CN206873458U - Rivers and lakes breach a dyke fast blockage ship - Google Patents
Rivers and lakes breach a dyke fast blockage ship Download PDFInfo
- Publication number
- CN206873458U CN206873458U CN201720763274.5U CN201720763274U CN206873458U CN 206873458 U CN206873458 U CN 206873458U CN 201720763274 U CN201720763274 U CN 201720763274U CN 206873458 U CN206873458 U CN 206873458U
- Authority
- CN
- China
- Prior art keywords
- dyke
- ship
- hull
- steel plate
- rivers
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Revetment (AREA)
Abstract
A kind of rivers and lakes breach a dyke fast blockage ship, leak stopping ship includes hull, excavator, anchor, telescopic arm and hemispherical leather bag balloon, excavator is arranged among hull, one telescopic arm and an anchor are installed respectively in hull corner, the column articulated big disk of branch of telescopic arm front end, it is a hemispherical leather bag balloon below big disk;When carrying out leak stopping using the utility model, combined steel plate is made first, the flexible steel plate that combined steel plate is made up of some steel plates, leak stopping ship is reached near the mouth that breaches a dyke from high water level, under anchor is thrown, starting hydraulic means stretches out horizontal extension arm, restarts air compressor machine to hemispherical leather bag balloon inflation, leak stopping ship is consolidated;I-steel is squeezed on mouth breaching a dyke, combined steel plate is caught in the groove of I-steel, blocks the mouth that breaches a dyke.It is the utility model safe operation, quick, flexibly, efficiently, specialization is realized, saves manpower and materials, breaching a dyke to administer rivers and lakes provides a kind of very effective method.
Description
Technical field
A kind of rivers and lakes embankment is the utility model is related to breach a dyke fast blockage ship.
Background technology
Big flood is run into, rivers and lakes breach a dyke can all bring massive losses to people's life and property.Often at present
Several rivers and lakes embankments, which breach a dyke, quickly blocks up dike method, adds stone among respectively big stone block, sand pocket and wattled wall
This several blocking method of sand pocket, stone block are bigger stone, general to carry out stifled dike with tens kilograms of stone.But this three
Stifled dike method of kind of conventional rivers and lakes embankment breaching a dyke all compares that expense is artificial, effect is slow, also has seepage after having blocked up.Do not have also at present
There is more preferable, more efficient method to solve embankment to breach a dyke problem so that when having larger flood, will employ compared with
More manpowers carries out flood control, reinforces river levee, massive losses are brought to prevent life and property of the dyke breach to the people.
The content of the invention
The purpose of this utility model is:Design it is a kind of can the rivers and lakes of operation on the water breach a dyke fast blockage ship, with
Overcome the shortcomings of present several blocking methods, improve effect, quickly block up dike, ne-leakage, safe ready, flood can be reduced to greatest extent
The loss that damage caused by waterlogging evil is brought to people's life and property.
Technical scheme is used by realizing the utility model purpose:Leak stopping ship includes hull, excavator, anchor, flexible
Arm and hemispherical leather bag balloon, excavator are fixedly mounted among deck in ship structure, are installed a level respectively in hull corner and are stretched
Contracting arm and an anchor, each horizontal extension arm front end are all connected with a downward pillar, and strut ends are connected to a great circle
On the center of disk, the same hemispherical leather bag balloon of a diameter is installed below in big disk;On horizontal extension arm and hull
Hydraulic system be connected, hemispherical leather bag balloon is connected with the air compressor machine on hull;The digging arm end of excavator, which is provided with, to be beaten
Stake head.
Strut ends are hinged on disk.
Electric control part colleague technical staff can designed, designed, it is not described here in detail.
Good effect of the present utility model is:Coordinate the combined steel plate outspoken speed that breach a dyke stifled using leak stopping ship, excavator
Leakage, equipment is simple, safe operation, quick, flexibly, efficiently, realizes specialization, saves manpower and materials;Efficiently solve biography
The rivers of system are moored recklessly adds this several stifled dike method expense of breaching a dyke of stone sand pocket when embankment breaches a dyke with stone block, sand pocket and wattled wall centre
Manually, operational hazards, effect are slow, blocked up after also have the problems such as seepage, the utility model breaches a dyke offer to administer rivers and lakes
A kind of very effective method.
Brief description of the drawings
Accompanying drawing 1 is leak stopping ship structural representation of the present utility model;Accompanying drawing 2 is the left view of accompanying drawing 1;Accompanying drawing 3 is accompanying drawing 1
Schematic top plan view;Accompanying drawing 4 is combined steel plate schematic diagram;Accompanying drawing 5 is the schematic diagram that combined steel plate is put into I-steel.
Embodiment
Leak stopping ship of the present utility model is as shown in accompanying drawing 1,2,3, including hull 3, excavator 4, anchor 7, digging arm 2 and half
Spherical leather bag balloon 6, excavator 4 are fixedly mounted among the deck of hull 3, and a horizontal extension is installed respectively for 3 four jiaos in hull
Arm 8 and an anchor 7, each front end of horizontal extension arm 8 are all connected with a downward pillar 5, and the end of pillar 5 is hinged on one big
On the center of disk 9, the same hemispherical leather bag balloon 6 of a diameter is installed below in big disk 9;Horizontal extension arm 8 with
Hydraulic system on hull 3 is connected, and hemispherical leather bag balloon 6 is connected with the air compressor machine on hull 3;The end of digging arm 2 of excavator 4
Portion is provided with piling head.
Application method of the present utility model is:A kind of combined steel plate 1 is made first, and combined steel plate 1 is vertical solid by two pieces
Determine the flexible steel plate that steel plate 10 and some groups of lateral connection steel plates 11 form, wide 1.5-2 rice, high 2-5 rice(As shown in Figure 4),
Every group of lateral connection steel plate 11 is made up of two blocks of steel plates, and one of steel plate one end carries a longitudinally elongated chute 12, in addition
One piece of steel plate end is riveted in elongated chute 12, can left and right pull, the both ends of lateral connection steel plate 11 are respectively hinged at both sides
On vertical fixation steel plate 10, combined steel plate 1 can twist up and down and left and right is flexible;Separately there is the I-steel of some long 5-9 rice;Will processing
Good combined steel plate and the I-steel got ready, are put into standby on leak stopping ship or other workboats.300-500 tons of leak stopping ship tonnage
Between, leak stopping ship is reached near the mouth that breaches a dyke from high water level, berthed leak stopping ship hull is vertical with river levee, fore against river levee,
Under the anchor of corner is thrown;1.5 meters of 9 diameter of big disk being hinged with the end of pillar 5, big disk 9 apart from 50 centimeters or so of the water surface,
The diameter of hemispherical leather bag balloon 6 that big disk 9 connects below is also 1.5 meters;Starting hydraulic means stretches out horizontal extension arm 8,
Restart air compressor machine to inflate to hemispherical leather bag balloon 6, leak stopping ship is consolidated;Start first and excavate, 4, with piling head certainly
An I-steel 14 is squeezed at interval of 1.5-2 rice on dike mouth, after squeezing into second I-steel 14, is clamped aboard ship with piling head
Ready combined steel plate 1, is put into the groove of two I-steel 14 and clips(As shown in Figure 5), then the 3rd I-steel is squeezed into,
Second piece of combined steel plate is put into, by that analogy, combined steel plate 1 is covered the whole mouth that breaches a dyke, blocks the mouth that breaches a dyke, wait and move back it under flood
Taken out afterwards with the first I-steel of digging machine piling machine and combined steel plate, then repair embankment;I-steel and combined steel plate can weigh
It is multiple to use.
Claims (2)
- The fast blockage ship 1. a kind of rivers and lakes breach a dyke, it is characterised in that:Leak stopping ship includes hull, excavator, anchor, telescopic arm And hemispherical leather bag balloon, excavator are fixedly mounted among deck in ship structure, a horizontal extension is installed respectively in hull corner Arm and an anchor, each horizontal extension arm front end are all connected with a downward pillar, and strut ends are arranged on a big disk Center on, the same hemispherical leather bag balloon of a diameter is installed below in big disk;On horizontal extension arm and hull Hydraulic system is connected, and hemispherical leather bag balloon is connected with the air compressor machine on hull;The digging arm end of excavator is provided with piling Head.
- The fast blockage ship 2. rivers and lakes according to claim 1 breach a dyke, it is characterised in that:Strut ends are to be hinged on circle On disk.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720763274.5U CN206873458U (en) | 2017-06-28 | 2017-06-28 | Rivers and lakes breach a dyke fast blockage ship |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720763274.5U CN206873458U (en) | 2017-06-28 | 2017-06-28 | Rivers and lakes breach a dyke fast blockage ship |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206873458U true CN206873458U (en) | 2018-01-12 |
Family
ID=61331823
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720763274.5U Active CN206873458U (en) | 2017-06-28 | 2017-06-28 | Rivers and lakes breach a dyke fast blockage ship |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206873458U (en) |
-
2017
- 2017-06-28 CN CN201720763274.5U patent/CN206873458U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106948349A (en) | Quick block up fabricated construction system, erecting device and method | |
CN216108586U (en) | Novel pile foundation scour prevention protective structure | |
CN216194719U (en) | Dam gap plugging equipment with piles | |
CN206873458U (en) | Rivers and lakes breach a dyke fast blockage ship | |
CN108104058A (en) | A kind of dykes and dams flood crevasse plugging device and its method for blocking | |
CN107130605A (en) | Rivers and lakes breach a dyke fast blockage ship and blocking method | |
CN102031766A (en) | Hydroelectric barrage building machine | |
CN104790377B (en) | The quick-discharging consolidation device and method of high sticky content river and lake dredging bed mud | |
CN104594291B (en) | A kind of soft raft mattress sinking construction method that can improve mattress sinking smooth degree | |
CN106542051A (en) | A kind of landing stage is tethered at composite structure equipment | |
CN103485356A (en) | Overwater laying frame and method for filling sand pockets with same | |
CN215367481U (en) | Backfill system for pile foundation erosion pit of ocean platform | |
CN205839817U (en) | A kind of hull back-off type basis antiscour preventer | |
CN206680946U (en) | One kind combination inflatable rubber small dike | |
CN106677121B (en) | Protect the movable permeable spur structure and construction method of Coastal erosion | |
CN208949945U (en) | It is dumpable to mention pile frame | |
CN206784389U (en) | Quick block up fabricated construction system and erecting device | |
CN211285476U (en) | Hydraulic engineering is with high-efficient durable flood bank | |
CN105714740B (en) | Dyke fast blockage equipment | |
CN104612106B (en) | A kind of permeable geotechnique soft raft structure | |
CN210560009U (en) | Reinforced device is concretied to silt dystopy utilization dead weight | |
CN105002870A (en) | Stage-by-stage wet stacking tailing drainage acceleration and consolidation device | |
CN105568954A (en) | Over-water construction method of geotechnical cloth bag bulk piles | |
CN106337397A (en) | Quick plugging system and method for dam break | |
RU2380478C1 (en) | Mobile dam of parachute type |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |