CN206923053U - A kind of integrated base station of Fast Construction - Google Patents

A kind of integrated base station of Fast Construction Download PDF

Info

Publication number
CN206923053U
CN206923053U CN201720817536.1U CN201720817536U CN206923053U CN 206923053 U CN206923053 U CN 206923053U CN 201720817536 U CN201720817536 U CN 201720817536U CN 206923053 U CN206923053 U CN 206923053U
Authority
CN
China
Prior art keywords
tower body
base station
round tube
communication
tube tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720817536.1U
Other languages
Chinese (zh)
Inventor
陈明军
孙欢启
田哲
盖佳宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoning Is Along Communication Technology Ltd Co Of Nation
Original Assignee
Liaoning Is Along Communication Technology Ltd Co Of Nation
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liaoning Is Along Communication Technology Ltd Co Of Nation filed Critical Liaoning Is Along Communication Technology Ltd Co Of Nation
Priority to CN201720817536.1U priority Critical patent/CN206923053U/en
Application granted granted Critical
Publication of CN206923053U publication Critical patent/CN206923053U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Support Of Aerials (AREA)

Abstract

本实用新型公开了一种快速建设的一体化基站,包括通信机房及通信塔,通信塔设于通信机房的上方,通信机房底部设置有钢架基座,通信塔包括由上至下依次设置的避雷针、天线抱杆、第一圆管塔体及第二圆管塔体。避雷针和天线抱杆设于第一圆管塔体上方,第二圆管塔体设于第一圆管塔体下方且与第一圆管塔体通过法兰连接,第二圆管塔体设有四根向外延伸的主支撑杆、且主支撑杆底部分别设有支撑立柱,支撑立柱的一端通过转换法兰与主支撑杆连接,支撑立柱的另一端通过螺栓与钢架基座固定连接。本实用新型结构简单设计合理,支撑强度大、安全性高,施工周期短、占地面积小、节约施工和制造成本、不受季节性影响。

The utility model discloses a rapid construction integrated base station, which comprises a communication machine room and a communication tower. The communication tower is arranged above the communication machine room. A steel frame base is arranged at the bottom of the communication machine room. Lightning rod, antenna pole, first round tube tower body and second round tube tower body. The lightning rod and the antenna holding rod are arranged above the first round tube tower body, the second round tube tower body is arranged under the first round tube tower body and connected with the first round tube tower body through a flange, and the second round tube tower body is arranged There are four main support rods extending outward, and the bottom of the main support rods is respectively provided with a support column, one end of the support column is connected to the main support rod through a conversion flange, and the other end of the support column is fixedly connected to the steel frame base through bolts . The utility model has the advantages of simple structure and reasonable design, high supporting strength, high safety, short construction period, small occupied area, low construction and manufacturing costs, and no seasonal influence.

Description

一种快速建设的一体化基站A rapid construction integrated base station

技术领域technical field

本实用新型涉及通信塔构件技术领域,尤其涉及一种快速建设的一体化基站。The utility model relates to the technical field of communication tower components, in particular to a rapidly constructed integrated base station.

背景技术Background technique

随着通信行业的不断发展,传统基础式通信塔受到诸多因素的限制:体积大,需要现场进行混凝土基础施工,这样造成冬季不能施工,费时费力,而且配套机房需要放置基础,工作量比较大,建站周期比较长。进而导致搬迁困难,外形笨重,施工成本高等难题。塔房一体化的出现成为了快速建站的首选,目前塔房一体化的支撑样式各有不同,安全性、稳定性能更好的四腿支撑式集成一体化基站则成为必然趋势。With the continuous development of the communication industry, the traditional basic communication tower is limited by many factors: it is large in size and requires on-site concrete foundation construction, which makes it impossible to construct in winter, which is time-consuming and labor-intensive. Moreover, the supporting equipment room needs to place a foundation, and the workload is relatively large. The construction cycle is relatively long. This leads to difficulties in relocation, bulky appearance, and high construction costs. The emergence of integrated towers has become the first choice for rapid site construction. At present, the support styles of integrated towers are different. Four-legged integrated integrated base stations with better safety and stability have become an inevitable trend.

传统通信铁塔的基础采用现场浇筑式,施工量大、配重块养生周期长,施工成本高,容易延误施工进度,而且易对环境造成污染;传统通信塔体积庞大,外形不美观,重量大,制作成本高,因为施工周期长可能导致基站无法建立,而且需要为通信机房单独建设基础,整体占地面积大;传统通信塔的施工对季节要求较高,冬季施工非常困难,受季节性影响比较大,而且不能够进行基站的快速搬迁。The foundation of the traditional communication tower adopts the cast-in-place type, which requires a large amount of construction, a long maintenance period for counterweights, high construction costs, easy delays in construction progress, and easy pollution to the environment; traditional communication towers are bulky, unattractive in appearance, and heavy in weight. The production cost is high, because the long construction period may lead to the failure of the base station to be established, and it is necessary to build a separate foundation for the communication room, and the overall area is large; the construction of traditional communication towers has high requirements for seasons, and winter construction is very difficult, which is affected by seasonality. Large, and it is not possible to quickly relocate the base station.

实用新型内容Utility model content

本实用新型的目的在于为克服现有技术的缺陷,而提供一种结构简单,占地面积小、节约施工和制造成本、不受季节性影响、能够进行快速搬迁和快速建设的一体化基站。The purpose of the utility model is to overcome the defects of the prior art, and provide an integrated base station with simple structure, small footprint, saving construction and manufacturing costs, not affected by seasonality, and capable of rapid relocation and rapid construction.

为实现上述目的,本实用新型采用以下技术方案:一种快速建设的一体化基站,包括通信机房及通信塔,通信塔设于通信机房的上方,所述通信机房底部设置有钢架基座,所述通信塔包括由上至下依次设置的避雷针、天线抱杆、第一圆管塔体及第二圆管塔体;所述避雷针和天线抱杆设于所述第一圆管塔体上方,所述第二圆管塔体设于第一圆管塔体下方且与第一圆管塔体通过法兰连接,所述第二圆管塔体设有四根向外延伸的主支撑杆、且所述主支撑杆底部分别设有支撑立柱,所述支撑立柱的一端通过转换法兰与主支撑杆连接,所述支撑立柱的另一端通过螺栓与钢架基座固定连接。In order to achieve the above purpose, the utility model adopts the following technical solutions: a rapid construction integrated base station, including a communication room and a communication tower, the communication tower is set above the communication room, and the bottom of the communication room is provided with a steel frame base, The communication tower includes a lightning rod, an antenna pole, a first round tube tower body and a second round tube tower body arranged sequentially from top to bottom; the lightning rod and antenna pole are arranged above the first round tube tower body , the second round tube tower body is arranged below the first round tube tower body and is connected with the first round tube tower body through a flange, and the second round tube tower body is provided with four main support rods extending outward , and the bottom of the main support rod is respectively provided with a support column, one end of the support column is connected to the main support rod through a conversion flange, and the other end of the support column is fixedly connected to the steel frame base through a bolt.

进一步地,所述支撑立柱之间设有横杆,所述横杆用于加强每根支撑立柱之间连接强度。Further, cross bars are provided between the support columns, and the cross bars are used to strengthen the connection strength between each support column.

进一步地,所述主支撑杆为两段式结构、包括第一支撑杆和第二支撑杆;第一支撑杆焊接在第二圆管塔体上,第二支撑杆的一端与第一支撑杆通过法兰连接,第二支撑杆的另一端通过转换法兰与支撑立柱连接。Further, the main support rod is a two-stage structure, including a first support rod and a second support rod; the first support rod is welded on the second circular tube tower body, and one end of the second support rod is connected to the first support rod Through the flange connection, the other end of the second support rod is connected with the support column through the conversion flange.

进一步地,所述第一圆管塔体和第二圆管塔体上设有爬梯。Further, ladders are provided on the first round tube tower body and the second round tube tower body.

进一步地,所述钢架基座下端设有多个抗倾覆的混泥土配重块,各个混泥土配重块通过螺栓与钢架基座固定连接。Further, the lower end of the steel frame base is provided with a plurality of anti-overturning concrete counterweights, and each concrete counterweight is fixedly connected to the steel frame base by bolts.

进一步地,所述通信塔由多节圆管塔体构成,相邻圆管塔体之间通过法兰连接。Further, the communication tower is composed of multi-section circular tube towers, and adjacent circular tube towers are connected by flanges.

本实用新型与现有技术相比的有益效果是:本实用新型主要由圆管塔体、通信机房、钢架基础及混凝土配重块组成,圆管塔体采用法兰连接,混凝土配重块与钢架基座采用螺栓连接,并且上述部件采用工厂预先加工成型,只需在施工现场进行连接装配即可,大大缩短了施工时间。本实用新型结构简单设计合理,支撑强度大、安全性高,施工周期短、占地面积小、节约施工和制造成本、不受季节性影响、能够进行快速搬迁,并且能够降低施工对环境造成的污染,值得推广。Compared with the prior art, the utility model has the beneficial effects that: the utility model is mainly composed of a circular tube tower, a communication room, a steel frame foundation and a concrete counterweight. The circular tube tower is connected by a flange, and the concrete counterweight It is connected with the steel frame base by bolts, and the above components are pre-processed in the factory, and only need to be connected and assembled at the construction site, which greatly shortens the construction time. The utility model has the advantages of simple structure, reasonable design, high support strength, high safety, short construction period, small occupied area, saving construction and manufacturing costs, not affected by seasonality, quick relocation, and can reduce the impact of construction on the environment. Pollution is worth promoting.

附图说明Description of drawings

图1为本实用新型的整体结构实施例示意图。Fig. 1 is a schematic diagram of an overall structure embodiment of the present utility model.

图中:避雷针1、天线抱杆2、第一圆管塔体3、第二圆管塔体4、主支撑杆5、支撑立柱6、爬梯7、钢架基座8、混泥土配重块9、通信机房10、第一支撑杆11、第二支撑杆12、横杆13、转换法兰14、法兰连接15。In the figure: lightning rod 1, antenna holding pole 2, first round tube tower body 3, second round tube tower body 4, main support rod 5, support column 6, climbing ladder 7, steel frame base 8, concrete counterweight 9. Communication machine room 10, first support rod 11, second support rod 12, cross bar 13, conversion flange 14, flange connection 15.

具体实施方式detailed description

为了更充分理解本实用新型的技术内容,下面结合具体实施例对本实用新型的技术方案作进一步介绍和说明。In order to fully understand the technical content of the utility model, the technical solution of the utility model will be further introduced and illustrated below in conjunction with specific embodiments.

如图1所示,一种快速建设的一体化基站,包括通信机房10及通信塔,通信塔设于通信机房10的上方,通信机房10底部设置有钢架基座8,通信塔包括由上至下依次设置的避雷针1、天线抱杆2、第一圆管塔体3及第二圆管塔体4。避雷针1和天线抱杆2设于第一圆管塔体3上方,第二圆管塔体4设于第一圆管塔体3下方且与第一圆管塔体3通过法兰连接,第二圆管塔体4设有四根向外延伸的主支撑杆5、且主支撑杆5底部分别设有支撑立柱6,支撑立柱6的一端通过转换法兰14与主支撑杆5连接,支撑立柱6的另一端通过螺栓与钢架基座8固定连接。As shown in Fig. 1, a kind of rapid construction integrated base station includes a communication machine room 10 and a communication tower. The communication tower is arranged above the communication machine room 10. The lightning rod 1, the antenna pole 2, the first round tube tower body 3 and the second round tube tower body 4 are arranged in sequence from bottom to bottom. The lightning rod 1 and the antenna pole 2 are arranged above the first round tube tower body 3, the second round tube tower body 4 is arranged under the first round tube tower body 3 and connected with the first round tube tower body 3 through a flange, and the second round tube tower body 4 The two circular tube towers 4 are provided with four main support rods 5 extending outward, and the bottom of the main support rods 5 are respectively provided with a support column 6, and one end of the support column 6 is connected with the main support rod 5 by a conversion flange 14, and supports The other end of the column 6 is fixedly connected with the steel frame base 8 by bolts.

优选地,支撑立柱6之间设有横杆13,横杆13用于加强每根支撑立柱6之间连接强度。Preferably, a cross bar 13 is provided between the support columns 6 , and the cross bar 13 is used to strengthen the connection strength between each support column 6 .

优选地,主支撑杆5为两段式结构、包括第一支撑杆11和第二支撑杆12。第一支撑杆11焊接在第二圆管塔体4上,第二支撑杆12的一端与第一支撑杆11通过法兰连接15,第二支撑杆12的另一端通过转换法兰14与支撑立柱6连接。Preferably, the main support rod 5 is a two-stage structure, including a first support rod 11 and a second support rod 12 . The first support rod 11 is welded on the second circular tube tower body 4, and one end of the second support rod 12 is connected with the first support rod 11 by a flange 15, and the other end of the second support rod 12 is connected with the support by a conversion flange 14. Column 6 is connected.

优选地,第一圆管塔体3和第二圆管塔体4上设有爬梯7。Preferably, a climbing ladder 7 is provided on the first round tube tower body 3 and the second round tube tower body 4 .

优选地,钢架基座8下端设有多个抗倾覆的混泥土配重块9,混泥土配重块9通过螺栓与钢架基座8固定连接。Preferably, the lower end of the steel frame base 8 is provided with multiple anti-overturning concrete counterweights 9, and the concrete counterweights 9 are fixedly connected to the steel frame base 8 by bolts.

优选地,该通信塔由多节圆管塔体构成,相邻圆管塔体之间通过法兰连接;本实施例中的通信塔由第一圆管塔体3和第二圆管塔体4组成的塔体结构,该通信塔不限于上述结构,还可根据实际的需求设置成多节塔体结构。Preferably, the communication tower is composed of multi-section circular tube towers, and adjacent circular tube towers are connected by flanges; the communication tower in this embodiment consists of a first circular tube tower 3 and a second circular tube tower 4 tower structure, the communication tower is not limited to the above structure, but also can be set into a multi-section tower structure according to actual needs.

本实用新型主要由圆管塔体、通信机房、钢架基础及混凝土配重块组成,圆管塔体采用法兰连接,混凝土配重块与钢架基座采用螺栓连接,并且上述部件采用工厂预先加工成型,只需在施工现场进行连接装配即可,大大缩短了施工时间。本实用新型结构简单设计合理,支撑强度大、安全性高,施工周期短、占地面积小、节约施工和制造成本、不受季节性影响、能够进行快速搬迁,并且能够降低施工对环境造成的污染,值得推广。The utility model is mainly composed of a circular tube tower, a communication room, a steel frame foundation and a concrete counterweight. The circular tube tower is connected by a flange, and the concrete counterweight and the steel frame base are connected by bolts. It is pre-processed and formed, and only needs to be connected and assembled at the construction site, which greatly shortens the construction time. The utility model has the advantages of simple structure, reasonable design, high support strength, high safety, short construction period, small occupied area, saving construction and manufacturing costs, not affected by seasonality, quick relocation, and can reduce the impact of construction on the environment. Pollution is worth promoting.

以上陈述仅以实施例来进一步说明本实用新型的技术内容,以便于读者更容易理解,但不代表本实用新型的实施方式仅限于此,任何依本实用新型所做的技术延伸或再创造,均受本实用新型的保护。The above statements only use examples to further illustrate the technical content of the utility model, so that readers can understand it more easily, but it does not mean that the implementation of the utility model is limited to this, and any technical extension or re-creation according to the utility model, All are protected by the utility model.

Claims (6)

1. a kind of integrated base station of Fast Construction, including communications equipment room and communication tower, communication tower is located at the top of communications equipment room, It is characterized in that:The communications equipment room bottom is provided with steelframe pedestal, and what the communication tower included from top to bottom setting gradually keeps away Thunder pin, antenna holding pole, the first pipe tower body and the second pipe tower body;The lightning rod and antenna holding pole are located at first pipe Above tower body, the second pipe tower body is connected below the first pipe tower body and with the first pipe tower body by flange, institute State the second pipe tower body and be respectively equipped with support post provided with four main support rods to stretch out and the main support rod bottom, One end of the support post is connected by crossover flange with main support rod, and the other end of the support post passes through bolt and steel Frame pedestal is fixedly connected.
A kind of 2. integrated base station of Fast Construction according to claim 1, it is characterised in that:Between the support post Provided with cross bar, the cross bar is used to strengthen bonding strength between every support post.
A kind of 3. integrated base station of Fast Construction according to claim 1, it is characterised in that:The main support rod is two Segmentation structure including first support bar and second support bar;First support bar is welded on the second pipe tower body, second support bar One end be connected with first support bar by flange, the other end of second support bar is connected by crossover flange with support post.
A kind of 4. integrated base station of Fast Construction according to claim 1, it is characterised in that:The first pipe tower body Cat ladder is provided with the second pipe tower body.
A kind of 5. integrated base station of Fast Construction according to claim 1, it is characterised in that:The steelframe pedestal lower end Mixed mud balancing weight provided with multiple antidumpings, the mixed mud balancing weight are fixedly connected by bolt with steelframe pedestal.
A kind of 6. integrated base station of Fast Construction according to claim 1, it is characterised in that:The communication tower is by more piece Pipe tower body is formed, and is connected between adjacent pipe tower body by flange.
CN201720817536.1U 2017-07-07 2017-07-07 A kind of integrated base station of Fast Construction Expired - Fee Related CN206923053U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720817536.1U CN206923053U (en) 2017-07-07 2017-07-07 A kind of integrated base station of Fast Construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720817536.1U CN206923053U (en) 2017-07-07 2017-07-07 A kind of integrated base station of Fast Construction

Publications (1)

Publication Number Publication Date
CN206923053U true CN206923053U (en) 2018-01-23

Family

ID=61335766

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720817536.1U Expired - Fee Related CN206923053U (en) 2017-07-07 2017-07-07 A kind of integrated base station of Fast Construction

Country Status (1)

Country Link
CN (1) CN206923053U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108756426A (en) * 2018-06-08 2018-11-06 杭州万兴科技股份有限公司 Tower built in communication equipment
CN109339555A (en) * 2018-10-15 2019-02-15 合肥鸿坤通信工程有限公司 A kind of New Style Mountainous Regions integrated communication base station

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108756426A (en) * 2018-06-08 2018-11-06 杭州万兴科技股份有限公司 Tower built in communication equipment
CN109339555A (en) * 2018-10-15 2019-02-15 合肥鸿坤通信工程有限公司 A kind of New Style Mountainous Regions integrated communication base station

Similar Documents

Publication Publication Date Title
CN202559571U (en) Net rack roof with siphon rainwater pipeline
CN103043543B (en) Device for reinforcing tower crane in coastal zone
CN206923053U (en) A kind of integrated base station of Fast Construction
CN204920400U (en) Tower room integration communication base station
CN205531392U (en) Stop device that topples is prevented in steel space frame jacking
CN203788804U (en) Design of wind-resistant and snow-resistant sunlight greenhouse framework
CN203626212U (en) Pier stud construction operation platform quick to disassemble and assemble
CN207863305U (en) A kind of building iron concrete structure column contracture device
CN206329135U (en) A kind of narrow base angle head tower used for transmission line
CN205238603U (en) A big beam mold steelframe for preparation of aerogenerator blade
CN206015700U (en) A kind of raft foundation steelframe support
CN206035063U (en) Tripod support's integrated communication tower
CN203729653U (en) Wind-resistant reinforced type iron tower
CN203225074U (en) Advertising board of net rack structure
CN209009971U (en) A kind of spiral duct lifting moulding bed
CN201883728U (en) DC filter structural frame for converter station
CN202672823U (en) Power tower
CN219365350U (en) Movable scaffold tower
CN102410159A (en) wind turbine tower
CN203285092U (en) Integrated base station
CN205100604U (en) Tower room integration basic station
CN203271093U (en) Novel scaffold
CN204531380U (en) Band post Concrete Anti wall with flues common group closes steel form device
CN206458055U (en) Scaffold
CN203684777U (en) 220 kV substation framework

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180123