CN206800970U - A kind of integral lifting elevator hoistways operating platform - Google Patents

A kind of integral lifting elevator hoistways operating platform Download PDF

Info

Publication number
CN206800970U
CN206800970U CN201720654955.8U CN201720654955U CN206800970U CN 206800970 U CN206800970 U CN 206800970U CN 201720654955 U CN201720654955 U CN 201720654955U CN 206800970 U CN206800970 U CN 206800970U
Authority
CN
China
Prior art keywords
girder
secondary beam
connector
movable part
fixture
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720654955.8U
Other languages
Chinese (zh)
Inventor
张鹏
吴浩然
吴梦杰
陈晓
宋启华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201720654955.8U priority Critical patent/CN206800970U/en
Application granted granted Critical
Publication of CN206800970U publication Critical patent/CN206800970U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of integral lifting elevator hoistways operating platform, including girder movable part, girder fixture, standard secondary beam and steel pipe support body, the girder movable part includes the antiskid part set enough under girder movable part and two piece of first connector of top welding, the first connector of girder movable part are fixedly connected with the second connector of girder fixture by the first latch;Described girder fixture includes lower end and is centrally located one block of end socket steel plate that one piece of second connector and top are set, and the side wing on girder fixture sets primary and secondary beam connection, and standard secondary beam is fixedly connected with primary and secondary beam connection by the second latch;Standard secondary beam steel pipe support body stud welded reinforcement head, by steel bar end by steel pipe support body firm welding.It is the utility model patent convenient disassembly, high recycling rate, safe and reliable, cost-effective.

Description

A kind of integral lifting elevator hoistways operating platform
Technical field
It the utility model is related in building engineering construction crosshead, particularly a kind of integral lifting elevator in elevator Road operating platform, belong to elevator hoistways technical field of construction.
Background technology
As domestic construction industry continues to develop, skyscraper continues to bring out, and the construction technology of high rise elevator hoistway is always The difficult point of high-building construction.Traditional handicraft, which is often taken, to be set up full hall frame in elevator hoistways and is put down as hoistway constructing operation Under platform, material occupancy is larger, while efficiency of construction is at a fairly low, safety guarantee is poor, be in current high-building construction urgently Problem to be solved.
Therefore, it is necessary to a kind of integral lifting elevator hoistways operating platform is developed to solve problem above.
Utility model content
The purpose of this utility model is to provide a kind of elevator hoistways operating platform simple in construction, easy to use, overcome The defects of aforementioned conventional elevator hoistways crosshead is set up, propose that a kind of new integral lifting elevator hoistways scaffold shaped steel is put down Platform, only once-through operation frame need to being set up in work progress, and being fixed on section steel platform, a liter installation is directly hung using tower crane, Hang in liter installation process, take it is short, save manpower, be safe and reliable.
This integral lifting elevator hoistways operating platform provided by the utility model, including girder movable part, girder Fixture, standard secondary beam and steel pipe support body, the girder movable part include under girder movable part the antiskid part that sets enough and Two piece of first connector of top welding, the first connector of girder movable part and the second connector of girder fixture pass through First latch is fixedly connected;Described girder fixture includes one that lower end is centrally located one piece of second connector and top setting Block end socket steel plate, the side wing on girder fixture set primary and secondary beam connection, and standard secondary beam and primary and secondary beam connection pass through the Two latches are fixedly connected;Standard secondary beam is welded steel pipe support body by steel bar end in the stud welded reinforcement head of steel pipe support body Connect firmly.
Girder movable part body and girder fixture are made of 16# I-beams.
First connector and the second connector are made using steel plate, and connector end offers circular hole.
Suspension ring are set on girder fixture.
Compared with prior art, the utility model has advantages below:
Girder fixture is connected by girder movable part with girder movable part with fixture attachment means using latch, Described girder fixture is connected with standard secondary beam by primary and secondary beam joint device using latch, forms integral steel platform, steel pipe Support body is used with standard secondary beam and is welded and fixed, so as to realize that section steel platform is integrally lifted with scaffold, this integral lifting shaped steel Platform in use, can it is assembled in advance on the ground after the completion of again integral hoisting installed to required floor.Platform carries Girder movable part need to only be rotated when rising, you can overall that section steel platform and scaffold are promoted to last layer flooring, dismounting side Just, high recycling rate, safe and reliable, cost-effective.
Brief description of the drawings
, below will be to needed for embodiment description in order to illustrate more clearly of the technical scheme in the embodiment of the utility model The accompanying drawing to be used is described in further detail, wherein:
Fig. 1 the present embodiment girder movable part elevation;
Fig. 2 the present embodiment girder movable part top views;
The main girder steel fixture elevation of Fig. 3 the present embodiment;
The main girder steel fixture top view of Fig. 4 the present embodiment;
The connecting-piece structure schematic diagram of Fig. 5 the present embodiment primary and secondary movable parts and fixture;
Fig. 6 the present embodiment standard secondary beam elevation;
Fig. 7 the present embodiment standard secondary beam top views;
Fig. 8 the present embodiment primary-secondary beam connecting-piece structure schematic diagrames;
Elevation is completed in the connection of Fig. 9 the present embodiment girder;
Figure 10 the present embodiment section steel platform and elevator hoistways top view;
Figure 11 the present embodiment section steel platform and the first installation elevation of support body;
Figure 12 section steel platforms and scaffold ramp-up period elevation.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describe.
This product includes girder movable part (Fig. 1, Fig. 2), and girder fixture (Fig. 3, Fig. 4), girder movable part is with consolidating Determine part attachment means (Fig. 5), standard secondary beam (Fig. 6, Fig. 7), primary and secondary beam joint device (Fig. 8) composition, described girder fixture Be connected with girder movable part by girder movable part with fixture attachment means using latch, described girder fixture with Standard secondary beam is connected by primary and secondary beam joint device using latch, forms integral steel platform.Steel pipe support body uses with standard secondary beam It is welded and fixed, so as to realize section steel platform and steel pipe frame integral hoisting.
Embodiment one
Step 1:
Referring to Fig. 1, Fig. 2, girder movable part long side is 600mm, and movable part body is made using 16# I-beams 1, living 150mm length antiskids part 2 is set enough under dynamic component, and two piece of first connector 3 is welded at top;
Step 2:
Referring to Fig. 3, Fig. 4, girder fastener length is 2700mm, and girder fixture body is made using 16# I-beams 4, Girder fixture lower end is centrally located one piece of second connector 5, and top sets one block of end socket steel plate 6, flank on girder fixture Plate sets three primary and secondary beam connections 7;
Step 3:
Referring to Fig. 5, connector 3 and connector 5 can use this structural connection to be made using 8mm steel plates, connection Open diameter 22mm circular holes in part end;
Step 4:
The connection of the present embodiment can use pin diameter 20mm, length 150mm;
Step 5:
Referring to Fig. 6, Fig. 7, the length of standard secondary beam 8 is 1500mm, is made using 16# I-steel, and secondary beam sets twice spiral shell altogether Keyhole, and in steel pipe post position welded reinforcement first 9;
Step 6:
Referring to Fig. 8, Fig. 9, standard secondary beam 8 is connected with primary and secondary beam connection 7 by latch 11;
Step 7:
Referring to Figure 10, section steel platform sets girder 2, standard secondary beam 3 altogether;, can be pre- according to the requirement of layout design size First completed on ground assembled.
Step 8:
Referring to Figure 11, after the completion of section steel platform assembly, disposably hung by suspension ring 10 using tower crane to elevator hoistways, And rotate girder movable part to 180 °, parallel with girder fixture, antiskid key 2 and floor structure checkpost are tight, end socket steel plate 6 Held out against with shear wall, then carry out top steel pipe frame body 12 and set up, by support body bottom and the firm welding of steel bar end 9, complete first Secondary section steel platform and erection of frames;
Referring to Figure 12, after the completion of section steel platform scaffold use, using tower crane by suspension ring 10 by section steel platform and support body Slowly lifted, now girder movable part is automatically rotated to 90 °, and section steel platform is gradually promoted to last layer flooring, then by platform Slowly transfer, girder movable part is rotated to 180 °, antiskid key 2 and floor structure checkpost is tight, end socket steel plate 6 and shear wall Hold out against, complete support body and platform and integrally climb operation.
Preferred embodiment of the present utility model is the foregoing is only, is not limited to the utility model, for this For the technical staff in field, the utility model can have various modifications and variations.It is all in the spirit and principles of the utility model Within, any modification, equivalent substitution and improvements made etc., it should be included within the scope of protection of the utility model.

Claims (4)

  1. A kind of 1. integral lifting elevator hoistways operating platform, it is characterised in that including girder movable part, girder fixture, Standard secondary beam and steel pipe support body, the girder movable part include the antiskid part set enough under girder movable part and top welding Two piece of first connector, the first connector of girder movable part and the second connector of girder fixture pass through the first latch It is fixedly connected;Described girder fixture includes one block of end socket steel that lower end is centrally located one piece of second connector and top is set Plate, the side wing on girder fixture set primary and secondary beam connection, and standard secondary beam is consolidated with primary and secondary beam connection by the second latch Fixed connection;Standard secondary beam steel pipe support body stud welded reinforcement head, by steel bar end by steel pipe support body firm welding.
  2. 2. elevator hoistways operating platform according to claim 1, it is characterised in that the girder movable part body and master Beam fixture is made of 16# I-beams.
  3. 3. elevator hoistways operating platform according to claim 1, it is characterised in that first connector and the second connection Part is made using steel plate, and connector end offers circular hole.
  4. 4. elevator hoistways operating platform according to claim 1, it is characterised in that set and hang on the girder fixture Ring.
CN201720654955.8U 2017-06-07 2017-06-07 A kind of integral lifting elevator hoistways operating platform Expired - Fee Related CN206800970U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720654955.8U CN206800970U (en) 2017-06-07 2017-06-07 A kind of integral lifting elevator hoistways operating platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720654955.8U CN206800970U (en) 2017-06-07 2017-06-07 A kind of integral lifting elevator hoistways operating platform

Publications (1)

Publication Number Publication Date
CN206800970U true CN206800970U (en) 2017-12-26

Family

ID=60745055

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720654955.8U Expired - Fee Related CN206800970U (en) 2017-06-07 2017-06-07 A kind of integral lifting elevator hoistways operating platform

Country Status (1)

Country Link
CN (1) CN206800970U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110130673A (en) * 2019-05-20 2019-08-16 中建钢构有限公司 Bracket removes device and bracket method for dismounting

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110130673A (en) * 2019-05-20 2019-08-16 中建钢构有限公司 Bracket removes device and bracket method for dismounting

Similar Documents

Publication Publication Date Title
CN105201195B (en) One kind can lift supporting leg type elevator hoistway construction platform and construction method
CN102864936A (en) Combination lifting construction method for large-scale high hollow building roof of steel structure
CN201367728Y (en) Derrick-less hydraulic slip form device used for reinforced concrete water tower supporting tube construction
CN107190964A (en) A kind of construction method of prefabricated hoistway operation platform
CN105908761A (en) Construction technology of hanging basket moving platform for high slope
WO2019011319A1 (en) Hydraulic steel jacking platform capable of achieving integral and local jacking of external formwork and steel platform
CN113152873A (en) Heightening hanging basket system
CN103206075B (en) Suspension platform for construction of steel reinforced concrete cantilever structure
CN206800970U (en) A kind of integral lifting elevator hoistways operating platform
CN103075001A (en) Steel tube fastener slip form platform system
CN113062584A (en) Multipoint elevator shaft construction lifting platform and construction method
CN201221194Y (en) Postposition pre-embedded type wall connecting components
CN204456816U (en) One can promote supporting leg type elevator hoistway construction platform
CN108222006B (en) Construction method of square underground continuous wall
CN210619969U (en) Prefabricated staircase hoist and mount subassembly
CN111809528A (en) Pier column vertical back cage platform channel construction method and back cage platform channel device
CN208310204U (en) A kind of pedestal for elevator coupling beam formwork erection
CN203475801U (en) Telescopic steel platform for elevator shaft
CN204238537U (en) A kind of elevated hoistway operation platform
CN201826438U (en) Steel column convenient for constructing temporary operating platform
CN203222981U (en) Suspended platform for steel reinforced concrete cantilever structure construction
CN205742952U (en) Elevator civil engineering mobile platform
CN212359061U (en) PC staircase safety protection operation platform
CN204781892U (en) Modular can promote elevartor shaft operation platform
CN203905436U (en) Steel chimney annular installation platform

Legal Events

Date Code Title Description
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171226

Termination date: 20180607

CF01 Termination of patent right due to non-payment of annual fee