CN108756426A - Tower built in communication equipment - Google Patents

Tower built in communication equipment Download PDF

Info

Publication number
CN108756426A
CN108756426A CN201810584207.6A CN201810584207A CN108756426A CN 108756426 A CN108756426 A CN 108756426A CN 201810584207 A CN201810584207 A CN 201810584207A CN 108756426 A CN108756426 A CN 108756426A
Authority
CN
China
Prior art keywords
steel
tower
column foot
tower body
steel frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810584207.6A
Other languages
Chinese (zh)
Inventor
赵欣荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Wanxing Polytron Technologies Inc
Original Assignee
Hangzhou Wanxing Polytron Technologies Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Wanxing Polytron Technologies Inc filed Critical Hangzhou Wanxing Polytron Technologies Inc
Priority to CN201810584207.6A priority Critical patent/CN108756426A/en
Publication of CN108756426A publication Critical patent/CN108756426A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/02Structures made of specified materials
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/22Sockets or holders for poles or posts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/22Sockets or holders for poles or posts
    • E04H12/2292Holders used for protection, repair or reinforcement of the post or pole

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Materials Engineering (AREA)
  • Wood Science & Technology (AREA)
  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

Tower built in a kind of communication equipment, tower body is to use connecting structure of resin composite material single-pipe tower, is mainly technically characterized by tower body bottom and fixes column foot, column foot is steel-frame structure, the square body being made of top surface, side and bottom surface, each face are welded into side by girder steel respectively;Column foot and tower body pass through fixed conversion flanged joint between upper and lower two blocks of crossover flange plates.The present invention fixes the column foot of steel framework posture under primary resin composite material single-pipe tower, and support more consolidates, provides more load capacity.Filtration system and intelligent checking system are placed in steel frame, filtration system includes filter screen, air-conditioning;Detecting system includes filter screen life tests temperature detection, air detection, Humidity Detection, infrared temperature Scanning Detction, warning function.

