CN206770801U - A kind of multi-functional suspension and support based on pipe gallery arrangement - Google Patents

A kind of multi-functional suspension and support based on pipe gallery arrangement Download PDF

Info

Publication number
CN206770801U
CN206770801U CN201720521155.9U CN201720521155U CN206770801U CN 206770801 U CN206770801 U CN 206770801U CN 201720521155 U CN201720521155 U CN 201720521155U CN 206770801 U CN206770801 U CN 206770801U
Authority
CN
China
Prior art keywords
suspension
hanger body
pipe gallery
connecting plate
extension type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720521155.9U
Other languages
Chinese (zh)
Inventor
黄益平
秦凤祥
徐艳红
朱东亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Industrial and Energy Engineering Group Co Ltd
Original Assignee
China Construction Industrial Equipment Installation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Industrial Equipment Installation Co Ltd filed Critical China Construction Industrial Equipment Installation Co Ltd
Priority to CN201720521155.9U priority Critical patent/CN206770801U/en
Application granted granted Critical
Publication of CN206770801U publication Critical patent/CN206770801U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a kind of multi-functional suspension and support based on pipe gallery arrangement, including hanger body, has at the top of the hanger body a pair and hangs foot lever, the top for hanging foot lever, which is set, hangs pin;If being divided into dried layer suspension bracket area by crossbeam inside the hanger body, some groups of anti-rock supports are provided with top suspension bracket area;Some extension types suspention clip is provided with other suspension bracket areas.Component by BIM system designs model and simulates installation in the utility model, RFID codings are carried out to each component, improve the standardization level of component, only needed in installation process according to simulation system and the rapid installation of RFID coding positioning, greatly reduce the problem of in-site installation precision is low, the miscellaneous work in processes such as narrow working space blanking, cutting, simmering and bending, welding, drillings is decreased simultaneously, reduce waste of material, avoid environmental pollution, installation cost is reduced, improves installation effectiveness, aesthetics and installation reliability.

Description

A kind of multi-functional suspension and support based on pipe gallery arrangement
Technical field
The utility model belongs to infrastructure machine pipe installation technology field, and in particular to a kind of city for underground construction The multi-functional suspension and support of city's pipe gallery.
Background technology
City integrated piping lane is arrived by the two or more pipeline concentrated setting such as feedwater, draining, electric power, communication, combustion gas The same underground space below road and formed a kind of modernization, scientific, intensive urban infrastructure, it is solved During urban development the problem of " slide fastener road " caused by the maintenances of all kinds of pipelines, dilatation and aerial " cobweb ", to lifting city City's pan-image, create city harmony ecological environment and serve the effect actively promoted.
The pipe gallery underground space is narrow and small, and each professional crossed construction in the same scope of operation, working space is limited, therefore coordinates The sequence of construction for distributing each professional contingent is extremely important.Polytype pipeline concentrates on small space in piping lane, inside pipeline Medium, temperature, pressure are different, and the multiple contradiction weave in such as spoil disposal, exhaust, flexible, pipeline arrangement is complicated, interspersed frequent, Collision occurs unavoidably in pipeline mark height, how to improve level of Construction Project Management, improves production efficiency, reduces the duration, reduces people Expenses of labour turn into one it is in the urgent need to address the problem of.In city integrated piping lane, HVAC, plumbing, power in building, Technique, pipeline, equipment, the electric wire etc. such as electrically all must support be fixedly mounted, general support installation procedure is all relatively answered It is miscellaneous, need to drill, weld, it is impossible to arbitrarily regulation, it is dangerous also higher in welding, for this case, it is necessary to there is a kind of succinct side Just support installation system, and can reuse.
Suspension and support accounts for more than 95% using welding suspension and support during China's construction and installation.Welding support is according to existing Field actual conditions and position, it is determined that rational cantilever type, with reference to construction reference atlas, using materials such as channel-section steel, angle steel, round steel The processes such as blanking, cutting, simmering and bending, welding, drilling, derusting anti-corrosive are carried out at the construction field (site).Because welding suspension and support can combine work Cheng Shiji, scene is processed making, so being widely used.But welding suspension and support is the continuity of traditional handicraft, from The manufacturing process of suspension and support is welded, will find that it has the following disadvantages:1)Waste of material;2)Potential safety hazard, weld suspension and support Manufacturing process is easily ignited the combustibles of job site, hidden danger be present;3)Environmental pollution;4)Installation cost is higher;5)Aesthetic property compared with Difference.
The content of the invention
Goal of the invention:The utility model purpose is in view of the shortcomings of the prior art, there is provided a kind of stock utilization height, Easy for installation, safety and the multi-functional suspension and support for being applied to various pipes and being arranged based on pipe gallery for realizing green energy conservation.
Technical scheme:A kind of multi-functional suspension and support based on pipe gallery arrangement described in the utility model, including suspension bracket Main body, the hanger body top, which has a pair, hangs foot lever, and the top for hanging foot lever, which is set, hangs pin;Inside the hanger body If being divided into dried layer suspension bracket area by crossbeam, some groups of anti-rock supports are provided with top suspension bracket area;Set in other suspension bracket areas There are some extension type suspention clips.
Further, the pin that hangs includes being fixed on the substrate hung at the top of foot lever and the lock-bit being hinged with described substrate one end Frame, corresponding position is provided with the pin-and-hole of matching on the other end of the lock-bit frame and on substrate, installation lock-bit in the pin-and-hole Part.
Further, the anti-rock support includes the extension type vertical rod being fixed in hanger body on top crossbeam With the inversion A type anti-shake frame at the top of vertical rod, the A types anti-shake frame is interior to be provided with buffering spacer.
Further, the extension type bottom of upright rod is fixed on top in the hanger body by the first connecting plate On crossbeam, the extension type bottom of upright rod has the first screens disk, has on first connecting plate and is worn for the vertical rod The first spacing hole crossed, the internal diameter of first spacing hole are less than the internal diameter of the first screens disk, and the extension type is stood The top of bar is fixedly connected after being passed by first spacing hole with A type anti-shake framves;The bottom of extension type vertical rod is spacing The inner side of one connecting plate, and be fixed on the first connecting plate in the hanger body on top crossbeam.
Further, the extension type suspention clip includes what a pair of extension type suspending rods connected with suspending rod bottom Clip, a pair of described extension type suspending rods are fixed on the downside of crossbeam inside hanger body by the second connecting plate, described There is the second screens disk, have that the confession suspending rod passes through on second connecting plate a pair second spacing at the top of suspending rod Hole, the internal diameter of second spacing hole are less than the internal diameter of the second screens disk, the bottom of the extension type suspending rod by Second spacing hole is fixedly connected after passing with clip;The upper limit of extension type suspension rod in the inner side of the second connecting plate, And it is fixed on the second connecting plate on the crossbeam in the hanger body.
Further, the clip includes bottom plate and garter spring, and the bottom plate is fixed on the bottom of suspending rod, the garter spring two End has engaging lug, and the garter spring is fixedly connected by engaging lug with the bottom plate.
Further, there is buffering spacer in the garter spring.
Further, for ease of construction and installation, the hanger body, hang foot lever, hang pin, crossbeam, anti-rock support and Unique RFID codings are respectively provided with extension type suspention clip.
Before construction, first job site is measured, and uses BIM system modellings, the suspension bracket that various pipes are needed Board design is carried out, and simulates arrangement, after the completion of arrangement, design suspension and support pattern is quickly exported by database, by intensity Calculate and confirm suspension and support section bar type selecting, design and produce assembled combination suspension and support, each part that simulation is arranged is carried out unique RFID is encoded, and the standardized production of part is carried out by the coding, and also there is the part for producing to obtain corresponding unique RFID to compile Code, it is easy to the construction and installation at scene.
Beneficial effect:1)Component by BIM system designs model and simulates installation in the utility model, to each component RFID codings are carried out, improve the standardization level of component, it is fixed according to simulation system and RFID codings only to be needed in installation process The rapid installation in position, greatly reduces the problem of in-site installation precision is low, at the same decrease narrow working space blanking, cutting, The miscellaneous work of the processes such as simmering and bending, welding, drilling, reduces waste of material, avoids environmental pollution;Reduce installation cost, Improve installation effectiveness, aesthetics and installation reliability;2)The present apparatus on suspension bracket by setting multiple anti-shake supports and hanging Hoop, improves the utilization rate of the underground space, is easy to the maintenance of underground pipe gallery while improving stock utilization;3)This dress The connection reliability of each part is high in putting, and by setting the vertical rod of extension type and the suspension rod of extension type, expands this practicality New structure uses space, suitable for the suspension bracket of the pipeline of various height.
Brief description of the drawings
Fig. 1 is the overall structure diagram of the present apparatus;
Wherein:1st, hanger body, 2, hang foot lever, 3, hang pin, 4, crossbeam, 5, anti-rock support, 51, extension type vertical rod, 52nd, inversion A type anti-shake frame, 6, extension type suspention clip, 61, extension type suspending rod, 62, clip, 621, bottom plate, 622, hoop Ring, 623, engaging lug.
Embodiment
Technical solutions of the utility model are described in detail below by accompanying drawing, but the scope of protection of the utility model It is not limited to the embodiment.
Embodiment:A kind of multi-functional suspension and support based on pipe gallery arrangement, including hanger body 1, the hanger body Top, which has a pair, hangs foot lever 2, and the top for hanging foot lever, which is set, hangs pin 3;Hanging pin includes being fixed on the substrate hung at the top of foot lever With the lock-bit frame being hinged with described substrate one end, corresponding position is provided with matching on the other end of the lock-bit frame and on substrate Pin-and-hole, installation lock-bit part in the pin-and-hole.
Three floor suspension bracket areas are divided into by two crossbeams 4 inside hanger body 1, three groups of anti-shakes are provided with top suspension bracket area Dynamic support 5;Four groups of extension type suspention clips 6 are respectively equipped with lower two layers of suspension bracket area.
Anti-rock support 5 includes the extension type vertical rod 51 being fixed in hanger body on top crossbeam and vertical rod top Inversion A type anti-shake frame 52, top in the hanger body is fixed in the bottom of extension type vertical rod 51 by the first connecting plate On crossbeam, the bottom of extension type vertical rod 51 has the first screens disk, has the passed through for the vertical rod on the first connecting plate One spacing hole, the internal diameter of the first spacing hole are less than the internal diameter of the first screens disk, and the top of extension type vertical rod 51 is by described the One spacing hole is fixedly connected after passing with A type anti-shake framves;The bottom of extension type vertical rod is spacing in the inner side of the first connecting plate, and It is fixed on the first connecting plate in the hanger body on top crossbeam;Buffering spacer is provided with A type anti-shakes frame 52.
The clip 62 that extension type suspention clip 6 connects including a pair of extension type suspending rods 61 with suspending rod bottom, one The downside of crossbeam inside hanger body is fixed on by the second connecting plate to extension type suspending rod, has second at the top of suspending rod Screens disk, has a pair of second spacing holes passed through for suspending rod on the second connecting plate, and the internal diameter of the second spacing hole is less than the The internal diameter of two screens disks, the bottom of extension type suspending rod is passed by the second spacing hole to be fixedly connected with clip afterwards;It is scalable The upper limit of formula suspension rod is fixed on the crossbeam in hanger body in the inner side of the second connecting plate, and with the second connecting plate;Card Hoop 62 includes bottom plate 621 and garter spring 622, and bottom plate 621 is fixed on the bottom of suspending rod 61, and garter spring both ends have engaging lug 623, hoop Ring is fixedly connected by engaging lug with the bottom plate;There is buffering spacer in garter spring.
Before construction, first job site is measured, and uses BIM system modellings, the suspension bracket that various pipes are needed Board design is carried out, and simulates arrangement, after the completion of arrangement, design suspension and support pattern is quickly exported by database, by intensity Calculate and confirm suspension and support section bar type selecting, design and produce assembled combination suspension and support, each part that simulation is arranged is carried out unique RFID encode, and by the coding carry out part standardized production, the part for producing to obtain such as hanger body, hang foot lever, hang pin, Unique RFID codings, when installing at the construction field (site), root are respectively provided with crossbeam, anti-rock support and extension type suspention clip According to RFID codings it is quick, easily assemble pipe gallery, greatly reduce construction error, improve operating efficiency, particularly pair Constructed in the complicated pipeline positioning of staggered floor and narrow and small pipe cage, flat-top, reduce difficulty of construction, reduce the labor intensity of worker.
As described above, although the utility model has been represented and described with reference to specific preferred embodiment, but it must not It is construed to the limitation to the utility model itself.In the spirit and scope of the present utility model for not departing from appended claims and defining Under the premise of, can various changes can be made in the form and details to it.

