CN205450042U - Experimental switching operation platform of power transformer - Google Patents
Experimental switching operation platform of power transformer Download PDFInfo
- Publication number
- CN205450042U CN205450042U CN201620243137.4U CN201620243137U CN205450042U CN 205450042 U CN205450042 U CN 205450042U CN 201620243137 U CN201620243137 U CN 201620243137U CN 205450042 U CN205450042 U CN 205450042U
- Authority
- CN
- China
- Prior art keywords
- test
- transformer
- connection terminal
- terminal
- test side
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)
Abstract
本实用新型公开了一种电力变压器试验转接操作平台,包括箱体,所述箱体的上面绝缘板上设置有用于连接测试仪器的测试侧高绕组接线端子、测试侧中绕组接线端子和测试侧低绕组接线端子,所述测试侧高绕组接线端子、测试侧中绕组接线端子和测试侧低绕组接线端子各连接一个短路刀闸,所述短路刀闸与接地刀闸连接;所述箱体的侧面绝缘板上设置有用于连接变压器的与测试侧高绕组接线端子、测试侧中绕组接线端子和测试侧低绕组接线端子对应连接的变压器侧高绕组接线端子、变压器侧中绕组接线端子和变压器侧低绕组接线端子;设置接地端子与所述箱体的外壳、接地刀闸连接。本实用新型结构简单、操作方便、安全可靠,效率高,耗费少,可满足现场测试和安全要求。
The utility model discloses a power transformer test switching operation platform, which comprises a box body, and the upper insulating plate of the box body is provided with a test side high winding connection terminal, a test side middle winding connection terminal and a test The low winding terminal on the test side, the high winding terminal on the test side, the medium winding terminal on the test side and the low winding terminal on the test side are each connected to a short-circuit knife switch, and the short-circuit knife switch is connected to the grounding knife switch; the box body The side insulation plate of the transformer is provided with the transformer side high winding terminal, transformer side medium winding terminal and transformer side correspondingly connected to the test side high winding terminal, test side medium winding terminal and test side low winding terminal for connecting the transformer. Side low winding terminal; set the ground terminal to connect with the shell of the box and the ground knife switch. The utility model has the advantages of simple structure, convenient operation, safety and reliability, high efficiency and low cost, and can meet field test and safety requirements.
Description
技术领域 technical field
本实用新型涉及电力领域电力变压器试验的一种辅助装置,具体涉及一种用于辅助电力变压器试验的转接操作平台。 The utility model relates to an auxiliary device for a power transformer test in the electric power field, in particular to a transfer operation platform for auxiliary power transformer tests.
背景技术 Background technique
随着电网规模的不断发展,电网对设备的安全性提出了更高的要求,历来开展的预试定检工作也显得尤为重要。其中,电力变压器的预试工作较为重要和频繁,尤其近年来电网的扩建致使变压器数量与日俱增,电气试验人员将面临前所未有的试验工作量,如何提高工作效率、缩短试验时间、保障设备检测到位等问题已成为电气试验工作人员极为关心的课题。 With the continuous development of the scale of the power grid, the power grid has put forward higher requirements for the safety of equipment, and the pre-test and regular inspection work that has always been carried out is also particularly important. Among them, the pre-test work of power transformers is more important and frequent. Especially in recent years, the expansion of the power grid has caused the number of transformers to increase day by day. Electrical testers will face unprecedented test workload. How to improve work efficiency, shorten test time, and ensure that equipment detection is in place and other issues It has become a topic of great concern to electrical test workers.
传统开展的变压器试验需要人为的将变压器各侧的绕组引出线进行短接或者引到地面测试仪器上,比如:进行直流电阻测试时,需将被试侧各相接到仪器上,非被试绕组进行悬空;而进行变压器绝缘试验时,又需将被试绕组短接,而非被试绕组短接接地。如此简单的试验项目在更换接线方式时,需要试验人员爬上套管拆除原来的测试线,然后再依次对各绕组进行短接,不仅增加了试验人员的工作量和作业时间,也增加了反复登高存在的安全风险,其中以110kV及以上的变压器试验或变压器需要反复进行试验时尤为明显。 The traditional transformer test needs to artificially short-circuit the winding lead-out wires on each side of the transformer or lead them to the ground test instrument. The winding is suspended in the air; and when performing the transformer insulation test, the tested winding needs to be short-circuited, and the non-tested winding is short-circuited to ground. When changing the wiring mode of such a simple test item, the tester needs to climb up the bushing to remove the original test line, and then short-circuit each winding in turn, which not only increases the workload and working time of the tester, but also increases the number of repetitions. The safety risks of climbing are especially obvious when the transformer test with 110kV and above or the transformer needs repeated tests.
实用新型内容 Utility model content
本实用新型所要解决的技术问题是,克服以上所述缺陷,提供一种电力变压器试验转接操作平台,进行一次接线便可完成变压器的基本试验,有效减少试验人员的工作量和安全风险,对设备维护单位开展试验工作意义重大。 The technical problem to be solved by the utility model is to overcome the above-mentioned defects and provide a power transformer test switching operation platform, which can complete the basic test of the transformer after one connection, effectively reducing the workload and safety risks of the test personnel It is of great significance for the equipment maintenance unit to carry out the test work.
为了解决以上所述技术问题,本实用新型所述电力变压器试验转接操作平台,包括箱体,所述箱体的上面绝缘板上设置有用于连接测试仪器的测试侧高绕组接线端子、测试侧中绕组接线端子和测试侧低绕组接线端子,所述测试侧高绕组接线端子、测试侧中绕组接线端子和测试侧低绕组接线端子各连接一个短路刀闸,所述短路刀闸与接地刀闸连接;所述箱体的侧面绝缘板上设置有用于连接变压器的与测试侧高绕组接线端子、测试侧中绕组接线端子和测试侧低绕组接线端子对应连接的变压器侧高绕组接线端子、变压器侧中绕组接线端子和变压器侧低绕组接线端子;设置接地端子与所述箱体的外壳、接地刀闸连接。 In order to solve the above-mentioned technical problems, the power transformer test transfer operation platform described in the utility model includes a box body, and the upper insulating plate of the box body is provided with a test side high winding terminal for connecting a test instrument, a test side The middle winding connection terminal and the test side low winding connection terminal, the test side high winding connection terminal, the test side middle winding connection terminal and the test side low winding connection terminal are each connected to a short-circuit knife switch, and the short-circuit knife switch and the grounding knife switch connection; the side insulation plate of the box body is provided with transformer side high winding terminal, transformer side The middle winding connection terminal and the transformer side low winding connection terminal; the grounding terminal is provided to connect with the shell of the box body and the grounding knife switch.
本实用新型基于改善试验方法、提高工作效率而提出,所述电力变压器试验转接操作平台包括连接测试仪器一侧的高、中、低三组接线端子,对应的连接变压器一侧的高、中、低三组接线端子,三把绕组短路刀闸和三把接地刀闸。当需要将变压器各侧短路时,合上相应的短路刀闸便可,无需工作人员再爬上套管利用裸铜线进行短接,需要分开测量时拉开短路刀闸即可。除此,还可以利用本装置进行绝缘测试和介损测试,给试验人员带来极大的方便。 The utility model is proposed on the basis of improving the test method and improving the work efficiency. The power transformer test switching operation platform includes three groups of high, medium and low terminals connected to the test instrument side, and the corresponding high, medium and low terminals connected to the transformer side. , Three sets of low terminals, three winding short-circuit switches and three grounding switches. When it is necessary to short-circuit each side of the transformer, it is enough to close the corresponding short-circuit knife switch. There is no need for the staff to climb up the bushing and use bare copper wires to short-circuit. In addition, this device can also be used for insulation test and dielectric loss test, which brings great convenience to test personnel.
本实用新型的有益效果:由于使用了以上所述结构,本实用新型具有结构简单、操作方便、安全可靠等优点,其功能可满足现场测试和安全要求,相比传统接线方式,工作效率得以提高,耗费时间明显减少,操作装置基本达到预期的效果。 Beneficial effects of the utility model: due to the use of the above-mentioned structure, the utility model has the advantages of simple structure, convenient operation, safety and reliability, etc., and its function can meet the field test and safety requirements. Compared with the traditional wiring method, the work efficiency is improved , the time-consuming is significantly reduced, and the operating device basically achieves the expected effect.
附图说明 Description of drawings
图1为本实用新型结构示意图。 Fig. 1 is the structural representation of the utility model.
具体实施方式 detailed description
下面结合附图对本实用新型作进一步详细说明。 Below in conjunction with accompanying drawing, the utility model is described in further detail.
本实用新型所述电力变压器试验转接操作平台,包括箱体1,所述箱体1的上面绝缘板8上设置有用于连接测试仪器的测试侧高绕组接线端子5、测试侧中绕组接线端子6和测试侧低绕组接线端子7,所述测试侧高绕组接线端子5、测试侧中绕组接线端子6和测试侧低绕组接线端子7各连接一个短路刀闸2,所述短路刀闸2与接地刀闸3连接;所述箱体1的侧面绝缘板9上设置有用于连接变压器的与测试侧高绕组接线端子5、测试侧中绕组接线端子6和测试侧低绕组接线端子7对应连接的变压器侧高绕组接线端子10、变压器侧中绕组接线端子11和变压器侧低绕组接线端子12;设置接地端子4与所述箱体1的外壳、接地刀闸3连接。 The power transformer test switching operation platform described in the utility model includes a box body 1, and the upper insulating plate 8 of the box body 1 is provided with a test side high winding connection terminal 5 and a test side middle winding connection terminal for connecting the test instrument. 6 and the test side low winding connection terminal 7, the test side high winding connection terminal 5, the test side middle winding connection terminal 6 and the test side low winding connection terminal 7 are each connected to a short circuit switch 2, the short circuit switch 2 and The grounding knife switch 3 is connected; the side insulation plate 9 of the box body 1 is provided with a corresponding connection with the high winding terminal 5 on the test side, the middle winding terminal 6 on the test side and the low winding terminal 7 on the test side for connecting the transformer. The transformer side high winding terminal 10, the transformer side middle winding terminal 11 and the transformer side low winding terminal 12; the grounding terminal 4 is provided to connect with the casing of the box 1 and the grounding knife switch 3.
实施例:本实用新型所述电力变压器试验转接操作平台,其核心结构是箱体的绝缘板、短路刀闸和接地刀闸,所述绝缘板采用目前市场上绝缘强度较高的环氧树脂板,平行层向击穿电压达到35kV以上,垂直层向电气强度达到每米16.1兆伏以上,保证了所测绝缘真实反映变压器绝缘,也足以承受介损测试所加10kV电压;所述短路刀闸2采用63A传统三相刀闸加工而成,其承载短路电流具备足够的裕度;所述接地刀闸3采用特殊的单刀单投加工而成,保证了短路接地的可靠。 Embodiment: The power transformer test switching operation platform described in the utility model has an insulating plate, a short-circuit knife switch and a grounding knife switch as the core structure of the box body. The insulating plate adopts epoxy resin with relatively high dielectric strength currently on the market board, the breakdown voltage in the parallel layer direction reaches more than 35kV, and the vertical layer direction electric strength reaches more than 16.1 megavolts per meter, which ensures that the measured insulation truly reflects the transformer insulation, and is also sufficient to withstand the 10kV voltage applied in the dielectric loss test; the short circuit knife Gate 2 is made of 63A traditional three-phase switch, which has sufficient margin for carrying short-circuit current; the grounding switch 3 is made of special single-pole single-throw, which ensures the reliability of short-circuit grounding.
本实用新型与变压器测试仪器配合使用,将测试仪器,如直流电阻测试仪、绝缘电阻测试仪、介损测试仪等接到测试侧高绕组接线端子5、测试侧中绕组接线端子6和测试侧低绕组接线端子7上,对应地,变压器三侧绕组分别与变压器侧高绕组接线端子10、变压器侧中绕组接线端子11和变压器侧低绕组接线端子12相连接,接地端子4与箱体外壳、三把接地刀闸刀口连接,每当合上其中一把接地刀闸即实现接地操作。当进行变压器高压侧对中压侧、低压侧及地绝缘测试时,将高压侧的短路刀闸2合上、高压侧的接地刀闸3断开,中压侧的短路刀闸2合上、中压侧的接地刀闸3合上,低压侧的短路刀闸2合上、低压侧的接地刀闸3合上,接地端子4接地,将绝缘测试表测试线夹在高压侧的短路刀闸2上便可进行绝缘测试。除此之外,本实用新型还可用于进行绝缘测试和介损测试,给试验人员带来极大的方便。 The utility model is used in conjunction with the transformer test instrument, and the test instrument, such as a DC resistance tester, an insulation resistance tester, a dielectric loss tester, etc., is connected to the high winding terminal 5 on the test side, the middle winding terminal 6 on the test side and the test side On the low winding terminal 7, correspondingly, the windings on the three sides of the transformer are respectively connected to the high winding terminal 10 on the transformer side, the middle winding terminal 11 on the transformer side and the low winding terminal 12 on the transformer side, and the grounding terminal 4 is connected to the box shell, The three grounding knife switches are connected, and the grounding operation is realized whenever one of the grounding knife switches is closed. When conducting the insulation test between the high voltage side of the transformer and the medium voltage side, low voltage side and ground, close the short-circuit switch 2 on the high-voltage side, disconnect the grounding switch 3 on the high-voltage side, and close the short-circuit switch 2 on the medium-voltage side. Close the grounding switch 3 on the medium-voltage side, close the short-circuiting switch 2 on the low-voltage side, close the grounding switch 3 on the low-voltage side, and ground the grounding terminal 4, and clamp the test line of the insulation test meter to the short-circuiting switch on the high-voltage side 2 for insulation testing. In addition, the utility model can also be used for insulation test and dielectric loss test, which brings great convenience to test personnel.
采用本实用新型所述电力变压器试验转接操作平台,试验人员在地面上即可完成相应试验接线方式改变,省去试验人员爬上变压器套管来回更换测试线或者短接绕组的过程,提高了工作效率,节约时间,减少工作量,降低反复登高存在的安全风险,对开展电力变压器试验有很高的运用价值。 By adopting the power transformer test switching operation platform described in the utility model, the test personnel can complete the change of the corresponding test wiring mode on the ground, which saves the process of the test personnel climbing up the transformer bushing to change the test line or short-circuit the winding back and forth, which improves the efficiency of the test. It improves work efficiency, saves time, reduces workload, and reduces the safety risks of repeated climbing. It has high application value for carrying out power transformer tests.
Claims (1)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620243137.4U CN205450042U (en) | 2016-03-28 | 2016-03-28 | Experimental switching operation platform of power transformer |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620243137.4U CN205450042U (en) | 2016-03-28 | 2016-03-28 | Experimental switching operation platform of power transformer |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205450042U true CN205450042U (en) | 2016-08-10 |
Family
ID=56607702
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201620243137.4U Expired - Fee Related CN205450042U (en) | 2016-03-28 | 2016-03-28 | Experimental switching operation platform of power transformer |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205450042U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107942101A (en) * | 2017-11-02 | 2018-04-20 | 国网浙江省电力公司嘉兴供电公司 | A kind of portable transformer test harness device |
| CN110854698A (en) * | 2019-12-09 | 2020-02-28 | 双杰电气合肥有限公司 | Switch cabinet with insulation test function |
| CN115173304A (en) * | 2022-07-13 | 2022-10-11 | 西安江夏电力设备制造有限公司 | Automatic hot-line work operating platform and method for replacing high-voltage equipment in bypass hot-line mode |
-
2016
- 2016-03-28 CN CN201620243137.4U patent/CN205450042U/en not_active Expired - Fee Related
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107942101A (en) * | 2017-11-02 | 2018-04-20 | 国网浙江省电力公司嘉兴供电公司 | A kind of portable transformer test harness device |
| CN110854698A (en) * | 2019-12-09 | 2020-02-28 | 双杰电气合肥有限公司 | Switch cabinet with insulation test function |
| CN115173304A (en) * | 2022-07-13 | 2022-10-11 | 西安江夏电力设备制造有限公司 | Automatic hot-line work operating platform and method for replacing high-voltage equipment in bypass hot-line mode |
| CN115173304B (en) * | 2022-07-13 | 2024-02-09 | 西安江夏电力设备制造有限公司 | Automatic live working operation platform and bypass live replacement method for high-voltage equipment |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103698621B (en) | A kind of transformer vehicular integrated test system | |
| CN102156242B (en) | Method for testing transformer insulation combination | |
| CN201402539Y (en) | Power Cable Fault Test Simulator | |
| CN106226564B (en) | Routine test transfer box for high-voltage capacitive voltage transformer without removing the lead wire | |
| CN104062526A (en) | Oil-oil bushing cable outlet transformer test method without head removing | |
| CN106324444A (en) | Transformer test platform | |
| CN205450042U (en) | Experimental switching operation platform of power transformer | |
| CN103675535A (en) | High-tension transmission line power frequency parameter testing and testing connection switching integrated device | |
| CN203849288U (en) | Wiring conversion device for electrical routine tests of transformer | |
| CN202094322U (en) | Multipurpose lead wiring device of large-scale transformer test | |
| CN207318540U (en) | A kind of transformer test p-wire contact switching device | |
| CN106556745B (en) | A DC voltage divider and its capacitance and dielectric loss detection method | |
| CN104237639A (en) | Online monitoring method of insulation state of medium-voltage power cable based on impact impedance characteristic parameter | |
| CN111123050A (en) | Transformer partial discharge test of transformer and GIS in GIL connection mode | |
| CN207380180U (en) | A high-voltage cable insulation aging test circuit | |
| CN205157597U (en) | Power transformer's experimental pencil | |
| CN106680609A (en) | Automatic line changing device for power transformer routine tests | |
| CN104360175A (en) | Measurement method for head-dismounting-free turns ratio test of oil-oil sleeve pipe transformer | |
| CN105823969B (en) | A kind of partial discharge of transformer defects simulation device | |
| CN210690637U (en) | A special short-circuit device for electrical testing of high-voltage transformers | |
| CN111707887A (en) | An Optimal Scheme for Routine Test of Power Transformer | |
| CN103245834B (en) | Deformation of transformer winding low-voltage impedance on-the-spot test method | |
| CN202041553U (en) | Combined wiring device for transformer test | |
| CN113759293B (en) | Simulated power transformer for training and modeling method thereof | |
| CN204495857U (en) | The portable test connection platform of high-potting |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160810 |