CN204919607U - City is prefab for underpass - Google Patents

City is prefab for underpass Download PDF

Info

Publication number
CN204919607U
CN204919607U CN201520685072.4U CN201520685072U CN204919607U CN 204919607 U CN204919607 U CN 204919607U CN 201520685072 U CN201520685072 U CN 201520685072U CN 204919607 U CN204919607 U CN 204919607U
Authority
CN
China
Prior art keywords
curb plate
support structure
roof
side plate
top board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520685072.4U
Other languages
Chinese (zh)
Inventor
张伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xingtai Yizheng Special Optical Cable Manufacturing Co Ltd
Original Assignee
Xingtai Yizheng Special Optical Cable Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xingtai Yizheng Special Optical Cable Manufacturing Co Ltd filed Critical Xingtai Yizheng Special Optical Cable Manufacturing Co Ltd
Priority to CN201520685072.4U priority Critical patent/CN204919607U/en
Application granted granted Critical
Publication of CN204919607U publication Critical patent/CN204919607U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model relates to a city is prefab for underpass, it includes roof, two curb plates, is located two the location support structure between the curb plate and the water catch bowl of bottom, the roof is the arc of epirelief, set up the hand -hole on the roof, two the curb plate be connected and move towards parallel with the underground piping with roof opposite ends respectively, set up the opening that the confession pipeline passes through on the curb plate, the up end of curb plate sets up sealed cushion, the location support structure sets up between two curb plates, the location support structure is support and/or couple, couple fixed connection is on the curb plate, be connected with tang and location plug -in components mode between curb plate and the roof. The utility model discloses can realize the various pipe network unified plannings in city underground, reasonable layout has saved underground resources, is convenient for concentrate the construction, and the totality investment reduces, and comprehensive cost reduces, has avoided the road surface excavation of many times being under construction, very big has made things convenient for management and maintenance.

Description

一种城市地下通道用预制件A prefabricated part for urban underground passage

技术领域 technical field

本实用新型涉及一种城市地下通道用预制件。 The utility model relates to a prefabricated part for urban underground passages.

背景技术 Background technique

随着社会进步,城市化进展日新月异,新技术的普及和应用,城市铺设的各种地下管网越来越多,越来越复杂,可利用的空间越来越少。电缆、光缆、有线、电话、天然气、暖气、供水、排水等系统相对独立,井盖星罗棋布,给行人、车辆造成不便,既不利于施工,也不利于维护管理,每次管理维护都需要破坏路面,施工成本高,人力物力消耗严重。 With the progress of society, the rapid progress of urbanization, the popularization and application of new technologies, there are more and more various underground pipe networks laid in cities, which are more and more complex, and the available space is less and less. Cables, optical cables, cable, telephone, natural gas, heating, water supply, drainage and other systems are relatively independent, and manhole covers are scattered all over the place, causing inconvenience to pedestrians and vehicles, which is not conducive to construction or maintenance. The construction cost is high, and the manpower and material resources are seriously consumed.

实用新型内容 Utility model content

针对现有技术存在的缺陷,本实用新型所要解决的问题是,提供一种便于城市地下通道集中施工、合理布局、方便管道维护的城市地下通道用预制件。 Aiming at the defects existing in the prior art, the problem to be solved by the utility model is to provide a prefabricated part for urban underground passages which is convenient for centralized construction of urban underground passages, rational layout, and convenient pipeline maintenance.

本实用新型解决其技术问题采用的技术方案是: The technical scheme that the utility model solves its technical problem adopts is:

一种城市地下通道用预制件,其包括顶板、两个侧板、位于两个所述侧板之间的定位支撑结构和底部的集水槽;所述顶板为上凸的弧形,所述顶板上设置入孔;两个所述的侧板分别与顶板相对两端连接且与地下通道走向平行,侧板上设置供管道通过的开口,所述侧板的上端面设置密封胶垫;所述定位支撑结构设置于两个侧板之间,所述定位支撑结构为支架和/或挂钩,所述挂钩固定连接于侧板上;所述侧板与顶板之间以止口和定位插件方式连接。 A prefabricated part for an urban underground passage, which includes a top plate, two side plates, a positioning support structure located between the two side plates, and a sump at the bottom; the top plate is an upwardly convex arc, and the top plate An inlet hole is arranged on the top; the two side plates are respectively connected to the opposite ends of the top plate and parallel to the direction of the underground passage, an opening for the pipeline to pass is set on the side plate, and a sealing rubber pad is set on the upper end surface of the side plate; The positioning support structure is arranged between the two side plates, the positioning support structure is a bracket and/or a hook, and the hook is fixedly connected to the side plate; the side plate and the top plate are connected by a notch and a positioning plug-in .

进一步的改进,所述顶板和/或侧板设置钢筋支撑。 As a further improvement, the top board and/or side boards are provided with steel bar support.

本实用新型的有益效果是:预制件采用组合式,顶板和侧板采用止口和定位插件连接,保证安装定位准确避免位置错移,可以根据不同规格要求组合使用,可以产业化制造生产,利于保证产品质量,便于产品运输,降低了使用成本;预制件结合面采用密封胶垫密封,解决渗漏问题;预制件内部采用高强度钢筋,保证了预制件的强度,提高了地下使用的安全性;定位支撑结构对管道和线路进行定位和支撑,实现立体铺设管道线缆,充分利用空间以利于线缆管道安装施工;顶盖弧形设计,耐压强度高,使用寿命长;开口设置在侧板上,供与侧板板面垂直方向的管道通过;底部设有集水凹槽,便于清除积水及污物;本实用新型的腔内可以人员行走,因而也适用于人防工程,可用于战备防空工程设施。 The beneficial effects of the utility model are: the prefabricated parts are combined, and the top plate and the side plate are connected by a stopper and a positioning plug-in, so as to ensure accurate installation and positioning and avoid misalignment of the position. Guarantee product quality, facilitate product transportation, and reduce the cost of use; the joint surface of the prefabricated part is sealed with a sealing rubber pad to solve the leakage problem; the interior of the prefabricated part is made of high-strength steel bars to ensure the strength of the prefabricated part and improve the safety of underground use ;The positioning support structure positions and supports the pipes and lines, realizes three-dimensional laying of pipes and cables, and makes full use of the space to facilitate the installation and construction of cable pipes; the arc-shaped design of the top cover has high compressive strength and long service life; On the plate, the pipeline perpendicular to the side plate surface passes through; the bottom is provided with a water collection groove, which is convenient for removing accumulated water and dirt; the cavity of the utility model can be walked by people, so it is also suitable for civil air defense projects and can be used for combat readiness Air defense engineering facilities.

本实用新型能够实现城市地下各种管网统一规划,合理布局,节省了地下资源,便于集中施工,总体投资减少,综合成本降低,避免了路面多次施工开挖,极大的方便了管理和维护。 The utility model can realize unified planning and reasonable layout of various underground pipe networks in cities, save underground resources, facilitate centralized construction, reduce overall investment, reduce comprehensive costs, avoid multiple construction excavations on the road surface, and greatly facilitate management and maintenance. maintain.

附图说明 Description of drawings

图1为本实用新型的俯视结构示意图; Fig. 1 is the top view structural representation of the utility model;

图2为本实用新型的侧面结构示意图; Fig. 2 is the side structure schematic diagram of the utility model;

附图中,1顶板,2侧板,3集水槽,4入孔,5开口,6密封胶垫,7支架,8挂钩,9钢筋支撑,10地下管道。 In the accompanying drawings, 1 top board, 2 side boards, 3 water collection tanks, 4 inlet holes, 5 openings, 6 sealing rubber pads, 7 brackets, 8 hooks, 9 steel bar supports, and 10 underground pipes.

具体实施方式 Detailed ways

为使本实用新型的上述目的、特征和优点能够更加明显易懂,下面将结合本实用新型实施例中的附图和具体实施方式,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。 In order to make the above purpose, features and advantages of the utility model more obvious and easy to understand, the technical solution in the utility model embodiment will be clearly and completely described below in conjunction with the drawings and specific implementation methods in the utility model embodiment Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.

本实施例包括顶板1、两个侧板2、位于两个侧板2之间的定位支撑结构和底部的集水槽3;所述顶板1为上凸的弧形,所述顶板1上设置入孔4;两个所述的侧板2分别与顶板1相对两端连接且与地下管道10走向平行,侧板2上设置开口5,供与侧板2板面方向垂直的管道通过;所述侧板1的上端面设置密封胶垫6;所述定位支撑结构设置于侧板的侧面,所述定位支撑结构为支架7和挂钩8两种形式,所述挂钩8固定连接于侧板2,所述支架7的走向与管道和线路走向垂直用于支撑地下管道和线路;所述侧板2与顶板1之间以止口和定位插件连接。 This embodiment includes a top board 1, two side boards 2, a positioning support structure between the two side boards 2 and a sump 3 at the bottom; Holes 4; the two side plates 2 are respectively connected to the opposite ends of the top plate 1 and are parallel to the underground pipeline 10, and the side plates 2 are provided with openings 5 for passage of pipelines perpendicular to the direction of the side plates 2; The upper end surface of the plate 1 is provided with a sealing rubber pad 6; the positioning support structure is arranged on the side of the side plate, and the positioning support structure is in the form of a bracket 7 and a hook 8, and the hook 8 is fixedly connected to the side plate 2, so The direction of the bracket 7 is perpendicular to the direction of the pipes and lines to support the underground pipes and lines; the side plate 2 and the top plate 1 are connected by a notch and a positioning plug-in.

所述顶板设置钢筋支撑9。 The top plate is provided with steel bar support 9.

Claims (2)

1. a Urban Underground Passage prefabricated component, is characterized in that, it comprises top board (1), two side plates (2), is positioned at the catch basin (3) of positioning support structure between two described side plates (2) and bottom; The arc that described top board (1) is epirelief, described top board (1) is arranged hand-hole (4); Side plate (2) described in two connects with top board (1) opposite end respectively and moves towards parallel with underground pipeline (10), and side plate (2) is arranged the opening (5) passed through for pipeline, the upper surface of described side plate (2) arranges seal gasket (6); Described positioning support structure is arranged between two side plates (2), and described positioning support structure is support (7) and/or hook (8), and described hook (8) is fixedly connected on side plate (2); With seam with locate plug-in unit mode and be connected between described side plate (2) with top board (1).
2. Urban Underground Passage prefabricated component according to claim 1, described top board (1) and/or side plate (2) arrange reinforced bar support (9).
CN201520685072.4U 2015-09-07 2015-09-07 City is prefab for underpass Expired - Fee Related CN204919607U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520685072.4U CN204919607U (en) 2015-09-07 2015-09-07 City is prefab for underpass

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520685072.4U CN204919607U (en) 2015-09-07 2015-09-07 City is prefab for underpass

Publications (1)

Publication Number Publication Date
CN204919607U true CN204919607U (en) 2015-12-30

Family

ID=54968751

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520685072.4U Expired - Fee Related CN204919607U (en) 2015-09-07 2015-09-07 City is prefab for underpass

Country Status (1)

Country Link
CN (1) CN204919607U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105971090A (en) * 2016-06-28 2016-09-28 衡阳市金泓建筑装饰设计有限公司 Sidewalk based integrated pipe network and water storage and drainage system
CN106594604A (en) * 2016-12-06 2017-04-26 绍兴明煌建材科技有限公司 Road lamp system
CN109355989A (en) * 2017-07-10 2019-02-19 梁云玉 Superficial anti-strong pressure double-lane one-way underground pedestrian crossing device
CN113089725A (en) * 2021-04-28 2021-07-09 宝业湖北建工集团有限公司 Building structure assembly type construction method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105971090A (en) * 2016-06-28 2016-09-28 衡阳市金泓建筑装饰设计有限公司 Sidewalk based integrated pipe network and water storage and drainage system
CN105971090B (en) * 2016-06-28 2019-04-02 衡阳市金泓建筑装饰设计有限公司 Pavement comprehensive pipe network and drainage system
CN106594604A (en) * 2016-12-06 2017-04-26 绍兴明煌建材科技有限公司 Road lamp system
CN109355989A (en) * 2017-07-10 2019-02-19 梁云玉 Superficial anti-strong pressure double-lane one-way underground pedestrian crossing device
CN113089725A (en) * 2021-04-28 2021-07-09 宝业湖北建工集团有限公司 Building structure assembly type construction method

Similar Documents

Publication Publication Date Title
CN204898721U (en) Steel construction city utility tunnel
CN205479706U (en) Push pipe work jing ding advances structure
CN102011369B (en) Construction method of steel shells of bridge closure segments striding over various roads
CN205576972U (en) Three storehouse formula utility tunnel structures
CN105064400A (en) Urban comprehensive pipe rack of steel corrugated plate structure
CN205530344U (en) Utility tunnel is pour to split type no mould
CN202247950U (en) Square culvert component
CN109944273A (en) A kind of city tunnel, track traffic regional tunnel and pipe gallery build structure jointly
CN104410031A (en) Prefabricated cable duct bank
CN205617426U (en) Cast -in -place bottom plate of utility tunnel and prefabricated outer panel connection structure
CN205776342U (en) A kind of prefabricated pipe gallery tube coupling attachment structure
CN206396792U (en) A kind of three-way sewage pipe crosses pipe gallery crossover node structure
CN102367735A (en) Back-to-back waterstop installation equipment for tunnel construction joint
CN204151824U (en) A kind of glass reinforced plastic underground comprehensive pipe network common trench
CN110233465A (en) A kind of structure enhanced type cable duct bank module
CN205839796U (en) Utility tunnel internode connection structure
CN108777470A (en) A kind of cable duct bank and its construction method
CN205617425U (en) Prefabricated structure of assembling of utility tunnel
CN211816399U (en) Prefabricated assembled city utility tunnel
CN202370544U (en) Installation equipment for back-stick type waterstop for tunnel construction joint
CN206396789U (en) A kind of comprehensive pipe gallery structure for being easy to sewage collecting to discharge
CN206396790U (en) A kind of comprehensive pipe gallery structure for being easy to rainwater to discharge
CN105971016A (en) Utility tunnel internode connection structure
CN207846469U (en) A pre-embedded C-shaped channel steel device on the formwork of the inner formwork trolley of the pipe gallery
CN207739281U (en) A kind of prefabricated piping lane device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151230

Termination date: 20160907