Claims (8)

  1. A kind of 1. multi-functional suspension and support based on pipe gallery arrangement, it is characterised in that:Including hanger body, the hanger body Top, which has a pair, hangs foot lever, and the top for hanging foot lever, which is set, hangs pin;It is divided into inside the hanger body by crossbeam some Floor suspension bracket area, some groups of anti-rock supports are provided with top suspension bracket area;Hanged in other suspension bracket areas provided with some extension types Elevator hoop.
  2. 2. the multi-functional suspension and support according to claim 1 based on pipe gallery arrangement, it is characterised in that:It is described to hang pin bag Include the lock-bit frame for being fixed on and hanging substrate at the top of foot lever and being hinged with described substrate one end, on the other end of the lock-bit frame and Corresponding position is provided with the pin-and-hole of matching on substrate, and lock-bit part is installed in the pin-and-hole.
  3. 3. the multi-functional suspension and support according to claim 1 based on pipe gallery arrangement, it is characterised in that:The anti-rock Support includes the inversion A type anti-shake frame being fixed in hanger body at the top of extension type vertical rod and vertical rod on top crossbeam, Buffering spacer is provided with the A types anti-shake frame.
  4. 4. the multi-functional suspension and support according to claim 3 based on pipe gallery arrangement, it is characterised in that:It is described scalable Formula bottom of upright rod is fixed in the hanger body on top crossbeam by the first connecting plate, the extension type bottom of upright rod There is the first spacing hole passed through for the vertical rod with the first screens disk, on first connecting plate, described first is spacing The internal diameter in hole is less than the internal diameter of the first screens disk, and the top of the extension type vertical rod is passed by first spacing hole It is fixedly connected afterwards with A type anti-shake framves;The bottom of extension type vertical rod is spacing in the inner side of the first connecting plate, and with the first connecting plate It is fixed in the hanger body on top crossbeam.
  5. 5. the multi-functional suspension and support according to claim 1 based on pipe gallery arrangement, it is characterised in that:It is described scalable Formula suspention clip includes the clip that a pair of extension type suspending rods connect with suspending rod bottom, a pair of described extension types suspention Bar is fixed on the downside of crossbeam inside hanger body by the second connecting plate, has the second screens disk at the top of the suspending rod, There are a pair of second spacing holes passed through for the suspending rod, the internal diameter of second spacing hole is less than on second connecting plate The internal diameter of the second screens disk, the bottom of the extension type suspending rod is passed by second spacing hole to be consolidated with clip afterwards Fixed connection;The upper limit of extension type suspension rod is fixed on the suspension bracket in the inner side of the second connecting plate, and with the second connecting plate On crossbeam in main body.
  6. 6. the multi-functional suspension and support according to claim 5 based on pipe gallery arrangement, it is characterised in that:The clip bag Bottom plate and garter spring are included, the bottom plate is fixed on the bottom of suspending rod, and the garter spring both ends have engaging lug, and the garter spring passes through company Lug is fixedly connected with the bottom plate.
  7. 7. the multi-functional suspension and support according to claim 6 based on pipe gallery arrangement, it is characterised in that:In the garter spring With buffering spacer.
  8. 8. the multi-functional suspension and support according to claim 1 based on pipe gallery arrangement, it is characterised in that:The suspension bracket master Body, foot lever is hung, hangs and is respectively provided with unique RFID coding on pin, crossbeam, anti-rock support and extension type suspention clip.
CN201720521155.9U 2017-05-11 2017-05-11 A kind of multi-functional suspension and support based on pipe gallery arrangement Active CN206770801U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720521155.9U CN206770801U (en) 2017-05-11 2017-05-11 A kind of multi-functional suspension and support based on pipe gallery arrangement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720521155.9U CN206770801U (en) 2017-05-11 2017-05-11 A kind of multi-functional suspension and support based on pipe gallery arrangement

Publications (1)

Publication Number Publication Date
CN206770801U true CN206770801U (en) 2017-12-19

Family

ID=60650597

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720521155.9U Active CN206770801U (en) 2017-05-11 2017-05-11 A kind of multi-functional suspension and support based on pipe gallery arrangement

Country Status (1)

Country Link
CN (1) CN206770801U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109537629A (en) * 2019-01-07 2019-03-29 无锡市嘉邦电力管道厂 Composite cable pipe gallery and its component units
CN111749274A (en) * 2020-07-15 2020-10-09 石研研 Assembled underground pipe gallery system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109537629A (en) * 2019-01-07 2019-03-29 无锡市嘉邦电力管道厂 Composite cable pipe gallery and its component units
CN111749274A (en) * 2020-07-15 2020-10-09 石研研 Assembled underground pipe gallery system

Similar Documents

Publication Publication Date Title
CN105677978A (en) Horizontal multi-pipe support and prefabricating construction method thereof based on BIM
CN206770801U (en) A kind of multi-functional suspension and support based on pipe gallery arrangement
CN205639870U (en) A pipeline gallows is synthesized in heavy construction
CN103206075B (en) Suspension platform for construction of steel reinforced concrete cantilever structure
CN201176703Y (en) Tripod for construction of hyperbola cooling tower cylinder
CN104878867A (en) Ceiling joist and double-layer construction platform integrated structure and manufacturing method thereof
CN207143708U (en) A kind of across foundation ditch synthesis steel trestle of lift-on/lift-off type
CN103556820A (en) Suspension mold for enlarging and reinforcing concrete beam and construction method of suspension mold
CN205498908U (en) Overhaul and use combination platform structure
CN100570757C (en) The modular construction method that is used for nuclear island of nuclear power station
CN205414827U (en) Quick assembly tooling system for pipelines
CN101736925B (en) Modular construction method for nuclear island of nuclear power station
CN101752017B (en) Modularization construction method for nuclear power station nuclear island
CN204370314U (en) A kind of lower hanging steel bridge erects suspension rod
CN204919607U (en) City is prefab for underpass
CN203111475U (en) Anchor platform structure manufactured through integral manufacturing process of drilling-ship anchor platform
CN101748915B (en) Modularization construction method for nuclear power station nuclear island
CN206052777U (en) Overlapping assembled underground pipe gallery wallboard positioner
CN209681505U (en) It is a kind of that conduit saddle installation effectiveness fixture easy to make can be improved
CN201344038Y (en) Mining survival active supporting net
CN208123629U (en) Outdoor overhead lifting pipeline equipment
CN204311724U (en) A kind of hanging basket suspension device away from structure limit
CN2775138Y (en) Steel-aluminum alloy base
CN102635732A (en) Process for mounting relatively long pipeline
CN203514751U (en) Convenient-to-move scaffold for building interior wall construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 210023 No. 6 Wenlan Road, Xianlin University City, Nanjing, Jiangsu Province

Patentee after: China Construction Installation Group Co., Ltd.

Address before: 210023 No. 6 Wenlan Road, Xianlin University City, Nanjing, Jiangsu Province

Patentee before: China Construction Industrial Equipment Installation Co., Ltd.