CN207469262U - The supporting construction that a kind of foundation pit is combined with side slope - Google Patents

The supporting construction that a kind of foundation pit is combined with side slope Download PDF

Info

Publication number
CN207469262U
CN207469262U CN201721370520.7U CN201721370520U CN207469262U CN 207469262 U CN207469262 U CN 207469262U CN 201721370520 U CN201721370520 U CN 201721370520U CN 207469262 U CN207469262 U CN 207469262U
Authority
CN
China
Prior art keywords
anchor cable
column
foundation pit
guan liang
side slope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721370520.7U
Other languages
Chinese (zh)
Inventor
张恩祥
龙照
沈秋武
张森安
刘若琪
项龙江
孔维刚
刘志刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gansu Zhongjian Municipal Engineering Survey Design And Research Institute
Gansu CSCEC Municipal Engineering Investigation and Design Institute Co Ltd
Original Assignee
Gansu Zhongjian Municipal Engineering Survey Design And Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gansu Zhongjian Municipal Engineering Survey Design And Research Institute filed Critical Gansu Zhongjian Municipal Engineering Survey Design And Research Institute
Priority to CN201721370520.7U priority Critical patent/CN207469262U/en
Application granted granted Critical
Publication of CN207469262U publication Critical patent/CN207469262U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses the supporting construction that a kind of foundation pit is combined with side slope, the support pile equidistantly arranged including several, the first anchor cable is provided between the two neighboring support pile, the top of the support pile is provided with Guan Liang, the first hole passed through for first anchor cable is provided in the Guan Liang, one end of first anchor cable passes through first hole and is fixedly connected by the first anchorage with the Guan Liang, column and breast boards have been poured by formwork in the Guan Liang, the second anchor cable is connected on the column, the second hole passed through for second anchor cable is provided on the column, one end of second anchor cable passes through second hole and is fixedly connected by the second anchorage with the column.The utility model can be when carrying out provisional excavation of foundation pit and carrying out engineering construction in special circumstances close to side slope slope foot, easy construction, cost saving.

Description

The supporting construction that a kind of foundation pit is combined with side slope
Technical field
Utility model is related to building foundation pit and slope project technical field, the branch that specially a kind of foundation pit is combined with side slope Protection structure.
Background technology
With Urban Expansion, construction land is more and more nervous, need to carry out provisional excavation of foundation pit close to side slope slope foot sometimes, And permanent supporting need to be carried out to the side slope after foundation pit backfill.In general, foundation pit supporting construction is as provisional knot Structure, design service life are generally 12 months, i.e. ineffective after foundation pit backfill, become the building rubbish for being embedded in underground Rubbish;Slope retaining structure is as permanent structure, and design service life is typically no less than 50 years, in the life that it protects object In period, slope retaining structure must keep stablizing and having certain safety coefficient.In engineering practice, usually by the base of early period Hole is excavated and the slope retaining in later stage was designed and constructs respectively according to two completely different stages, lacks system therebetween Consideration is raised, easily cause the front and rear conflict of design or is repeated before and after constructing, so as to bring many unnecessary troubles and waste.If it can incite somebody to action The two effectively combines, and is fully considered in the permanent support structure design of side slope and foundation pit temporary supporting structure is used, It then not only can ensure that the coordinating and unifying of front and rear design and construction, but also can turn waste into wealth, save project cost.
Therefore, design a kind of can carry out provisional excavation of foundation pit and progress engineering is built in special circumstances close to side slope slope foot If when, easy construction, cost saving a kind of foundation pit be very necessary with the supporting construction that side slope is combined.
Utility model content
The supporting construction for being designed to provide a kind of foundation pit and being combined with side slope of utility model, to solve above-mentioned background skill The problem of being proposed in art.
To achieve the above object, utility model provides following technical solution:The supporting knot that a kind of foundation pit is combined with side slope Structure including the support pile that several are equidistantly arranged, is provided with the first anchor cable, the supporting between the two neighboring support pile The top of stake is provided with Guan Liang, and the first hole passed through for first anchor cable, first anchor cable are provided in the Guan Liang One end pass through and first hole and be fixedly connected by the first anchorage with the Guan Liang, poured in the Guan Liang by formwork There are column and breast boards, the second anchor cable is connected on the column, be provided with what is passed through for second anchor cable on the column Second hole, one end of second anchor cable pass through second hole and are fixedly connected by the second anchorage with the column.
Preferably, it is connected between the column and the breast boards by embedded bar.
Preferably, the column, the breast boards, the Guan Liang and the support pile are integral structure.
Preferably, the plan-position of second anchor cable should be arranged in a one-to-one correspondence with the plan-position of the column.
Compared with prior art, the advantageous effect of utility model is:The supporting construction that the foundation pit is combined with side slope, comprising There are support pile, Guan Liang, column, breast boards, the first anchor cable, the first anchorage, the first gunite concrete face layer, the second gunite concrete Face layer, soil nailing, the second anchor cable and the second anchorage, first by the soil nailing and the second gunite concrete face layer to upper slope Temporary supporting is carried out, then right by the support pile, the Guan Liang, first anchor cable and the first gunite concrete face layer Lower part foundation pit carries out temporary supporting, after foundation pit backfill, by the column, the breast boards and second anchor cable to top Side slope carries out permanent supporting;By the way that the excavation of foundation pit temporary supporting of early period and the permanent supporting coordination of the side slope in later stage are examined Consider, be used in the method that embedded bar in Guan Liang pours column, the support pile of a provisional foundation pit supporting construction part will be belonged to It is efficiently used with Guan Liang, a kind of permanent slope retaining structure of peg board formula is formed with column, breast boards and the second anchor cable, it should Structure stress is clear and definite, easy construction, and can greatly save later stage side slope permanent support expense, has preferable economic effect Benefit and promotional value.
Description of the drawings
A kind of Fig. 1 side structure schematic views when the supporting construction that side slope is combined is in foundation pit gib for foundation pit;
A kind of Fig. 2 positive structure diagrams when the supporting construction that side slope is combined is in foundation pit gib for foundation pit;
A kind of Fig. 3 side structure schematic views when the supporting construction that side slope is combined is in side slope permanent support for foundation pit;
A kind of Fig. 4 positive structure diagrams when the supporting construction that side slope is combined is in side slope permanent support for foundation pit;
Fig. 5 is that a kind of foundation pit is illustrated with the Guan Liang for the supporting construction that side slope is combined with column horizontal layout plan structure Figure.
In figure:1- support piles;2- Guan Liangs;3- columns;4- breast boards;The first anchor cables of 5-;The first anchorages of 6-;7- first sprays Concrete topping;The second gunite concretes of 8- face layer;9- soil nailings;The second anchor cables of 10-;The second anchorages of 11-;12- backfills;13- Basement structure;14- agent structures.
Specific embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out It clearly and completely describes, it is clear that the described embodiments are only a part of the embodiments of the utility model rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are without making creative work All other embodiments obtained shall fall within the protection scope of the present invention.
- 5 are please referred to Fig.1, the utility model provides a kind of technical solution:The supporting knot that a kind of foundation pit is combined with side slope Structure including the support pile 1 that several are equidistantly arranged, is provided with the first anchor cable 5 between the two neighboring support pile 1, described The top of support pile 1 is provided with Guan Liang 2, and the first hole passed through for first anchor cable 5 is provided in the Guan Liang 2, described One end of first anchor cable 5 passes through first hole and is fixedly connected by the first anchorage 6 with the Guan Liang 2, in the Guan Liang 2 Column 3 and breast boards 4 have been poured by formwork, the second anchor cable 10 is connected on the column 3, confession is provided on the column 3 The second hole that second anchor cable 10 passes through, one end of second anchor cable 10 pass through second hole and pass through the second anchor Tool 11 is fixedly connected with the column 3.
It is connected between the column 3 and the breast boards 4 by embedded bar.
The column 3, the breast boards 4, the Guan Liang 2 and the support pile 1 are integral structure.
The plan-position of second anchor cable 10 should be arranged in a one-to-one correspondence with the plan-position of the column 3.
Operation principle:During construction, the earthwork first is carried out by certain ratio of slope to upper slope and is successively excavated, and soil nailing of successively constructing 9 and second gunite concrete face layer 8, until earth excavation to slope foot design below ground, pays attention to simultaneously in advance construct conduct after Second anchor cable 10 of phase permanent supporting construction component part, it is ensured that the plan-position of second anchor cable 10 is with setting The plan-position for counting the column 3 is arranged in a one-to-one correspondence;It first constructs the support pile 1, the support pile 1 is equal by certain stake spacing Even arrangement, first anchor cable 5 of then constructing between adjacent two support piles 1, then construct and be set to first anchor The Guan Liang 2 of the stake top of rope 5, the Guan Liang 2 pay attention to reserved the first hole passed freely through for each first anchor cable 5 when pouring Hole, while should treat the support pile 1, the Guan Liang 2 and described by the pre-buried embedded bar in 3 plan-position of column After one anchor cable 5 reaches design requirement intensity, tensioning, locking carry out first anchor cable 5 using first anchorage 6, with Afterwards to lower part pit earthwork carry out stage excavation, and on the support pile 1 lean on foundation pit side construction in layer described in first injection Concrete topping 7, until earth excavation is to foundation pit bottom surface is designed, the then basement structure 13 and agent structure in construction foundation pit 14;When the construction of basement structure 13 is completed and agent structure 14 is constructed to more than slope foot design ground, foundation pit backfill is carried out, After being backfilled to the top surface absolute altitude of the Guan Liang 2, start formwork and pour the column 3 and the breast boards 4, and pass through described pre-buried Bar connecting, the column 3, the breast boards 4, the Guan Liang 2 and the support pile 1 form an entirety, and the column 3 pours When building, the reserved hole passed freely through for each second anchor cable 10 treats that the column 3 and the breast boards 4 reach design After desired strength, the surplus earth backfill of slope foot foundation pit and the back-filling in layers of the earthwork after the breast boards 4 are carried out, backfilling of earthwork is extremely After the top of the slope height of upper slope, second anchor cable 10 is first passed through into 3 reserving hole of column, is further continued for carrying out the gear Backfilling of earthwork after native plate 4, until being backfilled to upper slope design top of the slope height;Finally to 10 tensioning of the second anchor cable, locking On the column 3, and carry out permanent preservative treatment.The supporting construction and construction method that the foundation pit is combined with side slope, Include support pile 1, Guan Liang 2, column 3, breast boards 4, the first anchor cable 5, the first anchorage 6, the first gunite concrete face layer 7, the Two gunite concrete faces layer 8, soil nailing 9, the second anchor cable 10 and the second anchorage 11, first by the soil nailing 9 and the described second injection Concrete topping 8 carries out temporary supporting to upper slope, then by the support pile 1, the Guan Liang 2,5 and of the first anchor cable First gunite concrete face layer, 7 pairs of lower part foundation pit carry out temporary supportings, after foundation pit backfill, by the column 3, described Breast boards 4 and second anchor cable 10 carry out permanent supporting to upper slope;By by the provisional branch of the excavation of foundation pit of early period Shield and the permanent supporting of side slope in later stage are coordinated to consider, are used in the method that embedded bar pours column 3 in Guan Liang 2, will belong to The support pile 1 and Guan Liang 2 of a provisional foundation pit supporting construction part are efficiently used, with column 3,4 and second anchor of breast boards Rope 10 forms a kind of permanent slope retaining structure of peg board formula, and the structure stress is clear and definite, easy construction, and can greatly save About later stage side slope permanent support expense has preferable economic benefit and promotional value.
Obviously, those skilled in the art can carry out the utility model various modification and variations without departing from this practicality Novel spirit and scope.If in this way, these modifications and variations of the present invention belong to the utility model claims and Within the scope of its equivalent technologies, then the utility model is also intended to include these modifications and variations.

Claims (4)

1. a kind of supporting construction that foundation pit is combined with side slope, it is characterised in that:The support pile equidistantly arranged including several (1), the first anchor cable (5) is provided between the two neighboring support pile (1), the top of the support pile (1) is provided with Guan Liang (2), the first hole passed through for first anchor cable (5), one end of first anchor cable (5) are provided on the Guan Liang (2) It is fixedly connected across first hole and by the first anchorage (6) with the Guan Liang (2), passes through formwork on the Guan Liang (2) Column (3) and breast boards (4) have been poured, the second anchor cable (10) is connected on the column (3), is provided on the column (3) For the second hole that second anchor cable (10) passes through, one end of second anchor cable (10) passes through second hole and passes through Second anchorage (11) is fixedly connected with the column (3).
2. the supporting construction that a kind of foundation pit as described in claim 1 is combined with side slope, it is characterised in that:The column (3) It is connected between the breast boards (4) by embedded bar.
3. the supporting construction that a kind of foundation pit as described in claim 1 is combined with side slope, it is characterised in that:The column (3), The breast boards (4), the Guan Liang (2) and the support pile (1) are integral structure.
4. the supporting construction that a kind of foundation pit as described in claim 1 is combined with side slope, it is characterised in that:Second anchor cable (10) plan-position should be arranged in a one-to-one correspondence with the plan-position of the column (3).
CN201721370520.7U 2017-10-20 2017-10-20 The supporting construction that a kind of foundation pit is combined with side slope Expired - Fee Related CN207469262U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721370520.7U CN207469262U (en) 2017-10-20 2017-10-20 The supporting construction that a kind of foundation pit is combined with side slope

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721370520.7U CN207469262U (en) 2017-10-20 2017-10-20 The supporting construction that a kind of foundation pit is combined with side slope

Publications (1)

Publication Number Publication Date
CN207469262U true CN207469262U (en) 2018-06-08

Family

ID=62264466

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721370520.7U Expired - Fee Related CN207469262U (en) 2017-10-20 2017-10-20 The supporting construction that a kind of foundation pit is combined with side slope

Country Status (1)

Country Link
CN (1) CN207469262U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107558477A (en) * 2017-10-20 2018-01-09 甘肃中建市政工程勘察设计研究院 The supporting construction and construction method that a kind of foundation ditch is combined with side slope
CN112281862A (en) * 2020-10-13 2021-01-29 中国建筑第八工程局有限公司 Deep foundation pit large-gradient inverted hanging type steel anchor-shotcrete supporting structure and construction method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107558477A (en) * 2017-10-20 2018-01-09 甘肃中建市政工程勘察设计研究院 The supporting construction and construction method that a kind of foundation ditch is combined with side slope
CN112281862A (en) * 2020-10-13 2021-01-29 中国建筑第八工程局有限公司 Deep foundation pit large-gradient inverted hanging type steel anchor-shotcrete supporting structure and construction method thereof
CN112281862B (en) * 2020-10-13 2022-06-28 中国建筑第八工程局有限公司 Deep foundation pit large-gradient inverted hanging type steel anchor-shotcreting supporting structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN106499413B (en) A kind of Shallow-buried section tunnel stratum consolidation construction method
CN102444142B (en) Pile group column replacement expanded basement and construction method of same
CN105064397B (en) Open excavation construction method for expanding excavation of station on metro interzone shield tunnel foundation
CN103696784B (en) Large-diameter long pipe curtain construction method for shallowly-buried large-span under-tunnel-passing architectural structure
CN108035361A (en) A kind of advanced support supporting construction and its construction method
CN106930319A (en) A kind of high slope framed revetment and its construction method
CN104563131B (en) Rectangular enclosure pile, and construction method using rectangular enclosure pile as main structure
CN207512752U (en) A kind of tall earth fill supporting construction
CN103452120B (en) A kind of stake apical cap girder construction of the high-strength Prestressed Pipe Pile for pattern foundation pit supporting structure and construction method thereof
CN107558477A (en) The supporting construction and construction method that a kind of foundation ditch is combined with side slope
CN110777802A (en) Deep foundation pit high-low span supporting structure and construction method thereof
CN111042053A (en) Permanent temporary combined retaining wall structure in urban hydraulic engineering and construction method thereof
CN207469262U (en) The supporting construction that a kind of foundation pit is combined with side slope
CN206554091U (en) The foundation ditch temporary support structures of anti-Nearby Structure foundation deformation
JP2000008394A (en) Construction method for underground structure such as underground pit for installation of parking lot
CN106758890B (en) Campshed box culvert structure and its construction method
CN104196036B (en) Foundation pit supporting structure and method based on old underground outdoor wall structure
CN207211158U (en) Assembled pile board wall foundation pit supporting construction
CN113417300A (en) Slope support system and construction method thereof
CN104213567B (en) Underground pipe gallery controls the construction method of slope section slippage
CN108035360A (en) A kind of method for pattern foundation pit supporting structure
CN106917358A (en) A kind of cable-stayed bridge main-beam combination constructing method thereof and its counter weight construction system
CN204199296U (en) Foundation pit supporting structure based on old underground outdoor wall structure
CN105840216A (en) Underground space exploitation excavation construction method
CN115821949A (en) Support system and support method for existing high and steep slope in narrow space

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180608

Termination date: 20181020

CF01 Termination of patent right due to non-payment of annual fee