CN206829758U - A kind of safety rope hanging point of truss column - Google Patents
A kind of safety rope hanging point of truss column Download PDFInfo
- Publication number
- CN206829758U CN206829758U CN201621407785.5U CN201621407785U CN206829758U CN 206829758 U CN206829758 U CN 206829758U CN 201621407785 U CN201621407785 U CN 201621407785U CN 206829758 U CN206829758 U CN 206829758U
- Authority
- CN
- China
- Prior art keywords
- safety rope
- hanging point
- rope hanging
- truss column
- latch pedestal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims abstract description 37
- 238000010276 construction Methods 0.000 description 4
- 238000000034 method Methods 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000000750 progressive effect Effects 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Landscapes
- Emergency Lowering Means (AREA)
Abstract
The utility model embodiment discloses a kind of safety rope hanging point of truss column, the safety rope hanging point includes latch pedestal, pipe shaft and link, the safety rope hanging point is arranged on the capital face of the truss column by the latch pedestal, one end of the pipe shaft is connected with the latch pedestal, the other end is connected with link, and the link is used to hang safety rope.So workmen during especially carrying out crossbeam assembling operation, is provided with the safety rope hanging point for hanging safety rope, improves job security in work high above the ground on truss column on truss column.
Description
Technical field
Engineering field is the utility model is related to, more particularly to a kind of safety rope hanging point of truss column.
Background technology
, it is necessary to workmen's work high above the ground in transformer substation framework post hoisting process.Especially complete that ground terminal is not installed
Or after the A words bar lifting of lightning rod, carry out the process of crossbeam assembling operation.
In order to ensure the construction safety of construction safety, particularly work high above the ground, workmen is needed in work high above the ground fashionable dress
With safety rope.But the characteristics of truss column, cause during workmen carries out crossbeam assembling operation, around without can be with
Hang the hanging point of safety rope.Cause workmen to be difficult to obtain the protection that is provided of safety rope in work progress, constitute
Potential safety hazard.
Utility model content
In order to solve the above-mentioned technical problem, the utility model provides a kind of safety rope hanging point of truss column, to apply
Worker person is provided with the safety rope hanging point for hanging safety rope, improves work in work high above the ground on truss column on truss column
Make security.
The utility model embodiment discloses following technical scheme:
A kind of safety rope hanging point of truss column, the safety rope hanging point include latch pedestal, pipe shaft and link:
The safety rope hanging point is arranged on by the latch pedestal on the capital face of the truss column;
One end of the pipe shaft is connected with the latch pedestal, and the other end is connected with link, and the link is used to hang peace
Quan Sheng.
Optionally, the side of latch pedestal back on the pipe shaft is provided with the multiple bolts being parallel to each other, described
Safety rope hanging point is arranged on the capital face of the truss column by the latch pedestal, including:
The latch pedestal is inserted by the multiple bolt in the screw that the capital face is pre-set, the multiple spiral shell
The latch pedestal is fastened on the capital face by the other end of bolt by screwing in nut.
Optionally, the multiple bolt is specially two bolts.
Optionally, the link is specially semicircle, is connected by one end of level with the pipe shaft.
Safety rope hanging point includes latch pedestal, pipe shaft and link, the safety rope hanging it can be seen from above-mentioned technical proposal
Point is arranged on the capital face of the truss column by the latch pedestal, and one end of the pipe shaft is connected with the latch pedestal,
The other end is connected with link, and the link is used to hang safety rope.So workmen is in work high above the ground on truss column, especially
It is that during carrying out crossbeam assembling operation, the safety rope hanging point for hanging safety rope, workmen are provided with truss column
Safety rope hanging can be located on the safety rope hanging point, improve job security.
Brief description of the drawings
, below will be to embodiment in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art
Or the required accompanying drawing used is briefly described in description of the prior art, it should be apparent that, drawings in the following description are only
It is some embodiments of the utility model, for those of ordinary skill in the art, before creative labor is not paid
Put, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is a kind of structural representation of the safety rope hanging point for truss column that the utility model embodiment provides;
Fig. 2 is a kind of top view for latch pedestal that the utility model embodiment provides;
Fig. 3 is a kind of screw schematic diagram in capital face that the utility model embodiment provides.
Embodiment
It is new below in conjunction with this practicality to make the purpose, technical scheme and advantage of the utility model embodiment clearer
Accompanying drawing in type embodiment, the technical scheme in the embodiment of the utility model is explicitly described, it is clear that described reality
It is the utility model part of the embodiment to apply example, rather than whole embodiments.Based on the embodiment in the utility model, ability
The every other embodiment that domain those of ordinary skill is obtained under the premise of creative work is not made, it is new to belong to this practicality
The scope of type protection.
, it is necessary to workmen's work high above the ground in transformer substation framework post hoisting process.It is particularly high in order to ensure construction safety
The construction safety of idle job, workmen need to assemble safety rope in work high above the ground.But the characteristics of truss column, cause applying
Worker person is after completing not installing the A words bar lifting of ground terminal or lightning rod, during carrying out crossbeam assembling operation, truss column
Surrounding is without the hanging point that can hang safety rope.Workmen is caused to be difficult to obtain what safety belt was provided in work progress
Protection, constitutes potential safety hazard.
Therefore, the utility model provides a kind of safety rope hanging point of truss column, safety rope hanging point includes latch pedestal, pipe
Body and link, the safety rope hanging point by the latch pedestal be arranged on the truss column capital face, the one of the pipe shaft
End is connected with the latch pedestal, and the other end is connected with link, and the link is used to hang safety rope.So workmen is in structure
On trestle during work high above the ground, during especially carrying out crossbeam assembling operation, it is provided with truss column for hanging safety rope
Safety rope hanging point, safety rope hanging can be located on the safety rope hanging point by workmen, improve job security.
Fig. 1 be a kind of truss column provided by the utility model safety rope hanging point structural representation, the safety rope hanging
Point includes latch pedestal 10, pipe shaft 20 and link 30:
The safety rope hanging point is arranged on by the latch pedestal 10 on the capital face of the truss column.
One end of the pipe shaft 20 is connected with the latch pedestal 10, and the other end is connected with link 30, and the link 30 is used
In hanging safety rope.Optionally, the link is specially semicircle, is connected by one end of level with the pipe shaft.Such as such as
Shown in Fig. 1.
Pipe shaft 20 described here can be steel pipe, and latch pedestal 10 can be one block of steel plate, and side passes through welding and institute
Pipe shaft 20 is stated to be connected.
Optionally, the side of the latch pedestal 10 back on the pipe shaft 20 is provided with the multiple bolts being parallel to each other
11.The safety rope hanging point is arranged on by the latch pedestal 10 on the capital face of the truss column, including:
The latch pedestal 10 is inserted by the multiple bolt 11 in the screw that the capital face is pre-set, described more
The latch pedestal 10 is fastened on the capital face by the other end of individual bolt 11 by screwing in nut.Optionally, it is described more
Individual bolt 11 is specially two bolts.Wherein, the particular location of bolt included by the latch pedestal 10 can with as shown in Fig. 2
The number and distribution spacing of the default screw in the capital face are identical with the multiple bolt of the latch pedestal, and particular location can
With as shown in Figure 3.
It can be seen that safety rope hanging point includes latch pedestal, pipe shaft and link, the safety rope hanging point passes through the latch pedestal
Installed in the capital face of the truss column, one end of the pipe shaft is connected with the latch pedestal, and the other end is connected with link, institute
Link is stated to be used to hang safety rope.So workmen especially carries out crossbeam assembling operation in work high above the ground on truss column
During, the safety rope hanging point for hanging safety rope is provided with truss column, safety rope hanging can be located at by workmen
On the safety rope hanging point, job security is improved.
It should be noted that each embodiment in this specification is described by the way of progressive, each embodiment it
Between identical similar part mutually referring to what each embodiment stressed is the difference with other embodiment.
Equipment and system embodiment described above is only schematical, wherein as the unit that separating component illustrates can be or
Person may not be physically separate, can be as the part that unit is shown or may not be physical location, you can
With positioned at a place, or can also be distributed on multiple units.Can select according to the actual needs part therein or
Person's whole module realizes the purpose of this embodiment scheme.Those of ordinary skill in the art are not paying the situation of creative work
Under, you can to understand and implement.
It is described above, the only preferable embodiment of the utility model, but the scope of protection of the utility model is not
This is confined to, any one skilled in the art can readily occur in the technical scope that the utility model discloses
Change or replacement, should all cover within the scope of protection of the utility model.Therefore, the scope of protection of the utility model should
It is defined by scope of the claims.
Claims (4)
1. the safety rope hanging point of a kind of truss column, it is characterised in that the safety rope hanging point includes latch pedestal, pipe shaft and extension
Ring:
The safety rope hanging point is arranged on by the latch pedestal on the capital face of the truss column;
One end of the pipe shaft is connected with the latch pedestal, and the other end is connected with link, and the link is used to hang safety rope.
2. safety rope hanging point according to claim 1, it is characterised in that the latch pedestal is back on the one of the pipe shaft
Side is provided with the multiple bolts being parallel to each other, and the safety rope hanging point is arranged on the post of the truss column by the latch pedestal
On top surface, including:
The latch pedestal is inserted by the multiple bolt in the screw that the capital face is pre-set, the multiple bolt
The latch pedestal is fastened on the capital face by the other end by screwing in nut.
3. safety rope hanging point according to claim 2, it is characterised in that the multiple bolt is specially two bolts.
4. safety rope hanging point according to claim 1, it is characterised in that the link is specially semicircle, passes through level
One end be connected with the pipe shaft.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621407785.5U CN206829758U (en) | 2016-12-20 | 2016-12-20 | A kind of safety rope hanging point of truss column |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621407785.5U CN206829758U (en) | 2016-12-20 | 2016-12-20 | A kind of safety rope hanging point of truss column |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206829758U true CN206829758U (en) | 2018-01-02 |
Family
ID=60779160
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621407785.5U Active CN206829758U (en) | 2016-12-20 | 2016-12-20 | A kind of safety rope hanging point of truss column |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206829758U (en) |
-
2016
- 2016-12-20 CN CN201621407785.5U patent/CN206829758U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108862014B (en) | Assembled wall body hoists with steel shoulder pole structure of lifting by crane based on BIM | |
CN206829758U (en) | A kind of safety rope hanging point of truss column | |
CN206971689U (en) | Support operating platform that is detachable and recycling | |
CN204454235U (en) | A kind of novel many suspension centres equalizing bar device | |
CN202156868U (en) | Lifting device for overweight and oversized thin-wall tower devices | |
CN206329056U (en) | A kind of safety rope hanging point of fire wall | |
CN206829656U (en) | A kind of safety rope hanging point of channel-section steel formula pipe mother's crossbeam | |
CN203022328U (en) | Climbing operation platform | |
CN205355669U (en) | Power transmission line construction is with supplementary cross arm | |
CN206293858U (en) | A kind of power equipment lightning arrester | |
CN206016412U (en) | Deflecting plate | |
CN204919365U (en) | Change hinge gleitbretter structure | |
CN104863491B (en) | A kind of steel pipe pole protects the cat ladder of cage with two-tube band | |
CN202990386U (en) | Externally-suspended scaffold | |
CN206829655U (en) | A kind of safety rope hanging point of tubular pipe mother crossbeam | |
CN104612166B (en) | The combination supporting device of a kind of supporting hole wall and method for protecting support | |
CN207296454U (en) | Edge protection system | |
CN205892526U (en) | Hoist and mount platform of spinning corridor equipment | |
CN204020928U (en) | Distribution transformer movable trailer | |
CN203559351U (en) | Suspended bridge overhauling workbench | |
CN203684714U (en) | Temporary security protective barrier | |
CN107676056B (en) | Wellhead supporting seat of oil drilling platform detaching and security falling protection device | |
CN207568220U (en) | Staircase protective fence | |
CN206928440U (en) | One kind is encorbelmented I-steel fixing device | |
CN104631844A (en) | Steel column mounting operation platform and mounting method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |