CN206829346U - A kind of main house body structure - Google Patents

A kind of main house body structure Download PDF

Info

Publication number
CN206829346U
CN206829346U CN201720701784.XU CN201720701784U CN206829346U CN 206829346 U CN206829346 U CN 206829346U CN 201720701784 U CN201720701784 U CN 201720701784U CN 206829346 U CN206829346 U CN 206829346U
Authority
CN
China
Prior art keywords
wall
foundation ring
house body
body structure
main house
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720701784.XU
Other languages
Chinese (zh)
Inventor
罗培伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Zhen Sheng Construction Engineering Co., Ltd.
Original Assignee
Dongguan Sheng Sheng Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dongguan Sheng Sheng Construction Engineering Co Ltd filed Critical Dongguan Sheng Sheng Construction Engineering Co Ltd
Priority to CN201720701784.XU priority Critical patent/CN206829346U/en
Application granted granted Critical
Publication of CN206829346U publication Critical patent/CN206829346U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of main house body structure, solve vapour content in indoor and outdoor air it is unequal when, stream molecule can permeate from the high side of pressure by building enclosure to the low side of pressure.The steam on ground is entered in ground, material is made moist, and reduces the heat insulation effect of material, simultaneously.Can also material be set to go mouldy, the problem of influenceing service life, its drip irrigation device is, including foundation ring girder, and the outer surface of the foundation ring girder is provided with damp-proof layer, and four foundation ring girders enclose to form framework two-by-two, reaches the moistureproof purpose of main house body.

Description

A kind of main house body structure
Technical field
Technical field of buildings is the utility model is related to, more particularly to a kind of main house body structure.
Background technology
Brick mix structure refers in building that the wall of vertical load-carrying members, post etc. are built by laying bricks or stones using brick or lay bricks, horizontal load-bearing Beam, floor, roof boarding etc. use reinforced concrete structure.Many houses, office building have been designed as brick mix structure.
The agent structure in house refers in building construction, have that some components are formed by connecting can hold plane the affected or Three-dimensional system.Agent structure will possess enough intensity, rigidity, stability, to bear the various loads on building, such as: Ground, load bearing wall etc., constructure body structure can be made up of one or more kinds of materials.
But the vapour content in indoor and outdoor air it is unequal when, stream molecule can pass through from the high side of pressure Building enclosure is permeated to the low side of pressure.The steam on ground is entered in ground, material is made moist, and reduces the insulation effect of material Fruit, simultaneously.It can also material is gone mouldy, influence service life.
Utility model content
The purpose of this utility model is to provide a kind of main house body structure, has the advantages of main house body protection against the tide.
Above-mentioned technical purpose of the present utility model technical scheme is that:A kind of main house body knot Structure, including foundation ring girder, the outer surface of the foundation ring girder are provided with damp-proof layer, and four foundation ring girders enclose to form frame two-by-two Body.
By using above-mentioned technical proposal, foundation ring girder is the ground in house, plays the various loads born on house, House is set to keep stable structure.Damp-proof layer is provided with the outer surface of foundation ring girder, the steam reduced in ground enters basis In collar tie beam, the service life of foundation ring girder is improved, while ensures that house has preferable heat insulation effect.Four foundation ring girders are two-by-two Enclose to form framework, be not susceptible to displacement between foundation ring girder, house is better secured on ground.
Of the present utility model further to set, the foundation ring girder is located in foundation ditch.
By using above-mentioned technical proposal, foundation ring girder is located in foundation ditch, and foundation ditch can fill rock, sand, cohesive soil etc., Foundation beam circle is preferably born the weight in house, make house be not susceptible to deform, ensure the firm durability in house.
Of the present utility model further to set, the foundation ring girder is fixed with wall away from the side of bottom of foundation ditch, described Damp-proof layer is fixed between wall and the contact surface of foundation ring girder.
By using above-mentioned technical proposal, the steam in foundation ditch can enter wall from the junction of wall and foundation ring girder With the inside of foundation ring girder, the service life of wall and foundation ring girder is influenceed.Damp-proof layer reduces steam from wall and foundation ring girder Junction enter the inside of wall and foundation ring girder.Instantly when raining heavyly, the outside in house is likely to occur ponding.Damp-proof layer subtracts Few ponding enters the inside of wall and foundation ring girder from the junction of wall and foundation ring girder, reduces ponding to main house body knot The influence of structure.
Of the present utility model further to set, the wall includes the first wall and the second wall, first wall and the second wall Between be connected with constructional column, is provided with reinforcing bar in the constructional column, the reinforcing bar is provided with dowel, the connection in a vertical direction Muscle is located at the first wall and second within the walls.
By using above-mentioned technical proposal, the first wall and the second wall are linked together by constructional column, keep building The globality and stability of wall.Reinforcing bar plays a part of reinforcing constructional column.Dowel is fixed with reinforcing bar, connection deviates from steel One end of muscle is located at the first wall and second within the walls, it can be seen that dowel plays is connected to structure by the first wall and the second wall Make on post.When earthquake occurs, dowel makes the first wall and the second wall preferably be connected on constructional column, the first wall and the second wall It is not easy to split in the junction of constructional column.
Of the present utility model further to set, first wall and the second wall are made up of brick body.
By using above-mentioned technical proposal, the first wall and the second wall are made up of brick body, the first wall and the second wall ratio it is stronger, Soundproof effect is good, and cold air and heating not easily run off.First wall and the second wall are easy for construction.
Of the present utility model further to set, the outer surface of brick body is provided with groove, and the dowel is fixed on groove It is interior.
By using above-mentioned technical proposal, dowel is placed in the groove of brick body, dowel and brick body coordinate structure The reinforcing bar for making post keeps the state erect, and then conveniently connecting pole is constructed.Meanwhile when earthquake occurs, dowel and Constructional column, which is worked in coordination, makes the first wall and the second wall be not easy to cave in, and then reduces influence of the earthquake to house.Dowel is positioned at recessed After groove, the cement between brick body and brick body can be entered in groove, and so as to which dowel be fixed, dowel is not easily disconnected from recessed Groove.
It is of the present utility model further to set, fix elasticity layer, the dowel position on the madial wall in the groove In the outer surface of elastic layer.
By using above-mentioned technical proposal, when earthquake occurs, dowel may be collided in groove.Elastic layer subtracts Few collision of the dowel to brick body, reduces the damage to brick body.Meanwhile dowel is not susceptible to deform, earthquake is reduced to connection The influence of muscle, brick body and constructional column.
Of the present utility model further to set, the damp-proof layer is water-repellent paint.
By using above-mentioned technical proposal, water-repellent paint it is cured after formed waterproofing membrane have certain extensibility, Elastoplasticity, crack resistance, impermeability and weatherability, waterproof can be played, prevent blending protective effect.Water-repellent paint has good temperature to fit Ying Xing, it is easy to operate, for ease of maintenaince and safeguard.
It is of the present utility model further to set, it is fixed with tie-beam, two connections between two foundation ring girders Beam is intersected in framework in crosswise, and the upper surface of the tie-beam and the framework is fixed with waterproof layer.
By using above-mentioned technical proposal, tie-beam becomes more stable foundation ring girder, the framework that foundation ring girder is formed It is not susceptible to deform, and then foundation ring girder can bear more house weight.When earthquake occurs, tie-beam plays protecting frame The effect of body.Waterproof layer reduces steam and entered in house, house is not easily susceptible to the influence of moisture.
Of the present utility model further to set, the upper surface of the waterproof layer is provided with cement layer.
By using above-mentioned technical proposal, cement layer plays a part of protecting waterproof layer, waterproof layer is not easily susceptible to artificially Destruction.It is convenient that building is constructed meanwhile cement layer supplies people's carry out activity.
In summary, the utility model has the advantages that:Protection against the tide, waterproof, Stability Analysis of Structures, there is certain antidetonation Ability.Generally speaking the utility model, improve the service life of building.
Brief description of the drawings
Fig. 1 is the structural representation of the present embodiment;
Fig. 2 is the structural representation of brick body in the present embodiment;
Fig. 3 is the enlarged drawing at A in Fig. 1.
Reference:1st, foundation ditch;2nd, foundation ring girder;3rd, tie-beam;4th, damp-proof layer;5th, filler;6th, waterproof layer;7th, wall Body;71st, the first wall;72nd, the second wall;73rd, brick body;731st, groove;732nd, elastic layer;8th, constructional column;81st, reinforcing bar;82nd, connect Muscle;9th, crossbeam;10th, pillar;11st, cement layer;12nd, floor.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.
This specific embodiment is only that it is not to limitation of the present utility model, ability to explanation of the present utility model Field technique personnel can make the modification of no creative contribution to the present embodiment as needed after this specification is read, but As long as all protected in right of the present utility model by Patent Law.
A kind of main house body structure, as shown in figure 1, being dug on the building site in house has foundation ditch 1, in the bottom of foundation ditch 1 It is provided with four foundation ring girders 2.Four foundation ring girders 2 enclose to form framework two-by-two.Protection against the tide is provided with the outer surface of foundation ring girder 2 Layer 4.Damp-proof layer 4 is water-repellent paint, and water-repellent paint forms one layer of waterproofing membrane in the outer surface of foundation ring girder 2.
Then, two tie-beams 3 have been poured in framework.Two tie-beams 3 intersect in crosswise in framework.Together Reason, the outer surface of tie-beam 3 is provided with damp-proof layer 4.Damp-proof layer 4 is water-repellent paint, and water-repellent paint is formed in the outer surface of tie-beam 3 One layer of waterproofing membrane.Steam in the reduction of damp-proof layer 4 ground of foundation ring girder 2 and the outer surface of tie-beam 3 enters basis In collar tie beam 2 and tie-beam 3, the service life of foundation ring girder 2 and tie-beam 3 is improved, while ensures that house has preferably insulation Effect.
Followed by filler 5 is added in the space between foundation ditch 1, framework and tie-beam 3, is set in the upper surface of filler 5 There is waterproof layer 6, waterproof layer 6 is waterproof roll, the ground in house is resisted the rainwater and steam in the external world.In waterproof layer 6 Upper surface has poured cement layer 11, and cement layer 11 supplies people's carry out activity, convenient that building is constructed.
Incorporated by reference to shown in Fig. 1 and Fig. 2, being built in the upper surface of cement layer 11 has wall 7, and wall 7 plays the work for safeguarding house With.Wall 7 includes the first wall 71 and the second wall 72.First wall 71 and the second wall 72 are what different time sections were built into, it is impossible to simultaneously It is connected together.First wall 71 and the second wall 72 are built into by polylith brick body 73.The brick body 73 is cuboid, brick body 73 compared with Big outer surface is provided with groove 731, and length direction of the groove 731 along brick body 73, being adhesively fixed in the inwall of groove 731 has bullet Property layer 732.Elastic layer 732 is elastomeric material.
Incorporated by reference to shown in Fig. 1 and Fig. 3, reinforcing bar 81 is placed with the junction of the first wall 71 and the second wall 72, in reinforcing bar 81 Vertical direction on be connected with dowel 82.Spacing distance between dowel 82 is 500mm.Dowel 82 is elongated rod shape.Even The other end for connecing muscle 82 is fixed by cement in groove 731 in fig. 2.Reinforcing bar 81 keeps perpendicular in the presence of dowel 82 Straight state.Reinforcing bar 81 and dowel 82 form constructional column 8 after the outer surface joints cement of reinforcing bar 81, joints cement.Work as hair When the dried rhizome of rehmannia shakes, dowel 82 makes the first wall 71 and the second wall 72 preferably be connected on constructional column 8, the first wall 71 and the second wall 72 It is not easy to split in the junction of constructional column 8.First wall 71 and the second wall 72 are not easy to cave in.
Waterproof layer 6 is provided with the junction of the wall 71 of constructional column 8 and first.Equally in the connection of the wall 72 of constructional column 8 and second Place is provided with waterproof layer 6.The waterproof layer 6 is waterproof roll, and waterproof roll is adhesively fixed in the wall 71 of constructional column 8 and first, the second wall 72 junction.Waterproof roll can resist extraneous rainwater, a kind of rollable flexible building materials into web-like of underground water seepage produce Product.
Pillar 10 has been poured in the upper surface of cement layer 11, crossbeam 9 and floor 12 have been poured in the upper end of pillar 10.Crossbeam 9 are adhesively fixed with the junction at the top of constructional column 8 waterproof roll.

Claims (10)

  1. A kind of 1. main house body structure, it is characterised in that including foundation ring girder (2), the outer surface for including foundation ring girder (2) Provided with damp-proof layer (4), four foundation ring girders (2) enclose to form framework two-by-two.
  2. 2. a kind of main house body structure according to claim 1, it is characterised in that the foundation ring girder (2) is located at foundation ditch (1) in.
  3. 3. a kind of main house body structure according to claim 1, it is characterised in that the foundation ring girder (2) deviates from foundation ditch (1) side of bottom is fixed with wall (7), the damp-proof layer (4) be fixed on wall (7) and foundation ring girder (2) contact surface it Between.
  4. 4. a kind of main house body structure according to claim 3, it is characterised in that the wall (7) includes the first wall (71) constructional column (8), the constructional column (8) and the second wall (72), are connected between first wall (71) and the second wall (72) Interior to be provided with reinforcing bar (81), the reinforcing bar (81) is provided with dowel (82) in a vertical direction, and the dowel (82) is located at first In wall (71) and the second wall (72).
  5. 5. a kind of main house body structure according to claim 4, it is characterised in that first wall (71) and the second wall (72) formed by brick body (73).
  6. 6. a kind of main house body structure according to claim 5, it is characterised in that the outer surface of brick body (73) is provided with Groove (731), the dowel (82) are fixed in groove (731).
  7. A kind of 7. main house body structure according to claim 6, it is characterised in that the madial wall in the groove (731) Upper fixed elasticity layer (732), the dowel (82) are located at the outer surface of elastic layer (732).
  8. 8. a kind of main house body structure according to claim 1, it is characterised in that the damp-proof layer (4) is water-repellent paint.
  9. 9. a kind of main house body structure according to claim 1, it is characterised in that between two foundation ring girders (2) Tie-beam (3) is fixed with, two tie-beams (3) are intersected in framework in crosswise, the tie-beam (3) and described The upper surface of framework is fixed with waterproof layer (6).
  10. 10. a kind of main house body structure according to claim 9, it is characterised in that the upper surface of the waterproof layer (6) is set There is cement layer (11).
CN201720701784.XU 2017-06-15 2017-06-15 A kind of main house body structure Active CN206829346U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720701784.XU CN206829346U (en) 2017-06-15 2017-06-15 A kind of main house body structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720701784.XU CN206829346U (en) 2017-06-15 2017-06-15 A kind of main house body structure

Publications (1)

Publication Number Publication Date
CN206829346U true CN206829346U (en) 2018-01-02

Family

ID=60774884

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720701784.XU Active CN206829346U (en) 2017-06-15 2017-06-15 A kind of main house body structure

Country Status (1)

Country Link
CN (1) CN206829346U (en)

Similar Documents

Publication Publication Date Title
SK8068Y1 (en) Modular frame construction
WO2016205968A1 (en) Structural wall with a structure exogenous to the longitudinal axis thereof for enabling the inside of the wall to be filled on site
CN203174810U (en) Bearing-and-leaning type installed assembly wall body
CN100410470C (en) Permanently waterproof and green roofing
CN204326299U (en) The antidetonation adobe wall that a kind of steel concrete sleeper and dark beam are strengthened
CN105040813B (en) The preceding facade system in aluminium alloy house
CN207032576U (en) A kind of brick mix structure wall
CN104631658B (en) The construction method and sun-dried mud brick of a kind of adobe wall suitable for highly seismic region of providing fortification against earthquakes
CN206829346U (en) A kind of main house body structure
Sharma et al. Traditional and vernacular buildings are ecological sensitive, climate responsive designs-study of Himachal Pradesh
Condit The first reinforced-concrete skyscraper: The Ingalls Building in Cincinnati and its place in structural history
CN201276862Y (en) Heat-preserving environment-friendly shockproof house
CN206360205U (en) large-span concrete truss structure
CN205776811U (en) A kind of node preventing assembled Timberwork wall from making moist with basis
CN102011495B (en) Anti-leakage balcony and hollow ecological garden of balcony type
Escamilla et al. Global or local construction materials for post-disaster reconstruction? Sustainability assessment of 20 post-disaster shelter designs
CN205134980U (en) Whole anti -seismic performance's of reinforcing adobe wall bearing local -style dwelling houses device
CN105089148B (en) The lateral facade system in aluminium alloy house
CN210636673U (en) Concrete slab convenient to observe
RU2350717C1 (en) Tall building
CN105133740A (en) Shock insulation construction applied to town building and construction method thereof
CN205369988U (en) Combined type steel -pipe column faced wall structure house
CN204475697U (en) For the thermal-insulating waterproof type built-up roofing in 500kV transformer station master control building
CN207582826U (en) A kind of trash repository roofing sealing structure
CN209025256U (en) A kind of brick mix structure exterior wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 523000 Lianchang Building, Shagang Mingwei Industrial Zone, Luosha Community, Guancheng Street, Dongguan City, Guangdong Province, 306 Building A

Patentee after: Guangdong Zhen Sheng Construction Engineering Co., Ltd.

Address before: 523000 Building 306, Lianchang Building, Shagang, Xiaowei Industrial Zone, Luosha Community, Guancheng City, Dongguan City, Guangdong Province

Patentee before: Dongguan Sheng Sheng Construction Engineering Co., Ltd.