Description

Tower built in communication equipment
Technical field
The present invention relates to a kind of communication towers, particularly relate to resin composite material single-pipe tower structure.
Background technology
One patent of invention of our company, a kind of entitled " connecting structure of resin composite material single-pipe tower ", Patent No. 200910209976.9, it includes tower body, internal lining pipe, ring flange etc., is equipped between technical characteristics tower body and ring flange Internal lining pipe, internal lining pipe one end are inlayed and are welded with ring flange inner ring, or are nested and weld with ring flange outer shroud, tower body and liner Pipe is wound formula molding.The present invention does not destroy the globality and aesthetics of tower body, and can be according to the ground in single-pipe tower location The natural conditions such as matter, wind speed and design requirement determine the internal lining pipe of corresponding length, it is ensured that have enough wind resistance power and twisting resistance. The present invention is improved structure on the basis of the invention, i.e., increases column foot under tower body.
Invention content
The present invention provides a kind of glass steel tower being more fixedly supported above, and can inside place the logical of communication equipment Believe tower built in equipment.
The present invention is achieved by the following technical solution:Tower built in a kind of communication equipment, including tower body, tower body are to adopt With connecting structure of resin composite material single-pipe tower, it is mainly technically characterized by tower body bottom and fixes column foot, column foot is steel frame knot Structure, the square body being made of top surface, side and bottom surface, each face are welded into side by girder steel respectively;Column foot passes through up and down with tower body Fixed conversion flanged joint between two blocks of crossover flange plates.
Column foot steel frame bottom is fixed by forming cross by bearing girder steel among four side of steel frame girder steel.
The steel frame side is welded into side by steelframe frame girder steel respectively and constitutes, and each layer is separated by steel frame crossbeam, point If being divided into dried layer, column foot wherein three faces are reinforced by steel frame cant beam;Four sides are also to be welded by steel frame girder steel at the top of steel frame It is constituted at side.
Four sides being made of steel frame girder steel at the top of the steel frame, centre are welded with the short conversion girder steel of two length two, are used for Crossover flange is connected, ribbed stiffener is fixed at intervals between crossover flange and conversion girder steel.
The tower body fixes upper crossover flange plate, column foot fixes lower crossover flange plate, between upper and lower two blocks of crossover flange plates Fixed conversion flange, crossover flange and conversion girder steel are welded to connect by four pieces of ribbed stiffeners, and tower body and upper crossover flange plate pass through 8- 12 high-strength bolts are fixed,
The crossover flange is fixedly arranged above tapered cap, prevents the rainwater in tower body from falling directly into inside steel frame.
The column foot periphery is equipped with outer cover, i.e., has wrapped up one layer of resin composite materials outer cover on the outside of steel frame to protect inside Equipment, outer cover is front and back to be equipped with door.
Feeder hole is equipped at the top of the outer cover, feeder hole is hook solid, prevents rainwater from entering inside outer cover;It is equipped in outer cover Filtration system and intelligent checking system, filtration system include filter screen, air-conditioning;Detecting system includes filter screen life tests temperature Detection, air detection, Humidity Detection, infrared temperature Scanning Detction, warning function.
The tower body is Wrapping formed on internal lining pipe and mold by resin composite materials, is implanted into when winding a half thickness Reinforcing bar circumferentially has several reinforcing bars, reinforcing bar to run through tower body, internal lining pipe and ring flange in tower body.
The steel frame girder steel for constituting column foot is channel steel, each other by being welded and fixed;Bearing girder steel converts girder steel as angle Iron.
The present invention fixes the column foot of steel framework posture under primary resin composite material single-pipe tower, and support is more firm, provides more Multi-load amount.
Filtration system and intelligent checking system are placed in steel frame, filtration system includes filter screen, air-conditioning;Detecting system packet The temperature detection of life tests containing filter screen, air detection, Humidity Detection, infrared temperature Scanning Detction, warning function.Air is logical It crosses filter screen and purifies the influence for being further reduced air particles to equipment, maintenance personnel can be allowed to carry by filter screen life tests It is early to replace.The air-conditioning integrated above is more preferably controlled in steel frame by temperature detection, Humidity Detection, infrared temperature Scanning Detction The temperature that portion's equipment is stablized.Warning function then can be when having a power failure, and when the temperature is excessively high, when being destroyed by external force, equipment does not work When etc. situations such as send out alarm, notify maintenance personnel to repair as early as possible.
Description of the drawings:
Fig. 1 is column foot steel frame bottom plan view;
Fig. 2 is column foot steel frame side expanded view;
Fig. 3 is column foot steel frame top plan view;
Fig. 4 is column foot structural schematic diagram;
Fig. 5 is overall diagram of the present invention;
Fig. 6 is column foot surface structure schematic diagram;
Fig. 7 is column foot place apparatus schematic diagram;
Fig. 8 is housing structure schematic diagram.
Specific implementation mode:
As shown in Fig. 1-Fig. 7, tower built in equipment is made of column foot steel frame 1 and tower body 2, and tower body is resin composite materials, column foot One layer of resin composite materials shell 3 has been wrapped up on the outside of steel frame protects internal equipment.Four side 2-1 of steel frame bottom is by steel frame Cross is formed among girder steel by bearing girder steel 2-2 to fix.The expansion of steel frame side is welded into side 2-3 by steelframe frame girder steel, each Layer is separated by steel frame crossbeam 2-4, can be separated into N layers according to demand, for placing operators communication equipment, then be used steel framework Frame cant beam 2-7 fixes each layer, fixes three faces, wherein one side is without the fixed entrance for being used for keeping place apparatus.It is overall The height of steel frame is then determined that four side 2-5 are also to be made of steel frame girder steel at the top of steel frame by steel frame girder steel.Steel frame Top is welded with the short conversion girder steel 2-6 of 2 length 2 by four side steel frame girder steels, centre, for connecting crossover flange 4, adds 4 Ribbed stiffener 5 and upper and lower crossover flange plate 6,6-1 are used for preferably fixed and stablize crossover flange 4, play so that when connecting tower body It waits highly stable firm.Tower body and column foot are welded to connect by upper and lower two blocks of crossover flange plates and 4 pieces of ribbed stiffeners, tower body and upper Crossover flange plate is fixed by 8-12 high-strength bolt 7, and crossover flange is fixedly arranged above tapered cap 8, prevents the rain in tower body Water is fallen directly into inside steel frame.
Such as the overall diagram of Fig. 5,6,7:It is wrapped in one layer of composite material fiberglass outer cover outside steel frame, has respectively before and after outer cover Two fan doors 9,9-1, are easy to open installation, maintained equipment.Top has equipped with feeder hole 10, and quantity can increase according to internal unit Or it reduces.Feeder hole is hook solid, prevents rainwater from entering inside outer cover.Crossover flange top be equipped with tapered cap, prevent water from Stream enters inside outer cover in tower body.Equipped with filtration system and intelligent checking system 11, filtration system includes filter screen, air-conditioning;Inspection Examining system includes filter screen life tests temperature detection, air detection, Humidity Detection, infrared temperature Scanning Detction, work(of alarming Energy.Air is further reduced influence of the air particles to equipment by filter screen purification, can be allowed by filter screen life tests Maintenance personnel replaces ahead of time.The air-conditioning integrated above is more preferably controlled by temperature detection, Humidity Detection, infrared temperature Scanning Detction The temperature that steel frame internal unit processed is stablized.Warning function then can have a power failure when, when the temperature is excessively high, when being destroyed by external force, Situations such as when equipment does not work etc., send out alarm, and maintenance personnel is notified to repair as early as possible.
As shown in figure 8, then use resin composite materials it is Wrapping formed on internal lining pipe and mold, wind a half thickness it When, meet implantation reinforcing bar 12 on material in the resin of a half thickness so that the upper lower flange 13 of the connection of reinforcing bar 12,13-1, internal lining pipe 14 and tower body 2, circumferentially there are several reinforcing bars, reinforcing bar to run through tower body, internal lining pipe and ring flange in tower body.Reinforce whole tower The intensity of body and flange provides more load capacity.Reinforcing bar can be implanted into different number according to tower body load bearing demand and be wanted to meet It asks, then proceedes to winding until completing.

Claims (10)

1. tower built in a kind of communication equipment, including tower body, tower body is to use connecting structure of resin composite material single-pipe tower, feature It is that column foot is fixed in tower body bottom, column foot is steel-frame structure, the square body being made of top surface, side and bottom surface, each face point Side is not welded by girder steel;Column foot and tower body pass through fixed conversion flanged joint between upper and lower two blocks of crossover flange plates.
2. tower built in a kind of communication equipment as described in claim 1, it is characterised in that column foot steel frame bottom is by steel frame steel Cross is formed among the sides Liang Si by bearing girder steel to fix.
3. tower built in a kind of communication equipment as described in claim 1, it is characterised in that steel frame side is respectively by steelframe frame steel Beam is welded into side composition, and each layer is separated by steel frame crossbeam, if being separated into dried layer, column foot wherein three faces are by steel frame cant beam It reinforces;Four are constituted when being also to be welded by steel frame girder steel at the top of steel frame.
4. tower built in a kind of communication equipment as described in claim 1, it is characterised in that by steel frame girder steel structure at the top of steel frame At four sides, centre is welded with the short conversion girder steel of two length two, for connecting crossover flange, between crossover flange and conversion girder steel between Every being fixed with ribbed stiffener.
5. tower built in a kind of communication equipment as described in claim 1, it is characterised in that tower body fixes upper crossover flange plate, column foot Fixed lower crossover flange plate, fixed conversion flange between upper and lower two blocks of crossover flange plates, crossover flange and conversion girder steel are by four pieces Ribbed stiffener is welded to connect, and tower body and upper crossover flange plate are fixed by 8-12 high-strength bolt.
6. tower built in a kind of communication equipment as claimed in claim 5, it is characterised in that crossover flange is fixedly arranged above tapered cap, Prevent the rainwater in tower body from falling directly into inside steel frame.
7. tower built in a kind of communication equipment as described in claim 1, it is characterised in that column foot periphery is equipped with outer cover, i.e. steel frame One layer of resin composite materials outer cover has been wrapped up to protect internal unit in outside, and outer cover is front and back to be equipped with door.
8. tower built in a kind of communication equipment as claimed in claim 7, it is characterised in that be equipped with feeder hole, feeder hole at the top of outer cover It is hook solid, prevents rainwater from entering inside outer cover;Filtration system and intelligent checking system are equipped in outer cover, filtration system included Strainer, air-conditioning;Detecting system includes filter screen life tests temperature detection, air detection, Humidity Detection, infrared temperature scanning Detection, warning function.
9. tower built in a kind of communication equipment as described in claim 1, it is characterised in that tower body is by resin composite materials in liner It is Wrapping formed on pipe and mold, it is implanted into reinforcing bar when winding a half thickness, i.e., circumferentially there are several reinforcing bars in tower body, Reinforcing bar runs through tower body, internal lining pipe and ring flange.
10. tower built in a kind of communication equipment as described in claim 1, it is characterised in that the steel frame girder steel for constituting column foot is slot Steel, each other by being welded and fixed;Bearing girder steel converts girder steel as angle bar.
CN201810584207.6A 2018-06-08 2018-06-08 Tower built in communication equipment Pending CN108756426A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810584207.6A CN108756426A (en) 2018-06-08 2018-06-08 Tower built in communication equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810584207.6A CN108756426A (en) 2018-06-08 2018-06-08 Tower built in communication equipment

Publications (1)

Publication Number Publication Date
CN108756426A true CN108756426A (en) 2018-11-06

Family

ID=64000449

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810584207.6A Pending CN108756426A (en) 2018-06-08 2018-06-08 Tower built in communication equipment

Country Status (1)

Country Link
CN (1) CN108756426A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111576983A (en) * 2020-05-27 2020-08-25 南京工程学院 Novel auxiliary supporting device for tower mast steel structure

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101812935A (en) * 2009-10-28 2010-08-25 赵欣荣 Connecting structure of resin composite material single-pipe tower
WO2012087145A1 (en) * 2010-12-22 2012-06-28 Jarlsø As Method for building a site for a telecommunication device
CN204782124U (en) * 2015-06-11 2015-11-18 江苏省邮电规划设计院有限责任公司 Steel underframe erects single -pipe tower's fast assembly basic station
CN105350811A (en) * 2015-11-05 2016-02-24 浙江巨匠钢业有限公司 Communication tower
CN206923053U (en) * 2017-07-07 2018-01-23 辽宁顺邦通信技术股份有限公司 A kind of integrated base station of Fast Construction
CN208430844U (en) * 2018-06-08 2019-01-25 杭州万兴科技股份有限公司 Tower built in communication equipment

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101812935A (en) * 2009-10-28 2010-08-25 赵欣荣 Connecting structure of resin composite material single-pipe tower
WO2012087145A1 (en) * 2010-12-22 2012-06-28 Jarlsø As Method for building a site for a telecommunication device
CN204782124U (en) * 2015-06-11 2015-11-18 江苏省邮电规划设计院有限责任公司 Steel underframe erects single -pipe tower's fast assembly basic station
CN105350811A (en) * 2015-11-05 2016-02-24 浙江巨匠钢业有限公司 Communication tower
CN206923053U (en) * 2017-07-07 2018-01-23 辽宁顺邦通信技术股份有限公司 A kind of integrated base station of Fast Construction
CN208430844U (en) * 2018-06-08 2019-01-25 杭州万兴科技股份有限公司 Tower built in communication equipment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111576983A (en) * 2020-05-27 2020-08-25 南京工程学院 Novel auxiliary supporting device for tower mast steel structure
CN111576983B (en) * 2020-05-27 2021-06-29 南京工程学院 Auxiliary supporting device for tower mast steel structure

Similar Documents

Publication Publication Date Title
EP2253781B1 (en) Composite connection for a wind turbine tower structure
CN208430844U (en) Tower built in communication equipment
WO2018076497A1 (en) Comprehensive bamboo composite pipe gallery capable of accommodating multiple types of pipes
CN105257032B (en) Large-scale main cylinder floor steel structure cooling tower
WO2018076494A1 (en) Embedded supporting assembly for pipe gallery
CN108265977B (en) Large-span space latticed shell assembly jig frame construction method under complex working condition
WO2016041291A1 (en) Method for the manufacture of a tubular steel pillar having a reinforcing internal wall structure
WO2018076489A1 (en) Comprehensive bamboo composite pipe gallery
CN108756426A (en) Tower built in communication equipment
CN104727620A (en) Self-supporting double-layer chimney
CN202001212U (en) Tower frame for wind generating set
CN103057877B (en) Arch-top storage tank with reticulated shell
CN110761954B (en) Precast concrete fan tower barrel with spiral line connecting seam and connecting method
CN102087031A (en) Large-diameter glass steel internal cylinder mounted in large-diameter chimney
CN206487178U (en) Distribution box protection canopy is used in one kind construction
CN206667244U (en) A kind of protection wall of bored pile
CN107100415A (en) A kind of multi-functional attachment means of putting more energy into of glass reinforced plastic inner cylinder
CN205206413U (en) Large -scale main section of thick bamboo console mode steel construction cooling tower
CN209145339U (en) A kind of double-layer detachable reinforcement shed
CN207919603U (en) A kind of basement roof construction drainage system
CN208043072U (en) A kind of total powerstation monitoring station for automatic monitoring
CN206971892U (en) The multi-functional attachment means of putting more energy into of glass reinforced plastic inner cylinder
CN202001213U (en) Cylindrical tower
CN110393092A (en) A kind of Multifunctional granary partly maked somebody a mere figurehead for storing Bulk Grain
EA015524B1 (en) Enclosed bridge

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination