- CN206844485U CN206844485U CN201720748737.0U CN201720748737U CN206844485U CN 206844485 U CN206844485 U CN 206844485U CN 201720748737 U CN201720748737 U CN 201720748737U CN 206844485 U CN206844485 U CN 206844485U
- Authority
- CN
- China
- Prior art keywords
- band steel
- tubing string
- steel tubing
- vertical
- horizontal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Load-Bearing And Curtain Walls (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
It the utility model is related to a kind of T type empty stomach organ timberings for longitudinal cross wall intersection,Including a vertical band steel tubing string and two horizontal band steel tubing strings being located along the same line,The vertical centre for being placed on two horizontal band steel tubing strings of the vertical band steel tubing string,Vertical band steel tubing string and horizontal band steel tubing string are the hollow rectangle structure including long side and short side,The rear long side of two horizontal band steel tubing strings is alignd with the rear short side of the vertical band steel tubing string,It is fixedly connected between the vertically band steel tubing string and the horizontal band steel tubing string on the left of it by least two uniform connection girder steels,It is fixedly connected between the vertically band steel tubing string and the horizontal band steel tubing string on the right side of it also by least two uniform connection girder steels,The T type empty stomach organ timberings can avoid producing projection at corner wall,The rigidity of structure of both direction is taken into account simultaneously;And the T-shaped empty stomach organ timbering is prefabricated component, convenience in transport, is easy to assemble, can save the engineering time of building-site.
Description
Technical field
It the utility model is related to the technical field of steel building, more particularly to a kind of T for longitudinal cross wall intersection
Type empty stomach organ timbering.
Background technology
In house, in the intersection of wall in length and breadth, concrete common practices is to set T-shaped shear wall, the thickness of wall
With filling wall thickness, interior is not in the situation of projection.In steel house, conventional Steel Frame Column is in order to meet two
The bending rigidity in direction, often section is larger, typically no less than 300mm, and the thickness for filling wall is generally no greater than 300mm.
After steel column finishes fireproof coating and building coats, a no small external corner projection is had indoors, influences the interior of residential housing
Use function.In order to avoid projection, while the rigidity of structure of both direction is taken into account, it is necessary to handle frame column.
Utility model content
In order to solve the above-mentioned technical problem, the utility model provides a kind of T types for longitudinal cross wall intersection and arranged on an empty stomach
Post.
The technical solution of the utility model is:A kind of T type empty stomach organ timberings for longitudinal cross wall intersection, including one perpendicular
The horizontal band steel tubing string being located along the same line to band steel tubing string and two, the vertical band steel tubing string it is vertical be placed on two
The centre of the horizontal band steel tubing string, the vertical band steel tubing string and the horizontal band steel tubing string are including long side and short side
Hollow rectangle structure, the rear long side of two horizontal band steel tubing strings are alignd with the rear short side of the vertical band steel tubing string,
It is uniform by least two between the vertically band steel tubing string and the horizontal band steel tubing string on the left of vertical band steel tubing string
Connection girder steel be fixedly connected, the vertical band steel tubing string and the horizontal band steel tubing string on the right side of vertical band steel tubing string it
Between be fixedly connected also by least two uniform connection girder steels.
Preferably, the left side short side of the horizontal band steel tubing string on the left of vertical band steel tubing string is fixed with two difference
The above and junction steel plate of lower section, the right short of the horizontal band steel tubing string on the right side of vertical band steel tubing string are also solid
Surely there are two difference above and the junction steel plate of lower section, the front short side of the vertical band steel tubing string are also fixed with two points
The not above and junction steel plate of lower section, the junction steel plate are provided with several uniform bolts hole.
Preferably, filled with the light-weight filled wall that several are connected successively between the adjacent connection girder steel of each two
Plate.
Preferably, the left side short side of the horizontal band steel tubing string on the left of vertical band steel tubing string is fixed with positioned at connection
The welding attachment strap of the upper and lower both sides of steel plate, the right short of the horizontal band steel tubing string on the right side of vertical band steel tubing string are also solid
Surely there is the welding attachment strap positioned at the upper and lower both sides of junction steel plate, the front short side of the vertical band steel tubing string is also fixed with positioned at company
Connect the welding attachment strap of the upper and lower both sides of steel plate.
Preferably, the length of the long side of the vertical band steel tubing string and/or the horizontal band steel tubing string is the length of short side
3-5 times.
The beneficial effects of the utility model are:
T type empty stomach organ timberings of the present utility model for longitudinal cross wall intersection, it can avoid producing in longitudinal cross wall intersection
Raw projection, while take into account the rigidity of structure of both direction;And the T-shaped empty stomach organ timbering is prefabricated component, convenience in transport, is easy to group
Dress, the engineering time of building-site can be saved.
Brief description of the drawings
Fig. 1 is main structure diagram of the present utility model;
Fig. 2 is Fig. 1 A-A sectional views;
Fig. 3 is Fig. 1 B-B sectional views;
Fig. 4 is Fig. 1 partial enlarged view;
In figure:1. vertical band steel tubing string, 2. horizontal band steel tubing strings, 3. connection girder steels, 4. framework girder steels, 5. junction steel plates,
6. light filling wallboard.
Embodiment
Specific embodiment of the present utility model is referring to Fig. 1-4:
Embodiment one, such as Fig. 1-3, a kind of T type empty stomach organ timberings for longitudinal cross wall intersection, including a vertical band steel
Tubing string 1 and two horizontal band steel tubing strings 2 being located along the same line, the vertical band steel tubing string 1 it is vertical be placed on two institutes
The centre of horizontal band steel tubing string 2 is stated, the vertical band steel tubing string 1 and the horizontal band steel tubing string 2 are including long side and short side
Hollow rectangle structure, the rear long side of two horizontal band steel tubing strings 2 and the rear short side pair of the vertical band steel tubing string 1
Together, the vertical band steel tubing string 1 and at least two are passed through between the horizontal band steel tubing string 2 in the vertical left side of band steel tubing string 1
Individual uniform connection girder steel 3 is fixedly connected, the vertical band steel tubing string 1 and the transverse direction positioned at the vertical right side of band steel tubing string 1
It is fixedly connected between band steel tubing string 2 also by least two uniform connection girder steels 3.
Embodiment two, as Figures 1 and 4, essentially identical with embodiment one, difference is, left positioned at vertical band steel tubing string 1
The left side short side of the horizontal band steel tubing string 2 of side is fixed with that two difference are above and the junction steel plate of lower section 5, positioned at perpendicular
To the right short of the horizontal band steel tubing string 2 on the right side of band steel tubing string 1 also it is fixed with that two difference are above and lower section
Junction steel plate 5, the front short side of the vertical band steel tubing string 1 are also fixed with that two difference are above and the junction steel plate of lower section
5, the junction steel plate 5 is provided with several uniform bolts hole.
Embodiment three, such as Fig. 1, essentially identical with embodiment one, difference is, the adjacent connection steel of each two
Filled with the light filling wallboard 6 that several are connected successively between beam 3.
Example IV, as Figures 1 and 4, essentially identical with embodiment three, difference is, left positioned at vertical band steel tubing string 1
The left side short side of the horizontal band steel tubing string 2 of side is fixed with the welding attachment strap positioned at 5 upper and lower both sides of junction steel plate, positioned at perpendicular
Also it is fixed with positioned at 5 upper and lower both sides of junction steel plate to the right short of the horizontal band steel tubing string 2 on the right side of band steel tubing string 1
Attachment strap is welded, the front short side of the vertical band steel tubing string 1 is also fixed with the welding attachment strap positioned at 5 upper and lower both sides of junction steel plate.
In use, the T type empty stomach organ timberings of the present utility model for longitudinal cross wall intersection are completed in factory,
Then transport to job site, be lifted into suitable position, the I-shaped that will be used cooperatively with T-shaped empty stomach organ timbering of the present utility model
The framework girder steel 4 of steel construction is also lifted into job site, and the web of framework girder steel 4 and junction steel plate 5 are connected with, by frame
The flange plate of frame girder steel 4 welds after being put on welding attachment strap with the corresponding vertical band steel tubing string 2 of band steel tubing string 1 or horizontal.
Claims (5)
1. a kind of T type empty stomach organ timberings for longitudinal cross wall intersection, it is characterised in that including a vertical band steel tubing string and two
The individual horizontal band steel tubing string being located along the same line, the vertical band steel tubing string it is vertical be placed on two horizontal Flat steel pipes
The centre of post, the vertical band steel tubing string and the horizontal band steel tubing string are the hollow rectangle structure including long side and short side,
The rear long side of two horizontal band steel tubing strings is alignd with the rear short side of the vertical band steel tubing string, the vertical Flat steel pipe
Fixed between post and the horizontal band steel tubing string on the left of vertical band steel tubing string by least two uniform connection girder steels
Connection, also by least two between the vertically band steel tubing string and the horizontal band steel tubing string on the right side of vertical band steel tubing string
Individual uniform connection girder steel is fixedly connected.
