CN206887985U - Isolated footing under a kind of photovoltaic generation support reinforced column - Google Patents

Isolated footing under a kind of photovoltaic generation support reinforced column Download PDF

Info

Publication number
CN206887985U
CN206887985U CN201720345123.8U CN201720345123U CN206887985U CN 206887985 U CN206887985 U CN 206887985U CN 201720345123 U CN201720345123 U CN 201720345123U CN 206887985 U CN206887985 U CN 206887985U
Authority
CN
China
Prior art keywords
pillar
pedestal
steel
pipe pile
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720345123.8U
Other languages
Chinese (zh)
Inventor
张利强
李烨雄
呼森巴图
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaxia Spotlight (inner Mongolia) Photovoltaic Power Co Ltd
Original Assignee
Huaxia Spotlight (inner Mongolia) Photovoltaic Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaxia Spotlight (inner Mongolia) Photovoltaic Power Co Ltd filed Critical Huaxia Spotlight (inner Mongolia) Photovoltaic Power Co Ltd
Priority to CN201720345123.8U priority Critical patent/CN206887985U/en
Application granted granted Critical
Publication of CN206887985U publication Critical patent/CN206887985U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

It the utility model is related to isolated footing under a kind of photovoltaic generation support reinforced column, including concrete cushion (1), pedestal (2), pillar (3) and steel-pipe pile (5);The pedestal (2) is placed on the concrete cushion (1), and the pillar (3) is located at the top of the pedestal (2);The pedestal (2) and the pillar (3) are overall structure, the overall structure includes bar frame (4) and poured in the concrete on bar frame (4), and steel-pipe pile (5) plugged and fixed is in the post heart of pillar (3).Compared to steel pipe pile foundation, due to eliminating the construction technologies such as backfill, compacting, drilling, concrete perfusion, difficulty after backfilling rammed earth can be avoided to reach expected compactness, the construction difficult problems such as collapse hole are easily caused after land subsidence, drilling;Steel-pipe pile is positioned on pillar during construction, more can guarantee that the construction precision of steel-pipe pile.

Description

Isolated footing under a kind of photovoltaic generation support reinforced column
Technical field
Isolated footing under reinforced column is the utility model is related to, more particularly to a kind of photovoltaic generation support is mixed with reinforcing bar Coagulate native independent foundation under column.
Background technology
Existing photovoltaic generation stand steel pipe pile foundation run into ground pit-hole or backfill recently weak, loose foundation soil when Need first to be backfilled, tamp, then-retaining wall-borehole cleaning-insertion steel-pipe pile that drill-stake positioning supporting-concrete perfusion-is shaken A series of construction technologies such as puddling reality.Compacting needs layered rolling, vibration compacting, time-consuming longer, and is extremely difficult to after tamping pre- The compactness of phase, later stage meet water and may result in land subsidence;Due to being the loose soil bed backfilled recently, easily caused after drilling Collapse hole;The complicated construction technique such as retaining wall, borehole cleaning and time-consuming after drilling;Need to be accurately positioned supporting after insertion steel-pipe pile;Perfusion The concrete vibrating for also needing to pour into after concrete is closely knit.Therefore the complicated construction technique of embedded steel pipe pile foundation, long in time limit And potential safety hazard be present, the integral construction progress, increase project construction cost, influence project construction matter of photovoltaic plant can be influenceed Amount.
Utility model content
The purpose of this utility model is to provide under a kind of photovoltaic generation support reinforced column isolated footing to solve Certainly current steel pipe pile foundation it is embedded caused by complicated construction technique, it is long in time limit, exist the potential safety hazards such as land subsidence risk, The technical problems such as project construction progress is slow, project construction cost of investment height.
The technical problem that the utility model solves can take following scheme to realize:A kind of photovoltaic generation support steel Reinforced concrete independent foundation under column, it is characterised in that:Including concrete cushion, pedestal, pillar and steel-pipe pile;The pedestal is put In on the concrete cushion, the pillar is located at the top of the pedestal;The pedestal and the pillar are overall structure, should Overall structure includes bar frame and poured in the concrete on bar frame, and the steel-pipe pile plugged and fixed is in the post heart of pillar In and stretch out above the pillar, the concrete cushion, the pedestal and the pillar be placed in foundation ditch, the coagulation Soil padding, the pedestal, the pillar and the steel-pipe pile are arranged concentrically and their area of section is sequentially reduced.
Preferably:The bar frame includes reinforced mesh and the reinforcing bar net post above the reinforced mesh.
Compared to steel pipe pile foundation, photovoltaic generation support uses isolated footing province under reinforced column of the present utility model The construction technologies such as drill-pouring concrete are carried out again after having gone backfill, compacting, are difficult after can avoiding ground loose backfilled soil compacting Reach expected compactness, the later stage meets the risk that water may result in land subsidence;It can also avoid due to being the pine backfilled recently Soil layer is dissipated, the construction difficult problems such as collapse hole are easily caused after drilling;Steel-pipe pile is positioned on pillar during construction, than backfill, compacting The way for carrying out drill-pouring concrete again afterwards more can guarantee that the construction precision of steel-pipe pile (as to position of related features, elevation tolerance Control etc.);Additionally due to eliminate multiple construction procedures, it is possible to reduce project construction cost of investment, ensure pressing for construction period When complete and accelerate integral construction progress.
Brief description of the drawings
, below will be to needed for embodiment description in order to illustrate more clearly of the technical scheme in the embodiment of the utility model The accompanying drawing to be used is briefly described, it should be apparent that, drawings in the following description are only some realities of the present utility model Example is applied, for those of ordinary skill in the art, on the premise of not paying creative work, can also be according to these accompanying drawings Obtain other accompanying drawings.
Fig. 1 is the top view of isolated footing under the utility model reinforced column
Fig. 2 is the top detail view of steel-pipe pile and pillar
Fig. 3 is longitudinal sectional drawing of the isolated footing along the line A-A in Fig. 1 under the utility model reinforced column
Main tender and label:
Concrete cushion:1;Pedestal:2;Pillar:3;Bar frame:4;Reinforced mesh:41;Reinforcing bar net post:42;Steel-pipe pile: 5;
Embodiment
To make the purpose of this utility model, technical scheme and advantage clearly show, below in conjunction with accompanying drawing to this Utility model embodiment is described in further detail.
Embodiment
Isolated footing under photovoltaic generation support reinforced column shown in Fig. 1, Fig. 3, including concrete cushion 1, base Seat 2, pillar 3 and steel-pipe pile 5;Pedestal 2 is placed on concrete cushion 1, and pillar 3 is located at the top of pedestal 2;Pedestal 2 and pillar 3 For overall structure, the overall structure includes bar frame 4 and poured in the concrete on bar frame 4, the plugged and fixed of steel-pipe pile 5 Stretched out in the minds of the post of pillar 3 and above pillar 3, concrete cushion 1, pedestal 2 and pillar 3 are placed in foundation ditch, concrete Bed course 1, pedestal 2, pillar 3 and steel-pipe pile 5 are arranged concentrically and their area of section is sequentially reduced.
Bar frame 4 includes reinforced mesh 41 and the reinforcing bar net post 42 above reinforced mesh 41.
Fig. 2 is the top detail view of steel-pipe pile 5 and pillar 3.
The utility model is in the specific implementation:Foundation ditch is carried out according to DESIGN OF RC INDEPENDENT FOUNDATION size of foundation base to open Dig, the casting concrete bed course in foundation ditch, then banding fixed bar frame and the reinforcing bar on bar frame on bed course Positioned on net post, fixed steel-pipe pile, formwork simultaneously pours base concrete, returned again after base concrete reaches design strength Fill out processing.
Compared to steel pipe pile foundation, due to eliminating the construction technologies such as backfill, compacting, drilling, concrete perfusion, can avoid Difficulty reaches expected compactness after the loose backfilled soil compacting of ground, and the later stage meets the risk that water may result in land subsidence;It can also keep away The construction difficult problems such as collapse hole are easily caused after exempting from drilling;Steel-pipe pile is positioned on pillar during construction, more can guarantee that applying for steel-pipe pile Work precision.
It is described above, only specific embodiment of the present utility model, but the scope of protection of the utility model is not limited to In this, any one skilled in the art can readily occur in change in the technical scope that the utility model discloses Or replace, it should all cover within the scope of protection of the utility model.Therefore, the scope of protection of the utility model should be with the power The protection domain that profit requires is defined.

Claims (2)

  1. A kind of 1. isolated footing under photovoltaic generation support reinforced column, it is characterised in that:Including concrete cushion (1), Pedestal (2), pillar (3) and steel-pipe pile (5);The pedestal (2) is placed on the concrete cushion (1), pillar (3) position In the top of the pedestal (2);The pedestal (2) and the pillar (3) are overall structure, and the overall structure includes bar frame (4) and pour in the concrete on bar frame (4), steel-pipe pile (5) plugged and fixed in pillar (3) post in the heart and from institute State and stretched out above pillar (3), the concrete cushion (1), the pedestal (2) and the pillar (3) are placed in foundation ditch, described Concrete cushion (1), the pedestal (2), the pillar (3) and the steel-pipe pile (5) are arranged concentrically and their section face Product is sequentially reduced.
  2. 2. isolated footing under photovoltaic generation support reinforced column according to claim 1, it is characterised in that:It is described Bar frame (4) includes reinforced mesh (41) and the reinforcing bar net post (42) above the reinforced mesh (41).
CN201720345123.8U 2017-04-01 2017-04-01 Isolated footing under a kind of photovoltaic generation support reinforced column Expired - Fee Related CN206887985U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720345123.8U CN206887985U (en) 2017-04-01 2017-04-01 Isolated footing under a kind of photovoltaic generation support reinforced column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720345123.8U CN206887985U (en) 2017-04-01 2017-04-01 Isolated footing under a kind of photovoltaic generation support reinforced column

Publications (1)

Publication Number Publication Date
CN206887985U true CN206887985U (en) 2018-01-16

Family

ID=61327425

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720345123.8U Expired - Fee Related CN206887985U (en) 2017-04-01 2017-04-01 Isolated footing under a kind of photovoltaic generation support reinforced column

Country Status (1)

Country Link
CN (1) CN206887985U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110565798A (en) * 2019-08-30 2019-12-13 浙江中清大建筑产业化有限公司 Assembled column base connecting device of anchor formula behind shock-proof type

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110565798A (en) * 2019-08-30 2019-12-13 浙江中清大建筑产业化有限公司 Assembled column base connecting device of anchor formula behind shock-proof type

Similar Documents

Publication Publication Date Title
CN204608536U (en) A kind of high-fill roadbed structure
CN106522241A (en) Deep foundation pit supporting method of ultrahigh floor height type basement structure
CN103696784B (en) Large-diameter long pipe curtain construction method for shallowly-buried large-span under-tunnel-passing architectural structure
CN103758113B (en) A kind of grid encloses the anti-liquefied foundation reinforcement means of hoop
CN203174619U (en) Reverse raft concrete terrace
CN207829006U (en) Sizing moves retaining wall mould bases
CN109403341A (en) A kind of compound gravity retaining wall structure of soft clay area ultra-deep foundation pit and its engineering method
CN106759345A (en) A kind of taper pile construction equipment and taper pile base pit stand construction
CN106759448A (en) A kind of sunk type agricultural greenhouse photovoltaic bracket foundation structure and its construction method
CN104775447A (en) Composite base framework used for power transmission tower in steep mountainous area and construction technology thereof
CN204662455U (en) Foundation pit support device reinforced by a kind of adjustable diagonal brace
CN202492854U (en) Foundation platform structures of deepwater bare rock and karstic piles
CN206887985U (en) Isolated footing under a kind of photovoltaic generation support reinforced column
CN107190772A (en) A kind of underground pipe gallery base configuration and its construction method
CN105625184B (en) Bridge, station build the subway station construction method of pattern jointly
CN102966109A (en) Method for constructing zonal deep foundation pit bottom sealing of soft soil foundation
CN207469262U (en) The supporting construction that a kind of foundation pit is combined with side slope
CN106917396B (en) A kind of taper foundation reinforcement method
CN110172988A (en) A kind of piling formula composite concrete placement ground and its construction method
CN205999887U (en) Boring steel reinforcement cage hoop slip casting broken stone pile
CN206887984U (en) A kind of photovoltaic generation support steel bar concrete reinforcement steel pipe pile foundation
CN204212163U (en) Karst depression talus off-load reinforced structure
CN209243733U (en) A kind of compound gravity retaining wall structure of soft clay area ultra-deep foundation pit
CN112921962A (en) Pile foundation reinforcing method
JPS63110319A (en) Stabilization work of banking

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180116

Termination date: 20190401

CF01 Termination of patent right due to non-payment of annual fee