CN206788308U - Full-automatic multiloop secondary cable Insulation test servicing unit - Google Patents
Full-automatic multiloop secondary cable Insulation test servicing unit Download PDFInfo
- Publication number
- CN206788308U CN206788308U CN201720598526.3U CN201720598526U CN206788308U CN 206788308 U CN206788308 U CN 206788308U CN 201720598526 U CN201720598526 U CN 201720598526U CN 206788308 U CN206788308 U CN 206788308U
- Authority
- CN
- China
- Prior art keywords
- test
- servicing unit
- automatic
- full
- multiloop
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)
Abstract
The utility model discloses a kind of full-automatic multiloop secondary cable Insulation test servicing unit, the servicing unit includes cpu controller, relay and the aviation plug being sequentially connected, and the controller is connected to power supply;The test survey of wire terminal one is set to be connected with aviation plug, the connection of opposite side and cable under test.The utility model has the advantages that circuit structure is simple, wiring is simple, easily makes, be easy to use, and finished-product volume is small, good insulation preformance, cost-effective;The testing time is substantially shorter using the utility model, and can effectively avoid test leakage phenomenon, it is ensured that the accuracy and reliability of Substation secondary circuit Insulation test.
Description
Technical field
It the utility model is related to a kind of Insulation test servicing unit, more particularly to a kind of full-automatic multiloop secondary cable is exhausted
Edge testing auxiliary device.
Background technology
According to pertinent regulations, overhaul, technological transformation or newly-built equipment must 100% pair of secondary device electric current, electricity before operation of going into operation
The return cables such as pressure, control, signal tested between cable core with cable core insulation against ground.At present, what can be taken in industry does
Method is to utilize insulation tester, carries out Insulation test by way of switching by hand.
Cable core insulation is tested using manual switching mode, need to repeat to insert to cut insulation tester p-wire plug, test the used time
Very long, the detection average used time of every secondary cable has been up to 3.13 minutes, and increasing with cable core, detects average use
When into geometry times increase;On the other hand, because needing test loop and cable core more, and cable distribution is intensive, manual switching cable
When core mode carries out Insulation test, test leakage slightly occurs without paying attention to;Intact secondary cable insulation is to ensure that secondary circuit is normal
One important indicator of operation, the cable of manual Insulation test test leakage have been buried hidden to the safety and stability reliability service of secondary circuit
Suffer from.
Utility model content
Technical problem to be solved in the utility model is to overcome defect described above, there is provided a kind of test speed is fast, keeps away
Exempt from the full-automatic multiloop secondary cable Insulation test servicing unit of test leakage.
In order to solve the problems, such as techniques described above, full-automatic multiloop secondary cable Insulation test described in the utility model is auxiliary
Device is helped, the servicing unit includes cpu controller, relay and the aviation plug being sequentially connected, and the controller is connected to
Power supply;The test survey of wire terminal one is set to be connected with aviation plug, the connection of opposite side and cable under test.
Further, cpu controller described in the utility model is single-chip microcomputer.
Preferably, aviation plug described in the utility model is 16 core aviation plugs;The test wire terminal is that 16 poles connect
Line connector.
Full-automatic multiloop secondary cable Insulation test servicing unit described in the utility model, by all cores of cable under test
Line with test wire terminal be connected after be connected to again on aviation plug, last cut-in relay, insulation tester p-wire also access after
Electrical equipment, by the way that cpu controller is single-chip microcomputer control relay connection point on-off to realize Insulation test changing-over line.The utility model is only
Need to be by after all cored wires disposably full access device, follow-up test is automatically finished, and the insulation of each cored wire can be surveyed simultaneously
Examination, the cable of either several cores, detection used time need to only disconnect the line average used time plus the measurement average used time, realize that overall shorten is surveyed
Try the target of time;The disposable whole access devices of all cable cores, something lost caused by artificial single line core is respectively connected to can be eliminated
Possibility is leaked, avoids test leakage.
The beneficial effects of the utility model:The utility model has that circuit structure is simple, wiring is simple, easily makes, makes
The advantages that with facilitating, finished-product volume is small, good insulation preformance, cost-effective;The utility model not only substantially reduces the testing time,
And test leakage phenomenon is effectively prevent, the accuracy and reliability of Substation secondary circuit Insulation test are greatly improved, very well
Solve the problems, such as exist during secondary cable Insulation test, reduce secondary circuit insulation it is unqualified caused by power network fortune
Sector-style danger;Wiring is simple, simple operation, optimizes Insulation test process, effectively shortens newly-built, technology innovation project construction, checks and accepts
The Insulation test activity duration;On-site personnel is freed from a large amount of mechanicalnesses, repetitive operation, avoids tired work
Industry, improve operating efficiency.
Brief description of the drawings
Fig. 1 is structural schematic block diagram of the present utility model.
Embodiment
The utility model is described in further detail below in conjunction with the accompanying drawings.
The full-automatic multiloop secondary cable Insulation test servicing unit of the utility model, the servicing unit include connecting successively
Cpu controller 1, relay 2 and the aviation plug 3 connect, the controller 1 are connected to power supply 5;Test wire terminal 4 one is set to survey
It is connected with aviation plug 3, opposite side and cable under test 6 connect.
Further, cpu controller 1 described in the utility model is single-chip microcomputer.
Preferably, aviation plug 3 described in the utility model is 16 core aviation plugs;The test wire terminal 4 is 16 poles
Wiring connector.
Embodiment:It is that the control relay 2 of cpu controller 1 realizes changing-over line using single-chip microcomputer, passes through programme-control relay
Action, bulk loop are built using general single chip plate and relay plates assembled, are changed the mode of connection and are used " double mothers " Dan Ji
Appliance wiring mode.The utility model outer box selection acrylic board makes, and insulating properties are good, easily cut easy processing, corrosion-resistant,
It is easy to clean, each part is installed in acrylic box.
In real work, conventional cable core number is 4,6,7,8,10,12,14, to meet routine work demand, this practicality
For the new full test core number that sets as 16, aviation plug 3 is 16 core aviation plugs, and test wire terminal 4 is 16 pole wiring connectors;
To meet the wiring requirement for adapting to a variety of line footpath cored wires, the test butted line of wire terminal 4 is not easy to take off by the way of crimping fastens
Fall, metal part is encapsulated in insulation crust during use, no ground and short-circuit risks, it is ensured that reliable test result;It will treat
Survey cable 6 all cored wires be connected by testing wire terminal 4 with the female of aviation plug 3, cored wire to be measured after tested wire terminal by
Aviation plug 3 is forwarded to the contact of relay 2, is not influenceed by cable under test cored wire length and spatial arrangement, is easy to wiring;Insulation is surveyed
P-wire also cut-in relay 2 of instrument 7 are tried, by single-chip microcomputer control relay connection point on-off to realize Insulation test changing-over line.
Single-chip microcomputer provides the output of 1-16 roads according to selection, controls normally opened, the normally closed contact of 1-16 relays, relay 2
Wire terminal 4, which is tested, by 16 core aviation plugs 3 and 16 poles corresponds wiring;Insulation tester 7 can provide 1000V alternating currents
Pressure, the cable under test 6 by try wire terminal 4, aviation plug 3 respectively correspond to be connected to relay 2, in cpu controller 1(Monolithic
Machine)Numeric keypad 8 on input cable under test number N+1, confirm and start Insulation test, it is complete by Automatic control of single chip microcomputer relay
Into cable under test core is alternate and insulation against ground test, after test terminates and the electric discharge of the core of cable under test 6 is automatically performed, tests number
Shown when factually on insulation tester 7.
The utility model can be tested secondary cable insulation automatically, realize the automatic test to cable core insulation,
Every secondary cable Insulation test is averaged by the detection used time for reducing unit cable, the missing inspection scene for eliminating core, final realize
Used time is foreshortened within 0.5 minute from more than 3 points, and eliminates secondary cable test leakage phenomenon.
A kind of embodiment of the present utility model is these are only, a people has used structure described above, all should fall into this reality
With new protection domain.
Claims (3)
1. full-automatic multiloop secondary cable Insulation test servicing unit, it is characterised in that the servicing unit includes connecting successively
The cpu controller connect(1), relay(2)And aviation plug(3), the controller(1)It is connected to power supply(5);P-wire is set
Joint(4)One survey and aviation plug(3)Connection, opposite side and cable under test(6)Connection.
2. full-automatic multiloop secondary cable Insulation test servicing unit according to claim 1, it is characterised in that described
Cpu controller(1)For single-chip microcomputer.
3. full-automatic multiloop secondary cable Insulation test servicing unit according to claim 1, it is characterised in that the boat
Blind plug(3)For 16 core aviation plugs;The test wire terminal(4)For 16 pole wiring connectors.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720598526.3U CN206788308U (en) | 2017-05-26 | 2017-05-26 | Full-automatic multiloop secondary cable Insulation test servicing unit |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720598526.3U CN206788308U (en) | 2017-05-26 | 2017-05-26 | Full-automatic multiloop secondary cable Insulation test servicing unit |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206788308U true CN206788308U (en) | 2017-12-22 |
Family
ID=60713552
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720598526.3U Active CN206788308U (en) | 2017-05-26 | 2017-05-26 | Full-automatic multiloop secondary cable Insulation test servicing unit |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206788308U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109444542A (en) * | 2018-10-30 | 2019-03-08 | 国网山西省电力公司晋城供电公司 | A kind of fully automatic secondary insulating resistance of cable auxiliary test unit and its test method |
CN111123046A (en) * | 2019-12-03 | 2020-05-08 | 国网河南省电力公司鹤壁供电公司 | A device for quickly measuring the insulation strength of cables |
-
2017
- 2017-05-26 CN CN201720598526.3U patent/CN206788308U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109444542A (en) * | 2018-10-30 | 2019-03-08 | 国网山西省电力公司晋城供电公司 | A kind of fully automatic secondary insulating resistance of cable auxiliary test unit and its test method |
CN111123046A (en) * | 2019-12-03 | 2020-05-08 | 国网河南省电力公司鹤壁供电公司 | A device for quickly measuring the insulation strength of cables |
CN111123046B (en) * | 2019-12-03 | 2022-06-10 | 国网河南省电力公司鹤壁供电公司 | A device for quickly measuring the insulation strength of cables |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110174590A (en) | A kind of power cable resultant fault test simulation system and method | |
CN104914391A (en) | Distribution network single-phase grounding fault simulation and positioning performance test platform and method | |
CN207440195U (en) | A kind of multi-functional energizing test platform | |
CN108318766B (en) | Quick detection device for alternating-current power distribution cabinet of contact net operation vehicle | |
CN101710163A (en) | On-line testing method for insulation condition of capacitive current transformer | |
CN206788308U (en) | Full-automatic multiloop secondary cable Insulation test servicing unit | |
CN105182173B (en) | Novel composite mutual inductor polarity tester | |
CN116520085A (en) | Forest pasture area low-voltage fire test system and method | |
CN208384025U (en) | A kind of test macro of direct-current charging post | |
CN204832412U (en) | Novel combined instrument transformer polarity test appearance | |
CN205450042U (en) | Experimental switching operation platform of power transformer | |
CN202177693U (en) | Industrial frequency withstand voltage and insulation resistance testing apparatus for current transformer | |
CN216215756U (en) | Automatic terminal acceptance device of 10kV pole-mounted switch | |
CN109324306B (en) | GIS equipment current transformer error testing system and construction method thereof | |
CN204044320U (en) | Apparatus for inspecting arc fault circuit breaker | |
CN101661090A (en) | Through-flow tester of neutral point current transformer of transformer | |
CN110045188A (en) | A kind of system and method for not removing high-side lead measuring transformer insulation resistance | |
CN108169610A (en) | A kind of one-phase earthing failure in electric distribution network test method based on Real Time Digital Simulator | |
CN202837471U (en) | Low-current grounding system single-phase earth fault wire discrimination device | |
CN203422430U (en) | Transformer acceptance impact switching-on remote control security tester | |
CN209132302U (en) | One kind being suitable for test and is shorted ground line with quick | |
CN201615936U (en) | Online monitoring device for state of insulation of capacitive current transformer | |
CN112180894A (en) | Electric performance detection device for pole-mounted circuit breaker controller | |
CN206960591U (en) | A kind of earth fault mutually quick judge module and arc-extinguishing resonance-extinguishing device | |
CN201845038U (en) | Electrical leakage tester for three-phase three-wire IT (information technology) system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |