CN206873971U - A kind of moveable BIPV project roofing construction safety nets - Google Patents

A kind of moveable BIPV project roofing construction safety nets Download PDF

Info

Publication number
CN206873971U
CN206873971U CN201720671891.2U CN201720671891U CN206873971U CN 206873971 U CN206873971 U CN 206873971U CN 201720671891 U CN201720671891 U CN 201720671891U CN 206873971 U CN206873971 U CN 206873971U
Authority
CN
China
Prior art keywords
safety net
steel wire
main rope
sides
snap ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720671891.2U
Other languages
Chinese (zh)
Inventor
覃幼辙
李世兴
黎钟辉
潘东美
陶兴南
甘恬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Construction No2 Building & Installation Co Ltd
Original Assignee
Guangxi Construction No2 Building & Installation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Construction No2 Building & Installation Co Ltd filed Critical Guangxi Construction No2 Building & Installation Co Ltd
Priority to CN201720671891.2U priority Critical patent/CN206873971U/en
Application granted granted Critical
Publication of CN206873971U publication Critical patent/CN206873971U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

The moveable BIPV projects roofing construction safety net of the utility model, it is related to technical field of building construction, including safety net, main rope track, fixed pulley, ground fixture, wire line hitch, snap ring, bottle gouard moved by hands I II, mobile steel wire rope, two main rope tracks positioneds are on the beam or post of factory building both sides, one end of main rope track is locked on the beam or post of factory building one end both sides by wire line hitch respectively, the other end extends around bottle gouard moved by hands I and is connected with ground fixture still further below after bypassing fixed pulley respectively, snap ring is uniformly connected to the both sides of safety net, two row's snap rings are gone here and there on two main rope tracks respectively, snap ring of the upper end of four mobile steel wire ropes respectively with four angles of safety net is connected, the lower end of four mobile steel wire ropes is connected with the ground fixture on the downside of it respectively.The advantages that the utility model is economical good, simple to operate, safe and reliable.

Description

A kind of moveable BIPV project roofing construction safety nets
Technical field
Technical field of building construction is the utility model is related to, more particularly to a kind of moveable BIPV projects roofing construction peace The whole network.
Background technology
BIPV(I.e. Building Integrated PV are BIPVs)Project is by solar energy power generating Square formation is integrated among architectural engineering, and photovoltaic module is directly installed on roof truss purline, and function is used in guarantee building Meet the function of photovoltaic generation simultaneously.When BIPV roofings are constructed, roofing only has purlin, no safe operation platform, and There are production equipment, electrical equipment, pendent lamp or other barriers in workshop, the operating platform of installation safety net is set up in workshop, can not The personal safety of workmen is ensured, great potential safety hazard be present, certain safety prevention measure i.e. roof purline must be taken Under hang up safety net.Traditional safety net hangs up system completely to spread safety net under roof, and safety net is fixed on into factory building both sides Pillar on, conventional method has following weak point:1st, BIPV roofings area is larger, completely spreads safety net very waste of materials;2、 BIPV roofings height is higher, often hangs up or removes a safety net and be required for worker to climb up and climbs down, very big potential safety hazard be present, Labor intensive is more simultaneously;3rd, factory building width is larger, using artificial tensioning safety net, can not make with both sides to reach among safety net Level, sagging serious, protecting effect is poor;4th, there are production equipment, electrical equipment, pendent lamp or other barriers in BIPV roofings workshop, Safety net can not be installed, roofing construction can not ensure safely.
The content of the invention
The purpose of this utility model is in view of the above-mentioned drawbacks of the prior art, providing a kind of moveable BIPV projects Roofing construction safety net, it can disposably be installed, good economy performance, it is simple to operate, safe and reliable, can be moved along before and after construction direction It is dynamic.
The technical scheme that the utility model uses to achieve the above object is:A kind of moveable BIPV project roofing constructions Safety net, including safety net, in addition to main rope track, fixed pulley, ground fixture, wire line hitch, snap ring, bottle gouard moved by hands Ith, bottle gouard moved by hands II, mobile steel wire rope, two main rope tracks positioneds are on the beam or post of factory building both sides, two main ropes One end of track is locked on the beam or post of factory building one end both sides by wire line hitch respectively, two main rope tracks it is another Respectively around extension is connected with each other with the ground fixture on the downside of fixed pulley still further below after fixed pulley, bottle gouard moved by hands I is connected at end In main rope track on the downside of fixed pulley, snap ring is uniformly connected to the both sides of safety net, and two row's snap rings are gone here and there at two respectively On main rope track, the snap ring of the upper ends of four mobile steel wire ropes respectively with four angles of safety net is connected, four mobile steel wires The lower end of rope is connected with the ground fixture on the downside of it respectively, and safety net has a movement in two mobile steel wire ropes per side Bottle gouard moved by hands II is connected with steel wire rope.
It is of the present utility model further technical scheme be:Main steel can be positioned by being additionally provided with the beam or post of factory building both sides The fixation steel wire rope head of cord track.
The moveable BIPV projects roofing construction safety net of the utility model has compared with traditional safety net hangs up system There is following beneficial effect:
1st, good economy performance:The utility model is not required to full paving safety net, moves back and forth and can realize merely with a safety net The purpose of construction area safety is protected, not only greatlys save material, and effectively reduces labour cost, shortens the duration.
2nd, it is simple to operate:The utility model just may be implemented in ground artificial by the steel wire rope of mobile security net corner Mobile security net to construction area purpose, it is simple to operate, climb up and climb down without worker, reduce labor strength.
3rd, stability is strong:The utility model makes full use of fixed pulley and bottle gouard moved by hands stretching wire rope and safety net, effectively The shortcomings that overcoming artificial tensioning safety net dynamics deficiency, safety net has been effectively ensured hangs up height and stability.
BIPV projects roofing construction safety net moveable to the utility model is made into one with reference to the accompanying drawings and examples The explanation of step.
Brief description of the drawings
Fig. 1 is the structural representation of the moveable BIPV projects roofing construction safety net of the utility model;
Fig. 2 is the perspective view of the moveable BIPV projects roofing construction safety net of the utility model;
Fig. 3 is the structural representation of wire line hitch;
Fig. 4 is the structural representation of snap ring;
Drawing reference numeral explanation:1- bottle gouards moved by hands I, 2- fixed pulleys, 3- movement steel wire ropes, 4- main rope tracks, 5- snap rings, 6- wire line hitch, 7- crossbeams, 8- safety nets, 9- columns, 10- fixation steel wire rope heads, 11- ground fixtures, 12- bottle gouards moved by hands Ⅱ。
Embodiment
As shown in Figures 1 to 4, a kind of moveable BIPV project roofing construction safety nets of the utility model, including safety Net 8, main rope track 4, fixed pulley 2, ground fixture 11, wire line hitch 6, snap ring 5, bottle gouard moved by hands I 1, bottle gouard moved by hands II 12nd, mobile steel wire rope 3.
Main rope track 4 is using φ 10mm steel wire rope, and each is about 200 meters, and mobile steel wire rope 3 is using φ 5mm Steel wire rope, each is about 20 meters.Two main rope track 4 is positioned on the beam or post of factory building both sides, two main ropes One end of track 4 is locked on the beam or post of factory building one end both sides by wire line hitch 6 respectively, two main rope tracks 4 The other end extends still further below after bypassing fixed pulley 2 respectively and the ground fixture 11 of the downside of fixed pulley 2 is connected with each other, bottle gouard moved by hands I 1 are connected in the main rope track 4 of the downside of fixed pulley 2.
Snap ring 5 is uniformly connected to the both sides of safety net 8, and two row's snap rings 5 are gone here and there on two main rope tracks 4 respectively, Snap ring 5 of the upper end of four mobile steel wire ropes 3 respectively with 8 four angles of safety net is connected, the lower end difference of four mobile steel wire ropes 3 It is connected with the ground fixture 11 on the downside of it, safety net 8 has a mobile steel wire rope 3 in two mobile steel wire ropes 3 per side On be connected with bottle gouard moved by hands II 12.The fixation of main rope track 4 can be positioned by being additionally provided with the beam or post of factory building both sides With steel wire rope head 10(A pair of fixation steel wire rope heads are only illustrated in figure, multipair fixation steel wire rope is installed in actual field Head), it is fixed to use φ 8mm steel cables with steel wire rope head 10.
During installation, the both sides snap ring 5 of safety net 8 is gone here and there on two main rope tracks 4 respectively, by two main rope rails The one end in road 4 is locked on the beam or post of factory building one end both sides by wire line hitch 6 respectively, then by two main rope tracks 4 The other end respectively bypass fixed pulley 2 after still further below extension be connected with bottle gouard moved by hands I 1, then with bottle gouard moved by hands I 1 slowly will lead Steel wire rope track 4 and safety net 8 pack up rising, and steel wire rope end is fixed on into ground again after reaching about 2 meters from roofing or so consolidates Earnest 11, and fixed φ 10mm main ropes track 4 with φ 8mm with steel wire rope head 10 at interval of about 40 meters and workshop post or beam Tightening up prevents that the radian on main rope both sides is too low.
Finally, safety net 8 is slowly pulled open using the removable steel wire rope 3 of 8 four jiaos of safety net on ground, makes safety net 8 Effectively open, without sagging, reach and tense main rope track 4 with bottle gouard moved by hands II 12 after width, make safety net 8 horizontal, Without sagging.Safety net 8 along the main rope track 4 as track do it is front and rear move, be moved in safety net 8 When fixing the position with steel wire rope head 10, the fixation steel wire rope head 10 of the position can be pulled down, and the fixation steel that will be pulled down Cord first 10 is installed on the main rope track 4 and column of the rear side of safety net 8, and therefore, in work progress, worker can basis The change in roofing construction region, hauled on ground and tie up to the steel wire rope of 8 four jiaos of safety net and move forward and backward safety net 8 at any time.
Above example is only preferred embodiment of the present utility model, and structure of the present utility model is not limited to above-mentioned implementation The form enumerated of example, any modification of all made within spirit of the present utility model and principle, equivalent substitution etc., all should be included Within the scope of protection of the utility model.

Claims (2)

1. a kind of moveable BIPV project roofing construction safety nets, including safety net(8), it is characterised in that also including main steel Cord track(4), fixed pulley(2), ground fixture(11), wire line hitch(6), snap ring(5), bottle gouard moved by hands I(1), manual calabash Reed II(12), mobile steel wire rope(3), two main rope tracks(4)It is positioned on the beam or post of factory building both sides, two row ground are consolidated Earnest(11)It is evenly arranged in two main rope tracks(4)On the ground of downside, two main rope tracks(4)One end point Wire line hitch is not passed through(6)It is locked on the beam or post of factory building one end both sides, two main rope tracks(4)The other end difference Around fixed pulley(2)Afterwards still further below extension and fixed pulley(2)The ground fixture of downside(11)It is connected with each other, bottle gouard moved by hands I(1) It is connected to fixed pulley(2)The main rope track of downside(4)In, snap ring(5)Uniformly it is connected to safety net(8)Both sides, two Arrange snap ring(5)Go here and there respectively in two main rope tracks(4)On, four mobile steel wire ropes(3)Upper end respectively with safety net(8) The snap ring at four angles(5)Connection, four mobile steel wire ropes(3)Lower end respectively with the ground fixture on the downside of it(11)Connection, Safety net(8)Two mobile steel wire ropes per side(3)In have a mobile steel wire rope(3)On be connected with bottle gouard moved by hands II (12).
2. moveable BIPV project roofing construction safety nets as claimed in claim 1, it is characterised in that in factory building both sides Main rope track can be positioned by being additionally provided with beam or post(4)Fixation steel wire rope head(10).
CN201720671891.2U 2017-06-09 2017-06-09 A kind of moveable BIPV project roofing construction safety nets Expired - Fee Related CN206873971U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720671891.2U CN206873971U (en) 2017-06-09 2017-06-09 A kind of moveable BIPV project roofing construction safety nets

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720671891.2U CN206873971U (en) 2017-06-09 2017-06-09 A kind of moveable BIPV project roofing construction safety nets

Publications (1)

Publication Number Publication Date
CN206873971U true CN206873971U (en) 2018-01-12

Family

ID=61332895

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720671891.2U Expired - Fee Related CN206873971U (en) 2017-06-09 2017-06-09 A kind of moveable BIPV project roofing construction safety nets

Country Status (1)

Country Link
CN (1) CN206873971U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110965798A (en) * 2019-11-26 2020-04-07 上海二十冶建设有限公司 Movable type limb vertical face protection device and construction method thereof
CN114412213A (en) * 2021-12-23 2022-04-29 中国华冶科工集团有限公司 Protection device and method for steel structure roof installation
CN114439262A (en) * 2020-11-04 2022-05-06 中国核工业二三建设有限公司 Automatic hole safety net protector

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110965798A (en) * 2019-11-26 2020-04-07 上海二十冶建设有限公司 Movable type limb vertical face protection device and construction method thereof
CN114439262A (en) * 2020-11-04 2022-05-06 中国核工业二三建设有限公司 Automatic hole safety net protector
CN114439262B (en) * 2020-11-04 2023-11-14 中国核工业二三建设有限公司 Automatic safety net protector in hole
CN114412213A (en) * 2021-12-23 2022-04-29 中国华冶科工集团有限公司 Protection device and method for steel structure roof installation
CN114412213B (en) * 2021-12-23 2023-09-08 中国华冶科工集团有限公司 Protective device and method for steel structure roof installation

Similar Documents

Publication Publication Date Title
CN206873971U (en) A kind of moveable BIPV project roofing construction safety nets
CN103993735A (en) Support system of roof inclined beam and slab cantilever structure and construction method of support system
CN105088979B (en) Demolition blasting method for large bridge
CN103422714B (en) A kind of high ferro is the safety protecting method of wired construction and the protective fence of formation thereof both
CN202530816U (en) A hurricane-shielding reinforcing device of a prefabricated house
CN206971760U (en) A kind of full steel structure assembled climbs material platform
CN202899600U (en) Construction site limb quick installation and removal protecting device
CN209780190U (en) Hanging platform for large-span beam string beam daylighting roof construction
CN204112697U (en) A kind of protector carrying raise scaffold turnover panel
CN206328110U (en) One kind customization hanging basket apparatus
CN204826867U (en) Building construction protection fence of steel cable structure
CN215671267U (en) Telescopic edge protection device
CN206273949U (en) A kind of plug-in movable operating platform
CN211775606U (en) Regularization assembled that can have enough to meet need climbs frame and goes up people's passageway
CN201649607U (en) Overhung-type outer wall scaffold
CN203257117U (en) Novel construction safety protection device of space long-span building
CN104060809A (en) Roof lighting glass steel frame installation device and operation method thereof
CN211775570U (en) Decoration trolley
CN103899078B (en) Attachment automatic lifting protecting screen mounting method
CN206955504U (en) One kind can have enough to meet the need people's escape way on regularization tower crane
CN1288276A (en) Method and equipment of stride across construction utilizing overhead cableway
CN209145170U (en) A kind of photovoltaic solar roof boarding
CN210177977U (en) Lifeline system for installing steel frame structure of factory building
CN113044741A (en) Safety channel for connecting integrated climbing frame and tower crane and lifting method thereof
CN206652466U (en) A kind of sintering machine mixing machine crossbeam that can prevent sizing

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180112

CF01 Termination of patent right due to non-payment of annual fee