right side long side of vertical band steel tubing string, the outer ledge of the connection girder steel and the rear of the right side long side of vertical band steel tubing string Align at edge.
Preferably, the right short of the horizontal band steel tubing string is fixed with that two difference are above and the connection steel of lower section Plate, the front short side of the vertical band steel tubing string are also fixed with that two difference are above and the junction steel plate of lower section, the company Connect steel plate and be provided with several uniform bolts hole, the right short of the horizontal band steel tubing string is fixed with junction steel plate, The welding attachment strap of lower both sides, the front short side of the vertical band steel tubing string are also fixed with the weldering positioned at the upper and lower both sides of junction steel plate Connect attachment strap.
Preferably, the T-shaped empty stomach organ timbering includes a vertical band steel tubing string and two transverse directions being located along the same line Band steel tubing string, the vertical centre for being placed on two horizontal band steel tubing strings of the vertical band steel tubing string, the vertical band steel Tubing string and the horizontal band steel tubing string are the hollow rectangle structure including long side and short side, two horizontal band steel tubing strings Rear long side is alignd with the rear short side of the vertical band steel tubing string, the vertical band steel tubing string and left positioned at vertical band steel tubing string Be fixedly connected between the horizontal band steel tubing string of side by least two uniform connection girder steels, the vertical band steel tubing string and Fix and connect also by least two uniform connection girder steels between the horizontal band steel tubing string on the right side of vertical band steel tubing string Connect.
Preferably, the left side short side of the horizontal band steel tubing string on the left of vertical band steel tubing string is fixed with two difference The above and junction steel plate of lower section, the right short of the horizontal band steel tubing string on the right side of vertical band steel tubing string are also solid Surely there are two difference above and the junction steel plate of lower section, the front short side of the vertical band steel tubing string are also fixed with two points The not above and junction steel plate of lower section, the junction steel plate is provided with several uniform bolts hole, positioned at vertical Flat steel pipe The left side short side of the horizontal band steel tubing string on the left of post is fixed with the welding attachment strap positioned at the upper and lower both sides of junction steel plate, is located at The right short of the horizontal band steel tubing string on the right side of vertical band steel tubing string is also fixed with the weldering positioned at the upper and lower both sides of junction steel plate Attachment strap is connect, the front short side of the vertical band steel tubing string is also fixed with the welding attachment strap positioned at the upper and lower both sides of junction steel plate.
Preferably, filled with the light-weight filled wall that several are connected successively between the adjacent connection girder steel of each two Plate.
Preferably, the length of the long side of the vertical band steel tubing string and/or the horizontal band steel tubing string is the length of short side 3-5 times.
Preferably, the heat preserving exterior wall is filled in the light filling spliced between the framework girder steel and two-by-two including multiple Wallboard, the side of the light filling wallboard are fixed with heat insulating decorative board, marine glue are used between heat insulating decorative board described in each two Bar is bonded.
Preferably, it is described every family wall and the compartment wall be multiple light fillings being filled between the framework girder steel Wallboard is spliced two-by-two.
The beneficial effects of the utility model are:
Empty stomach organ timbering system of steel residential structure of the present utility model, it can avoid in corner wall and the production of longitudinal cross wall intersection Raw projection;And L-type empty stomach organ timbering and T type empty stomaches organ timbering are prefabricated component, convenience in transport, are easy to assemble, can save building site and show The engineering time of field;Heat preserving exterior wall, between family wall and compartment wall are filled in framework girder steel, it is easy for installation.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the structural representation of structural framing of the present utility model;
Fig. 3 is the main structure diagram of L-type empty stomach organ timbering;
Fig. 4 is Fig. 3 A-A sectional views;
Fig. 5 is Fig. 3 B-B sectional views;
Fig. 6 is Fig. 3 partial enlarged view;
Fig. 7 is the main structure diagram of T-shaped empty stomach organ timbering;
Fig. 8 is Fig. 7 A-A sectional views;
Fig. 9 is Fig. 7 B-B sectional views;
Figure 10 is Fig. 7 partial enlarged view;
Figure 11 is Fig. 8 partial enlarged view;
Figure 12 is the structural representation of heat preserving exterior wall;
In figure:1. heat preserving exterior wall, 2. are every Hu Qiang, 3. compartment walls, 4.L type empty stomaches organ timbering, 5.T type empty stomaches organ timbering, 6. frameworks Girder steel, 7. vertical band steel tubing strings, 8. horizontal band steel tubing strings, 9. connection girder steels, 10. junction steel plates, 11. light filling wallboards, 1- 1. heat insulating decorative board, 1-2. assembleds basic unit wall, 1-3. waterproof adhesive tapes.
Embodiment
Specific embodiment of the present utility model is referring to Fig. 1-12:
A kind of empty stomach organ timbering system of steel residential structure, such as Fig. 1-12, including structural framing, heat preserving exterior wall 1, every the and of family wall 2 Compartment wall 3, the heat preserving exterior wall 1 is filled in the periphery of the structural framing, described to be filled in every family wall 2 and the compartment wall 3 The empty stomach organ timbering system of steel residential structure, the heat preserving exterior wall 1 and described is divided into by the inside of the structural framing every family wall 2 Some families, it is some it is described include per family it is multiple by the compartment wall 3, the heat preserving exterior wall 1 and described every the room that family wall 2 surrounds, The structural framing includes framework girder steel 6, the L-type empty stomach organ timbering 4 positioned at corner and the row of the T-shaped empty stomach positioned at intersection in length and breadth Post 5, it is the heat preserving exterior wall 1, described between family wall 2 and the compartment wall 3 are filled in the framework girder steel 6, outside the insulation Wall 1 is filled in the light filling wallboard 11 spliced between the framework girder steel 6 and two-by-two, the light filling wallboard including multiple 11 side is fixed with heat insulating decorative board 1-1, is bonded between heat insulating decorative board 1-1 described in each two with waterproof adhesive tape 1-3, described Every family wall 2 and the compartment wall 3 be multiple light filling wallboards 11 being filled between the framework girder steel 6 splice two-by-two and Into.
Further, the L-type empty stomach organ timbering 4 includes vertically arranged vertical band steel tubing string 7 and horizontal band steel tubing string 8, The vertical band steel tubing string 7 and the horizontal band steel tubing string 8 are the hollow rectangle structure including long side and short side, described vertical Band steel tubing string 7 is located at the left side of horizontal band steel tubing string 8, is provided with least between the vertical band steel tubing string 7 and horizontal band steel tubing string 8 Two uniform connection girder steels 9, the right-hand member of the connection girder steel 9 are fixed on the left side short side of horizontal band steel tubing string 8, the connection The left end of girder steel 9 is fixed on the right side long side of vertical band steel tubing string 7, the outer ledge and vertical Flat steel pipe of the connection girder steel 9 The rearward edges alignment of the right side long side of post 7, it is above that the right short of the horizontal band steel tubing string 8 is fixed with two difference With the junction steel plate 10 of lower section, the front short side of the vertical band steel tubing string 7 is also fixed with that two difference are above and lower section Junction steel plate 10, the junction steel plate 10 is provided with several uniform bolts hole, the right short of the horizontal band steel tubing string 8 The welding attachment strap positioned at 10 upper and lower both sides of junction steel plate is fixed with, the front short side of the vertical band steel tubing string 7 is also fixed with position Welding attachment strap in 10 upper and lower both sides of junction steel plate, between the adjacent connection girder steel 9 of each two filled with several successively The length of the long side of the light filling wallboard 11 of linking, the vertical band steel tubing string 7 and/or the horizontal band steel tubing string 8 is short 3-5 times of the length on side.
Equally, the T-shaped empty stomach organ timbering 5 includes a vertical band steel tubing string 7 and two transverse directions being located along the same line Band steel tubing string 8, the vertical 7 vertical centre for being placed on two horizontal band steel tubing strings 8 of band steel tubing string are described vertical flat Steel pipe column 7 and the horizontal band steel tubing string 8 are the hollow rectangle structure including long side and short side, two horizontal Flat steel pipes The rear long side of post 8 is alignd with the rear short side of the vertical band steel tubing string 7, the vertical band steel tubing string 7 and positioned at vertical flat It is fixedly connected between the horizontal band steel tubing string 8 in the left side of steel pipe column 7 by least two uniform connection girder steels 9, it is described perpendicular It is uniform also by least two to band steel tubing string 7 and between the horizontal band steel tubing string 8 on the right side of vertical band steel tubing string 7 Connection girder steel 9 is fixedly connected, and the left side short side positioned at the horizontal band steel tubing string 8 in the vertical left side of band steel tubing string 7 is fixed with two Individual difference is above and the junction steel plate of lower section 10, positioned at the right side of the horizontal band steel tubing string 8 on the vertical right side of band steel tubing string 7 Side short side is also fixed with that two difference are above and the junction steel plate of lower section 10, the front short side of the vertical band steel tubing string 7 Also it is fixed with that two difference are above and the junction steel plate of lower section 10, the junction steel plate 10 is provided with several uniform bolts Hole, be fixed with positioned at the left side short side of the horizontal band steel tubing string 8 in the vertical left side of band steel tubing string 7 on junction steel plate 10, The welding attachment strap of lower both sides, the right short positioned at the horizontal band steel tubing string 8 on the vertical right side of band steel tubing string 7 are also fixed with position Welding attachment strap in 10 upper and lower both sides of junction steel plate, the front short side of the vertical band steel tubing string 7 are also fixed with positioned at connection steel The welding attachment strap of 10 upper and lower both sides of plate, it is connected light successively filled with several between the adjacent connection girder steel 9 of each two The length of the long side of matter filled-in panel 11, the vertical band steel tubing string 7 and/or the horizontal band steel tubing string 8 is the length of short side 3-5 times.
In use, framework girder steel 6 and connection girder steel 9 use H profile steel beam;Installed between the floor of the structure dwelling house system Assembled floor, assembled floor use steel bar truss floor support plate or prefabricated assembled composite floor plate;It is L-type empty stomach organ timbering 4, T-shaped Empty stomach organ timbering 5 and framework girder steel 6 are processed into steel member as component component in factory, and steel bar truss floor support plate or assembled are answered Close floor and intermediate members are processed into factory.Every family wall 2, compartment wall 3, heat preserving exterior wall 1, standard is all processed into factory Component component;All component component conveyings to scene after, carry out prefabricated construction installation;L-type empty stomach organ timbering 4, T-shaped empty stomach organ timbering 5 and framework girder steel 6 be assembled into structural framing, lay steel bar truss floor support plate or assembled composite floor plate simultaneously on framework girder steel 6 Floorslab concrete is poured, then the assembled basic unit wall 1-2 of heat preserving exterior wall 1, the dried hanging thermal insulation decorative panel on the outside of basic unit's wall are installed Waterproof adhesive tape 1-3 is inserted at gap between 1-1, heat insulating decorative board 1-1, is installed every family wall 2 and compartment wall 3, and do surface Processing.

Claims (10)

  1. A kind of 1. empty stomach organ timbering system of steel residential structure, it is characterised in that including structural framing, heat preserving exterior wall, every family wall and every Room wall, the heat preserving exterior wall is filled in the periphery of the structural framing, described to be filled in the knot every family wall and the compartment wall The inside of structure framework, the heat preserving exterior wall and it is described the empty stomach organ timbering system of steel residential structure is divided into some families every family wall, It is some it is described include per family it is multiple by the compartment wall, the heat preserving exterior wall with it is described every family walled into room.
  2. 2. empty stomach organ timbering system of steel residential structure according to claim 1, it is characterised in that the structural framing includes frame Frame girder steel, the L-type empty stomach organ timbering positioned at corner and the T-shaped empty stomach organ timbering positioned at intersection in length and breadth, it is the heat preserving exterior wall, described Between family wall and the compartment wall are filled in the framework girder steel.
  3. 3. empty stomach organ timbering system of steel residential structure according to claim 2, it is characterised in that the L-type empty stomach organ timbering bag Vertically arranged vertical band steel tubing string and horizontal band steel tubing string are included, the vertical band steel tubing string and the horizontal band steel tubing string are Hollow rectangle structure including long side and short side, the vertical band steel tubing string is located at the left side of horizontal band steel tubing string, described vertical At least two uniform connection girder steels are provided between band steel tubing string and horizontal band steel tubing string, the right-hand member of the connection girder steel is fixed on The left side short side of horizontal band steel tubing string, the left end of the connection girder steel are fixed on the right side long side of vertical band steel tubing string, the company The outer ledge for connecing girder steel aligns with the rearward edges of the right side long side of vertical band steel tubing string.
  4. 4. empty stomach organ timbering system of steel residential structure according to claim 3, it is characterised in that the horizontal band steel tubing string It is above also solid with the junction steel plate of lower section, the front short side of the vertical band steel tubing string that right short is fixed with two difference Surely there are two difference above and the junction steel plate of lower section, the junction steel plate is provided with several uniform bolts hole, described The right short of horizontal band steel tubing string is fixed with the welding attachment strap positioned at the upper and lower both sides of junction steel plate, the vertical band steel tubing string Front short side be also fixed with the welding attachment strap positioned at the upper and lower both sides of junction steel plate.
  5. 5. empty stomach organ timbering system of steel residential structure according to claim 2, it is characterised in that the T-shaped empty stomach organ timbering bag A vertical band steel tubing string and two horizontal band steel tubing strings being located along the same line are included, the vertical band steel tubing string is vertical to be put Put in the centre of two horizontal band steel tubing strings, the vertical band steel tubing string and the horizontal band steel tubing string are including long side With the hollow rectangle structure of short side, the rear long side of two horizontal band steel tubing strings and the rear of the vertical band steel tubing string are short Side is alignd, and passes through at least two between the vertically band steel tubing string and the horizontal band steel tubing string on the left of vertical band steel tubing string Individual uniform connection girder steel is fixedly connected, the vertical band steel tubing string and the horizontal band steel on the right side of vertical band steel tubing string It is fixedly connected between tubing string also by least two uniform connection girder steels.
  6. 6. empty stomach organ timbering system of steel residential structure according to claim 5, it is characterised in that left positioned at vertical band steel tubing string The left side short side of the horizontal band steel tubing string of side is fixed with that two difference are above and the junction steel plate of lower section, positioned at vertical The right short of the horizontal band steel tubing string on the right side of band steel tubing string is also fixed with that two difference are above and the connection of lower section Steel plate, the front short side of the vertical band steel tubing string are also fixed with that two difference are above and the junction steel plate of lower section, described Junction steel plate is provided with several uniform bolts hole, and the left side of the horizontal band steel tubing string on the left of vertical band steel tubing string is short While the welding attachment strap positioned at the upper and lower both sides of junction steel plate is fixed with, the horizontal Flat steel pipe on the right side of vertical band steel tubing string The right short of post is also fixed with the welding attachment strap positioned at the upper and lower both sides of junction steel plate, and the front of the vertical band steel tubing string is short Side is also fixed with the welding attachment strap positioned at the upper and lower both sides of junction steel plate.
  7. 7. the empty stomach organ timbering system of steel residential structure according to claim 3 or 5, it is characterised in that the adjacent institute of each two State the light filling wallboard being connected successively filled with several between connection girder steel.
  8. 8. the empty stomach organ timbering system of steel residential structure according to claim any one of 3-6, it is characterised in that described vertical flat The length of the long side of steel pipe column and/or the horizontal band steel tubing string is 3-5 times of the length of short side.
  9. 9. empty stomach organ timbering system of steel residential structure according to claim 2, it is characterised in that the heat preserving exterior wall includes more Individual to be filled in the light filling wallboard spliced between the framework girder steel and two-by-two, the side of the light filling wallboard is fixed with Heat insulating decorative board, it is bonded with waterproof adhesive tape between heat insulating decorative board described in each two.
  10. 10. empty stomach organ timbering system of steel residential structure according to claim 2, it is characterised in that described every family wall and described Compartment wall is that multiple light filling wallboards being filled between the framework girder steel are spliced two-by-two.
CN201720750323.1U 2017-06-26 2017-06-26 Empty stomach organ timbering system of steel residential structure Active CN206928699U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720750323.1U CN206928699U (en) 2017-06-26 2017-06-26 Empty stomach organ timbering system of steel residential structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720750323.1U CN206928699U (en) 2017-06-26 2017-06-26 Empty stomach organ timbering system of steel residential structure

Publications (1)

Publication Number Publication Date
CN206928699U true CN206928699U (en) 2018-01-26

Family

ID=61352803

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720750323.1U Active CN206928699U (en) 2017-06-26 2017-06-26 Empty stomach organ timbering system of steel residential structure

Country Status (1)

Country Link
CN (1) CN206928699U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110805165A (en) * 2019-11-18 2020-02-18 西藏涛扬新型建材科技有限公司 Assembled row steel pipe concrete composite wall building structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110805165A (en) * 2019-11-18 2020-02-18 西藏涛扬新型建材科技有限公司 Assembled row steel pipe concrete composite wall building structure

Similar Documents

Publication Publication Date Title
JP5643205B2 (en) Unit building system
US8151539B2 (en) Panel building system
CN105421818B (en) Built-in steel Standard house
JPH11514061A (en) High-rise building system using light gauge steel wall panels
US7421828B2 (en) Integral forming technology, a method of constructing steel reinforced concrete structures
CN108277917A (en) A kind of sustainable full module-assembled building system of green and construction method
CN108951850B (en) Assembled house
CN105839782B (en) Modularized house
JP2010144448A (en) Wiring structure of building
CN207794290U (en) A kind of multilayer light gauge cold-formed steel shape-concrete composite structure building construction system
CN110778016B (en) External enclosure system of assembled steel structure house suitable for severe cold area
RU59088U1 (en) DESIGN OF THE METAL FRAME OF THE CONSTRUCTION VOLUME BLOCK FOR A SMALL BUILDING
AU2013332012B2 (en) Building system, particularly a residential building
CN206928699U (en) Empty stomach organ timbering system of steel residential structure
CZ196394A3 (en) Building comprised of modules of prefabricated structural cells
SK5482000A3 (en) Prefabricated house/building realised according to a metallic-structure modular construction method
CN108360682A (en) A kind of construction process of three-dimensional building module and three-dimensional building module
CN111502335A (en) Honeycomb living cabin
KR20090098729A (en) Improved construction system for buildings
US11098475B2 (en) Building system with a diaphragm provided by pre-fabricated floor panels
CN110952676A (en) Building wall module, movable house with building wall module and manufacturing method of movable house
CN205839980U (en) Novel modularized house
US3466828A (en) Modular wall construction
CN206844397U (en) For the L-type empty stomach organ timbering at corner wall
CN206844485U (en) T-shaped empty stomach organ timbering for longitudinal cross wall intersection

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant