CN206873304U - A kind of bridge protecting wall die assembly - Google Patents

A kind of bridge protecting wall die assembly Download PDF

Info

Publication number
CN206873304U
CN206873304U CN201720677731.9U CN201720677731U CN206873304U CN 206873304 U CN206873304 U CN 206873304U CN 201720677731 U CN201720677731 U CN 201720677731U CN 206873304 U CN206873304 U CN 206873304U
Authority
CN
China
Prior art keywords
template
side template
bridge
crack
protecting wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720677731.9U
Other languages
Chinese (zh)
Inventor
邢盼盼
丰逍野
杨东坤
孙晓强
赵振伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
Original Assignee
CCCC Second Harbor Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co filed Critical CCCC Second Harbor Engineering Co
Priority to CN201720677731.9U priority Critical patent/CN206873304U/en
Application granted granted Critical
Publication of CN206873304U publication Critical patent/CN206873304U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Moulds, Cores, Or Mandrels (AREA)

Abstract

Bridge protecting wall construction method technical field is the utility model is related to, in particular to a kind of bridge protecting wall die assembly.Including along bridge to spaced mould;Described mould includes the Side Template two pieces along the spaced apart side template of direction across bridge and positioned at side template along bridge to end;Described side template has the connecting plate vertical with side template to end set along bridge, it is characterised in that:Crack template is provided between two adjacent groups mould;Described crack template is the platy structure being fitted tightly between adjacent Side Template, and crack template includes four blocks of steel plates of the Side Template corner that is placed in.The utility model by crack template by being split as four pieces, the corner for the Side Template that is placed in, and reduces the size and weight of crack template, is easy to artificial carrying and operation, improves efficiency of construction, have great promotional value.

Description

A kind of bridge protecting wall die assembly
Technical field
Bridge protecting wall construction method technical field is the utility model is related to, in particular to a kind of bridge protecting wall set of molds Part.
Background technology
In bridge protecting wall work progress, it is necessary to every 2 meters of setting bridge breaking joints.Bridge can be discharged by breaking joint , to the prestressing force in direction, avoided along bridge in the case where prestressing force is excessive, crack or breakage occurs in protecting wall.General breaking joint Width for 1cm or so.At present, the construction method of breaking joint is typically by setting one piece of bamboo slab rubber or cystosepiment by before protecting wall After separate.After concreting is completed to reach strength of mould stripping, manually carry out removing bamboo slab rubber or cystosepiment, due to bamboo slab rubber with Protecting wall contact surface is closely connected, and it is serious to often result in protecting wall surface damage during manual demolition, and mold materials are often because itself is strong Degree is inadequate, and part mould material residues in protecting wall surface, does not meet protecting wall appearance requirement.
In order to reduce the difficulty of form removable, it is thus proposed that carried out a kind of formwork structure removed.Patent No. The Chinese utility model patent of entitled " readily removable to remove breaking joint formwork of protecting wall " of " CN202108006U " describes one kind and is easy to tear open The formwork structure unloaded, the formwork structure between adjacent Side Template by setting three-ply plate, by bolt arrangement by compound steel Plate is fixed between two layers of Side Template, after the completion of pouring, it is only necessary to removes bolt, it becomes possible to quickly steel plate is disassembled, Form breaking joint.Although the structure quickly can remove steel plate, due to having three-ply plate between abutting end template, if Protecting wall specification is larger, and steel plate weight is too big, and is not easy to workmen's carrying.Moreover, if steel plate both sides are pasted onto coagulation On soil, it is difficult to remove by manpower and materials merely.
The content of the invention
The purpose of this utility model seeks to the deficiency for solving above-mentioned background technology, there is provided a kind of bridge protecting wall set of molds Part
The technical solution of the utility model is:A kind of bridge protecting wall die assembly, including along bridge to spaced Multigroup mould;Described mould includes the end two pieces along the spaced apart side template of direction across bridge and positioned at side template along bridge to end Template;Described side template is along bridge to being provided with the connecting plate vertical with side template on plate body on the outside of end;Described Side Template It is held between two adjacent groups mould with being brought into close contact with the connecting plate of group, it is characterised in that:Set between two adjacent groups mould There is crack template;Described crack template includes the steel plate that polylith is fitted tightly between adjacent Side Template, and plurality of steel plates edge is perpendicular Nogata to or fore-and-aft direction arranged for interval.
Further described steel plate has four pieces, and adjacent steel plate leaves gap on vertical direction and fore-and-aft direction, four pieces Steel plate is placed in Side Template corner.
Bolt is equipped with further described connecting plate;Described screw bolt passes connecting plate, Side Template and folder Two groups of moulds are fixed together by slit die plate.
Further described crack template is that its transverse direction being fixed between two pieces of Side Templates protrudes from end mould to both sides The platy structure of plate and connecting plate, crack template protrude from the plate body of Side Template and connecting plate and offer through hole.
More horizontally extending floors, more floor edges are provided with further described side template lateral surface Vertical direction arranged for interval.
The utility model the corner for the Side Template that is placed in, reduces crack template by the way that crack template is split as into four pieces Size and weight, be easy to it is artificial carry and operation, improve efficiency of construction, there is great promotional value.
Brief description of the drawings
Fig. 1:Side view of the present utility model;
Fig. 2:Fig. 1 of the present utility model A-A views;
Fig. 3:The structural representation of crack template of the present utility model;
Wherein:1-side template;2-Side Template;3-connecting plate;4-crack template;5-bolt;6-through hole;7-rib Plate.
Embodiment
The utility model is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
Such as Fig. 1~3, a kind of bridge protecting wall die assembly, including along bridge to spaced multigroup mould, Duo Zumo Has arranged for interval, crack template 4 is arranged between adjacent molds.Mould includes two pieces along the spaced apart side template 1 of direction across bridge With the Side Template 2 positioned at side template 1 along bridge to end, side template 1 hangs down to being provided with plate body on the outside of end along bridge with side template 1 Straight connecting plate 3, connecting plate 3 play a part of fixed Side Template 2 and crack template 4.More are provided with the lateral surface of side template 1 Horizontally extending floor 7, more floors 7 vertically arranged for interval.Floor 7 is used for the structure for strengthening side template 1 Intensity.
The crack template 4 of the present embodiment includes four blocks of steel plates being fitted tightly between adjacent Side Template 2, four blocks of steel plates point It is placed in 2 four jiaos of Side Template.Bolt 5 is equipped with connecting plate 3, bolt 5 sequentially passes through connecting plate 3, Side Template 2 and crack template 4 Two groups of moulds are fixed together.By bolt arrangement, Side Template 2, connecting plate 3 and crack template 4 are closely joined together.
Crack template 4 is that its transverse direction being fixed between two pieces of Side Templates 2 protrudes from Side Template 2 and connecting plate 3 to both sides Platy structure, crack template 4, which is protruded from the plate body of Side Template 2 and connecting plate 3, offers through hole 6.Through hole 6 is easy to the later stage to tear open Used when unloading template as stress point.
In use, first rigging, crack template 4 is placed between the adjacent Side Template 2 in two groups of moulds, Ran Houtong Cross bolt 5 to connect as one three through connecting plate 3, Side Template 2 and crack template 4, after mould has assembled, to mould Interior casting concrete forms wall body structure.
After coagulation soil stabilization, demounting bolt, then it is extend into using rod-like structures such as crowbars in through hole 6, by crack mould Plate 4 is taken apart, and the sidepiece of Side Template 2 is then tapped along direction across bridge direction, Side Template 2 is disassembled, finally dismantles side form Plate 1, complete the dismounting of template.
The advantages of general principle of the present utility model, principal character and the utility model has been shown and described above.One's own profession The technical staff of industry is it should be appreciated that the utility model is not restricted to the described embodiments, described in above-described embodiment and specification Simply illustrate principle of the present utility model, the utility model can also on the premise of the spirit and scope of the utility model is not departed from There are various changes and modifications, these changes and improvements are both fallen within claimed the scope of the utility model.The utility model will Protection domain is asked to be defined by appended claims and its equivalent.

Claims (5)

1. a kind of bridge protecting wall die assembly, including along bridge to spaced multigroup mould;Described mould includes two Side Template (2) of the block along the spaced apart side template of direction across bridge (1) and positioned at side template (1) along bridge to end;Described side form Plate (1) is along bridge to being provided with the connecting plate (3) vertical with side template (1) on plate body on the outside of end;Described Side Template (2) clamping With being brought into close contact with the connecting plate (3) of group between two adjacent groups mould, it is characterised in that:It is provided between two adjacent groups mould Crack template (4);Described crack template (4) includes the steel plate that polylith is fitted tightly between adjacent Side Template, plurality of steel plates Vertically or fore-and-aft direction arranged for interval.
A kind of 2. bridge protecting wall die assembly as claimed in claim 1, it is characterised in that:Described steel plate has four pieces, phase Adjacent steel plate leaves gap on vertical direction and fore-and-aft direction, and four blocks of steel plates are placed in Side Template (2) corner.
A kind of 3. bridge protecting wall die assembly as claimed in claim 1, it is characterised in that:Worn on described connecting plate (3) Provided with bolt (5);Described bolt (5) sequentially passes through connecting plate (3), Side Template (2) and crack template (4) and consolidates two groups of moulds It is scheduled on together.
A kind of 4. bridge protecting wall die assembly as claimed in claim 3, it is characterised in that:Described crack template (4) is Its transverse direction being fixed between two pieces of Side Templates (2) protrudes from the platy structure of Side Template (2) and connecting plate (3) to both sides, folder Slit die plate (4), which is protruded from the plate body of Side Template (2) and connecting plate (3), offers through hole (6).
A kind of 5. bridge protecting wall die assembly as claimed in claim 1, it is characterised in that:On the outside of described side template (1) It is provided with more horizontally extending floors (7) on face, more floors (7) vertically arranged for interval.
CN201720677731.9U 2017-06-12 2017-06-12 A kind of bridge protecting wall die assembly Expired - Fee Related CN206873304U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720677731.9U CN206873304U (en) 2017-06-12 2017-06-12 A kind of bridge protecting wall die assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720677731.9U CN206873304U (en) 2017-06-12 2017-06-12 A kind of bridge protecting wall die assembly

Publications (1)

Publication Number Publication Date
CN206873304U true CN206873304U (en) 2018-01-12

Family

ID=61332741

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720677731.9U Expired - Fee Related CN206873304U (en) 2017-06-12 2017-06-12 A kind of bridge protecting wall die assembly

Country Status (1)

Country Link
CN (1) CN206873304U (en)

Similar Documents

Publication Publication Date Title
CN203712840U (en) Small box girder concrete pouring mold
CN206829379U (en) It is a kind of to be used to breathing out fragrant groove and nuzzle in advance the mounting structure of concrete component
CN105804395B (en) Stair continuously poured in one molding construction method based on monoblock type typified form
CN106193588B (en) A kind of method pouring building post-cast strip and pour mould
CN208534025U (en) Floor slab back casting band separate support formwork erecting structure
CN110396937A (en) The asynchronous construction of hollow thin-walled high pier binder pier beam
CN210396134U (en) Reinforcing tool for controlling horizontal joint quality of shear wall
CN105952154A (en) Concrete pouring template support
CN206873304U (en) A kind of bridge protecting wall die assembly
CN208167548U (en) Forming panel is used in a kind of segmentation disposal molding construction of box arch ring
CN103452319A (en) Chiseling-free device for concrete splicing interface and construction method for chiseling-free device
CN103590599A (en) Self-compaction mode locking device and using method
CN202831624U (en) Template for deformation joint of shear wall
CN105178593B (en) Fill the mold method and structure of wall construction post
CN207812625U (en) Special-shaped gutter template integrated apparatus
CN207469596U (en) A kind of beam column outer rim is exempted to tear concrete mold open
CN205775806U (en) A kind of railroad bridge gear tiny fragments of stone, coal, etc. wall light section template
CN104453235A (en) Convertor station firewall construction technology
CN207206697U (en) A kind of drawing and pulling type hollow plate beam internal model supporting mechanism
CN209958778U (en) Steel dustpan opening machined part convenient for pouring concrete of constructional column
CN209958777U (en) Steel dustpan opening machined part convenient for pouring concrete of constructional column
CN205875724U (en) Concrete placement formwork support
CN103485423B (en) The method of ater-casting indwelling
CN209323388U (en) Bridge breaking joint formwork of protecting wall tooling
CN207727997U (en) Concrete floor slab placement construction frame body platform structure for building construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180112