CN206888671U - A kind of convenient guard rail set up of rail construction - Google Patents

A kind of convenient guard rail set up of rail construction Download PDF

Info

Publication number
CN206888671U
CN206888671U CN201621332603.2U CN201621332603U CN206888671U CN 206888671 U CN206888671 U CN 206888671U CN 201621332603 U CN201621332603 U CN 201621332603U CN 206888671 U CN206888671 U CN 206888671U
Authority
CN
China
Prior art keywords
montant
fixedly connected
sleeve pipe
guard rail
supporting plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621332603.2U
Other languages
Chinese (zh)
Inventor
赵启明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Sunpoly Kaiyuan Technology Co Ltd
Original Assignee
Tianjin Sunpoly Kaiyuan Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Sunpoly Kaiyuan Technology Co Ltd filed Critical Tianjin Sunpoly Kaiyuan Technology Co Ltd
Priority to CN201621332603.2U priority Critical patent/CN206888671U/en
Application granted granted Critical
Publication of CN206888671U publication Critical patent/CN206888671U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/108Rainwater harvesting

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a kind of rail to construct with the convenient guard rail set up, including the first montant, the second montant and connecting rod, the bottom of first montant is fixedly connected with water tank, first montant inner vertical is provided with water pipe, the upper end of water pipe is connected with drip pan, and the bottom of the second montant is fixedly connected with supporting plate, the second road wheel is installed with the left of the bottom of supporting plate, through there is threaded rod, the lower end of threaded rod is fixedly connected with lower margin on the right side of supporting plate;Two connecting rods are vertically disposed between first montant and the second montant, connecting rod includes sleeve pipe and expansion link, montant is provided between upper and lower two connecting rods, concave block is fixedly connected with the left of first montant, projection is fixedly connected with the right side of the second montant, the utility model is simple in construction, reasonable in design, very simply it can be dismantled and be connected, reduction floor space, convenience in transport can also be shortened, while the connection between guard rail unit is also very convenient.

Description

A kind of convenient guard rail set up of rail construction
Technical field
A kind of guard rail is the utility model is related to, the convenient guard rail set up of specifically a kind of rail construction.
Background technology
Railway transportation is a kind of land transportation mode, is walked with locomotive traction rail vehicle on two parallel rails, If being arranged to work as, railway transportation can transport than road surface saves five to seventy percent energy when delivering same weight thing, and rail The weight of the average scatter columns car of energy, greatly improves the lifting capacity of train.
Rail construction is a ring mostly important in railway construction, in order to ensure being normally carried out for construction, prevents the external world To disturb, general on side at the construction field (site) all to install guard rail additional, guard rail is typically all what is be made up of multiple guard rail units, But modern guard rail unit can not be dismantled and shunk, the process at the scene of transporting is very troublesome, and guard rail It is typically all to be fixed together by bolt or iron wire between unit, although the former fixes firmly, disassembly and installation is all Inconvenience, although the latter's disassembly and installation is convenient, fixed is insecure.
Therefore, the problem of for being proposed in above-mentioned background technology, those skilled in the art propose a kind of new protection Column.
Utility model content
The purpose of this utility model is to provide a kind of rail construction the convenient guard rail set up, to solve above-mentioned background The problem of being proposed in technology.
To achieve the above object, the utility model provides following technical scheme:
A kind of rail the construction convenient guard rail set up, including the first montant, the second montant and connecting rod, described first The bottom of montant is fixedly connected with water tank, and the first montant inner vertical is provided with water pipe, and the upper end of water pipe is connected with drip pan, water The bottom of pipe connects with water tank, and the bottom of water tank is installed with the first road wheel, and water tank is connected with the side wall of bottom Tap;The bottom of second montant is fixedly connected with supporting plate, and the second walking is installed with the left of the bottom of supporting plate Wheel, through there is a threaded rod, the lower end of threaded rod is fixedly connected with lower margin for the right side of supporting plate, and the bottom of lower margin is bonded with anti-skidding Pad, the threaded upper ends of threaded rod are connected with nut, and the bottom surface of nut is fixedly connected with the top surface of supporting plate;First montant and The bottom of second montant is provided with reinforcing ring;Two connecting rods are vertically disposed between first montant and the second montant, Connecting rod includes sleeve pipe and expansion link;One end of described sleeve pipe is fixedly connected with the first montant, and the other end setting of sleeve pipe is limited Position ring, expansion link are set in sleeve pipe, and one end of expansion link is fixedly connected with the second montant, and the other end of expansion link is fixedly connected Limited location block, bolt is threaded with sleeve pipe, and the lateral wall of bolt through sleeve pipe and expansion link is brought into close contact;The upper end Sleeve upper end is provided with potted plant by neck, is provided with montant between upper and lower two connecting rods, montant is provided at both ends with hemisphere The block rubber of shape, block rubber and the arc groove being fixedly installed in the fixed block in connecting rod are connected;Described first is perpendicular Concave block is fixedly connected with the left of bar, the bottom of concave block is provided with the first magnet piece, is fixedly connected with the right side of the second montant convex Block, the top of projection are provided with the second magnet piece;The right side upper end of second montant is welded with handle.
Further, the top of the drip pan is embedded with screen pack.
Further, the diameter of the limited block is more than the minimum diameter of spacing ring.
Further, second magnet piece is opposite with the magnetic of the first magnet piece.
Compared with prior art, the utility model by hemispheric block rubber it is convenient by montant be erected at connecting rod it Between, connecting rod can arbitrarily change length, convenient use and installation, the cooperation of limited block and spacing ring can prevent expansion link from Extracted out for whole in sleeve pipe, pass through concave block between guard rail and projection is connected with each other, the cooperation of the second magnet piece and the first magnet piece So that the connection between guard rail is more stable, the first road wheel and the second road wheel facilitate device to move, and handle causes The mobility of device is more preferable, by the cooperation of threaded rod and lower margin, facilitates device to carry out stably, catchmenting on last first montant Bucket can be able to be that potted plant on guard rail is watered under dry weather, filter by rainwater-collecting to water tank Net prevents from blocking using rear water pipe for a long time.
Brief description of the drawings
Fig. 1 is the structural representation of the convenient guard rail set up of rail construction.
Fig. 2 is the structural representation of connecting rod in the convenient guard rail set up of rail construction.
Fig. 3 is concave block and the attachment structure schematic diagram of projection in the convenient guard rail set up of rail construction.
Embodiment
The technical scheme of this patent is described in more detail with reference to embodiment.
Refer to Fig. 1-3, a kind of rail the construction convenient guard rail set up, including the first montant 4, the and of the second montant 11 Connecting rod 8, the bottom of first montant 4 are fixedly connected with water tank 21, and the inner vertical of the first montant 4 is provided with water pipe 3, water pipe 3 upper end is connected with drip pan 1, and the top of drip pan 1 is embedded with screen pack 2, and the bottom of water pipe 3 connects with water tank 21, water tank 21 bottom is installed with the first road wheel 22, and water tank 21 is connected with tap 23 in the side wall of bottom;Described second The bottom of montant 11 is fixedly connected with supporting plate 17, and the second road wheel 18 is installed with the left of the bottom of supporting plate 17, supports Through there is a threaded rod 15, the lower end of threaded rod 15 is fixedly connected with lower margin 19 on the right side of plate 17, and the bottom of lower margin 19 is bonded with anti- Skidding, the threaded upper ends of threaded rod 15 are connected with nut 16, and the bottom surface of nut 16 is fixedly connected with the top surface of supporting plate 17;It is described The bottom of first montant 4 and the second montant 11 is provided with reinforcing ring 20;Between the montant 11 of first montant 4 and second up and down Two connecting rods 8 are provided with, connecting rod 8 includes sleeve pipe 9 and expansion link 10;One end of described sleeve pipe 9 is fixed with the first montant 4 to be connected Connect, the other end of sleeve pipe 9 sets restraining position ring block 31, and expansion link 10 is set in sleeve pipe 9, and one end of expansion link 10 is perpendicular with second Bar 11 is fixedly connected, and the other end of expansion link 10 is fixedly connected with limited block 30, and the diameter of limited block 30 is more than spacing ring 31 Minimum diameter, bolt 7 is threaded with sleeve pipe 9, and the lateral wall of bolt 7 through sleeve pipe 9 and expansion link 10 is brought into close contact;It is described The upper end of sleeve pipe 9 of upper end is provided with potted plant 5 by neck 6, and montant 26 is provided between upper and lower two connecting rods 8, montant 26 Hemispheric block rubber 27 is provided at both ends with, block rubber 27 and the arc in the fixed block 24 being fixedly installed in connecting rod 8 are recessed Groove 25 is connected;The left side of first montant 4 is fixedly connected with concave block 29, and the bottom of concave block 29 is provided with the first magnet piece 28, the right side of the second montant 11 is fixedly connected with projection 14, and the top of projection 14 is provided with the second magnet piece 13, the second magnet Block 13 is opposite with the magnetic of the first magnet piece 28;The right side upper end of second montant 11 is welded with handle 12, the construction of this rail With the convenient guard rail set up when in use, montant 26 is erected at connecting rod 8 by the way that hemispheric block rubber 27 is convenient Between, connecting rod 8 can arbitrarily change length, convenient use and installation, and the cooperation of limited block 30 and spacing ring 31 can prevent Expansion link 10 is extracted out for whole out of sleeve pipe 9, is connected with each other between guard rail by concave block 29 and projection 14, the second magnet piece 13 Cooperation with the first magnet piece 28 make it that the connection between guard rail is more stable, the first road wheel 22 and the second road wheel 18 Device is facilitated to move, handle 12 make it that the mobility of device is more preferable, by the cooperation of threaded rod 15 and lower margin 19, convenient dress Put and carry out stabilization, the drip pan 1 on last first montant 4 can be by rainwater-collecting to water tank 21, can under dry weather Think on the guard rail it is potted plant watered, screen pack 2 prevents from blocking using rear water pipe 3 for a long time.
The better embodiment of this patent is explained in detail above, but this patent is not limited to above-mentioned embodiment party Formula, can also be on the premise of this patent objective not be departed from one skilled in the relevant art's possessed knowledge Make a variety of changes.

Claims (4)

1. a kind of rail construction is existed with the convenient guard rail set up, including the first montant, the second montant and connecting rod, its feature In the bottom of first montant is fixedly connected with water tank, and the first montant inner vertical is provided with water pipe, the upper end connection of water pipe There is drip pan, the bottom of water pipe connects with water tank, and the bottom of water tank is installed with the first road wheel, and water tank is close to the side of bottom Tap is connected with wall;The bottom of second montant is fixedly connected with supporting plate, is fixedly mounted on the left of the bottom of supporting plate There is the second road wheel, the right side of supporting plate is through there is threaded rod, and the lower end of threaded rod is fixedly connected with lower margin, and the bottom of lower margin is glued Slipmat is had, the threaded upper ends of threaded rod are connected with nut, and the bottom surface of nut is fixedly connected with the top surface of supporting plate;Described The bottom of one montant and the second montant is provided with reinforcing ring;Two are vertically disposed between first montant and the second montant Connecting rod, connecting rod include sleeve pipe and expansion link;One end of described sleeve pipe is fixedly connected with the first montant, and the other end of sleeve pipe is set Spacing ring is equipped with, expansion link is set in sleeve pipe, and one end of expansion link is fixedly connected with the second montant, and the other end of expansion link is consolidated Surely limited block is connected with, bolt is threaded with sleeve pipe, the lateral wall of bolt through sleeve pipe and expansion link is brought into close contact;It is described The sleeve upper end of upper end is provided with potted plant by neck, is provided with montant between upper and lower two connecting rods, the both ends of montant are set There is hemispheric block rubber, block rubber and the arc groove being fixedly installed in the fixed block in connecting rod are connected;It is described Concave block is fixedly connected with the left of first montant, the bottom of concave block is provided with the first magnet piece, and the right side of the second montant, which is fixed, to be connected Projection is connected to, the top of projection is provided with the second magnet piece;The right side upper end of second montant is welded with handle.
2. the convenient guard rail set up of rail construction according to claim 1, it is characterised in that the top of the drip pan End is embedded with screen pack.
3. the convenient guard rail set up of rail according to claim 1 construction, it is characterised in that the limited block it is straight Footpath is more than the minimum diameter of spacing ring.
4. the convenient guard rail set up of rail construction according to claim 1, it is characterised in that second magnet piece It is opposite with the magnetic of the first magnet piece.
CN201621332603.2U 2016-12-07 2016-12-07 A kind of convenient guard rail set up of rail construction Expired - Fee Related CN206888671U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621332603.2U CN206888671U (en) 2016-12-07 2016-12-07 A kind of convenient guard rail set up of rail construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621332603.2U CN206888671U (en) 2016-12-07 2016-12-07 A kind of convenient guard rail set up of rail construction

Publications (1)

Publication Number Publication Date
CN206888671U true CN206888671U (en) 2018-01-16

Family

ID=61327863

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621332603.2U Expired - Fee Related CN206888671U (en) 2016-12-07 2016-12-07 A kind of convenient guard rail set up of rail construction

Country Status (1)

Country Link
CN (1) CN206888671U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108824269A (en) * 2018-07-03 2018-11-16 浙江海洋大学 A kind of combined type highway barrier

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108824269A (en) * 2018-07-03 2018-11-16 浙江海洋大学 A kind of combined type highway barrier

Similar Documents

Publication Publication Date Title
CN105484164B (en) Spanning type bailey beam bracket and construction method thereof
CN103469735B (en) The mounting method of curve ultrahigh hollow column plate type pier top solid section template
CN206888671U (en) A kind of convenient guard rail set up of rail construction
CN204023319U (en) For the triangular tower of cableway of constructing
CN202865707U (en) Equipment for erecting and constructing beam and vertical beam on existing line
CN206031120U (en) Equal adjustable of height and track prevents smooth right angle tower wagon of preventing inclining
CN208981809U (en) A kind of Ground arrangement constructing structure
CN204877488U (en) A bracket device that can walk that is used for tunnel no. 2 lining side wall operations
CN204551535U (en) A kind of safety against overturning fills with the well lid of leakproof
CN107386117A (en) A kind of device of double rod iron method construction bridges bent caps
CN205557213U (en) Operation car for maglev train construction
CN206705589U (en) A kind of urban discharging pipeline installation boom hoisting
CN207314179U (en) A kind of sound barrier monoblock type rim of a cup mounting structure
CN207016306U (en) A kind of outer elevator hoistways and wall body fixing device
CN207420098U (en) A kind of garden architecture supporting rack
CN207419526U (en) A kind of underpass falsework
CN206719341U (en) A kind of centre of gravity restrains compressed natural gas semitrailer
CN206502297U (en) A kind of belt feeder feeding device integral type aisle
CN203257133U (en) Arrangement structure of platform rainshed of railway station
CN203005481U (en) Solar energy heat collecting tube carrying trolley
CN206829182U (en) A kind of Combined formwork support system
CN206428815U (en) The firm sunlight shed of fixed structure
CN204490410U (en) Wind big gun lifting frock
CN208484682U (en) A kind of insulation track transport vehicle
CN206142667U (en) Bridge crane's crane span structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180116

Termination date: 20191207