CN206827899U - A pipe lifting fixture - Google Patents

A pipe lifting fixture Download PDF

Info

Publication number
CN206827899U
CN206827899U CN201720133078.XU CN201720133078U CN206827899U CN 206827899 U CN206827899 U CN 206827899U CN 201720133078 U CN201720133078 U CN 201720133078U CN 206827899 U CN206827899 U CN 206827899U
Authority
CN
China
Prior art keywords
clamping arm
arm
jig arm
left clamping
left jig
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720133078.XU
Other languages
Chinese (zh)
Inventor
陈俐光
姜涌
田辉
张洪亮
兰赫
郭小红
王楠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China State Construction Engineering Corp Ltd
China Construction First Group Corp Ltd
China Construction Municipal Engineering Corp Ltd
Original Assignee
China State Construction Engineering Corp Ltd
China Construction First Group Corp Ltd
China Construction Municipal Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China State Construction Engineering Corp Ltd, China Construction First Group Corp Ltd, China Construction Municipal Engineering Corp Ltd filed Critical China State Construction Engineering Corp Ltd
Priority to CN201720133078.XU priority Critical patent/CN206827899U/en
Application granted granted Critical
Publication of CN206827899U publication Critical patent/CN206827899U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

本实用新型属于一种管片吊装夹具主要由吊钩和连接臂所组成。左夹臂、右夹臂呈倒L型,左夹臂的上端折弯部为柱杆,右夹臂的上端折弯部为套筒,左夹臂的柱杆轴设在左夹臂的套筒内,两个连接臂的上端与吊钩的下部轴接,两个连接臂的下端分别与左夹臂和右夹臂的折弯部端轴接,左夹臂的下端外侧设有对准扶手,左夹臂的下端内侧设有橡胶垫片和卡头,右夹臂的下端内侧设有防滑块。本实用新型能机械化对管片进行装卸,提高了工程质量和进度。具有结构简单,吊装速度快,劳动强度低,省工省力,效率高,安全可靠,易安装拆卸,使用寿命长和使用效果好的优点。

The utility model belongs to a segment hoisting fixture mainly composed of a hook and a connecting arm. The left clamping arm and the right clamping arm are inverted L-shaped, the upper bending part of the left clamping arm is a pole, the upper bending part of the right clamping arm is a sleeve, and the pole shaft of the left clamping arm is set on the sleeve of the left clamping arm. Inside the barrel, the upper ends of the two connecting arms are pivotally connected to the lower part of the hook, and the lower ends of the two connecting arms are respectively pivotally connected to the bending parts of the left and right clamping arms. Handrail, the inner side of the lower end of the left clamping arm is provided with a rubber gasket and a clamping head, and the inner side of the lower end of the right clamping arm is provided with an anti-slip block. The utility model can mechanize the loading and unloading of the segments, which improves the engineering quality and progress. It has the advantages of simple structure, fast hoisting speed, low labor intensity, labor and labor saving, high efficiency, safety and reliability, easy installation and disassembly, long service life and good use effect.

Description

一种管片吊装夹具A pipe lifting fixture

技术领域technical field

本实用新型属于一种管片吊装夹具。The utility model belongs to a segment hoisting fixture.

背景技术Background technique

目前,隧道管片(或称管片)吊装是施工现场的必备工序,传统的施工方法是通过人工用吊绳预先对管片进行捆绑,再通过吊装绳和吊机进行起吊作业。这种传统的施工方法不仅施工速度慢,费时费力,工人劳动强度大,且吊装绳在长时间的使用过程中易发生老化,造成管片在吊装过程中散落,对现场工人的生命安全带来很大威胁;同时,吊装绳在吊装过程对管片造成磨损也影响管片的质量,大幅度降低了施工标准。At present, the hoisting of tunnel segments (or called segments) is an essential process at the construction site. The traditional construction method is to manually bind the segments with lifting ropes in advance, and then carry out lifting operations through lifting ropes and cranes. This traditional construction method is not only slow in construction speed, time-consuming and labor-intensive, but also labor-intensive for workers, and the hoisting rope is prone to aging during long-term use, causing the segments to be scattered during the hoisting process, which poses a threat to the life safety of the workers on site. At the same time, the hoisting rope will cause wear to the segment during the hoisting process and also affect the quality of the segment, which greatly reduces the construction standard.

另一方面,用钢丝绳捆绑的过程中需要用吊机将管片吊离地面一定距离,捆绑作业也需要占用吊车,增加了吊车的运转周期,且与管片吊装存在交叉作业,不利于吊装作业顺利进行,大幅度影响了工程施工质量和进度。On the other hand, in the process of bundling with steel wire ropes, it is necessary to use a crane to lift the segment a certain distance from the ground, and the bundling operation also needs to occupy the crane, which increases the operating cycle of the crane, and there is cross-operation with the segment hoisting, which is not conducive to hoisting operations The smooth progress has greatly affected the construction quality and progress of the project.

发明内容Contents of the invention

本实用新型的目的是设计一种管片吊装夹具,能机械化对管片进行装卸,提高了工程质量和进度。具有结构简单,吊装速度快,劳动强度低,省工省力,效率高,安全可靠,易安装拆卸,使用寿命长和使用效果好的优点。The purpose of the utility model is to design a segment hoisting jig, which can mechanize loading and unloading of the segment, and improves the quality and progress of the project. It has the advantages of simple structure, fast hoisting speed, low labor intensity, labor and labor saving, high efficiency, safety and reliability, easy installation and disassembly, long service life and good use effect.

为此,本实用新型主要由吊钩和连接臂所组成。左夹臂、右夹臂呈倒L型,左夹臂的上端折弯部为柱杆,右夹臂的上端折弯部为套筒,左夹臂的柱杆轴设在左夹臂的套筒内,两个连接臂的上端与吊钩的下部轴接,两个连接臂的下端分别与左夹臂和右夹臂的折弯部端轴接,左夹臂的下端外侧设有对准扶手,左夹臂的下端内侧设有橡胶垫片和卡头,右夹臂的下端内侧设有防滑块。For this reason, the utility model is mainly made up of suspension hook and connecting arm. The left clamping arm and the right clamping arm are inverted L-shaped, the upper bending part of the left clamping arm is a pole, the upper bending part of the right clamping arm is a sleeve, and the pole shaft of the left clamping arm is set on the sleeve of the left clamping arm. Inside the barrel, the upper ends of the two connecting arms are pivotally connected to the lower part of the hook, and the lower ends of the two connecting arms are respectively pivotally connected to the bending parts of the left and right clamping arms. Handrail, the inner side of the lower end of the left clamping arm is provided with a rubber gasket and a clamping head, and the inner side of the lower end of the right clamping arm is provided with an anti-slip block.

所述的连接臂、左夹臂和右夹臂均采用钢制材料制成。所述的两个连接臂的打开夹角为100°~160°。所述的左夹臂的下端面高于右夹臂的下端面。The connecting arm, the left jig arm and the right jig arm are all made of steel materials. The opening angle of the two connecting arms is 100°-160°. The lower end surface of the left clamping arm is higher than the lower end surface of the right clamping arm.

上述结构设计实现了本实用新型的目的。Above-mentioned structural design has realized the purpose of the utility model.

本实用新型具有如下优点:The utility model has the following advantages:

1、采用吊装夹具进行吊装,不需要人工预先对管片进行捆绑,减少了人力投入,通过夹具左、右臂固定管片,一次性吊装就位,提高了作业效率。1. The hoisting jig is used for hoisting, which does not require manual binding of the segment in advance, which reduces manpower input. The segment is fixed by the left and right arms of the jig, and it is hoisted in place at one time, which improves the working efficiency.

2、吊装作业不再使用钢丝绳捆绑管片,减少了吊装过程中管片的磨损,使管片吊装 作业更加标准化。2. The steel wire rope is no longer used to bind the segments in the hoisting operation, which reduces the wear of the segment during the hoisting process and makes the hoisting operation of the segments more standardized.

3、吊装作业有独立场地,加快了吊车的周转速度,与其他工序没有任何交叉作业,消除了交叉作业存在的安全隐患。3. There is an independent site for the hoisting operation, which speeds up the turnover speed of the crane, and there is no cross operation with other processes, eliminating the potential safety hazards of cross operation.

4、该装置发明构思独特、结构简单、紧凑合理、工作安全可靠、操作灵活省力,具有适宜施工使用、便于进行推广的优点。4. The device is unique in concept, simple in structure, compact and reasonable, safe and reliable in operation, flexible in operation and labor-saving, and has the advantages of being suitable for construction and use and easy to promote.

附图说明Description of drawings

图是本实用新型的结构示意图。Figure is a structural representation of the utility model.

具体实施方式detailed description

如图所示,一种管片吊装夹具,主要由吊钩4和连接臂3所组成。左夹臂2、右夹臂5呈倒L型。左夹臂的上端折弯部为柱杆。右夹臂的上端折弯部为套筒9。左夹臂的柱杆轴设在左夹臂的套筒内,形成伸缩杆结构。两个连接臂的上端与吊钩的下部轴接。两个连接臂的下端分别与左夹臂和右夹臂的折弯部端轴接。左夹臂的下端外侧设有对准扶手1,左夹臂的下端内侧设有橡胶垫片8和卡头6。右夹臂的下端内侧设有防滑块7。As shown in the figure, a segment hoisting jig is mainly composed of a hook 4 and a connecting arm 3 . The left jig arm 2 and the right jig arm 5 are inverted L-shaped. The upper end bending part of the left clamping arm is a pole. The upper end bending portion of the right clamping arm is a sleeve 9 . The mast shaft of the left clamping arm is arranged in the sleeve of the left clamping arm to form a telescopic rod structure. The upper ends of the two connecting arms are pivotally connected with the lower part of the suspension hook. The lower ends of the two connecting arms are respectively pivotally connected to the bending part ends of the left clamping arm and the right clamping arm. The outside of the lower end of the left clamp arm is provided with an alignment handrail 1, and the inside of the lower end of the left clamp arm is provided with a rubber gasket 8 and a chuck 6. The inner side of the lower end of the right jig arm is provided with an anti-skid block 7 .

橡胶垫片和卡头能起到紧固管片的作用。橡胶垫片和防滑块能避免管片在吊装过程中脱落,保证了施工的安全性。对准扶手可在吊装时人工进行精确对准操作,进一步提高施工效率。Rubber gaskets and chucks can play a role in fastening the segments. Rubber gaskets and anti-slip blocks can prevent the segment from falling off during hoisting, ensuring the safety of construction. Alignment handrails can be precisely aligned manually during hoisting, further improving construction efficiency.

所述的连接臂、左夹臂和右夹臂均采用钢制材料制成。所述的两个连接臂的打开夹角为100°~160°。所述的左夹臂的下端面高于右夹臂的下端面。The connecting arm, the left jig arm and the right jig arm are all made of steel materials. The opening angle of the two connecting arms is 100°-160°. The lower end surface of the left clamping arm is higher than the lower end surface of the right clamping arm.

使用时,将管片夹设在左夹臂和右夹臂之间,再将吊环与起重设备相连接,起重设备上抬吊环,管片的自重使左夹臂和右夹臂之间距离收缩,从而夹紧管片;反之,则卸下管片。When in use, the segment is clamped between the left and right clamp arms, and then the lifting ring is connected with the lifting device, and the lifting device lifts the lifting ring. The distance shrinks, thereby clamping the segment; otherwise, the segment is unloaded.

本实用新型能机械化对管片进行装卸,提高了工程质量和进度。操作灵活方便,提高了工程质量和进度。同时本实用新型能够适应多种具有吊装孔的混凝土构件吊装作业、提高作业效率与经济效益,促进了工程管理的规范化、标准化和精细化。The utility model can mechanize the loading and unloading of the segments, which improves the engineering quality and progress. The operation is flexible and convenient, which improves the project quality and progress. At the same time, the utility model can adapt to the hoisting operation of various concrete components with hoisting holes, improve the operating efficiency and economic benefits, and promote the standardization, standardization and refinement of engineering management.

总之,本实用新型能机械化对管片进行装卸,提高了工程质量和进度。具有结构简单,吊装速度快,劳动强度低,省工省力,效率高,安全可靠,易安装拆卸,使用寿命长和使用效果好的优点。In a word, the utility model can mechanize the loading and unloading of the segments, which improves the project quality and progress. It has the advantages of simple structure, fast hoisting speed, low labor intensity, labor and labor saving, high efficiency, safety and reliability, easy installation and disassembly, long service life and good use effect.

Claims (4)

1. a kind of section of jurisdiction stone tongs, is mainly made up of suspension hook and linking arm, it is characterised in that:Left jig arm, right jig arm are in inverted L Type, the upper end bending part of left jig arm is mast, and the upper end bending part of right jig arm is sleeve, and the mast axle of left jig arm is located at left jig arm Sleeve in, the upper end of two linking arms and the bottom axle of suspension hook connect, the lower ends of two linking arms respectively with left jig arm and right folder The bending part end axle of arm connects, and the lower end outside of left jig arm is provided with alignment handrail, the lower end inside of left jig arm be provided with rubber sheet gasket and Dop, the lower end inside of right jig arm are provided with non-slipping block.
A kind of 2. section of jurisdiction stone tongs as described in claim 1, it is characterised in that:Described linking arm, left jig arm and right folder Arm is made of steel material.
A kind of 3. section of jurisdiction stone tongs as described in claim 1, it is characterised in that:The opening angle of two described linking arms For 100 °~160 °.
A kind of 4. section of jurisdiction stone tongs as described in claim 1, it is characterised in that:The lower surface of described left jig arm is higher than the right side The lower surface of jig arm.
CN201720133078.XU 2017-02-09 2017-02-09 A pipe lifting fixture Expired - Fee Related CN206827899U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720133078.XU CN206827899U (en) 2017-02-09 2017-02-09 A pipe lifting fixture

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720133078.XU CN206827899U (en) 2017-02-09 2017-02-09 A pipe lifting fixture

Publications (1)

Publication Number Publication Date
CN206827899U true CN206827899U (en) 2018-01-02

Family

ID=60780164

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720133078.XU Expired - Fee Related CN206827899U (en) 2017-02-09 2017-02-09 A pipe lifting fixture

Country Status (1)

Country Link
CN (1) CN206827899U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111764927A (en) * 2020-06-30 2020-10-13 中电建十一局工程有限公司 A shield tunnel segment splicing device for subway construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111764927A (en) * 2020-06-30 2020-10-13 中电建十一局工程有限公司 A shield tunnel segment splicing device for subway construction

Similar Documents

Publication Publication Date Title
CN205294696U (en) Construct small -size traveling hoist
WO2022111218A1 (en) Pile casing hoisting arm
CN207243306U (en) Tower crane two sides jacks stock
CN206827900U (en) A kind of Three-jaw sling
CN205034964U (en) A hoist for vertical rolling mill transmission shaft
CN101734548A (en) Lifting pipe pile clamp
CN204342270U (en) A kind of spheroid suspender
CN205132903U (en) Steel wire slings
CN104528519A (en) Clamping tool for assisting in hoisting cement electric poles
CN205346603U (en) Pneumatic hoist of tubular pile mould is carried to tubular pile trade
CN102211735A (en) Lifting appliance special for spool
CN204324713U (en) Cement electric pole lifting auxiliary clamp
CN204778467U (en) Steel cable promotes material transporting device
CN204353734U (en) Derrick crane pin removal
CN100572254C (en) Brick handling equipment for construction
CN205312875U (en) Cement pole lifts by crane instrument
CN201605579U (en) Tubular pile trade steel cage hoist device
CN207596350U (en) A forklift lifting device
CN202054522U (en) Automatic fixture for crane
CN207108230U (en) A spreader for processing balanced suspension products
CN205346621U (en) Automatic hoist of tubular pile is carried to tubular pile trade
CN204549818U (en) A kind of device lifting Prestressed concrete cylinder pipe
CN203976225U (en) Building tower crane suspended block brick bucket
CN204643580U (en) Cement pole lifting chuck device
CN204400448U (en) Electric line pole handling pincers

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180102