CN206800462U - A kind of pre-fabricated electric cables corridor Gong Jing - Google Patents
A kind of pre-fabricated electric cables corridor Gong Jing Download PDFInfo
- Publication number
- CN206800462U CN206800462U CN201720596346.1U CN201720596346U CN206800462U CN 206800462 U CN206800462 U CN 206800462U CN 201720596346 U CN201720596346 U CN 201720596346U CN 206800462 U CN206800462 U CN 206800462U
- Authority
- CN
- China
- Prior art keywords
- side plate
- carriage
- plate
- pedestal
- corridor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model provides a kind of pre-fabricated electric cables corridor Gong Jing, including cover plate, carriage, side plate, pedestal, cable aperture and inner chamber, described cover plate are fixedly mounted on the upper inner of carriage;Described side plate uses polylith, and annular connection installation successively between side plate;Described side plate is fixed between carriage and pedestal, and side plate is internally formed the inner chamber of a sidepiece closing;Described cable aperture is located at the bottom or top of side plate;The cross-sectional area of described carriage is T-type structure;Described carriage includes upper catching groove, lower catching groove and built-in T-shaped plate.The utility model carriage, side plate, the setting of pedestal and Z-type guard strip, avoid or reduce heavy traffic road surface mixing concrete, construction infection is reduced, accelerating construction progress is simple in construction, install convenient, effectively shorten the construction period, improve construction quality, be easy to marketing and application.
Description
Technical field
The utility model belongs to cable installation Technology field, more particularly to a kind of pre-fabricated electric cables corridor Gong Jing.
Background technology
At present, it is general using corridor geosyncline is excavated in cable underground installation process, assembled using manual site or
Concrete casting, then after Concrete in Natural solidification air-dries, the installation of cable and its related facility could particularly be existed
The road surface mixing concrete of heavy traffic, increases construction infection.If work well integrally uses prefabricated components scheme, formed outside the venue
Standardized production, unify dispatching, one-shot forming outside the venue, compared with the work well of normal cable corridor, pre-fabricated electric cables corridor work well is not
On the premise of increasing difficulty of construction, the construction period is effectively shortened, improve construction quality and has implemented distribution network construction " four
The related request of the environmental protection of section one ".
Therefore, invent a kind of pre-fabricated electric cables corridor Gong Jing and seem very necessary.
Utility model content
In order to solve the above-mentioned technical problem, the utility model provides a kind of pre-fabricated electric cables corridor Gong Jing, to solve existing electricity
Engineering time existing for the work well construction process of cable corridor is grown, and construction reference and construction quality be difficult to ensure that, influence efficiency of construction and
The problem of construction quality.A kind of pre-fabricated electric cables corridor Gong Jing, including cover plate, carriage, side plate, pedestal, cable aperture and inner chamber, institute
The cover plate stated is fixedly mounted on the upper inner of carriage;Described side plate uses polylith, and annular connection successively between side plate
Installation;Described side plate is fixed between carriage and pedestal, and side plate is internally formed the inner chamber of a sidepiece closing;Described
Cable aperture is located at the bottom or top of side plate;The cross-sectional area of described carriage is T-type structure;Described carriage includes
Upper catching groove, lower catching groove and built-in T-shaped plate, upper catching groove top installation cover plate therein, lower catching groove bottom fixed side;Described is interior
Put T-shaped plate to be located in carriage, and concrete layer is set outside built-in T-shaped plate;Described side plate includes plate body, boss, Z-type shield
Bar and built-in stiffener, described plate body upper end or lower end set boss;Described Z-type guard strip is fixed on side plate junction,
And Z-type guard strip is connected with built-in stiffener;Described built-in stiffener is located at the inside of plate body.
Further, described pedestal includes locating slot, and described side plate is arranged on locating slot, had using fix stably,
It is easy to connect convenient, improve efficiency of construction.
Further, it is bonded and is connected by Z-type guard strip between described side plate, be advantageous to the transportation safety of protection side panel, is prevented
Only corner is collided with, and is influenceed safety and is used, while can use welding manner, improves the bonding strength between side plate, extension makes
Use the life-span.
Further, described carriage or pedestal use rectangular frame structure, are advantageous to overall structure install convenient, peace
It is complete reliable, efficiency of construction is improved, has ensured use quality.
Further, described side plate, carriage or pedestal use concrete casting structure, using prefabricated components scheme,
Standardized production outside the venue is formed, unifies dispatching, one-shot forming, compared with the work well of normal cable corridor, pre-fabricated electric cables corridor outside the venue
Work well effectively shortens the construction period, improves construction quality on the premise of difficulty of construction is not increased.
Compared with prior art, the utility model has the advantages that:
1. the setting of the utility model Z-type guard strip fitting, is advantageous to the transportation safety of protection side panel, prevents corner from colliding with,
Influence safety and use, while welding manner can be used, improve the bonding strength between side plate, increase the service life.
2. the setting of side plate of the present utility model, carriage or pedestal, using prefabricated components scheme, form standard outside the venue
Metaplasia is produced, and is unified dispatching, one-shot forming outside the venue, compared with the work well of normal cable corridor, is avoided or reduce heavy traffic road surface and mix
Concrete processed, reduce construction infection, accelerating construction progress, pre-fabricated electric cables corridor work well on the premise of difficulty of construction is not increased,
Effectively shorten the construction period, improve construction quality.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Fig. 2 is carriage cross-sectional structure schematic diagram of the present utility model.
Fig. 3 is side plate connecting structure schematic diagram of the present utility model.
Fig. 4 is pedestal attachment structure schematic diagram of the present utility model.
In figure:
1- cover plates, 2- carriages, the upper catching grooves of 21-, catching groove under 22-, T-shaped plate built in 23-, 3- side plates, 31- plate bodys, 32- are convex
Platform, 33-Z type guard strips, stiffener built in 34-, 4- pedestals, 41- locating slots, 5- cable aperture, 6- inner chambers.
Embodiment
The utility model is described further below in conjunction with accompanying drawing:
Embodiment:
As shown in accompanying drawing 1 to accompanying drawing 4
The utility model provides a kind of pre-fabricated electric cables corridor Gong Jing, including cover plate 1, carriage 2, side plate 3, pedestal 4, cable
Hole 5 and inner chamber 6, described cover plate 1 are fixedly mounted on the upper inner of carriage 2;Described side plate 3 uses polylith, and side plate 3
Between successively annular connection installation;Described side plate 3 is fixed between carriage 2 and pedestal 4, and side plate 3 is internally formed one
The inner chamber 6 of sidepiece closing;Described cable aperture 5 is located at the bottom or top of side plate 3;The cross-sectional area of described carriage 2
For T-type structure;Described carriage 2 includes upper catching groove 21, lower catching groove 22 and built-in T-shaped plate 23, the upper top of catching groove 21 therein
Cover plate 1, the lower bottom fixed side 3 of catching groove 22 are installed;Described built-in T-shaped plate 23 is located in carriage 2, and built-in T-shaped plate 23
Outside sets concrete layer;Described side plate 3 includes plate body 31, boss 32, Z-type guard strip 33 and built-in stiffener 34, described
The upper end of plate body 31 or lower end set boss 32;Described Z-type guard strip 33 is fixed on the junction of side plate 3, and Z-type guard strip 33 with it is interior
Stiffener 34 is put to be connected;Described built-in stiffener 34 is located at the inside of plate body 31.
Further, described pedestal 4 includes locating slot 41, and described side plate 3 is arranged on locating slot 41, has and utilizes fixation
It is firm, it is easy to connect convenient, improve efficiency of construction.
Further, it is bonded and is connected by Z-type guard strip 33 between described side plate 3, is advantageous to the transport peace of protection side panel 3
Entirely, prevent corner from colliding with, influence safety and use, while welding manner can be used, improve the bonding strength between side plate 3,
Increase the service life.
Further, described carriage 2 or pedestal 4 use rectangular frame structure, are advantageous to overall structure install convenient,
Securely and reliably, efficiency of construction is improved, has ensured use quality.
Further, described side plate 3, carriage 2 or pedestal 4 use concrete casting structure, using prefabricated components side
Case, standardized production outside the venue is formed, unify dispatching, one-shot forming outside the venue, compared with the work well of normal cable corridor, pre-fabricated electric cables are walked
Lang Gongjing effectively shortens the construction period, improves construction quality on the premise of difficulty of construction is not increased.
Operation principle
In the utility model, according to technical requirements and construction size, cover plate is made using prefabricated components scheme in precast plant
1, pedestal 4 through delivering to construction site after the assay was approved, is fixed in foundation ditch, then by side plate 3 by carriage 2 and side plate 3 first
It is sequentially fixed in the locating slot 41 of pedestal 4, is fixed between side plate 3 by welding or riveting method, then by under carriage 2
The lower catching groove 22 of side is buckled on the boss 32 of the upper end of side plate 3, finally cover plate 1 is embedded in the upper catching groove 21 of carriage 2, this reality
Prefabricated components scheme is used with new, standardized production outside the venue is formed, unifies dispatching, one-shot forming outside the venue, walked with normal cable
Lang Gongjing is compared, and avoids or reduce heavy traffic road surface mixing concrete, reduces construction infection, accelerating construction progress, prefabricated electricity
Cable corridor work well effectively shortens the construction period, improves construction quality on the premise of difficulty of construction is not increased.
Using technical scheme described in the utility model, or those skilled in the art is in technical solutions of the utility model
Under inspiration, similar technical scheme is designed, and reaches above-mentioned technique effect, is to fall into protection model of the present utility model
Enclose.
Claims (5)
- A kind of 1. pre-fabricated electric cables corridor Gong Jing, it is characterised in that:Including cover plate (1), carriage (2), side plate (3), pedestal (4), Cable aperture (5) and inner chamber (6), described cover plate (1) are fixedly mounted on the upper inner of carriage (2);Described side plate (3) is adopted With polylith, and annular connection installation successively between side plate (3);Described side plate (3) be fixed on carriage (2) and pedestal (4) it Between, and side plate (3) is internally formed the inner chamber (6) of a sidepiece closing;Described cable aperture (5) be located at side plate (3) bottom or Person top;The cross-sectional area of described carriage (2) is T-type structure;Described carriage (2) includes upper catching groove (21), lower button Groove (22) and built-in T-shaped plate (23), upper catching groove (21) top installation cover plate (1) therein, lower catching groove (22) bottom fixed side (3);Described built-in T-shaped plate (23) is located in carriage (2), and concrete layer is set outside built-in T-shaped plate (23);Described Side plate (3) includes plate body (31), boss (32), Z-type guard strip (33) and built-in stiffener (34), described plate body (31) upper end or Person lower end sets boss (32);Described Z-type guard strip (33) is fixed on side plate (3) junction, and Z-type guard strip (33) adds with built-in Strong bar (34) is connected;Described built-in stiffener (34) is located at the inside of plate body (31).
- 2. pre-fabricated electric cables corridor Gong Jing as claimed in claim 1, it is characterised in that:Described pedestal (4) includes locating slot (41), described side plate (3) is arranged on locating slot (41).
- 3. pre-fabricated electric cables corridor Gong Jing as claimed in claim 1, it is characterised in that:Protected between described side plate (3) by Z-type Bar (33) fitting is connected.
- 4. pre-fabricated electric cables corridor Gong Jing as claimed in claim 1, it is characterised in that:Described carriage (2) or pedestal (4) Using rectangular frame structure.
- 5. pre-fabricated electric cables corridor Gong Jing as claimed in claim 1, it is characterised in that:Described side plate (3), carriage (2) or Person's pedestal (4) uses concrete casting structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720596346.1U CN206800462U (en) | 2017-05-25 | 2017-05-25 | A kind of pre-fabricated electric cables corridor Gong Jing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720596346.1U CN206800462U (en) | 2017-05-25 | 2017-05-25 | A kind of pre-fabricated electric cables corridor Gong Jing |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206800462U true CN206800462U (en) | 2017-12-26 |
Family
ID=60743162
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720596346.1U Expired - Fee Related CN206800462U (en) | 2017-05-25 | 2017-05-25 | A kind of pre-fabricated electric cables corridor Gong Jing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206800462U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109488319A (en) * | 2018-12-17 | 2019-03-19 | 中国铁建重工集团有限公司 | Development machine |
CN109537633A (en) * | 2018-10-18 | 2019-03-29 | 杭州金盟道路设施有限公司 | A kind of integration manhole well |
-
2017
- 2017-05-25 CN CN201720596346.1U patent/CN206800462U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109537633A (en) * | 2018-10-18 | 2019-03-29 | 杭州金盟道路设施有限公司 | A kind of integration manhole well |
CN109488319A (en) * | 2018-12-17 | 2019-03-19 | 中国铁建重工集团有限公司 | Development machine |
CN109488319B (en) * | 2018-12-17 | 2024-03-08 | 中国铁建重工集团股份有限公司 | Tunneling machine |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206800462U (en) | A kind of pre-fabricated electric cables corridor Gong Jing | |
CN103437423B (en) | Controllable quantitative release connection method and structure for steel truss | |
CN103397718A (en) | Buckling-restrained stiffened steel plate shear wall | |
CN109914644A (en) | A kind of assembled heat insulation masonry wall and preparation method thereof | |
CN201762695U (en) | Structure applicable to large and medium-sized mechanical device to enter long tunnel for overhaul | |
CN212866010U (en) | Prefabricated assembly type case becomes basis | |
CN204243699U (en) | A kind of light concrete superimposed sheet assembly type cable slot | |
CN109681233A (en) | City Shallow tunnel with large cross-section uses the inverse-T-shaped excavation method in precast support section of jurisdiction and temporary support structure | |
CN212503680U (en) | Hoisting system for large-scale bridge crane heavy workpiece | |
CN108571096A (en) | A kind of the fabricated shear wall T-section point and its construction method of wet type connection | |
CN102287022A (en) | Large-span heavy-load prestress groove-shaped laminated plate for civil defense basement ceiling plate | |
CN209586382U (en) | The temporary support structure of the inverse-T-shaped excavation of city Shallow tunnel with large cross-section | |
CN218813780U (en) | Slope protection structure for mine geological environment treatment | |
CN206128787U (en) | Assembled dregs strorage device | |
CN105909006B (en) | A kind of precast assembly prefabricated substation | |
CN209010956U (en) | Prevent the bridge floor board fixing structure of fracture | |
CN209539357U (en) | One kind increasing vertical shaft hole of becoming a full member in inclined shaft end and post descends road construction structure | |
CN204059396U (en) | Fixed infrastructure bottom tower crane | |
CN202500359U (en) | Integrated flange connecting type communication machine room featuring separation between rod body and board room | |
CN111911185A (en) | PBA underground excavation station transfer passage structure and construction method thereof | |
CN207847078U (en) | Core Walls Structure shear wall converts boom device without wall without creeping formwork seat in the plane at beam | |
CN218757570U (en) | Frame-type prefabricated cabin basis of transformer substation | |
CN207079623U (en) | A kind of class rectangle Urban Underground Complex of efficiently damping | |
CN111593707A (en) | Construction channel structure and construction method for large arch dam bottom gallery | |
CN211776199U (en) | Prefabricated reinforced concrete power distribution room |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171226 Termination date: 20190525 |
|
CF01 | Termination of patent right due to non-payment of annual fee |