CN206794054U - One kind spray three proofings production equipment - Google Patents

One kind spray three proofings production equipment Download PDF

Info

Publication number
CN206794054U
CN206794054U CN201720501560.4U CN201720501560U CN206794054U CN 206794054 U CN206794054 U CN 206794054U CN 201720501560 U CN201720501560 U CN 201720501560U CN 206794054 U CN206794054 U CN 206794054U
Authority
CN
China
Prior art keywords
proofings
double track
spray
lift
elevator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720501560.4U
Other languages
Chinese (zh)
Inventor
黄加园
陈扬富
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Qiangli Photoelectricity Co Ltd
Original Assignee
Fujian Qiangli Photoelectricity Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Qiangli Photoelectricity Co Ltd filed Critical Fujian Qiangli Photoelectricity Co Ltd
Priority to CN201720501560.4U priority Critical patent/CN206794054U/en
Application granted granted Critical
Publication of CN206794054U publication Critical patent/CN206794054U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Drying Of Solid Materials (AREA)

Abstract

The utility model provides a kind of spray three proofings production equipment, using the production equipment of the automated mechanical production equipment semi-automation of instead of over, three spray three proofings processes are incorporated on a streamline, it substantially reduce the number artificial participation, reduce the labor intensity of operator, production cost is reduced, improves production efficiency and product quality.Including the point three proofings module, spray three proofings module and drain pan lock screw module being sequentially connected with;Point three proofings module includes the first transport mechanism, the point gum machine and surface drying frame being sequentially arranged among the first transport mechanism;Spray three proofings module includes the second transport mechanism, the flush coater and baking box being sequentially arranged in the second transport mechanism;Drain pan lock screw module includes the workbench and drain pan screw locking machine set gradually;Drain pan lock screw module is combined the product that spray three proofings module circulates with drain pan and lock screw is fixed, and after the completion of screw locking, tool separates with product outside the drain pan screw locking machine.

Description

One kind spray three proofings production equipment
Technical field
Production and processing field is the utility model is related to, more particularly to a kind of spray three proofings production equipment.
Background technology
Three proofings technique is sprayed in LED display manufacture craft to be followed successively by keypoint part point three proofings, comprehensively spray three proofings and will produce Product lock three steps on drain pan, and original spray three proofings operation is manually entered by manually carrying out three liquid-proof of a little three liquid-proof and spray Row screw locks, even if being operated using the feeding blanking from dynamic point three proofings equipment, but between three steps and point three proofings In surface drying process be all to be carried out by manually, on the one hand such mode of production needs to use substantial amounts of turnover tool, week Turn equipment and operating personnel;The two the entire production line needs to take a large amount of places;Meanwhile manual operation is difficult in process of production Ensure the uniformity of product quality, and accidental damage product easily occurs in circular flow.
Utility model content
The utility model provides a kind of spray three proofings production equipment, be instead of over using automated mechanical production equipment Semi-automatic production equipment, three spray three proofings processes are incorporated on a streamline, artificial participation is substantially reduce the number, drops The low labor intensity of operator, reduces production cost, improves production efficiency and product quality.
To achieve the above object, technical solutions of the utility model are:
One kind spray three proofings production equipment, including point three proofings module, spray three proofings module and the drain pan lock screw being sequentially connected with Module;
Described three proofings module includes the first transport mechanism, the point gum machine being sequentially arranged among first transport mechanism And surface drying frame;Product is combined with tool rear to carry out the liquid-proof of keypoint part point three to product by described three proofings module and dries Operation;
The spray three proofings module include the second transport mechanism, the flush coater being sequentially arranged in second transport mechanism with And baking box;The product that the spray three proofings module circulates to described three proofings module carries out three liquid-proof of comprehensive spraying and drying Operation;
The drain pan lock screw module includes the workbench and drain pan screw locking machine set gradually;The drain pan locks screw Module is combined the product that the spray three proofings module circulates with drain pan and lock screw is fixed, and is completed in screw locking Afterwards, tool separates with product outside the drain pan screw locking machine.
Further, in addition to tool transport module, the tool transport module collect the tool after being separated with product, and Tool is transmitted to the original position of described three proofings module.
Further, first transport mechanism include set gradually the first double track connection platform, the second double track connection platform, First double track lift and the second double track lift;The point gum machine is arranged on the first double track connection platform and described second Between double track connection platform, the surface drying frame is arranged between the first double track lift and the second double track lift.
Further, second transport mechanism includes the 3rd double track connection platform and conveyer belt set gradually;Described Three double track connection platforms are arranged on after the second double track lift;The flush coater be installed in the 3rd double track connection platform with Between the conveyer belt;The baking box is arranged on after the conveyer belt.
Further, the workbench is bilateral belt line, and the bilateral belt line is arranged on after the baking box.
Further, the tool transport module includes tool conveyer belt and double track elevator, the tool conveyer belt one End connects with the outlet of the drain pan screw locking machine, and the other end connects with the double track elevator entrance;The double track elevator Outlet connect with the entrance of the first double track connection platform.
Further, the point gum machine is double track selectivity point gum machine.
Further, the first double track lift and the second double track lift include crane, lifting platform, liter Motor and elevator controller drop, and the lifting platform is provided with transmission guide rail, and the lifting platform is installed in the crane, The lifting motor controls lifting platform elevating movement in the crane;The elevator controller passes including lift Sensor, lift control circuit and lift control drain pan, the lift-sensor is installed on the lifting platform, described Lift control circuit electrically connects with the lift-sensor, the lift control drain pan and the lift control circuit Signal connects, to be set to the motion mode of the lift.
Further, the first double track connection platform, the second double track connection platform and the 3rd double track connection platform wrap Include connection platform frame, bilateral track and connection platform controller;The bilateral track laying is described in the connection platform frame Connection platform controller includes being installed in the connection platform inductor at the bilateral track both ends and is installed in plugging into the frame Platform control circuit, the connection platform inductor and connection platform control circuit electrical connection.
Further, the surface drying frame includes support body, the surface drying frame drive mechanism being installed on the support body and surface drying frame Controlling organization, the support body include multilayer layer frame, and per sleeper is equipped with frame layer by layer, guide rail is fixed with the sleeper;Every layer Slideway is additionally provided with layer frame, the slideway is vertically arranged with the guide rail, and the side of the sleeper is embedded in the slideway, described The end of slideway is provided with position-limit mechanism, and the guide rail can pull out along the slideway direction.
Further, the guide rail includes two heavy tracks being parallel to each other and is set on the outside of the heavy track Rail brackets;The heavy track includes track frame and the heavy track chain being enclosed on outside the track frame;The guide rail Both ends are provided with lead angle.
Further, the surface drying frame drive mechanism includes motor, driving chain and drive link, the surface drying frame control machine Structure controls the motor to rotate, and the motor is installed in the frame of the slideway rear end and its top is covered with Weight plate;Institute The output shaft for stating motor is provided with drive sprocket, and the drive link is provided with driven sprocket, the drive sprocket and described driven The driving chain is provided between sprocket wheel;The drive link both ends are respectively provided with one and collaborate sprocket wheel, and each sprocket wheel that collaborates is distinguished With being located at transmission is engaged on the inside of the heavy track chain of respective one end.
Further, the surface drying frame controlling organization include surface drying frame control PLC, control relay, Switching Power Supply and Optoelectronic switch, the optoelectronic switch are installed on the framework of the surface drying frame, and are connected with the surface drying frame control PLC signal; The Switching Power Supply controls the switch of the surface drying frame controlling organization;The input of the control relay and the surface drying frame control PLC processed is connected, and output end controls the surface drying frame drive mechanism.
Further, the double track elevator includes elevator frame, elevator microscope carrier, elevator motor and elevator Control unit, the elevator microscope carrier are installed in the elevator frame, and the elevator motor is controlling the lifting The airborne elevating movement in the elevator frame;The hoister control unit includes elevator inductor and elevator control Circuit processed, the elevator inductor are installed on the elevator microscope carrier, the elevator inductor and the elevator control Circuit electrical connection processed.
From above-mentioned to description of the present utility model, compared to the prior art, the utility model has the following advantages that:
First, the utility model, will using the production equipment of the automated mechanical production equipment semi-automation of instead of over Three spray three proofings processes are incorporated on a streamline, be substantially reduce the number artificial participation, are reduced the labor intensity of operator, Production cost is reduced, improves production efficiency and product quality, production capacity is original 4 times per hour.
2nd, original scattered streamline is integrated connection by the utility model, is eliminated needed for original material cycling storage Tool, equipment and space, reduce the occupancy of production site.
3rd, the utility model will send tool back to initial bit automatically again by tool transport module after flow Put, avoid the flow of man-handling of materials tool, not only save manpower, more improve production efficiency, reduce production cost.
4th, the first double track lift and the second double track lift entirety firm stable in the utility model, product is changed Convenient, flexibility is strong;It is more convenient by modularized design and individually control evaluation control, equipment operation and maintenance.
5th, the first double track connection platform, the second double track connection platform, the 3rd double track connection platform and biography are passed through in the utility model Send band that product is transported into point gum machine, flush coater and baking box, material is obtained buffering of passing a bridge in feeding way is transported, alleviate line The pressure of body and board.
6th, surface drying frame includes multilayer layer frame in the utility model, adds the parking space and surface drying time of product, and often Frame and guide rail are separation design layer by layer, and track passes in and out layer frame, the convenient inspection and maintenance to track separately through slideway.
7th, the both ends of the utility model middle guide are provided with lead angle, it is ensured that will not clamp during work.
8th, motor is arranged on slideway rear end in the utility model, and is stamped Weight plate above, prevents from sending out in pull guide Raw rollover, while the position-limit mechanism of slideway end can prevent it from pulling out the problems such as transition slides during track pull-out.
9th, surface drying frame controlling organization is arranged on above framework in the utility model, motor is arranged on behind framework and passed through Drive link controls chain movement, does not have any line, only track and chain assemblies on such track, simple in construction, convenient follow-up Maintenance and repair.
Tenth, only need a small amount of personnel to carry out the nurse of equipment in whole technological process of the present utility model, saved manually into This, improves production efficiency;Using automatic control system, the uniformity of product is ensure that, improves product yield, is reduced Damage risk caused by man-handling of materials.
Brief description of the drawings
Accompanying drawing described herein is used for providing further understanding to of the present utility model, forms one of the present utility model Point, schematic description and description of the present utility model is used to explain the utility model, does not form to of the present utility model Improper restriction.In the accompanying drawings:
Fig. 1 is overall structure diagram of the present utility model;
Fig. 2 is surface drying frame structural representation one of the present utility model;
Fig. 3 is surface drying frame structural representation two of the present utility model;
Fig. 4 is the structural representation of the stereogram of surface drying rack-layer frame of the present utility model;
Fig. 5 is the structural representation of the side view of surface drying rack-layer frame of the present utility model;
Fig. 6 is the motor mounting part schematic diagram of surface drying frame of the present utility model;
Fig. 7 is the schematic diagram of the work block diagram of the utility model surface drying frame controlling organization;
Fig. 8 is the structural representation of the first double track lift of the present utility model and the second double track lift;
Fig. 9 is the knot of the first double track connection platform of the present utility model, the second double track connection platform and the 3rd double track connection platform Structure schematic diagram.
Embodiment
In order that technical problem to be solved in the utility model, technical scheme and beneficial effect are clearer, clear, with Under in conjunction with the accompanying drawings and embodiments, the utility model is further elaborated.It is it should be appreciated that described herein specific real Example is applied only to explain the utility model, is not used to limit the utility model.
Referring to figs. 1 to Fig. 9, one kind spray three proofings production equipment, including point three proofings module 1, the spray three proofings module 2 being sequentially connected with And drain pan lock screw module 3;
Described three proofings module 1 includes the first transport mechanism 10, is sequentially arranged among first transport mechanism 10 Point gum machine 11 and surface drying frame 12;Product combined with tool it is rear by described three proofings module 1 to product carry out keypoint part point Three liquid-proof and dry operation;
The spray three proofings module 2 includes the second transport mechanism 20, the spray being sequentially arranged in second transport mechanism 20 Painting machine 21 and baking box 22;The spray three proofings module 2 is comprehensively sprayed to the product that described three proofings module 1 circulates Three liquid-proof and drying operation;
The drain pan lock screw module 3 includes the workbench 30 and drain pan screw locking machine 31 set gradually;The drain pan Lock screw module 3 is combined the product that the spray three proofings module 2 circulates with drain pan and lock screw is fixed, in screw After the completion of locking, tool separates with product outside the drain pan screw locking machine 31.
Also including tool transport module 7, the tool transport module 7 collects the tool after being separated with product, and by tool Transmit to the original position of described three proofings module 1.
First transport mechanism 10 include set gradually the first double track connection platform 100, the second double track connection platform 101, First double track lift 102 and the second double track lift 103;The point gum machine 11 is arranged on the first double track connection platform Between 100 and the second double track connection platform 101, the surface drying frame 12 is arranged on the first double track lift 102 and described Between second double track lift 103.
Second transport mechanism 20 includes the 3rd double track connection platform 200 and conveyer belt 201 set gradually;Described 3rd Double track connection platform 200 is arranged on after the second double track lift 103;The flush coater 21 is installed in the 3rd double track Between connection platform 200 and the conveyer belt 201;The baking box 22 is arranged on after the conveyer belt 201.
The workbench 30 is bilateral belt line, and the bilateral belt line is arranged on after the baking box 22.
The tool transport module 7 includes tool conveyer belt 70 and double track elevator 71, described one end of tool conveyer belt 70 Outlet with the screw locking machine connects, and the other end connects with the entrance of double track elevator 71;The double track elevator 71 Outlet connects with the entrance of the first double track connection platform 100.
The point gum machine 11 is double track selectivity point gum machine.
The first double track lift 102, the second double track lift 103, the loading board lift 51 and described Unloading plate lift 53 includes crane 800, lifting platform 801, lifting motor 802 and elevator controller 803, the lifting Platform 801 is provided with transmission guide rail, and the lifting platform 801 is installed in the crane 800, and the lifting motor 802 controls institute State the elevating movement in the crane 800 of lifting platform 801;The elevator controller 803 includes lift-sensor, lifting Machine control circuit and lift control drain pan, the lift-sensor are installed on the lifting platform 801, the lift Control circuit electrically connects with the lift-sensor, and the lift control drain pan connects with the lift control circuit signal Connect, to be set to the motion mode of the lift.
The first double track connection platform 100, the second double track connection platform 101 and the 3rd double track connection platform 200 wrap Include connection platform frame 900, bilateral track 901 and connection platform controller 902;The bilateral track 901 is laid on described plug into In platform frame 900, the connection platform controller 902 include be installed in the both ends of bilateral track 901 connection platform inductor and The connection platform control circuit being installed in the frame, the connection platform inductor and connection platform control circuit electrical connection.
The surface drying frame 12 includes support body 120, the surface drying frame drive mechanism 121 being installed on the support body 120 and surface drying Frame controlling organization 122, the support body 120 include multilayer layer frame 123, every to be equipped with sleeper 1200, the sleeper in frame layer by layer Guide rail 1201 is fixed with 1200;Per slideway 1202 is additionally provided with frame 123 layer by layer, the slideway 1202 hangs down with the guide rail 1201 Straight to set, the side of the sleeper 1200 is embedded in the slideway 1202, and the end of the slideway 1202 is provided with position-limit mechanism, The guide rail 1201 can pull out along the direction of slideway 1202.
The guide rail 1201 includes two heavy tracks 124 being parallel to each other and is set in the outside of heavy track 124 Rail brackets 125;The heavy track 124 includes track frame 1240 and the heavy track being enclosed on outside the track frame 1240 Chain 1241;The both ends of the guide rail 1201 are provided with lead angle.
The surface drying frame drive mechanism 121 includes motor 1210, driving chain 1211 and drive link 1212, the surface drying frame Controlling organization 122 controls the motor 1210 to rotate, the motor 1210 be installed in the frame of the rear end of slideway 1202 and Its top is covered with Weight plate 1242;The output shaft of the motor 1210 is provided with drive sprocket 1213, the drive link 1212 Driven sprocket 1214 is provided with, the driving chain is provided between the drive sprocket 1213 and the driven sprocket 1214 1211;The both ends of drive link 1212 are respectively provided with one and collaborate sprocket wheel 1215, each described to collaborate sprocket wheel 1215 respectively with being located at respectively The inner side of the heavy track chain 1241 occlusion transmission from one end.
The surface drying frame controlling organization 122 includes surface drying frame control PLC 1220, control relay 1221, Switching Power Supply 1222 and optoelectronic switch 1223, the optoelectronic switch 1223 be installed on the framework of the surface drying frame 12, and with the surface drying The signal of frame control PLC 1220 connects;The Switching Power Supply 1222 controls the switch of the surface drying frame controlling organization 122;The control The input of relay 1221 processed is connected with the surface drying frame control PLC 1220, and output end controls the surface drying frame drive mechanism 121。
The double track elevator 71 includes elevator frame, elevator microscope carrier, elevator motor and hoister control list Member, the elevator microscope carrier are installed in the elevator frame, and the elevator motor 1210 is controlling the elevator Microscope carrier elevating movement in the elevator frame;The hoister control unit includes elevator inductor and hoister control Circuit, the elevator inductor are installed on the elevator microscope carrier, the elevator inductor and the hoister control Circuit electrically connects.
One kind spray three proofings production technology, including following technological process:
A, product carries out keypoint part point three proofings operation by a three proofings module;
B, enter spray three proofings module after the completion of point three proofings operation, carry out spraying three proofings operation;
C, enter drain pan lock screw module after the completion of spray three proofings operation, product is screwed with drain pan and is connected.
Three proofings operation is put described in step a includes following industrial flow:
(a), the product for flowing into a upper process loads on double track elevator, is carried out by the double track elevator on automatic Material;
(b), product is sent into the first double track connection platform by the double track elevator, and the first double track connection platform passes product Deliver to double track selectivity point gum machine;
(c), product enters after the double track selectivity point gum machine according to the program pre-set to the emphasis on product Device carries out dispensing operation successively;
(d), after the completion of dispensing, product flows into the second double track connection platform, and the first double track is sent to through the second double track connection platform Lift;
(e), the double track lift carries product to the support body entrance of surface drying frame, and the product is sent into the frame Product is sent to predeterminated position by body, the conveyer belt in the support body, while product is sent into support body, surface drying frame control machine Structure starts timing to the product entry time;
(f), repeat step (a) arrives (e), until the surface drying frame fills product per layer frame body.
Three proofings operation is sprayed described in step b includes following industrial flow:
(a), surface drying time of the timer record per flake products, product is sent to the after the product reaches preset time Two double track lifts;
(b), the second double track lift is sent to the 3rd double track connection platform after getting product, and the 3rd double track connection platform should Product is sent into flush coater the comprehensive spray three proofings operation for carrying out product;
(c) after the completion of, spraying the work of three machines, the product is sent into conveyer belt, conveyer belt is sent to baking box and toasted;
(d), repeat the above steps (a) arrive (e), the product on surface drying frame is sequentially removed into carry out operation.
Screw operation is locked described in step c includes following industrial flow:
(a), the product after oven cooking cycle is sent to bilateral belt line, assembles product and drain pan in bilateral belt line, And it is sent into drain pan screw locking machine and carries out locking screw operation;
(b) subsequent processing is transferred to after, screw locks.
The surface drying frame pan feeding operation includes following industrial flow:
A) elevator controller of the first double track lift controls double track elevator motion and searches the sky on surface drying frame Layer;
B) second double track is refuted to the product waited on platform be delivered to fishplate bar position with the first double track lift intersection, first Double track lift is entered in the first double track lift to product behind fishplate bar position;
C) the first double track lift starts to be elevated to the dead level position of search, and product enters in the dead level of surface drying frame;
D) after product enters surface drying frame, surface drying frame control PLC starts to cache timing, and the first double track lift is elevated to fishplate bar Position connects next product.
The surface drying frame discharging operation includes following industrial flow:
A), product caches in surface drying frame, surface drying frame control PLC control program SER search instructions, searches cache-time most Big value, when maximum >=surface drying frame caching setting time, i.e. product cache-time arrives, and product can discharge;
B) the second double track lift automatic lifting is to can go out bed of material position fishplate bar, product automatic transport to the second double track lift The ejecting plate position to connect with surface drying frame, product are transported on the second double track lift;
C) product automatic transport of the 3rd double track connection platform without product then in the second double track lift is plugged into the 3rd double track On platform, the product if the 3rd double track connection platform has plate in the second double track lift is rested on lift, treats the 3rd double track When connection platform is vacant, product is just delivered to the 3rd double track connection platform by the second double track lift automatically, and product is completely transported to the 3rd After double track connection platform, the circulation of the second double track lift connects next piece of product discharge.
Workflow of the present utility model is specific as follows:
Product is combined with tool and is delivered in point gum machine 11 on the first double track connection platform 100, the light in point gum machine 11 Glue dispensing valve starts dispensing according to programmed Program path after electric switch 1223 detects product conveying in place;After the completion of dispensing, the The controller of two double track connection platforms 101 feeds back whether have product stop thereon to point gum machine 11, if product, then waits, such as Product after dispensing is delivered to the second double track connection platform 101 by fruit without product, point gum machine 11, completes automatically dropping glue process;
The product for completing point glue process flows into the porch of the first double track lift 102, is prepared to enter into surface drying frame 12 and dries; The elevator controller 803 of first double track lift 102 controls double track elevator motion and searches the dead level on surface drying frame 12; Second double track is refuted to the product waited on platform and is delivered to fishplate bar position with the intersection of the first double track lift 102, the first double track liter Drop machine 102 is entered in the first double track lift 102 to product behind fishplate bar position;First double track lift 102 starts to be elevated to search Dead level position, product enter surface drying frame 12 the dead level in;After product enters surface drying frame 12, surface drying frame control PLC 1220 is opened Begin to cache timing, the first double track lift 102 is elevated to fishplate bar position and connects next product;So repeatedly until product fills surface drying frame 12 each layer;
The product for filling surface drying frame 12 dries in the caching of surface drying frame 12;Product after drying initially moves off surface drying frame 12, its Flow is:The control program SER search instructions of surface drying frame control PLC 1220, search cache-time maximum, when maximum >=table 12 caching setting times are quarreled, i.e. product cache-time arrives, and product can discharge;The automatic lifting of second double track lift 103 is to can Go out bed of material position fishplate bar, the ejecting plate position that product automatic transport connects to the second double track lift 103 and surface drying frame 12, product is transported to On second double track lift 103;Product of the 3rd double track connection platform 200 without product then in the second double track lift 103 is automatically defeated It is sent on the 3rd double track connection platform 200, the product if the 3rd double track connection platform 200 has plate in the second double track lift 103 Rest on lift, when the 3rd double track connection platform 200 is vacant, product is just delivered to by the second double track lift 103 automatically Three double track connection platforms 200, after product is completely transported to the 3rd double track connection platform 200, the circulation of the second double track lift 103 connects next Block product discharge;So repeatedly until the product dried all leaves surface drying frame 12;
The product for leaving surface drying frame 12 enters subsequent processing, the transport through the 3rd double track connection platform 200 to flush coater 21, spray Optoelectronic switch 1223 in painting machine 21 detects product conveying and starts to spray three-proofing coating glue in place according to the Program path of preference afterwards, After the completion of spraying, it judges whether there is product on conveyer belt 201, if product, then waits, if without product, flush coater 21 Product after spray three proofings is delivered to transmission belt, completes automatic spray three proofings process;
The communicated band 201 of product sprayed is automatically fed into baking box 22, by the baking of baking box 22, the three proofings of product surface The complete surface drying of glue is painted, product continues on through the bilateral line 60 of belt 5012 and circulated, and into people's frock drain pan, the product for installing drain pan passes through The bilateral line 60 of belt 5012 continues to be sent to screw locking machine, and simultaneously, product separates with tool herein, and tool transmits through tool It is sent to 70 in the double track elevator 71 of the front end of the first double track connection platform 100, is lifted and arranged through double track elevator 71 Reenter process cycles;
After product enters drain pan screw locking machine 31, drain pan screw locking machine 31 distributes screw position coordinate according to screw quantity, Screw locking machine includes 4 be sequentially connected with, and First first fixes product and drain pan according to technological requirement, drain pan lock screw below Machine 31 is uniformly distributed by a position and quantity successively, and drain pan screw locking machine 31 continues on to product after completing all screw lockings Appearance test process, complete drain pan lock screw process;
The product automatic transport of drain pan has been locked to functional test pipeline, and tester passes through the test detection fluorescent tube that is powered With the presence or absence of exception, such as dead point, do not work abnormal conditions;LED lamp plate encapsulating processes are delivered to by the product of test.
The utility model uses the production equipment of the automated mechanical production equipment semi-automation of instead of over, by three Spray three proofings process is incorporated on a streamline, be substantially reduce the number artificial participation, is reduced the labor intensity of operator, is reduced Production cost, improves production efficiency and product quality, production capacity is original 4 times per hour.Simultaneously by original scattered stream Waterline integrates connection, eliminate original material cycling storage needed for tool, equipment and space, reduce accounting for for production site With.And initial position back to again will be sent tool automatically after flow by tool transport module, avoid man-handling of materials The flow of tool, manpower is not only saved, more improves production efficiency, reduces production cost.
Preferred embodiment of the present utility model has shown and described in described above, as previously described, it should be understood that this practicality is new Type is not limited to form disclosed herein, is not to be taken as the exclusion to other embodiment, and available for various other groups Conjunction, modification and environment, and above-mentioned teaching or the technology of association area can be passed through in utility model contemplated scope described herein Or knowledge is modified.And the change and change that those skilled in the art are carried out do not depart from spirit and scope of the present utility model, then All should be in the protection domain of the appended claims for the utility model.

Claims (14)

1. one kind spray three proofings production equipment, it is characterised in that:Including the point three proofings module, spray three proofings module and bottom being sequentially connected with Shell locks screw module;
Described three proofings module include the first transport mechanism, the point gum machine being sequentially arranged among first transport mechanism and Surface drying frame;Product is combined with tool rear to carry out the liquid-proof of keypoint part point three to product by described three proofings module and dries work Industry;
The spray three proofings module includes the second transport mechanism, the flush coater being sequentially arranged in second transport mechanism and baked Case;The product that the spray three proofings module circulates to described three proofings module carries out three liquid-proof of comprehensive spraying and drying is made Industry;
The drain pan lock screw module includes the workbench and drain pan screw locking machine set gradually;The drain pan locks screw module The product that the spray three proofings module circulates is combined with drain pan and lock screw is fixed, after the completion of screw locking, Tool separates with product outside the drain pan screw locking machine.
A kind of 2. spray three proofings production equipment as claimed in claim 1, it is characterised in that:Also include tool transport module, it is described Tool transport module collects the tool after being separated with product, and tool is transmitted to the original position of described three proofings module.
A kind of 3. spray three proofings production equipment as claimed in claim 1, it is characterised in that:First transport mechanism is included successively The first double track connection platform, the second double track connection platform, the first double track lift and the second double track lift set;The dispensing Machine is arranged between the first double track connection platform and the second double track connection platform, and the surface drying frame is arranged on described first pair Between rail lift and the second double track lift.
A kind of 4. spray three proofings production equipment as claimed in claim 3, it is characterised in that:Second transport mechanism is included successively The 3rd double track connection platform and conveyer belt set;The 3rd double track connection platform is arranged on after the second double track lift; The flush coater is installed between the 3rd double track connection platform and the conveyer belt;The baking box be arranged on the conveyer belt it Afterwards.
A kind of 5. spray three proofings production equipment as claimed in claim 4, it is characterised in that:The workbench is bilateral belt line, The bilateral belt line is arranged on after the baking box.
A kind of 6. spray three proofings production equipment as claimed in claim 3, it is characterised in that:The tool transport module includes tool Conveyer belt and double track elevator, described tool conveyer belt one end connect with the outlet of the drain pan screw locking machine, the other end and institute Double track elevator entrance is stated to connect;The outlet of the double track elevator connects with the entrance of the first double track connection platform.
A kind of 7. spray three proofings production equipment as described in claim any one of 1-6, it is characterised in that:The point gum machine is double track Selective point gum machine.
A kind of 8. spray three proofings production equipment as claimed in claim 3, it is characterised in that:The first double track lift and described Second double track lift includes crane, lifting platform, lifting motor and elevator controller, and the lifting platform, which is provided with, to be passed Guide rail is sent, the lifting platform is installed in the crane, and the lifting motor controls the lifting platform in the crane Elevating movement;The elevator controller includes lift-sensor, lift control circuit and lift control drain pan, institute Lift-sensor to be stated to be installed on the lifting platform, the lift control circuit electrically connects with the lift-sensor, The lift control drain pan is connected with the lift control circuit signal, to be carried out to the motion mode of the lift Setting.
A kind of 9. spray three proofings production equipment as claimed in claim 4, it is characterised in that:It is the first double track connection platform, described Second double track connection platform and the 3rd double track connection platform include connection platform frame, bilateral track and connection platform controller;Institute Bilateral track laying is stated in the connection platform frame, the connection platform controller includes being installed in the bilateral track both ends Connection platform inductor and the connection platform control circuit being installed in the frame, the connection platform inductor and the connection platform control Circuit electrical connection processed.
A kind of 10. spray three proofings production equipment as claimed in claim 8, it is characterised in that:The surface drying frame includes support body, installing Surface drying frame drive mechanism and surface drying frame controlling organization on the support body, the support body include multilayer layer frame, often layer by layer in frame Sleeper is equipped with, guide rail is fixed with the sleeper;Per slideway is additionally provided with frame layer by layer, the slideway is vertical with the guide rail to be set Put, the side of the sleeper is embedded in the slideway, and the end of the slideway is provided with position-limit mechanism, and the guide rail can be along the cunning Road direction pulls out.
A kind of 11. spray three proofings production equipment as claimed in claim 10, it is characterised in that:The guide rail, which includes two, mutually puts down Capable heavy track and the rail brackets being set on the outside of the heavy track;The heavy track includes track frame and is enclosed on institute State the heavy track chain outside track frame;The both ends of the guide rail are provided with lead angle.
A kind of 12. spray three proofings production equipment as claimed in claim 11, it is characterised in that:The surface drying frame drive mechanism includes Motor, driving chain and drive link, the surface drying frame controlling organization control the motor to rotate, and the motor is installed in the cunning In the frame of road rear end and its top is covered with Weight plate;The output shaft of the motor is provided with drive sprocket, the drive link Driven sprocket is provided with, the driving chain is provided between the drive sprocket and the driven sprocket;The drive link both ends It is respectively provided with one and collaborates sprocket wheel, each sprocket wheel that collaborates is engaged with being located on the inside of the heavy track chain of respective one end respectively Transmission.
A kind of 13. spray three proofings production equipment as claimed in claim 12, it is characterised in that:The surface drying frame controlling organization includes Surface drying frame control PLC, control relay, Switching Power Supply and optoelectronic switch, the optoelectronic switch are installed in the surface drying frame On framework, and it is connected with the surface drying frame control PLC signal;The Switching Power Supply controls opening for the surface drying frame controlling organization Close;The input of the control relay is connected with the surface drying frame control PLC, and output end controls the surface drying frame driving machine Structure.
A kind of 14. spray three proofings production equipment as claimed in claim 6, it is characterised in that:The double track elevator includes lifting Machine frame, elevator microscope carrier, elevator motor and hoister control unit, the elevator microscope carrier are installed in the elevator In frame, the elevator motor is controlling elevator microscope carrier elevating movement in the elevator frame;It is described to carry Rising machine control unit includes elevator inductor and hoister control circuit, and the elevator inductor is installed in the elevator On microscope carrier, the elevator inductor electrically connects with the hoister control circuit.
CN201720501560.4U 2017-05-08 2017-05-08 One kind spray three proofings production equipment Expired - Fee Related CN206794054U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720501560.4U CN206794054U (en) 2017-05-08 2017-05-08 One kind spray three proofings production equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720501560.4U CN206794054U (en) 2017-05-08 2017-05-08 One kind spray three proofings production equipment

Publications (1)

Publication Number Publication Date
CN206794054U true CN206794054U (en) 2017-12-26

Family

ID=60739484

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720501560.4U Expired - Fee Related CN206794054U (en) 2017-05-08 2017-05-08 One kind spray three proofings production equipment

Country Status (1)

Country Link
CN (1) CN206794054U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106984496A (en) * 2017-05-08 2017-07-28 厦门强力巨彩光电科技有限公司 One kind spray three proofings production equipment and process
CN112024288A (en) * 2020-09-01 2020-12-04 深圳市森阳智能制造装备有限公司 On-line vacuum automatic glue pouring production line

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106984496A (en) * 2017-05-08 2017-07-28 厦门强力巨彩光电科技有限公司 One kind spray three proofings production equipment and process
CN112024288A (en) * 2020-09-01 2020-12-04 深圳市森阳智能制造装备有限公司 On-line vacuum automatic glue pouring production line

Similar Documents

Publication Publication Date Title
CN107016939A (en) A kind of double track assembly line and its production technology
CN106984496A (en) One kind spray three proofings production equipment and process
US8235000B2 (en) Modular paint line and method of operation therefor
CN102907749B (en) Automatic cleaning and sorting production line of rhizoma dioscoreae
US8360225B2 (en) Modular manufacturing chain including a utility transfer module and method of operation therefor
CN103763866B (en) Pcb board is torn open and is turned over the automation integrated machine of patch
CN203708651U (en) PCB plate dismounting, turning and pasting automated all-in-one machine
US7815036B2 (en) Modular manufacturing chain including a position tracking device and method of operation therefor
CN206794054U (en) One kind spray three proofings production equipment
CN107051966A (en) Full-automatic silicon wafer cleans line and its method of work
CN206931322U (en) A kind of double track assembly line
US7900767B2 (en) Modular manufacturing chain including a vertical lift device and method of operation thereof
CN205204350U (en) Automatic plate turnover machine
CN110369206B (en) Automatic spraying and drying production system for net rack connecting rod
CN110217612A (en) A kind of dustless unmanned automatic loading method of bagged material and its loading system
CN203096175U (en) Automatic production line for enamel of water tank inner container of solar water heater
CN104384926A (en) Production line workshop for LED (Light Emitting Diode) street lamp
CN201579168U (en) Automobile part spraying production line
CN108435464B (en) Automatic change paint spraying apparatus
CN208082782U (en) A kind of plank automatic glue spreaders
US8196731B2 (en) Modular manufacturing chain including a reverse transport direction and method of operation therefor
CN206799151U (en) A kind of LED module adhesive injection device
CN206813938U (en) A kind of PCB upper plates automate Wiring device
US8086341B2 (en) Control system and method for a modular manufacturing chain
CN106694292A (en) Workpiece integrated automation device

Legal Events

Date Code Title Description
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171226

Termination date: 20180508