2. the T type empty stomach organ timberings according to claim 1 for longitudinal cross wall intersection, it is characterised in that positioned at vertical
The left side short side of the horizontal band steel tubing string on the left of band steel tubing string is fixed with that two difference are above and the connection steel of lower section
Plate, the right short of the horizontal band steel tubing string on the right side of vertical band steel tubing string be also fixed with two difference it is above and
The junction steel plate of lower section, the front short side of the vertical band steel tubing string are also fixed with that two difference are above and the connection of lower section
Steel plate, the junction steel plate are provided with several uniform bolts hole.
3. the T type empty stomach organ timberings according to claim 1 or 2 for longitudinal cross wall intersection, it is characterised in that each two
Filled with the light filling wallboard that several are connected successively between the adjacent connection girder steel.
4. the T type empty stomach organ timberings according to claim 3 for longitudinal cross wall intersection, it is characterised in that positioned at vertical
The welding that the left side short side of the horizontal band steel tubing string on the left of band steel tubing string is fixed with positioned at the upper and lower both sides of junction steel plate is taken
Plate, the right short of the horizontal band steel tubing string on the right side of vertical band steel tubing string are also fixed with upper and lower positioned at junction steel plate
The welding attachment strap of both sides, the front short side of the vertical band steel tubing string are also fixed with the welding positioned at the upper and lower both sides of junction steel plate
Attachment strap.
5. the T type empty stomach organ timberings according to claim 3 for longitudinal cross wall intersection, it is characterised in that described vertical
The length of the long side of band steel tubing string and/or the horizontal band steel tubing string is 3-5 times of the length of short side.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720748737.0U CN206844485U (en) | 2017-06-26 | 2017-06-26 | T-shaped empty stomach organ timbering for longitudinal cross wall intersection |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720748737.0U CN206844485U (en) | 2017-06-26 | 2017-06-26 | T-shaped empty stomach organ timbering for longitudinal cross wall intersection |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206844485U true CN206844485U (en) | 2018-01-05 |
Family
ID=60802335
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720748737.0U Active CN206844485U (en) | 2017-06-26 | 2017-06-26 | T-shaped empty stomach organ timbering for longitudinal cross wall intersection |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206844485U (en) |
-
2017
- 2017-06-26 CN CN201720748737.0U patent/CN206844485U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104712089B (en) | Open the compound shear attachment structure of net | |
TWI632272B (en) | Three-dimensional light steel frame composed of two-way continuous double beams | |
WO2019178905A1 (en) | Assembling structure for assembled steel structure building | |
CN106677336A (en) | Connecting joint structure of square concrete filled steel tubular column and I-shaped section steel beam | |
WO2016197919A1 (en) | Prefabricated light steel concrete plate column structure and construction method therefor | |
CN105951991B (en) | A kind of assembling type steel structure frame system | |
KR102079008B1 (en) | E-z connecting structure for beam and column wherein the end-moment and bending resistibility are reinforced | |
CN104499567B (en) | Frame structure, frame structure assembly and prefabricating and constructing methods of frame structure assembly | |
CN208934197U (en) | The plug-in filling wall construction system of steel frame and assembled filled-in panel | |
WO2019100798A1 (en) | Fabricated building structure having combined steel structure and concrete structure, and construction method | |
CN107989228A (en) | A kind of prefabricated steel reinforced concrete shear wall structure and its preparation and installation method | |
CN102661010A (en) | Composite shear wall | |
CN107143068A (en) | Steel plate concrete combined shear wall and construction method that a kind of steel bar girder is put more energy into | |
CN104631629A (en) | Assembling type frame structure | |
CN214220084U (en) | Row-shaped steel concrete shear wall and assembly type building structure system thereof | |
CN206737200U (en) | A kind of assembled arthitecutral structure system | |
CN206844485U (en) | T-shaped empty stomach organ timbering for longitudinal cross wall intersection | |
CN110748043A (en) | Anti-buckling steel plate shear wall restrained by all-steel assembly type double-limb steel pipes | |
CN106760059A (en) | A kind of assembled arthitecutral structure system | |
CN206070560U (en) | The steel beam foundation of building hoist | |
CN207363019U (en) | Concrete-filled steel tubular frame structure non-dismantling formwork fills wall and steel pipe anchor connector | |
CN202611010U (en) | Steel plate and brickwork combination shear wall | |
CN205776898U (en) | Overall assembled reinforced concrete shear wall structure system | |
CN205976166U (en) | Assembled composite floor slab | |
KR20110108085A (en) | Structural system for one-room type multi-story building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |