CN206859380U - The fan-shaped drainage inspection well of plastics municipal administration - Google Patents
The fan-shaped drainage inspection well of plastics municipal administration Download PDFInfo
- Publication number
- CN206859380U CN206859380U CN201720812058.5U CN201720812058U CN206859380U CN 206859380 U CN206859380 U CN 206859380U CN 201720812058 U CN201720812058 U CN 201720812058U CN 206859380 U CN206859380 U CN 206859380U
- Authority
- CN
- China
- Prior art keywords
- well
- post
- plastics
- shaft
- pit shaft
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
A kind of fan-shaped drainage inspection well of plastics municipal administration is the utility model is related to, belongs to drainage system field, more particularly to applies the inspection shaft at the large-caliber drainage pipeline turning under town road.Mainly it is made up of plastics well body and reinforced concrete frame, plastics well body include well seat, well bore, bed die, pit shaft using plastic production into component, plastic member assembled in situ is into well body, it is basis, the cast-in-situ steel reinforced concrete framework of well room post, cover plate, pit shaft post, walling crib composition around plastics well body, a waterproof plastic well body being assembled by plastic member is formed, steel bar framework mixes structure inspection well for the modeling of load-carrying members.Soil pressure around ground load and well is undertaken by armored concrete, and this mixed structure of modeling has the good seal of plastics, the stronger bearing capacity of armored concrete.The inspection shaft Assembling speed of application is fast, and water resistance is good, and quality is easily controlled.
Description
Technical field
A kind of fan-shaped drainage inspection well of plastics municipal administration is the utility model is related to, belongs to drainage system field, more particularly to should
The inspection shaft at large-caliber drainage pipeline turning under town road.
Background technology
Municipal drainage is divided into rainwater and sewage, and run-off system is divided into two kinds of separate system and combined system, and most of city is all
Separate system is taken, i.e. rainwater, sewage discharges respectively.Unit or residential area along urban road are typically all functional in organized water drainage,
Rainwater, sewage are collected to the drainage pipeline drained under urban road, are commonly called as municipal drain.Rainwater, sewage are arranged by municipal administration again
Waterpipe drains into water body or sewage treatment plant.Municipal drainage pipeline at spacing intervals, pipeline turning, need at branch pipe access
Inspection shaft is set.The characteristics of municipal drain is that caliber is larger, and the inspection shaft used is also larger.《Code for design of outdoor sewerage engineering》
GB50014-2006, regulation is all made that to the well room height of inspection shaft, the setting of chute, turning inspection shaft chute radius.
When carrying out drainage pipeline design, designer is to use national standard drawing《Drainage inspection well》02S515, or《Municipal administration row
Waterpipe engineering and affiliated facility》06MS201, the latter are the former revision file versions.Municipal drainage inspection shaft is according to caliber
Difference is divided into circle, rectangle, sector etc..Circular inspection well is only applicable to the pipeline that caliber is less than 1000mm, turns in drainage pipeline
Crook, pipeline of the caliber more than or equal to 1000mm typically all use fan-shaped well.
The chute of fan-shaped well is curvilinear, existing standard drawing inspection shaft, is divided to brick and two kinds of structure shapes of concreting
Formula.Most of in Practical Project is to use brickwork construction, brick to have easy construction, short time limit etc. relative to concrete structure
Advantage.But building by laying bricks or stones for brick drainage inspection well requires very high, and puzzle joint mortar should be full, and well inner waterproofing sand finish is closely knit.
Closed-water test is carried out before drainage pipeline backfill, examines the airtight performance of pipeline.Closed-water test requires that band well is tested, i.e., pipeline connects
With inspection shaft together closed-water test.Inspection shaft in practice of construction being often present, to build brickwork joint by laying bricks or stones not tight, especially pipeline and inspection
Look into it is more difficult between well build by laying bricks or stones, the hidden danger of quality such as leakiness of being wiped one's face in well.Height of being wiped one's face in standard drawing rainwater inspection well is in pipe
200mm on top, height of wiping one's face in sewage inspection well to well ceiling, the water level of closed-water test are the inspection well casing of test section most upstream
Interior top above 2m, it is possible to the phenomenon that water level is higher than height of wiping one's face be present, inspection shaft easily causes leak especially cover plate
It is main portions that leak occur with the seat of well body slurry, it is not reach requirement, it is necessary to wipe one's face again very that leak, which causes closed-water test,
Built by laying bricks or stones again to inspection shaft is removed.Drainage also occurs in the inspection shaft of concrete cast in situs leakiness of vibrating.Therefore, if
Meter personnel typically can be when applying mechanically standard drawing, it is desirable to wipes one's face in rainwater inspection well to well head, is wiped one's face inside and outside sewage inspection well to well
Mouthful.The chute of fan-shaped well is curvilinear, and brick and concrete inspection well technological requirement is high, and difficulty of construction is big, and site operation is by people
Member's technical merit influences greatly, and construction quality is uneven, long construction period, and airtight performance is not so good as plastic inspection well.Due to big mouth
The fan-shaped well size of footpath drainage pipeline is larger, and plastic inspection well bearing capacity is limited, and prior art is more than for caliber etc.
In 1000mm plastics sector drainage inspection well.
The content of the invention
The purpose of this utility model is:There is provided a kind of plastics municipal administration fan-shaped drainage inspection well, be more than or equal to for caliber
At 1000mm drainage system pipeline turning.Using the construction size of current standard figure inspection shaft as foundation, meet specification chute,
Workbench and maintenance requirement of going into the well.Mainly it is made up of plastics well body and reinforced concrete frame, plastics well body includes well seat, well
Body, bed die, pit shaft using plastic production into component, these plastic member assembled in situ form, and are around plastics well body
Basis, well room post, cover plate, pit shaft post, walling crib composition cast-in-situ steel reinforced concrete framework, composition one by plastic member assemble and
Into waterproof plastic well body, steel bar framework mixes structure inspection well for the modeling of load-carrying members.Soil pressure around ground load and well
Undertaken by armored concrete, this mixed structure of modeling has the good seal of plastics, the stronger bearing capacity of armored concrete.Framework
Concreting makees template using plastics well body, without formwork and form removal, saves the material of formwork form removal and artificial.Beneficial to effect
Fruit is:Solve the problems, such as the low inadaptable making heavy caliber drain pipe sector inspection shaft of plastic strength, compensate for prior art
Brick or concrete inspection well seal is poor, drainage easily occurs, working procedure is complicated, the weakness of long construction period.
The utility model is realized by following technology:The fan-shaped drainage inspection well of plastics municipal administration, including well seat 1, well bore
2nd, bed die 3, pit shaft 4 using plastic production into component, plastic member is assembled plastics well body, inspection shaft also include basis 5,
The reinforced concrete frame that well room post 6, cover plate 7, pit shaft post 8, walling crib 9 form, framework is interior to set reinforcing bar, is poured using concrete
Build.Well seat 1 and well bore 2 collectively constitute the space well room 10 for checking well servicing, and the level cross-sectionn of well room 10 is fan-shaped, and four
Angle is provided with well room post internal model 11, and the fan-shaped outer arcuate borehole wall in well room 10 sets 1~3 well room post internal model 11, well room post internal model
BODY WITH SQUARE APERTURE is formed between 11 and the borehole wall, for setting well room post 6, the both ends of well seat 1 are the mouth of pipe 12, are arc between two mouths of pipe 12
Shape connects chute 13, and the both sides of chute 13 are workbench 14;Plastics well body and reinforced concrete frame form one by plastics
The waterproof borehole wall that component is assembled, periphery set inspection shaft with complex structure of the armored concrete as bearing structure.
The described top of well seat 1 is provided with the bellmouth of connection well bore 2, and being provided with well room between well room post internal model 11 laterally strengthens
Rib 15;Well bore 2 is arranged on the top of well seat 1, and the bottom of well bore 2 is inserted in the bellmouth on the top of well seat 1.
The flat shape of described bed die 3 is fan-shaped with the identical of well room 10, and bed die is provided with the upside of the bottom plate of bed die 3 and is strengthened
There is bed die corner apertures rib 16, the position of well room post internal model 11 of corresponding well room 10, and the reinforcing bar of well room post 6 can stretch into lid from bed die corner apertures
In plate 7, the bottom of bed die 3 is provided with bellmouth, and bellmouth is downward, and for being connected with well bore 2, top corresponds to setting bellmouth at pit shaft 4, holds
Mouth is upward, for being connected with pit shaft 4.
It is circular shaft in wall 17 on the inside of the level cross-sectionn of described pit shaft 4, outside is and the circular phase of shaft in wall 17
The square well drum outer wall 18 of connection is cut, four angles of circular shaft in wall 17 and square well drum outer wall 18 form the three of rounded oblique side
Angular duct, for setting pit shaft post 8.The lower end shaft in wall 17 of pit shaft 4 stretches out pit shaft outer wall 18, for inserting bed die 6
The bellmouth on top, the upper end shaft in wall 17 of pit shaft 4 also stretches out pit shaft outer wall 18, for setting walling crib 9.
Described basis 5 is provided with reinforcement foundation 20, and well room post 6 sets well room post reinforcing bar 21, and well room post reinforcing bar 21 is embedded in
In basis 5, it is connected with the colligation of reinforcement foundation 20.Cover plate 7 is provided with cover plate reinforcing bar 22, the colligation of well room post reinforcing bar 21 stretched into bottom
Connection.Pit shaft post 8 sets pit shaft post reinforcing bar 23, and bottom is embedded in cover plate 7, is connected with the colligation of cover plate reinforcing bar 22, top is stretched into
Walling crib 9, it is connected with the colligation of walling crib reinforcing bar 24.
The fan-shaped drainage inspection well of plastics municipal administration is bottom-up to be followed successively by:Basis 5, well seat 1, well bore 2, bed die 3, cover plate 7, well
Cylinder 4, walling crib 9, inspection shaft well lid are arranged in walling crib 9.Ground load passes to reinforced concrete frame by inspection shaft well lid,
The order of transmission is well lid, walling crib 9, pit shaft post 8, cover plate 7, well room post 6, basis 5, ground.
The utility model is a kind of plastics well body component of batch production manufacture, and each component separately manufacturing of plastics pit shaft is square
Just transport, assembled in situ combination, the modeling formed with reference to pouring reinforcement concrete framework mixes structure inspection well.Pouring frame concrete
When, make template using plastics well body, without formwork and form removal, save the material of formwork form removal and artificial.Eliminate existing skill
Art municipal drainage inspection shaft is laid bricks or the cumbersome process of formwork casting concrete, speed of application, quality are easily controlled.
Brief description of the drawings
Fig. 1 is the utility model plan;
Fig. 2 is the A-A sections of the utility model longitudinal direction sectional elevation 1;
Fig. 3 is the B-B sections of the utility model transverse direction sectional elevation 1;
Fig. 4 is well bore position horizontal sectional drawing;
Fig. 5 is bed die horizontal sectional drawing;
Fig. 6 is shaft location horizontal sectional drawing;
Fig. 7 is walling crib position horizontal sectional drawing;
Fig. 8 is the C-C sections of reinforced concrete frame sectional elevation 1.
In figure:1- wells seat, 2- well bores, 3- bed dies, 4- pit shafts, 5- bases, 6- wells room post, 7- cover plates, 8- pit shafts post, 9- wells
Circle, 10- wells room, 11- wells room post internal model, the 12- mouths of pipe, 13- chutes, 14- workbench, 15- wells room transverse direction ribs, 16- bed dies
Ribs, 17- shaft in wall, 18- pit shafts outer wall, 19- cat ladders, 20- reinforcement foundations, 21- wells room post reinforcing bar, 22- cover plates reinforcing bar,
23- pit shaft posts reinforcing bar, 24- walling crib reinforcing bars.
Embodiment
The utility model is a kind of well body being made up of plastic member, and assembled in situ combines, and is mixed around well body provided with reinforcing bar
Coagulate inspection shaft of the native framework as the mixed structure of modeling of carrying.It is made up of plastics well body and reinforced concrete frame two parts, plastics
Well body includes well seat 1, well bore 2, bed die 3, pit shaft 4, and reinforced concrete frame includes basis 5, well room post 6, cover plate 7, pit shaft post
8th, walling crib 9.Plastics well body and reinforced concrete frame form the waterproof borehole wall being assembled by plastic member, and surrounding is set
Inspection shaft with complex structure of the armored concrete as bearing structure.The utility model plan is shown in Fig. 1, and the foot of inspection shaft is
Basis 5, using concreting, sees that longitudinal deep cutting meets personally Fig. 2, horizontal deep cutting meets personally Fig. 3, and Fig. 2 is Fig. 1 A-A sections, Fig. 3
It is Fig. 1 B-B sections.Fig. 1 is along the position of pipeline center's sectional horizontal, i.e. well seat 1, is the horizontal throwing for reflecting inspection shaft
Shadow, pit shaft 4 are located at the top of inspection shaft, and not cutting is arrived, in order to represent the plan positional relationship with well seat 1, using dotted line table
Show.Well seat 1 is made of HDPE vinyons, installed in the top on basis 5.The level cross-sectionn of well seat 1 is sector, and corner is set
There is well room post internal model 11, the fan-shaped outer arcuate borehole wall in well room 10 sets 1~3 well room post internal model 11, turned for fan-shaped well
When angle is larger, the longer fan-shaped well of the outer arcuate borehole wall, BODY WITH SQUARE APERTURE is formed between well room post internal model 11 and the borehole wall, for setting
Put well room post 6.The both ends of well seat 1 are the mouth of pipe 12, are that arc shape connects chute 13 between two mouths of pipe 12, the both sides of chute 13 are work
Make platform 14.The inspection shaft is used for the drainage pipeline turning that caliber is more than 1000mm, is a kind of conventional inspection of drainage pipeline project
Look into well.The top of well seat 1 is provided with the bellmouth of connection well bore 2, is provided with heating wire in bellmouth, well is provided between well room post internal model 11
Room transverse direction ribs 15, to strengthen the wall strength of well seat 1, resist lateral pressure native around inspection shaft.Well bore 2 is arranged on well
The top of seat 1, the bottom of well bore 2 are inserted in the bellmouth on the top of well seat 1.Well bore 2 is made of HDPE vinyons, well bore 2
Horizontal sectional drawing see Fig. 4, level cross-sectionn is sector, and corner is provided with well room post internal model 11, the outer arcuate of the sector of well room 10
The borehole wall sets 1~3 well room post internal model 11, and BODY WITH SQUARE APERTURE is formed between well room post internal model 11 and the borehole wall, for setting well
Room post 6, well room transverse direction ribs 15 also is provided between well room post internal model 11.Well bore 2 is inserted in the bellmouth on the top of well seat 1, electric heating
Molten connection.Well seat 1 and well bore 2 collectively constitute the space well room 10 for checking well servicing, see Fig. 2, Fig. 3.
Bed die 3 is made of HDPE vinyons, and the horizontal sectional drawing of bed die 3 is shown in Fig. 5.The flat shape of bed die 3 is and well
The identical of room 10 is fan-shaped, and bed die 3 is arranged on the top of well bore 2, sees Fig. 2, Fig. 3.The bottom of bed die 3 is provided with bellmouth, and bellmouth is downward,
Heating wire is provided with bellmouth, for being connected with well bore 2.The concrete that bed die 3 is used to pour cover plate 7 makees template, the bottom of bed die 3
The bed die ribs 16 being provided with the upside of plate, to strengthen the intensity of bottom, avoids bed die 3 during casting concrete from deforming.The correspondence of bed die 3
There is bed die corner apertures the position of well room post internal model 11 of well room 10, and the reinforcing bar of well room post 6 can be stretched into cover plate 7 from bed die corner apertures, poured
During 7 concrete of cover plate with the strong bonded of well room post 6.The top of bed die 3 corresponds to setting bellmouth at pit shaft 4, and bellmouth is upward, is set in bellmouth
Heating wire is equipped with, for being connected with pit shaft 4.
Pit shaft 4 is made of HDPE vinyons, and the horizontal sectional drawing of pit shaft 4 is shown in Fig. 6.Pit shaft 4 is arranged on bed die 3
Top, see Fig. 2, Fig. 3.It is circular shaft in wall 17 on the inside of the level cross-sectionn of pit shaft 4, outside is and the circular phase of shaft in wall 17
The square well drum outer wall 18 of connection is cut, four angles of circular shaft in wall 17 and square well drum outer wall 18 form the three of rounded oblique side
Angular duct, for setting pit shaft post 8.The lower end shaft in wall 17 of pit shaft 4 stretches out pit shaft outer wall 18, and the length of stretching is equal to
The depth of the bellmouth on the top of bed die 3, for inserting the bellmouth on the top of bed die 6, the upper end shaft in wall 17 of pit shaft 4 also stretches out pit shaft
Outer wall 18, for setting walling crib 9, the length of stretching is equal to the height of walling crib 9.
The topmost of inspection shaft is walling crib 9, is poured using armored concrete, the horizontal sectional drawing of walling crib 9 is shown in Fig. 7.
Cat ladder 19 is installed on the inwall of pit shaft 4 and well bore 2, is easy to attendant to go into the well, cat ladder 19 is anchored at pit shaft post 8
In the concrete of well room post 6.
Reinforced concrete frame pours when being the assembling of site operation combination plastics well body.Basis 5 is provided with reinforcement foundation 20, well
Room post 6 sets well room post reinforcing bar 21, and well room post reinforcing bar 21 is embedded in basis 5, is connected with the colligation of reinforcement foundation 20.Cover plate 7 is set
There is cover plate reinforcing bar 22, be connected with the colligation of well room post reinforcing bar 21 that bottom is stretched into.Pit shaft post 8 sets pit shaft post reinforcing bar 23, and bottom is buried
It is located in cover plate 7, is connected with the colligation of cover plate reinforcing bar 22, walling crib 9 is stretched on top, is connected with the colligation of walling crib reinforcing bar 24.Reinforced concrete
Native framework sectional elevation is shown in Fig. 8, and the figure is Fig. 1 C-C sections.
Well seat 1, well bore 2, bed die 3, the pit shaft 4 of plastics well body not operate scene, and first combination is assembled, but binding reinforcement
Concrete frame pours substep assembling hot-melt adhesive paste.The utility model assembled in situ construction procedure is as follows.
1)Make colligation reinforcement foundation 20, well room post reinforcing bar 21, cover plate reinforcing bar 22, pit shaft post reinforcing bar 23, walling crib reinforcing bar 24.
2)Reinforcement foundation 20 is placed on the inspection shaft ground dug, well room post reinforcing bar 21 is stood on reinforcement foundation 20 simultaneously
Colligation is firm, pours basic 5 concrete, and well room post reinforcing bar 21 is embedded in the concrete on basis 5.
3)After basic 5 concrete final set, well seat 1 is arranged on above basis 5, the square opening of the well room post internal model 11 of well seat 1
Road entangles well room post reinforcing bar 21, adjusts position and the elevation of the mouth of pipe 12, well seat 1 is fixed, the gap between bottom and basis 5
Sealed using mortar, pour the concrete of the well room post 6 of well seat 1, the bottom of chute 13 is connected with well room post 6, pours well
Also the bottom filling concrete of chute 13, the bottom of chute 13 and the concrete of well room post 6 are connected as a single entity while room post 6, adopted
Vibrated with vibrating head, concreting to the top of chute 13 along when stop, formed workbench 14.
4)After the well room post 6 of well seat 1 and the concrete final set of the bottom of chute 13, well bore 2 is arranged on to the top of well seat 1,
The square duct of the well room post internal model 11 of well bore 2 is enclosed on well room post reinforcing bar 21, well bore 2 is inserted to the bell and spigot of well seat 1, to electric heating
Silk is powered, and well seat 1 fuses with well bore 2, pours the concrete of well room post 6 of 2 four jiaos of well bore.
5)After the concrete final set of well room post 6 of well bore 2, bed die 3 is arranged on to the top of well bore 2, the bellmouth of the bottom of bed die 3
It is enclosed on well bore 2, well room post reinforcing bar 21 penetrates from the bed die corner apertures of 3 four jiaos of bed die, gives heating wire to be powered, and well bore 2 is molten with bed die 3
Close.Place cover plate reinforcing bar 22, and well room 21 colligations of post reinforcing bar with stretching into cover plate 7 are firm, installation pit shaft post reinforcing bar 23 and with lid
The colligation of slab muscle 22 is firm, and pit shaft post reinforcing bar 23 is embedded in cover plate 7, pours the concrete of cover plate 7.
6)After the concrete final set of cover plate 7, pit shaft 4 is arranged on the top of bed die 3, by between shaft in wall 17 and pit shaft outer wall 18
Four angles rounded oblique side triangle duct be enclosed on pit shaft post reinforcing bar 23, the top of pit shaft post reinforcing bar 23 is stretched from pit shaft outer wall 17
Go out, for being connected with walling crib reinforcing bar 24.Pit shaft 4 is inserted in the bellmouth on the top of bed die 3, is powered to heating wire, pit shaft 4 and bed die 3
Fusion, pours the concrete of pit shaft post 8.
7)After the concrete of pit shaft post 8 reaches intensity, backfill the earthwork in the periphery of inspection shaft and ram packing reality, be filled to walling crib 9
Bottom when, place walling crib reinforcing bar 24, and firm with stretching into pit shaft post 23 colligations of reinforcing bar in walling crib 9, pour the coagulation of walling crib 9
Soil.
8)After the concrete final set of walling crib 9, well lid is arranged on above walling crib 9 using mortar seat slurry, around making inspection shaft
Road surface.
Construction described by present utility model application file accompanying drawing is only one embodiment, makees well body with plastic member, with
Reinforced concrete frame makees the fan-shaped drainage inspection well of load-carrying members all in the protection domain of the application.
Claims (8)
1. a kind of fan-shaped drainage inspection well of plastics municipal administration, it is characterized in that:Described inspection shaft includes well seat(1), well bore(2), bottom
Mould(3), pit shaft(4)Using plastic production into component, plastic member is assembled plastics well body, and described inspection shaft also includes
Basis(5), well room post(6), cover plate(7), pit shaft post(8), walling crib(9)The reinforced concrete frame of composition, framework is interior to set steel
Muscle, using concreting;Well seat(1)And well bore(2)Collectively constitute the space well room for checking well servicing(10), well room
(10)Level cross-sectionn for sector, corner is provided with well room post internal model(11), well room(10)The fan-shaped outer arcuate borehole wall sets 1
~3 well room post internal model(11), well room post internal model(11)BODY WITH SQUARE APERTURE is formed between the borehole wall, for setting well room post(6), well
Seat(1)Both ends are the mouth of pipe(12), two mouths of pipe(12)Between for arc shape connect chute(13), chute(13)Both sides be work
Platform(14);Plastics well body and reinforced concrete frame form the waterproof borehole wall being assembled by plastic member, and periphery is set
Inspection shaft with complex structure of the armored concrete as bearing structure.
2. the fan-shaped drainage inspection well of plastics municipal administration according to claim 1, it is characterized in that:Described well seat(1)Top is set
It is equipped with connection well bore(2)Bellmouth, well room post internal model(11)Between be provided with well room transverse direction ribs(15);Well bore(2)It is arranged on
Well seat(1)Top, well bore(2)Bottom insertion well seat(1)In the bellmouth on top.
3. the fan-shaped drainage inspection well of plastics municipal administration according to claim 1, it is characterized in that:Described bed die(3)Plane
It is shaped as and well room(10)Identical is fan-shaped, bed die(3)Bottom plate on the upside of be provided with bed die ribs(16), corresponding well room(10)'s
Well room post internal model(11)There are bed die corner apertures, well room post in position(6)Reinforcing bar can stretch into cover plate from bed die corner apertures(7)It is interior, bed die
(3)Bottom be provided with bellmouth, bellmouth is downward, is used for and well bore(2)Connection, top corresponds to pit shaft(4)Place set bellmouth, bellmouth to
On, it is used for and pit shaft(4)Connection.
4. the fan-shaped drainage inspection well of plastics municipal administration according to claim 1, it is characterized in that:Described pit shaft(4)Level
It is circular shaft in wall on the inside of cross section(17), outside is and circular shaft in wall(17)The square well drum outer wall of tangent connection
(18), circular shaft in wall(17)With square well drum outer wall(18)Four angles formed rounded oblique side triangle duct, use
In setting pit shaft post(8).
5. the fan-shaped drainage inspection well of plastics municipal administration according to claim 1, it is characterized in that:Described pit shaft(4)Lower end
Shaft in wall(17)Stretch out pit shaft outer wall(18), for inserting bed die(3)The bellmouth on top, pit shaft(4)Upper end shaft in wall
(17)Also pit shaft outer wall is stretched out(18), for setting walling crib(9).
6. the fan-shaped drainage inspection well of plastics municipal administration according to claim 1, it is characterized in that:Described basis(5)Provided with base
Plinth reinforcing bar(20), well room post(6)Well room post reinforcing bar is set(21), well room post reinforcing bar(21)It is embedded in basis(5)It is interior, with basic steel
Muscle(20)Colligation connects.
7. the fan-shaped drainage inspection well of plastics municipal administration according to claim 1, it is characterized in that:Described cover plate(7)Provided with lid
Slab muscle(22), the well room post reinforcing bar that is stretched into bottom(21)Colligation connects.
8. the fan-shaped drainage inspection well of plastics municipal administration according to claim 1, it is characterized in that:Described pit shaft post(8)Set
Pit shaft post reinforcing bar(23), bottom is embedded in cover plate(7)It is interior, with cover plate reinforcing bar(22)Colligation connects, and walling crib is stretched on top(9), with
Walling crib reinforcing bar(24)Colligation connects.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720812058.5U CN206859380U (en) | 2017-07-06 | 2017-07-06 | The fan-shaped drainage inspection well of plastics municipal administration |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720812058.5U CN206859380U (en) | 2017-07-06 | 2017-07-06 | The fan-shaped drainage inspection well of plastics municipal administration |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206859380U true CN206859380U (en) | 2018-01-09 |
Family
ID=60832260
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720812058.5U Expired - Fee Related CN206859380U (en) | 2017-07-06 | 2017-07-06 | The fan-shaped drainage inspection well of plastics municipal administration |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206859380U (en) |
-
2017
- 2017-07-06 CN CN201720812058.5U patent/CN206859380U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206693363U (en) | Assembled plastics municipal drainage inspection shaft | |
CN206859369U (en) | Assembled plastic circular municipal drainage inspection shaft | |
CN105201012B (en) | Casting cable trench after assembly of L-shaped precast concrete and construction method of casting cable trench | |
CN103835217A (en) | Method for prevention and treatment on damage and depression of pavement around inspection well | |
CN104358275B (en) | Darker elevator shaft or collecting well construction method | |
CN206859370U (en) | Plastic rectangular straight line municipal drainage inspection shaft | |
CN108726348B (en) | Horizontal prefabrication, overturning and hoisting method for pipe gallery segments | |
CN104328790B (en) | Cast-in-situ sprayed concrete hidden bearing platform and hidden ground beam molding bed | |
CN110056000B (en) | Construction method and structure of counter weight type retaining wall | |
CN109972638B (en) | Construction method of prefabricated thin-wall formwork lattice beam ecological slope protection | |
CN109137986B (en) | Green lifting and reinforcing construction method for manhole ring of urban road inspection well | |
CN105756100B (en) | Basement post-pouring zone system and preparation method thereof | |
CN113898056A (en) | Construction method of traffic lane inspection well | |
CN206859381U (en) | Plastics municipal administration rectangle crosses drainage inspection well | |
CN107023061B (en) | Assembled plastic municipal drainage inspection well and construction method | |
CN206859380U (en) | The fan-shaped drainage inspection well of plastics municipal administration | |
CN106400838B (en) | A kind of city integrated Pipe rack of prefabricated assembled concrete and construction method | |
CN206752632U (en) | Plastic reinforcing steel composite construction municipal drainage inspection shaft | |
CN104895379B (en) | Reinforced concrete water pool and construction method for same | |
CN208167805U (en) | A kind of prefabricated assembling type reinforced concrete inspection shaft | |
CN107288153A (en) | A kind of prefabricated Gravity Retaining Wall | |
CN103541372B (en) | Concrete poured communication through-type 4.0 manhole and construction method thereof | |
CN102864832A (en) | Draining inspection shaft capable of controlling lifting, and manufacture method of draining inspection shaft | |
AU2008201825A1 (en) | Method of constructing building slabs and pavements and storing water | |
CN114319426A (en) | Consider novel assembled reinforced concrete barricade of planting technique wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180109 Termination date: 20190706 |