CN206815279U - 一种装配式高桩承台驳岸结构 - Google Patents
一种装配式高桩承台驳岸结构 Download PDFInfo
- Publication number
- CN206815279U CN206815279U CN201720609667.0U CN201720609667U CN206815279U CN 206815279 U CN206815279 U CN 206815279U CN 201720609667 U CN201720609667 U CN 201720609667U CN 206815279 U CN206815279 U CN 206815279U
- Authority
- CN
- China
- Prior art keywords
- pile
- pile foundation
- cap
- bottom plate
- reserved
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A20/00—Water conservation; Efficient water supply; Efficient water use
- Y02A20/40—Protecting water resources
- Y02A20/402—River restoration
Abstract
本实用新型公开了一种装配式高桩承台驳岸结构,包括现浇帽梁、预制混凝土承台、后排桩基和前排板桩墙;所述预制混凝土承台呈L型,预制混凝土承台包括立板和底板;所述前排板桩墙由若干个板桩墙组成,所述后排桩基由若干个桩基组成;所述底板的一端端部通过现浇帽梁与每个板桩墙的顶部相固定连接;底板的另一端均匀的设置有预留桩基孔;所述预留桩基孔与桩基一一对应,且预留桩基孔位于桩基的正上方;所述预留桩基孔通过浇筑使底板与桩基的顶部相固定连接;本实用新型装配式高桩承台驳岸结构不仅避免了在狭窄区域的土方大开挖,还具有节能环保、标准化施工、预制化程度高、施工速度快、减少现场作业量、受自然条件影响小等优点,应用前景广阔。
Description
技术领域
本实用新型涉及驳岸结构技术领域,特别是一种装配式高桩承台驳岸结构。
背景技术
驳岸作为水陆连接的重要组成部分,在水利、水运工程中广泛应用,近年来随着城市水环境治理、航道扩宽升级、沿海滨海城市的发展,越来越多的工程需要在城市河道及城市滨海地区新建驳岸。由于在城市中新建驳岸常常受到周边建筑的影响,施工作业面较小,土方开挖受到限制,高桩承台驳岸结构较好的避免了在狭窄区域的土方大面积开挖,因此高桩承台驳岸结构近年来在城市河道整治、航道升级等工程中得以广泛应用,传统高桩承台驳岸结构施工均是先打设下部桩基,然后现场浇注上部承台结构,存在施工过程复杂、施工周期长、现场浇注作业量大、环境污染大、受自然条件影响大等问题,目前尚未有一种既能节约作业空间,又能达到节能环保、施工便捷的结构方案。
实用新型内容
本实用新型的目的在于提供一种结构简单、施工方便、适用于软土地基的装配式高桩承台驳岸结构及施工方法。
实现本实用新型目的的技术解决方案为:
一种装配式高桩承台驳岸结构,其特征在于,包括现浇帽梁、预制混凝土承台、后排桩基和前排板桩墙;所述预制混凝土承台呈L型,预制混凝土承台包括立板和底板;所述前排板桩墙由若干个板桩墙组成,若干个板桩墙排成一排;所述后排桩基由若干个桩基组成,若干个桩基排成一排;所述底板的一端端部通过现浇帽梁与每个板桩墙的顶部相固定连接;底板的另一端均匀的设置有预留桩基孔;所述预留桩基孔与桩基一一对应,且预留桩基孔位于桩基的正上方;所述预留桩基孔通过浇筑使底板与桩基的顶部相固定连接。
优选地,所述预制混凝土承台采用一体浇筑而成。
优选地,所述后排桩基的桩基均采用方桩或PHC桩。
优选地,所述前排板桩墙的板桩墙均采用预制钢筋混凝土板桩。
本实用新型与现有技术相比,其显著优点:本实用新型装配式高桩承台驳岸结构不仅避免了在狭窄区域的土方大开挖,还具有节能环保、标准化施工、预制化程度高、施工速度快、减少现场作业量、受自然条件影响小等优点,应用前景广阔,且随着国家对节能环保要求的提高,劳动力成本的不断增长,我国在预制混凝土装配化施工技术方面的研究与应用逐渐升温,推进施工现场装配化已是大势所趋。
下面结合附图对本实用新型作进一步详细描述。
附图说明
图1为本实用新型装配式高桩承台驳岸结构的结构示意图。
具体实施方式
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。
实施例1:
如图1所示,一种装配式高桩承台驳岸结构,包括现浇帽梁1、预制混凝土承台2、后排桩基6和前排板桩墙7;所述预制混凝土承台2呈L型,预制混凝土承台2包括立板和底板;所述前排板桩墙7由若干个板桩墙组成,若干个板桩墙排成一排;所述后排桩基6由若干个桩基组成,若干个桩基排成一排;所述底板的一端端部通过现浇帽梁1与每个板桩墙的顶部相固定连接;底板的另一端均匀的设置有预留桩基孔4;所述预留桩基孔4与桩基一一对应,且预留桩基孔4位于桩基的正上方;所述预留桩基孔4通过浇筑使底板与桩基的顶部相固定连接;其中,所述预制混凝土承台2采用一体浇筑而成;所述后排桩基6的桩基均采用方桩或PHC桩;所述前排板桩墙7的板桩墙均采用预制钢筋混凝土板桩,利用前排板桩墙7挡水挡土。
综上所述,本实用新型装配式高桩承台驳岸结构不仅避免了在狭窄区域的土方大开挖,还具有节能环保、标准化施工、预制化程度高、施工速度快、减少现场作业量、受自然条件影响小等优点,应用前景广阔,且随着国家对节能环保要求的提高,劳动力成本的不断增长,我国在预制混凝土装配化施工技术方面的研究与应用逐渐升温,推进施工现场装配化已是大势所趋。
Claims (4)
1.一种装配式高桩承台驳岸结构,其特征在于,包括现浇帽梁(1)、预制混凝土承台(2)、后排桩基(6)和前排板桩墙(7);所述预制混凝土承台(2)呈L型,预制混凝土承台(2)包括立板和底板;所述前排板桩墙(7)由若干个板桩墙组成,若干个板桩墙排成一排;所述后排桩基(6)由若干个桩基组成,若干个桩基排成一排;所述底板的一端端部通过现浇帽梁(1)与每个板桩墙的顶部相固定连接;底板的另一端均匀的设置有预留桩基孔(4);所述预留桩基孔(4)与桩基一一对应,且预留桩基孔(4)位于桩基的正上方;所述预留桩基孔(4)通过浇筑使底板与桩基的顶部相固定连接。
2.根据权利要求1所述的装配式高桩承台驳岸结构,其特征在于,所述预制混凝土承台(2)采用一体浇筑而成。
3.根据权利要求1所述的装配式高桩承台驳岸结构,其特征在于,所述后排桩基(6)的桩基均采用方桩或PHC桩。
4.根据权利要求1所述的装配式高桩承台驳岸结构,其特征在于,所述前排板桩墙(7)的板桩墙均采用预制钢筋混凝土板桩。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720609667.0U CN206815279U (zh) | 2017-05-27 | 2017-05-27 | 一种装配式高桩承台驳岸结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720609667.0U CN206815279U (zh) | 2017-05-27 | 2017-05-27 | 一种装配式高桩承台驳岸结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206815279U true CN206815279U (zh) | 2017-12-29 |
Family
ID=60757641
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720609667.0U Expired - Fee Related CN206815279U (zh) | 2017-05-27 | 2017-05-27 | 一种装配式高桩承台驳岸结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206815279U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107059774A (zh) * | 2017-05-27 | 2017-08-18 | 中交第三航务工程勘察设计院有限公司 | 一种装配式高桩承台驳岸结构及施工方法 |
-
2017
- 2017-05-27 CN CN201720609667.0U patent/CN206815279U/zh not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107059774A (zh) * | 2017-05-27 | 2017-08-18 | 中交第三航务工程勘察设计院有限公司 | 一种装配式高桩承台驳岸结构及施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107059774A (zh) | 一种装配式高桩承台驳岸结构及施工方法 | |
CN1837511B (zh) | 一种双排围堰及其制作方法 | |
CN104314042B (zh) | 采用桩承式箱筒结构的防波堤施工方法 | |
CN203213136U (zh) | 一种加固地基的沉箱与桩组合基础 | |
WO2017084573A1 (zh) | 抗隆支护结构 | |
CN104652444B (zh) | 超大型深基坑中心岛式交替土方开挖的整体逆作施工方法 | |
CN104179156A (zh) | 箱筒型基础水闸结构及围埝合拢口的施工方法 | |
CN208219694U (zh) | 一种预制挡墙 | |
CN204551430U (zh) | 一种用于软土地基上的预埋花管注浆加固装置 | |
CN109898556A (zh) | 一种地下综合管廊结构及下沉式施工方法 | |
CN206815279U (zh) | 一种装配式高桩承台驳岸结构 | |
CN204282295U (zh) | 桩承式箱筒防波堤结构 | |
CN107299640A (zh) | 一种变截面井筒式地下连续墙基础及其施工方法 | |
CN203891012U (zh) | 一种预设粘土桩的新型灌注桩 | |
CN206829167U (zh) | 一种带泄流孔的现浇箱梁支架筏板基础 | |
CN215441846U (zh) | 一种地基防沉降结构 | |
CN108867664A (zh) | 一种基于逆作法的路改桥段基坑支护结构及其施工方法 | |
CN208717919U (zh) | 一种基于逆作法的路改桥段基坑支护结构 | |
CN111980039B (zh) | 一种海域潮汐区钢板桩围堰的施工方法及结构 | |
CN107165170A (zh) | 一种基坑施工方法 | |
CN210151776U (zh) | 一种衡重式挡土墙的结构 | |
CN209603047U (zh) | 桩承式半圆体防波堤结构 | |
CN208578025U (zh) | 一种用于填海筑岛能排水的多功能管桩的施工装置 | |
CN206457856U (zh) | 一种地面防开裂结构 | |
CN204780965U (zh) | 复杂地质及环境接入地铁既有支护体系施工结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171229 Termination date: 20200527 |