CN206902528U CN201720545639.7U CN201720545639U CN206902528U CN 206902528 U CN206902528 U CN 206902528U CN 201720545639 U CN201720545639 U CN 201720545639U CN 206902528 U CN206902528 U CN 206902528U
Authority
CN
China
Prior art keywords
vertical rod
steel
wood
lumps
adjacent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720545639.7U
Other languages
Chinese (zh)
Inventor
关琦峰
孙俊德
刘林
杜小波
罗文�
刘俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Creation Luqiao Construction Co Ltd
Original Assignee
Chongqing Creation Luqiao Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Creation Luqiao Construction Co Ltd filed Critical Chongqing Creation Luqiao Construction Co Ltd
Priority to CN201720545639.7U priority Critical patent/CN206902528U/en
Application granted granted Critical
Publication of CN206902528U publication Critical patent/CN206902528U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of overpass structure-improved, the top of each steel corbel is provided with the first I-steel;It is provided with one group of truss between each two adjacent bridge piers, the top of the head and the tail both ends of this group of truss respectively with two adjacent the first I-steel is fixed;The top of this group of truss is provided with several the second I-steel, the first vertical rod is provided with each second I-steel, the bottom of each first vertical rod with each second I-steel with being connected respectively, the top of each first vertical rod is provided with first lumps of wood, connected between each two adjacent first lumps of wood by second lumps of wood, the bottom of second lumps of wood is connected with first lumps of wood, and the top of second lumps of wood is provided with template.On the one hand the utility model extends the service life of bridge pier;On the other hand, when with a varied topography, surface relief be larger and soil layer is to be set up on soft layer, the firmness of the whole pontic of cost is effectively reduced.

Description

Overpass structure-improved
Technical field
It the utility model is related to a kind of overpass structure-improved.
Background technology
Overpass, i.e. overbridge.Espespecially rest on a series of narrow armored concrete or bricklaying arch, there is the tower of high support Or pillar, across the bridge of mountain valley, river, road or other lower barriers.Congested in traffic after urban development, building is close Collection, and street is difficult to widen, and uses this bridge to improve conevying efficiency with relief of traffic density.
In addition, in intercity highway or railway, to avoid and All other routes level-crossing, saving land used, reduce It roadbed settlement (certain areas), can not have to embankment yet, and use overpass.But there is following defect in existing overpass:One side Face, existing overpass bridge is longer, so as to need multiple bridge piers to be supported bridge, but because bridge pier height is higher, So as to cause the stability of whole pontic to decline, particularly when setting up across the bridge in mountain valley, the height of bridge pier can gradually increase It is high, it is impossible to the weight of bridge to be distributed on bridge pier, the concentrated force of bridge pier is larger, so as to cause easily to damage bridge pier by pressure, makes whole The service life of individual pontic shortens;On the other hand, with a varied topography, surface relief be larger and soil layer is to be set up on soft layer When, build that cost is higher and firmness cannot effectively improve.
Therefore those skilled in the art are directed to developing a kind of overpass improvement knot that can effectively improve pontic stability Structure.
Utility model content
The purpose of this utility model is just to provide a kind of overpass structure-improved that can effectively improve pontic stability.
The purpose of this utility model realizes that it includes a kind of overpass structure-improved by such technical scheme, Including several bridge piers, the bridge pier both sides are provided with steel corbel;The top of each steel corbel is provided with the first I-shaped Steel;
Be provided with one group of truss between each two adjacent bridge piers, the head and the tail both ends of this group of truss respectively with it is adjacent The tops of two the first I-steel fix;The top of this group of truss is provided with several the second I-steel, each second work Be provided with the first vertical rod on word steel, each first adjacent vertical rod is connected by the second vertical rod, second vertical rod with First vertical rod is vertical;The bottom of each first vertical rod with each second I-steel with being connected respectively, and each described first The top of vertical rod is provided with first lumps of wood,
Connected between each two adjacent first lumps of wood by second lumps of wood, the bottom of second lumps of wood and institute The connection of first lumps of wood is stated, the top of second lumps of wood is provided with template.
In order to further improve bridge stability, each bridge pier offers first through hole, and first is logical on each bridge pier The center line in hole overlaps, and is provided with chrome molybdenum rod iron in the first through hole, and the both ends of the chrome molybdenum rod iron each extend over out described First through hole, and be bonded through the steel corbel for being arranged on bridge pier both sides, the inner side of the steel corbel with the bridge pier outer surface, institute State a diameter of 120mm of chrome molybdenum rod iron;The top of two steel corbels is connected by the first screw-thread steel and the second screw-thread steel on the bridge pier Connect, the diameter of each first screw-thread steel and each second screw-thread steel is 40mm.
Preferably, the height of first I-steel is 590mm, and it is described, it is described to be arranged on the first of steel corbel top The number of I-steel is two, and the spacing of described two first I-steel is 30mm.
Preferably, the truss is made of several beret truss, each two beret truss is one group, described adjacent two It is apart 45cm, and connected by connector between group beret truss.
Preferably, the first vertical rod is button bowl vertical rod.
Preferably, the top of each first adjacent vertical rod is connected by the 3rd vertical rod, each described adjacent the The bottom of one vertical rod is connected by the 4th vertical rod, and the 3rd vertical rod is put down with the 4th vertical rod with second vertical rod OK.
Preferably, some 5th vertical rods are provided with above the second I-steel, the upper end point of each 5th vertical rod Do not fixed with first vertical rod with the 3rd vertical rod junction, first vertical rod and the is distinguished in the lower end of each 5th vertical rod The junction of four vertical rods is fixed, and the angle of each 5th vertical rod and the 3rd vertical rod is 29 °, each 5th vertical rod and institute The angle for stating the 4th vertical rod is 29 °.
By adopting the above-described technical solution, the utility model has the following advantages:On the one hand the utility model extends The service life of bridge pier;On the other hand, when with a varied topography, surface relief be larger and soil layer is to be set up on soft layer, have The firmness for reducing the whole pontic of cost of effect.
Other advantages, target and feature of the present utility model will be explained in the following description to a certain extent State, and to a certain extent, based on will be apparent to those skilled in the art to investigating hereafter, or Person can be instructed from practice of the present utility model.Target of the present utility model and other advantages can be said by following Bright book and claims are realized and obtained.
Brief description of the drawings
Brief description of the drawings of the present utility model is as follows.
Fig. 1 is the structural representation of the embodiment of the utility model one.
Fig. 2 is close-up schematic view at A in Fig. 1.
Connection diagram in Fig. 3 the utility model between the lumps of wood and vertical rod.
Fig. 4 is the left view structural representation in Fig. 3.
Embodiment
The utility model is described in further detail with reference to the accompanying drawings and examples.
Embodiment 1:
To shown in Fig. 4, a kind of overpass structure-improved, including several bridge piers 1, the both sides of bridge pier 1 are all provided with below figure 1 It is equipped with steel corbel 50;The top of each steel corbel 50 is provided with the first I-steel 2;
Be provided with one group of truss 3 between each two adjacent bridge piers 1, the head and the tail both ends of this group of truss 3 respectively with The top of two adjacent the first I-steel 2 is fixed;The top of this group of truss 3 is provided with several the second I-steel 4, each described The first vertical rod 5 is provided with second I-steel 4, each first adjacent vertical rod 5 is connected by the second vertical rod 6, described Second vertical rod 6 is vertical with first vertical rod 5;The bottom of each first vertical rod 5 with each second I-steel 4 with connecting respectively Connecing, the top of each first vertical rod 5 is provided with first lumps of wood 7,
Connected between each two adjacent first lumps of wood 7 by second lumps of wood 8, the bottom of second lumps of wood 8 It is connected with first lumps of wood 7, the top of second lumps of wood 8 is provided with template 9.
Each bridge pier 1 offers first through hole 10, and the center line of first through hole 10 overlaps on each bridge pier 1, described Chrome molybdenum rod iron 11 is provided with first through hole 10, the both ends of the chrome molybdenum rod iron 11 each extend over out the first through hole 10, and Through the steel corbel 50 for being arranged on the both sides of bridge pier 1, the inner side of the steel corbel 50 is bonded with the outer surface of bridge pier 1, the chromium A diameter of 120mm of molybdenum steel rod 11;The top of two steel corbels 50 passes through the first screw-thread steel 12 and the second screw-thread steel on the bridge pier 1 13 connections, the diameter of each first screw-thread steel 12 and each second screw-thread steel 13 is 40mm.
The truss 3 is made of several beret truss 14, and each two beret truss 14 is one group, two groups of adjacent shellfishes It is apart 45cm, and connected by connector between thunder piece 14.
First vertical rod 5 is button bowl vertical rod.
The top of each first adjacent vertical rod 5 is connected by the 3rd vertical rod 15, each first adjacent vertical rod 5 Bottom connected by the 4th vertical rod 16, the 3rd vertical rod 15 is flat with second vertical rod 6 with the 4th vertical rod 16 OK.
The top of second I-steel 4 is provided with some 5th vertical rods 17, the upper end point of each 5th vertical rod 17 Do not fixed with first vertical rod 5 with the junction of the 3rd vertical rod 15, the lower end difference described first of each 5th vertical rod 17 is vertical Bar 5 and the junction of the 4th vertical rod 16 are fixed, and the angle of each 5th vertical rod 17 and the 3rd vertical rod 15 is 29 °, each institute The angle for stating the 5th vertical rod 17 and the 4th vertical rod 16 is 29 °.
Embodiment 2:
To shown in Fig. 4, a kind of overpass structure-improved, including several bridge piers 1, the both sides of bridge pier 1 are provided with below figure 1 Steel corbel 50;The top of each steel corbel 50 is provided with the first I-steel 2;
Be provided with one group of truss 3 between each two adjacent bridge piers 1, the head and the tail both ends of this group of truss 3 respectively with it is adjacent The tops of two the first I-steel 2 fix;The top of this group of truss 3 is provided with several the second I-steel 4, each second I-shaped It is provided with the first vertical rod 5 on steel 4, in the present embodiment, the first vertical rod 5 is button bowl vertical rod.Each the first adjacent vertical rod 5 passes through Second vertical rod 6 connects, and the second vertical rod 6 is vertical with the first vertical rod 5;The bottom of each first vertical rod 5 with respectively with each second I-steel 4 Connection, the top of each first vertical rod 5 are provided with first lumps of wood 7,
Connected between each two adjacent first lumps of wood 7 by second lumps of wood 8, the bottom of second lumps of wood 8 and first party Wood 7 connects, and the top of second lumps of wood 8 is provided with template 9.
Each bridge pier 1 offers first through hole 10, and the center line of first through hole 10 overlaps on each bridge pier 1, in first through hole 10 Chrome molybdenum rod iron 11 is provided with, the both ends of chrome molybdenum rod iron 11 each extend over out first through hole 10, and pass through and be arranged on the both sides of bridge pier 1 Steel corbel 50, the inner side of steel corbel 50 are bonded with the outer surface of bridge pier 1, a diameter of 120mm of chrome molybdenum rod iron 11;Two on the bridge pier 1 The top of individual steel corbel 50 is connected by the first screw-thread steel 12 and the second screw-thread steel 13, each first screw-thread steel 12 and each second screw thread The diameter of steel 13 is 40mm.
The height H of first I-steel 2 is 590mm, and the number for being arranged on first I-steel 2 on the top of steel corbel 50 is two Individual, the spacing of two the first I-steel 2 is 30mm.
Truss 3 is made of several beret truss 14, and each two beret truss 14 is one group, adjacent two groups of beret truss 14 it Between at a distance of being 45cm, and connected by connector.
The top of each the first adjacent vertical rod 5 is connected by the 3rd vertical rod 15, and the bottom of each the first adjacent vertical rod 5 is equal Connected by the 4th vertical rod 16, the 3rd vertical rod 15 is parallel with the second vertical rod 6 with the 4th vertical rod 16.
The top of second I-steel 4 is provided with some 5th vertical rods 17, and the upper end of each 5th vertical rod 17 is respectively with first Vertical rod 5 is fixed with the junction of the 3rd vertical rod 15, and the connection of the first vertical rod 5 and the 4th vertical rod 16 is distinguished in the lower end of each 5th vertical rod 17 Place is fixed, and the angle of each 5th vertical rod 17 and the 3rd vertical rod 15 is 29 °, and the angle of each 5th vertical rod 17 and the 4th vertical rod 16 is 29°。
In the utility model, embodiment 2 is most preferred embodiment.
Finally illustrate, above example is only unrestricted to illustrate the technical solution of the utility model, although ginseng The utility model is described in detail according to preferred embodiment, it will be understood by those within the art that, can be to this The technical scheme of utility model is modified or equivalent substitution, and without departing from the objective and scope of the technical program, it all should Cover among right of the present utility model.

Claims (7)

1. a kind of overpass structure-improved, including several bridge piers (1), it is characterized in that:Bridge pier (1) both sides are provided with steel Bracket (50);The top of each steel corbel (50) is provided with the first I-steel (2);
One group of truss (3), the head and the tail both ends difference of this group of truss (3) are provided between each two adjacent bridge piers (1) Fixed with the top of two adjacent the first I-steel (2);The top of this group of truss (3) is provided with several the second I-steel (4) the first vertical rod (5), is provided with each second I-steel (4), each adjacent first vertical rod (5) passes through Two vertical rods (6) connect, and second vertical rod (6) is vertical with first vertical rod (5);The bottom of each first vertical rod (5) with It is connected respectively with each second I-steel (4), the top of each first vertical rod (5) is provided with first lumps of wood (7),
Connected between each two adjacent first lumps of wood (7) by second lumps of wood (8), the bottom of second lumps of wood (8) End is connected with first lumps of wood (7), and the top of second lumps of wood (8) is provided with template (9).
2. overpass structure-improved as claimed in claim 1, it is characterized in that:Each bridge pier (1) offers first through hole (10), the center line of first through hole (10) is overlapped on each bridge pier (1), and chrome molybdenum rod iron is provided with the first through hole (10) (11), the both ends of the chrome molybdenum rod iron (11) each extend over out the first through hole (10), and pass through and be arranged on bridge pier (1) both sides Steel corbel (50), the inner side of the steel corbel (50) is bonded with the bridge pier (1) outer surface, the chrome molybdenum rod iron (11) it is straight Footpath is 120mm;The top of upper two steel corbels (50) of the bridge pier (1) is connected by the first screw-thread steel (12) and the second screw-thread steel (13) Connect, the diameter of each first screw-thread steel (12) and each second screw-thread steel (13) is 40mm.
3. overpass structure-improved as claimed in claim 1, it is characterized in that:The height (H) of first I-steel (2) is 590mm, described, the number of first I-steel (2) for being arranged on steel corbel (50) top is two, described two first works The spacing of word steel (2) is 30mm.
4. overpass structure-improved as claimed in claim 1, it is characterized in that:The truss (3) uses several beret truss (14) it is made, each two beret truss (14) is one group, is apart 45cm, and pass through between two groups of adjacent beret truss (14) Connector connects.
5. overpass structure-improved as claimed in claim 1, it is characterized in that:First vertical rod (5) is button bowl vertical rod.
6. overpass structure-improved as claimed in claim 1, it is characterized in that:The top of each adjacent first vertical rod (5) Connected by the 3rd vertical rod (15), the bottom of each adjacent first vertical rod (5) is connected by the 4th vertical rod (16), institute It is parallel with second vertical rod (6) with the 4th vertical rod (16) to state the 3rd vertical rod (15).
7. overpass structure-improved as claimed in claim 6, it is characterized in that:It is provided with above second I-steel (4) Some 5th vertical rods (17), the upper end of each 5th vertical rod (17) respectively with first vertical rod (5) and the 3rd vertical rod (15) junction is fixed, and first vertical rod (5) and the company of the 4th vertical rod (16) are distinguished in the lower end of each 5th vertical rod (17) Place is met to fix, the angle of each 5th vertical rod (17) and the 3rd vertical rod (15) is 29 °, each 5th vertical rod (17) with The angle of 4th vertical rod (16) is 29 °.
CN201720545639.7U 2017-05-12 2017-05-12 Overpass structure-improved Active CN206902528U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720545639.7U CN206902528U (en) 2017-05-12 2017-05-12 Overpass structure-improved

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720545639.7U CN206902528U (en) 2017-05-12 2017-05-12 Overpass structure-improved

Publications (1)

Publication Number Publication Date
CN206902528U true CN206902528U (en) 2018-01-19

Family

ID=61288910

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720545639.7U Active CN206902528U (en) 2017-05-12 2017-05-12 Overpass structure-improved

Country Status (1)

Country Link
CN (1) CN206902528U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107083740A (en) * 2017-05-12 2017-08-22 重庆创发路桥建设有限公司 A kind of overpass structure-improved

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107083740A (en) * 2017-05-12 2017-08-22 重庆创发路桥建设有限公司 A kind of overpass structure-improved

Similar Documents

Publication Publication Date Title
CN100543232C (en) The double-deck continuous girder bridge of steel-concrete combined structure
CN106978777B (en) A kind of make-shift bridge device
CN201891069U (en) Through steel pipe-concrete open type truss combination beam bridge
CN105178206B (en) Spliced-type shed tunnel
CN208995896U (en) Space truss suspension bridge
CN105133484B (en) A kind of part earth anchor higher-lower tower cable-stayed bridge structure
CN201778275U (en) Dual-lane cableway bridge
CN209227563U (en) High steep weathering seriously with the rock side slope supporting construction of joints development
CN206902528U (en) Overpass structure-improved
CN108060634A (en) Duplexing font ultra-high performance concrete-normal concrete composite beam bridge girder construction and its construction method
CN102912701B (en) Multi-functional left-turn directional interchange overpass
CN204780568U (en) High water level, fast velocity of flow arched bridge binder buttress system
CN106758745A (en) A kind of arch bridge and its construction method
CN209082285U (en) A kind of pavement structure having fiber mixture
CN207032000U (en) The arch bridge that a kind of oblique is crossed over
CN107083740A (en) A kind of overpass structure-improved
CN108978436A (en) Space truss suspension bridge
CN101570956B (en) Two-lane beam-bridge end reinforcement concrete frame pier in side walk
CN212375700U (en) Torsion inclined pier
CN206941328U (en) Prevent the bridge paving structure that pave-load layer ftractures at Steel Continuous Box beam bridge central bearing point
CN206768571U (en) A kind of hybrid structure of arch and beam structure of band pair string
CN205856952U (en) A kind of stretch-proof road structure
CN203583369U (en) Underwater temporary supporting pier for steel trussed beam dragging erection
CN205188794U (en) Novel pipeline structure that crosses river
CN212316646U (en) Double-truss double-arch bridge