- CN206873971U CN206873971U CN201720671891.2U CN201720671891U CN206873971U CN 206873971 U CN206873971 U CN 206873971U CN 201720671891 U CN201720671891 U CN 201720671891U CN 206873971 U CN206873971 U CN 206873971U
- Authority
- CN
- China
- Prior art keywords
- safety net
- steel wire
- main rope
- sides
- snap ring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Emergency Lowering Means (AREA)
Abstract
The moveable BIPV projects roofing construction safety net of the utility model, it is related to technical field of building construction, including safety net, main rope track, fixed pulley, ground fixture, wire line hitch, snap ring, bottle gouard moved by hands I II, mobile steel wire rope, two main rope tracks positioneds are on the beam or post of factory building both sides, one end of main rope track is locked on the beam or post of factory building one end both sides by wire line hitch respectively, the other end extends around bottle gouard moved by hands I and is connected with ground fixture still further below after bypassing fixed pulley respectively, snap ring is uniformly connected to the both sides of safety net, two row's snap rings are gone here and there on two main rope tracks respectively, snap ring of the upper end of four mobile steel wire ropes respectively with four angles of safety net is connected, the lower end of four mobile steel wire ropes is connected with the ground fixture on the downside of it respectively.The advantages that the utility model is economical good, simple to operate, safe and reliable.
Description
Technical field
Technical field of building construction is the utility model is related to, more particularly to a kind of moveable BIPV projects roofing construction peace
The whole network.
Background technology
BIPV(I.e. Building Integrated PV are BIPVs)Project is by solar energy power generating
Square formation is integrated among architectural engineering, and photovoltaic module is directly installed on roof truss purline, and function is used in guarantee building
Meet the function of photovoltaic generation simultaneously.When BIPV roofings are constructed, roofing only has purlin, no safe operation platform, and
There are production equipment, electrical equipment, pendent lamp or other barriers in workshop, the operating platform of installation safety net is set up in workshop, can not
The personal safety of workmen is ensured, great potential safety hazard be present, certain safety prevention measure i.e. roof purline must be taken
Under hang up safety net.Traditional safety net hangs up system completely to spread safety net under roof, and safety net is fixed on into factory building both sides
Pillar on, conventional method has following weak point:1st, BIPV roofings area is larger, completely spreads safety net very waste of materials;2、
BIPV roofings height is higher, often hangs up or removes a safety net and be required for worker to climb up and climbs down, very big potential safety hazard be present,
Labor intensive is more simultaneously;3rd, factory building width is larger, using artificial tensioning safety net, can not make with both sides to reach among safety net
Level, sagging serious, protecting effect is poor;4th, there are production equipment, electrical equipment, pendent lamp or other barriers in BIPV roofings workshop,
Safety net can not be installed, roofing construction can not ensure safely.
The content of the invention
The purpose of this utility model is in view of the above-mentioned drawbacks of the prior art, providing a kind of moveable BIPV projects
Roofing construction safety net, it can disposably be installed, good economy performance, it is simple to operate, safe and reliable, can be moved along before and after construction direction
It is dynamic.
The technical scheme that the utility model uses to achieve the above object is:A kind of moveable BIPV project roofing constructions
Safety net, including safety net, in addition to main rope track, fixed pulley, ground fixture, wire line hitch, snap ring, bottle gouard moved by hands
Ith, bottle gouard moved by hands II, mobile steel wire rope, two main rope tracks positioneds are on the beam or post of factory building both sides, two main ropes
One end of track is locked on the beam or post of factory building one end both sides by wire line hitch respectively, two main rope tracks it is another
Respectively around extension is connected with each other with the ground fixture on the downside of fixed pulley still further below after fixed pulley, bottle gouard moved by hands I is connected at end
In main rope track on the downside of fixed pulley, snap ring is uniformly connected to the both sides of safety net, and two row's snap rings are gone here and there at two respectively
On main rope track, the snap ring of the upper ends of four mobile steel wire ropes respectively with four angles of safety net is connected, four mobile steel wires
The lower end of rope is connected with the ground fixture on the downside of it respectively, and safety net has a movement in two mobile steel wire ropes per side
Bottle gouard moved by hands II is connected with steel wire rope.
It is of the present utility model further technical scheme be:Main steel can be positioned by being additionally provided with the beam or post of factory building both sides
The fixation steel wire rope head of cord track.
The moveable BIPV projects roofing construction safety net of the utility model has compared with traditional safety net hangs up system
There is following beneficial effect:
1st, good economy performance:The utility model is not required to full paving safety net, moves back and forth and can realize merely with a safety net
The purpose of construction area safety is protected, not only greatlys save material, and effectively reduces labour cost, shortens the duration.
2nd, it is simple to operate:The utility model just may be implemented in ground artificial by the steel wire rope of mobile security net corner
Mobile security net to construction area purpose, it is simple to operate, climb up and climb down without worker, reduce labor strength.
3rd, stability is strong:The utility model makes full use of fixed pulley and bottle gouard moved by hands stretching wire rope and safety net, effectively
The shortcomings that overcoming artificial tensioning safety net dynamics deficiency, safety net has been effectively ensured hangs up height and stability.
BIPV projects roofing construction safety net moveable to the utility model is made into one with reference to the accompanying drawings and examples
The explanation of step.
Brief description of the drawings
Fig. 1 is the structural representation of the moveable BIPV projects roofing construction safety net of the utility model;
Fig. 2 is the perspective view of the moveable BIPV projects roofing construction safety net of the utility model;
Fig. 3 is the structural representation of wire line hitch;
Fig. 4 is the structural representation of snap ring;
Drawing reference numeral explanation:1- bottle gouards moved by hands I, 2- fixed pulleys, 3- movement steel wire ropes, 4- main rope tracks, 5- snap rings,
6- wire line hitch, 7- crossbeams, 8- safety nets, 9- columns, 10- fixation steel wire rope heads, 11- ground fixtures, 12- bottle gouards moved by hands
Ⅱ。
Embodiment
As shown in Figures 1 to 4, a kind of moveable BIPV project roofing construction safety nets of the utility model, including safety
Net 8, main rope track 4, fixed pulley 2, ground fixture 11, wire line hitch 6, snap ring 5, bottle gouard moved by hands I 1, bottle gouard moved by hands II
12nd, mobile steel wire rope 3.
Main rope track 4 is using φ 10mm steel wire rope, and each is about 200 meters, and mobile steel wire rope 3 is using φ 5mm
Steel wire rope, each is about 20 meters.Two main rope track 4 is positioned on the beam or post of factory building both sides, two main ropes
One end of track 4 is locked on the beam or post of factory building one end both sides by wire line hitch 6 respectively, two main rope tracks 4
The other end extends still further below after bypassing fixed pulley 2 respectively and the ground fixture 11 of the downside of fixed pulley 2 is connected with each other, bottle gouard moved by hands
I 1 are connected in the main rope track 4 of the downside of fixed pulley 2.
Snap ring 5 is uniformly connected to the both sides of safety net 8, and two row's snap rings 5 are gone here and there on two main rope tracks 4 respectively,
Snap ring 5 of the upper end of four mobile steel wire ropes 3 respectively with 8 four angles of safety net is connected, the lower end difference of four mobile steel wire ropes 3
It is connected with the ground fixture 11 on the downside of it, safety net 8 has a mobile steel wire rope 3 in two mobile steel wire ropes 3 per side
On be connected with bottle gouard moved by hands II 12.The fixation of main rope track 4 can be positioned by being additionally provided with the beam or post of factory building both sides
With steel wire rope head 10(A pair of fixation steel wire rope heads are only illustrated in figure, multipair fixation steel wire rope is installed in actual field
Head), it is fixed to use φ 8mm steel cables with steel wire rope head 10.
During installation, the both sides snap ring 5 of safety net 8 is gone here and there on two main rope tracks 4 respectively, by two main rope rails
The one end in road 4 is locked on the beam or post of factory building one end both sides by wire line hitch 6 respectively, then by two main rope tracks 4
The other end respectively bypass fixed pulley 2 after still further below extension be connected with bottle gouard moved by hands I 1, then with bottle gouard moved by hands I 1 slowly will lead
Steel wire rope track 4 and safety net 8 pack up rising, and steel wire rope end is fixed on into ground again after reaching about 2 meters from roofing or so consolidates
Earnest 11, and fixed φ 10mm main ropes track 4 with φ 8mm with steel wire rope head 10 at interval of about 40 meters and workshop post or beam
Tightening up prevents that the radian on main rope both sides is too low.
Finally, safety net 8 is slowly pulled open using the removable steel wire rope 3 of 8 four jiaos of safety net on ground, makes safety net 8
Effectively open, without sagging, reach and tense main rope track 4 with bottle gouard moved by hands II 12 after width, make safety net 8 horizontal,
Without sagging.Safety net 8 along the main rope track 4 as track do it is front and rear move, be moved in safety net 8
When fixing the position with steel wire rope head 10, the fixation steel wire rope head 10 of the position can be pulled down, and the fixation steel that will be pulled down
Cord first 10 is installed on the main rope track 4 and column of the rear side of safety net 8, and therefore, in work progress, worker can basis
The change in roofing construction region, hauled on ground and tie up to the steel wire rope of 8 four jiaos of safety net and move forward and backward safety net 8 at any time.
Above example is only preferred embodiment of the present utility model, and structure of the present utility model is not limited to above-mentioned implementation
The form enumerated of example, any modification of all made within spirit of the present utility model and principle, equivalent substitution etc., all should be included
Within the scope of protection of the utility model.
Claims (2)
1. a kind of moveable BIPV project roofing construction safety nets, including safety net(8), it is characterised in that also including main steel
Cord track(4), fixed pulley(2), ground fixture(11), wire line hitch(6), snap ring(5), bottle gouard moved by hands I(1), manual calabash
Reed II(12), mobile steel wire rope(3), two main rope tracks(4)It is positioned on the beam or post of factory building both sides, two row ground are consolidated
Earnest(11)It is evenly arranged in two main rope tracks(4)On the ground of downside, two main rope tracks(4)One end point
Wire line hitch is not passed through(6)It is locked on the beam or post of factory building one end both sides, two main rope tracks(4)The other end difference
Around fixed pulley(2)Afterwards still further below extension and fixed pulley(2)The ground fixture of downside(11)It is connected with each other, bottle gouard moved by hands I(1)
It is connected to fixed pulley(2)The main rope track of downside(4)In, snap ring(5)Uniformly it is connected to safety net(8)Both sides, two
Arrange snap ring(5)Go here and there respectively in two main rope tracks(4)On, four mobile steel wire ropes(3)Upper end respectively with safety net(8)
The snap ring at four angles(5)Connection, four mobile steel wire ropes(3)Lower end respectively with the ground fixture on the downside of it(11)Connection,
Safety net(8)Two mobile steel wire ropes per side(3)In have a mobile steel wire rope(3)On be connected with bottle gouard moved by hands II
(12).
2. moveable BIPV project roofing construction safety nets as claimed in claim 1, it is characterised in that in factory building both sides
Main rope track can be positioned by being additionally provided with beam or post(4)Fixation steel wire rope head(10).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720671891.2U CN206873971U (en) | 2017-06-09 | 2017-06-09 | A kind of moveable BIPV project roofing construction safety nets |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720671891.2U CN206873971U (en) | 2017-06-09 | 2017-06-09 | A kind of moveable BIPV project roofing construction safety nets |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206873971U true CN206873971U (en) | 2018-01-12 |
Family
ID=61332895
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720671891.2U Expired - Fee Related CN206873971U (en) | 2017-06-09 | 2017-06-09 | A kind of moveable BIPV project roofing construction safety nets |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206873971U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110965798A (en) * | 2019-11-26 | 2020-04-07 | 上海二十冶建设有限公司 | Movable type limb vertical face protection device and construction method thereof |
CN114412213A (en) * | 2021-12-23 | 2022-04-29 | 中国华冶科工集团有限公司 | Protection device and method for steel structure roof installation |
CN114439262A (en) * | 2020-11-04 | 2022-05-06 | 中国核工业二三建设有限公司 | Automatic hole safety net protector |
-
2017
- 2017-06-09 CN CN201720671891.2U patent/CN206873971U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110965798A (en) * | 2019-11-26 | 2020-04-07 | 上海二十冶建设有限公司 | Movable type limb vertical face protection device and construction method thereof |
CN114439262A (en) * | 2020-11-04 | 2022-05-06 | 中国核工业二三建设有限公司 | Automatic hole safety net protector |
CN114439262B (en) * | 2020-11-04 | 2023-11-14 | 中国核工业二三建设有限公司 | Automatic safety net protector in hole |
CN114412213A (en) * | 2021-12-23 | 2022-04-29 | 中国华冶科工集团有限公司 | Protection device and method for steel structure roof installation |
CN114412213B (en) * | 2021-12-23 | 2023-09-08 | 中国华冶科工集团有限公司 | Protective device and method for steel structure roof installation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206873971U (en) | A kind of moveable BIPV project roofing construction safety nets | |
CN103993735A (en) | Support system of roof inclined beam and slab cantilever structure and construction method of support system | |
CN105088979B (en) | Demolition blasting method for large bridge | |
CN103422714B (en) | A kind of high ferro is the safety protecting method of wired construction and the protective fence of formation thereof both | |
CN202530816U (en) | A hurricane-shielding reinforcing device of a prefabricated house | |
CN206971760U (en) | A kind of full steel structure assembled climbs material platform | |
CN202899600U (en) | Construction site limb quick installation and removal protecting device | |
CN209780190U (en) | Hanging platform for large-span beam string beam daylighting roof construction | |
CN204112697U (en) | A kind of protector carrying raise scaffold turnover panel | |
CN206328110U (en) | One kind customization hanging basket apparatus | |
CN204826867U (en) | Building construction protection fence of steel cable structure | |
CN215671267U (en) | Telescopic edge protection device | |
CN206273949U (en) | A kind of plug-in movable operating platform | |
CN211775606U (en) | Regularization assembled that can have enough to meet need climbs frame and goes up people's passageway | |
CN201649607U (en) | Overhung-type outer wall scaffold | |
CN203257117U (en) | Novel construction safety protection device of space long-span building | |
CN104060809A (en) | Roof lighting glass steel frame installation device and operation method thereof | |
CN211775570U (en) | Decoration trolley | |
CN103899078B (en) | Attachment automatic lifting protecting screen mounting method | |
CN206955504U (en) | One kind can have enough to meet the need people's escape way on regularization tower crane | |
CN1288276A (en) | Method and equipment of stride across construction utilizing overhead cableway | |
CN209145170U (en) | A kind of photovoltaic solar roof boarding | |
CN210177977U (en) | Lifeline system for installing steel frame structure of factory building | |
CN113044741A (en) | Safety channel for connecting integrated climbing frame and tower crane and lifting method thereof | |
CN206652466U (en) | A kind of sintering machine mixing machine crossbeam that can prevent sizing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||