CN204919607U - City is prefab for underpass - Google Patents
City is prefab for underpass Download PDFInfo
- Publication number
- CN204919607U CN204919607U CN201520685072.4U CN201520685072U CN204919607U CN 204919607 U CN204919607 U CN 204919607U CN 201520685072 U CN201520685072 U CN 201520685072U CN 204919607 U CN204919607 U CN 204919607U
- Authority
- CN
- China
- Prior art keywords
- curb plate
- roof
- support structure
- side plate
- top board
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
The utility model relates to a city is prefab for underpass, it includes roof, two curb plates, is located two the location support structure between the curb plate and the water catch bowl of bottom, the roof is the arc of epirelief, set up the hand -hole on the roof, two the curb plate be connected and move towards parallel with the underground piping with roof opposite ends respectively, set up the opening that the confession pipeline passes through on the curb plate, the up end of curb plate sets up sealed cushion, the location support structure sets up between two curb plates, the location support structure is support and/or couple, couple fixed connection is on the curb plate, be connected with tang and location plug -in components mode between curb plate and the roof. The utility model discloses can realize the various pipe network unified plannings in city underground, reasonable layout has saved underground resources, is convenient for concentrate the construction, and the totality investment reduces, and comprehensive cost reduces, has avoided the road surface excavation of many times being under construction, very big has made things convenient for management and maintenance.
Description
Technical field
The utility model relates to a kind of Urban Underground Passage prefabricated component.
Background technology
Along with social progress, urbanization progress is maked rapid progress, and the universal and application of new technology, the various network of underground that city is laid get more and more, and become increasingly complex, available space is fewer and feweri.The system such as cable, optical cable, wired, phone, natural gas, heating installation, water supply, draining is relatively independent, well lid spreads all over the place, bring inconvenience to pedestrian, vehicle, both construction had been unfavorable for, also maintenance management is unfavorable for, each management maintenance all needs to destroy road surface, and construction cost is high, and manpower and materials consumption is serious.
Utility model content
For the defect that prior art exists, problem to be solved in the utility model is, provides a kind of Urban Underground Passage of being convenient to concentrate construction, rational deployment, facilitate the Urban Underground Passage prefabricated component of pipe-line maintenance.
The technical scheme that the utility model solves the employing of its technical problem is:
A kind of Urban Underground Passage prefabricated component, it comprises the catch basin of top board, two side plates, positioning support structure between two described side plates and bottom; Described top board is the arc of epirelief, and described top board arranges hand-hole; Side plate described in two connects with top board opposite end respectively and moves towards parallel with underground passage, and side plate is arranged the opening passed through for pipeline, the upper surface of described side plate arranges seal gasket; Described positioning support structure is arranged between two side plates, and described positioning support structure is support and/or hook, and described hook is fixedly connected on side plate; Described side plate with between top board with seam with locate plug-in unit mode and be connected.
Further improvement, described top board and/or side plate arrange reinforced bar support.
The beneficial effects of the utility model are: prefabricated component adopts combined type, top board and side plate adopt seam to be connected with location plug-in unit, ensure that installing accurate positioning avoids position to offset, can require to combinationally use according to different size, can produce by industrialized manufacture, be beneficial to guarantee product quality, be convenient to Product transport, reduce use cost; Prefabricated component bonding surface adopts seal gasket sealing, solves leakage problems; Prefabricated component inside adopts high strength cast iron, ensure that the intensity of prefabricated component, improves the safety that underground uses; Positioning support structure positions pipeline and circuit and supports, and realizes three-dimensional tubing cable, makes full use of space and is beneficial to cable pipeline installation; Top cover cambered design, compressive resistance is high, long service life; Opening is arranged on side plate, for passing through with the pipeline of side plate plate face vertical direction; Bottom is provided with catchment recess, is convenient to remove ponding and dirt; Personnel can walk in chamber of the present utility model, be thus also applicable to civil air defense constructions and installations, can be used for war preparedness air defence work facility.
The utility model can realize the various pipe network unified planning of Urban Underground, and rational deployment, saves subterranean resource, is convenient to concentrate construction, and overall investment reduces, and integrated cost reduces, and avoids road surface repeatedly construction and excavation, greatly facilitates and administer and maintain.
Accompanying drawing explanation
Fig. 1 is plan structure schematic diagram of the present utility model;
Fig. 2 is side structure schematic diagram of the present utility model;
In accompanying drawing, 1 top board, 2 side plates, 3 catch basins, 4 hand-holes, 5 openings, 6 seal gaskets, 7 supports, 8 hooks, 9 reinforced bar support, 10 underground pipelines.
Detailed description of the invention
For enabling above-mentioned purpose of the present utility model, feature and advantage become apparent more, below in conjunction with the drawings and specific embodiments in the utility model embodiment, technical scheme in the utility model embodiment is clearly and completely described, obviously, described embodiment is only the utility model part embodiment, instead of whole embodiments.Based on the embodiment in the utility model, those of ordinary skill in the art are not making the every other embodiment obtained under creative work prerequisite, all belong to the scope of the utility model protection.
The present embodiment comprises the catch basin 3 of top board 1, two side plates 2, positioning support structure between two side plates 2 and bottom; Described top board 1 is the arc of epirelief, and described top board 1 arranges hand-hole 4; Side plate 2 described in two connects with top board 1 opposite end respectively and moves towards parallel with underground pipeline 10, side plate 2 is arranged opening 5, passes through for the pipeline vertical with direction, side plate 2 plate face; The upper surface of described side plate 1 arranges seal gasket 6; Described positioning support structure is arranged at the side of side plate, and described positioning support structure is support 7 and hook 8 two kinds of forms, and described hook 8 is fixedly connected on side plate 2, and the trend of described support 7 is vertical with line alignment for support underground pipeline and circuit with pipeline; Described side plate 2 with between top board 1 with seam with locate plug-in unit and be connected.
Described top board arranges reinforced bar support 9.
Claims (2)
1. a Urban Underground Passage prefabricated component, is characterized in that, it comprises top board (1), two side plates (2), is positioned at the catch basin (3) of positioning support structure between two described side plates (2) and bottom; The arc that described top board (1) is epirelief, described top board (1) is arranged hand-hole (4); Side plate (2) described in two connects with top board (1) opposite end respectively and moves towards parallel with underground pipeline (10), and side plate (2) is arranged the opening (5) passed through for pipeline, the upper surface of described side plate (2) arranges seal gasket (6); Described positioning support structure is arranged between two side plates (2), and described positioning support structure is support (7) and/or hook (8), and described hook (8) is fixedly connected on side plate (2); With seam with locate plug-in unit mode and be connected between described side plate (2) with top board (1).
2. Urban Underground Passage prefabricated component according to claim 1, described top board (1) and/or side plate (2) arrange reinforced bar support (9).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520685072.4U CN204919607U (en) | 2015-09-07 | 2015-09-07 | City is prefab for underpass |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520685072.4U CN204919607U (en) | 2015-09-07 | 2015-09-07 | City is prefab for underpass |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204919607U true CN204919607U (en) | 2015-12-30 |
Family
ID=54968751
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520685072.4U Expired - Fee Related CN204919607U (en) | 2015-09-07 | 2015-09-07 | City is prefab for underpass |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204919607U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105971090A (en) * | 2016-06-28 | 2016-09-28 | 衡阳市金泓建筑装饰设计有限公司 | Sidewalk based integrated pipe network and water storage and drainage system |
CN106594604A (en) * | 2016-12-06 | 2017-04-26 | 绍兴明煌建材科技有限公司 | Road lamp system |
CN113089725A (en) * | 2021-04-28 | 2021-07-09 | 宝业湖北建工集团有限公司 | Building structure assembly type construction method |
-
2015
- 2015-09-07 CN CN201520685072.4U patent/CN204919607U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105971090A (en) * | 2016-06-28 | 2016-09-28 | 衡阳市金泓建筑装饰设计有限公司 | Sidewalk based integrated pipe network and water storage and drainage system |
CN105971090B (en) * | 2016-06-28 | 2019-04-02 | 衡阳市金泓建筑装饰设计有限公司 | Pavement comprehensive pipe network and drainage system |
CN106594604A (en) * | 2016-12-06 | 2017-04-26 | 绍兴明煌建材科技有限公司 | Road lamp system |
CN113089725A (en) * | 2021-04-28 | 2021-07-09 | 宝业湖北建工集团有限公司 | Building structure assembly type construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204898721U (en) | Steel construction city utility tunnel | |
CN205530344U (en) | Utility tunnel is pour to split type no mould | |
CN204919607U (en) | City is prefab for underpass | |
CN205576972U (en) | Three storehouse formula utility tunnel structures | |
CN202247950U (en) | Quadrate culvert member | |
CN105971007A (en) | Split type non-formwork pouring underground comprehensive pipe gallery | |
CN204023628U (en) | A kind of water-stopping structure | |
CN105401593A (en) | Assembly type square underground pipe gallery | |
CN107503382B (en) | End template fixed rubber water stop belt structure and construction method thereof | |
CN209891244U (en) | Prefabricated assembled concrete assembles utility tunnel from top to bottom | |
CN205839796U (en) | Pipe gallery internode attachment structure | |
CN205617425U (en) | Prefabricated structure of assembling of utility tunnel | |
CN104712105A (en) | Tile plate preventing rainwater leakage | |
CN105971016A (en) | Connection structure between joints of comprehensive pipe rack | |
CN108571012B (en) | Piping lane construction joint integrated installation mold construction technology | |
CN103662467B (en) | Assembled tank | |
CN204113295U (en) | A kind of municipal shield tunnel | |
CN206396789U (en) | A kind of comprehensive pipe gallery structure for being easy to sewage collecting to discharge | |
CN106049552A (en) | Inter-section sealing structure for comprehensive pipe racks | |
CN207260191U (en) | A kind of class rectangle pipe gallery section of jurisdiction connection structure | |
CN206956775U (en) | A kind of cabin pipe gallery of plain type underground three | |
CN205804404U (en) | A kind of novel prefabricated box culvert for pipe gallery | |
CN203383234U (en) | Sealed half multipurpose inspection well | |
CN106013230B (en) | A kind of Pipe rack | |
CN205171548U (en) | Novel plastics piping lane |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151230 Termination date: 20160907 |