CN204919607U - City is prefab for underpass - Google Patents

City is prefab for underpass Download PDF

Info

Publication number
CN204919607U
CN204919607U CN201520685072.4U CN201520685072U CN204919607U CN 204919607 U CN204919607 U CN 204919607U CN 201520685072 U CN201520685072 U CN 201520685072U CN 204919607 U CN204919607 U CN 204919607U
Authority
CN
China
Prior art keywords
curb plate
roof
support structure
side plate
top board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520685072.4U
Other languages
Chinese (zh)
Inventor
张伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xingtai Yizheng Special Optical Cable Manufacturing Co Ltd
Original Assignee
Xingtai Yizheng Special Optical Cable Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xingtai Yizheng Special Optical Cable Manufacturing Co Ltd filed Critical Xingtai Yizheng Special Optical Cable Manufacturing Co Ltd
Priority to CN201520685072.4U priority Critical patent/CN204919607U/en
Application granted granted Critical
Publication of CN204919607U publication Critical patent/CN204919607U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model relates to a city is prefab for underpass, it includes roof, two curb plates, is located two the location support structure between the curb plate and the water catch bowl of bottom, the roof is the arc of epirelief, set up the hand -hole on the roof, two the curb plate be connected and move towards parallel with the underground piping with roof opposite ends respectively, set up the opening that the confession pipeline passes through on the curb plate, the up end of curb plate sets up sealed cushion, the location support structure sets up between two curb plates, the location support structure is support and/or couple, couple fixed connection is on the curb plate, be connected with tang and location plug -in components mode between curb plate and the roof. The utility model discloses can realize the various pipe network unified plannings in city underground, reasonable layout has saved underground resources, is convenient for concentrate the construction, and the totality investment reduces, and comprehensive cost reduces, has avoided the road surface excavation of many times being under construction, very big has made things convenient for management and maintenance.

Description

A kind of Urban Underground Passage prefabricated component
Technical field
The utility model relates to a kind of Urban Underground Passage prefabricated component.
Background technology
Along with social progress, urbanization progress is maked rapid progress, and the universal and application of new technology, the various network of underground that city is laid get more and more, and become increasingly complex, available space is fewer and feweri.The system such as cable, optical cable, wired, phone, natural gas, heating installation, water supply, draining is relatively independent, well lid spreads all over the place, bring inconvenience to pedestrian, vehicle, both construction had been unfavorable for, also maintenance management is unfavorable for, each management maintenance all needs to destroy road surface, and construction cost is high, and manpower and materials consumption is serious.
Utility model content
For the defect that prior art exists, problem to be solved in the utility model is, provides a kind of Urban Underground Passage of being convenient to concentrate construction, rational deployment, facilitate the Urban Underground Passage prefabricated component of pipe-line maintenance.
The technical scheme that the utility model solves the employing of its technical problem is:
A kind of Urban Underground Passage prefabricated component, it comprises the catch basin of top board, two side plates, positioning support structure between two described side plates and bottom; Described top board is the arc of epirelief, and described top board arranges hand-hole; Side plate described in two connects with top board opposite end respectively and moves towards parallel with underground passage, and side plate is arranged the opening passed through for pipeline, the upper surface of described side plate arranges seal gasket; Described positioning support structure is arranged between two side plates, and described positioning support structure is support and/or hook, and described hook is fixedly connected on side plate; Described side plate with between top board with seam with locate plug-in unit mode and be connected.
Further improvement, described top board and/or side plate arrange reinforced bar support.
The beneficial effects of the utility model are: prefabricated component adopts combined type, top board and side plate adopt seam to be connected with location plug-in unit, ensure that installing accurate positioning avoids position to offset, can require to combinationally use according to different size, can produce by industrialized manufacture, be beneficial to guarantee product quality, be convenient to Product transport, reduce use cost; Prefabricated component bonding surface adopts seal gasket sealing, solves leakage problems; Prefabricated component inside adopts high strength cast iron, ensure that the intensity of prefabricated component, improves the safety that underground uses; Positioning support structure positions pipeline and circuit and supports, and realizes three-dimensional tubing cable, makes full use of space and is beneficial to cable pipeline installation; Top cover cambered design, compressive resistance is high, long service life; Opening is arranged on side plate, for passing through with the pipeline of side plate plate face vertical direction; Bottom is provided with catchment recess, is convenient to remove ponding and dirt; Personnel can walk in chamber of the present utility model, be thus also applicable to civil air defense constructions and installations, can be used for war preparedness air defence work facility.
The utility model can realize the various pipe network unified planning of Urban Underground, and rational deployment, saves subterranean resource, is convenient to concentrate construction, and overall investment reduces, and integrated cost reduces, and avoids road surface repeatedly construction and excavation, greatly facilitates and administer and maintain.
Accompanying drawing explanation
Fig. 1 is plan structure schematic diagram of the present utility model;
Fig. 2 is side structure schematic diagram of the present utility model;
In accompanying drawing, 1 top board, 2 side plates, 3 catch basins, 4 hand-holes, 5 openings, 6 seal gaskets, 7 supports, 8 hooks, 9 reinforced bar support, 10 underground pipelines.
Detailed description of the invention
For enabling above-mentioned purpose of the present utility model, feature and advantage become apparent more, below in conjunction with the drawings and specific embodiments in the utility model embodiment, technical scheme in the utility model embodiment is clearly and completely described, obviously, described embodiment is only the utility model part embodiment, instead of whole embodiments.Based on the embodiment in the utility model, those of ordinary skill in the art are not making the every other embodiment obtained under creative work prerequisite, all belong to the scope of the utility model protection.
The present embodiment comprises the catch basin 3 of top board 1, two side plates 2, positioning support structure between two side plates 2 and bottom; Described top board 1 is the arc of epirelief, and described top board 1 arranges hand-hole 4; Side plate 2 described in two connects with top board 1 opposite end respectively and moves towards parallel with underground pipeline 10, side plate 2 is arranged opening 5, passes through for the pipeline vertical with direction, side plate 2 plate face; The upper surface of described side plate 1 arranges seal gasket 6; Described positioning support structure is arranged at the side of side plate, and described positioning support structure is support 7 and hook 8 two kinds of forms, and described hook 8 is fixedly connected on side plate 2, and the trend of described support 7 is vertical with line alignment for support underground pipeline and circuit with pipeline; Described side plate 2 with between top board 1 with seam with locate plug-in unit and be connected.
Described top board arranges reinforced bar support 9.

Claims (2)

1. a Urban Underground Passage prefabricated component, is characterized in that, it comprises top board (1), two side plates (2), is positioned at the catch basin (3) of positioning support structure between two described side plates (2) and bottom; The arc that described top board (1) is epirelief, described top board (1) is arranged hand-hole (4); Side plate (2) described in two connects with top board (1) opposite end respectively and moves towards parallel with underground pipeline (10), and side plate (2) is arranged the opening (5) passed through for pipeline, the upper surface of described side plate (2) arranges seal gasket (6); Described positioning support structure is arranged between two side plates (2), and described positioning support structure is support (7) and/or hook (8), and described hook (8) is fixedly connected on side plate (2); With seam with locate plug-in unit mode and be connected between described side plate (2) with top board (1).
2. Urban Underground Passage prefabricated component according to claim 1, described top board (1) and/or side plate (2) arrange reinforced bar support (9).
CN201520685072.4U 2015-09-07 2015-09-07 City is prefab for underpass Expired - Fee Related CN204919607U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520685072.4U CN204919607U (en) 2015-09-07 2015-09-07 City is prefab for underpass

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520685072.4U CN204919607U (en) 2015-09-07 2015-09-07 City is prefab for underpass

Publications (1)

Publication Number Publication Date
CN204919607U true CN204919607U (en) 2015-12-30

Family

ID=54968751

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520685072.4U Expired - Fee Related CN204919607U (en) 2015-09-07 2015-09-07 City is prefab for underpass

Country Status (1)

Country Link
CN (1) CN204919607U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105971090A (en) * 2016-06-28 2016-09-28 衡阳市金泓建筑装饰设计有限公司 Sidewalk based integrated pipe network and water storage and drainage system
CN106594604A (en) * 2016-12-06 2017-04-26 绍兴明煌建材科技有限公司 Road lamp system
CN113089725A (en) * 2021-04-28 2021-07-09 宝业湖北建工集团有限公司 Building structure assembly type construction method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105971090A (en) * 2016-06-28 2016-09-28 衡阳市金泓建筑装饰设计有限公司 Sidewalk based integrated pipe network and water storage and drainage system
CN105971090B (en) * 2016-06-28 2019-04-02 衡阳市金泓建筑装饰设计有限公司 Pavement comprehensive pipe network and drainage system
CN106594604A (en) * 2016-12-06 2017-04-26 绍兴明煌建材科技有限公司 Road lamp system
CN113089725A (en) * 2021-04-28 2021-07-09 宝业湖北建工集团有限公司 Building structure assembly type construction method

Similar Documents

Publication Publication Date Title
CN204898721U (en) Steel construction city utility tunnel
CN205530344U (en) Utility tunnel is pour to split type no mould
CN204919607U (en) City is prefab for underpass
CN205576972U (en) Three storehouse formula utility tunnel structures
CN202247950U (en) Quadrate culvert member
CN105971007A (en) Split type non-formwork pouring underground comprehensive pipe gallery
CN204023628U (en) A kind of water-stopping structure
CN105401593A (en) Assembly type square underground pipe gallery
CN107503382B (en) End template fixed rubber water stop belt structure and construction method thereof
CN209891244U (en) Prefabricated assembled concrete assembles utility tunnel from top to bottom
CN205839796U (en) Pipe gallery internode attachment structure
CN205617425U (en) Prefabricated structure of assembling of utility tunnel
CN104712105A (en) Tile plate preventing rainwater leakage
CN105971016A (en) Connection structure between joints of comprehensive pipe rack
CN108571012B (en) Piping lane construction joint integrated installation mold construction technology
CN103662467B (en) Assembled tank
CN204113295U (en) A kind of municipal shield tunnel
CN206396789U (en) A kind of comprehensive pipe gallery structure for being easy to sewage collecting to discharge
CN106049552A (en) Inter-section sealing structure for comprehensive pipe racks
CN207260191U (en) A kind of class rectangle pipe gallery section of jurisdiction connection structure
CN206956775U (en) A kind of cabin pipe gallery of plain type underground three
CN205804404U (en) A kind of novel prefabricated box culvert for pipe gallery
CN203383234U (en) Sealed half multipurpose inspection well
CN106013230B (en) A kind of Pipe rack
CN205171548U (en) Novel plastics piping lane

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151230

Termination date: 20160907