CN206769475U - A kind of biocontainment laboratory layout structure - Google Patents

A kind of biocontainment laboratory layout structure Download PDF

Info

Publication number
CN206769475U
CN206769475U CN201720618071.7U CN201720618071U CN206769475U CN 206769475 U CN206769475 U CN 206769475U CN 201720618071 U CN201720618071 U CN 201720618071U CN 206769475 U CN206769475 U CN 206769475U
Authority
CN
China
Prior art keywords
area
core spaces
logistics
stream
preparation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201720618071.7U
Other languages
Chinese (zh)
Inventor
陈文云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Shipbuilding NDRI Engineering Co Ltd
Original Assignee
China Shipbuilding NDRI Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Shipbuilding NDRI Engineering Co Ltd filed Critical China Shipbuilding NDRI Engineering Co Ltd
Priority to CN201720618071.7U priority Critical patent/CN206769475U/en
Application granted granted Critical
Publication of CN206769475U publication Critical patent/CN206769475U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of biocontainment laboratory layout structure, it is characterized in using the planar structure of T-shape between preparing, the process layout that its axial both sides is set up in parallel with two P3 core spaces respectively, logistics area and stream of people area are disposed in parallel in close to side between preparation, wash and disinfectant house is next between preparing and two P3 core spaces sides, cup is next to logistics area and stream of people area side, bio-safety experiment is gradually transitions cleaning region to Semi-Contaminated Zone domain, Polluted area successively from cleaning region.The utility model has the stream of people, logistics, dirt stream clear compared with prior art, have a safety feature, floor space is small, logistics is reasonable, production operation is more convenient, and design meets standard, specification, can meet the experiment of clinical, diagnosis, teaching and research, securely and reliably, energy-saving and emission-reduction, there is certain directive significance to biology laboratory engineering construction.

Description

A kind of biocontainment laboratory layout structure
Technical field
Architectural design technical field is the utility model is related to, it is specifically a kind of to be applied to clinic, diagnose, impart knowledge to students, grinding Study carefully or the biocontainment laboratory layout structure such as production facility.
Background technology
Bio-safety(P3)Laboratory applications are opened in clinical, diagnosis, teaching, research or production facility in the rank The work about endogenous and exogenous pathogeny is opened up, if sucking the pathogeny because of exposure, serious, may be lethal disease can be triggered Disease.Bio-safety(P3)Laboratory, it is made up of main laboratory, auxiliary room, isolating device, its main laboratory(Also referred to as core space) Environmental requirement:Clean rank, rate of ventilation, relative atmospheric minimum differntial pressure, adjacent with outdoor direction communicate room most Small pressure difference(Pa), humiture, noise, average illumination, the tightness of building enclosure, national standard (GB50346-2011) has bright True standard requirement.But how these rooms and isolating device rational deployment, relative position relation is established, a science is built and closes The layout structure of reason, to realize and ensure Microbiological Lab's core space environmental requirement of standard requirement, while meet inspection again Workflow is looked into, is a knowledge.
The bio-safety process layout of prior art is disorderly and unsystematic, the relative position between each function room and isolating device Arbitrarily layout, can not meet workflow and the environmental requirement of Experiment on Microbiology.
Utility model content
A kind of Microbiological Lab's layout structure that the purpose of this utility model is in view of the shortcomings of the prior art and provided, Be connected side by side with two P3 core spaces between being prepared using T " types planar structure, and by logistics area and stream of people area be disposed in parallel in close to Side between preparation, wash and disinfectant house are next between preparing and two P3 core spaces sides, and empirically flow is from the clear of logistics area and stream of people area Polluted area of the clean region successively to the Semi-Contaminated Zone domain between preparation and two P3 core spaces is gradually transitions the clear area of wash and disinfectant house Domain, facilitate controlled environment, facilitate that the stream of people, logistics and dirt stream are controlled, and securely and reliably, not only floor space is small, and logistics is reasonable, and And more convenient operation, it is especially suitable for the experiment of clinical, diagnosis, teaching and research, investment reduction, further increases economic efficiency.
What the purpose of this utility model was realized in:A kind of biocontainment laboratory layout structure, including cup, preparation Between, the first P3 core spaces, the 2nd P3 core spaces and wash and disinfectant house, be characterized in using the planar structure of T-shape, its axial direction between preparing The process layout that both sides are set up in parallel with the first P3 core spaces and the 2nd P3 core spaces respectively, logistics area and stream of people area are set up in parallel Close to side between preparation, wash and disinfectant house is next to be arranged on the 2nd P3 core spaces side, cup between the first P3 core spaces, preparation Close to logistics area and stream of people area side, make bio-safety experiment from the cleaning region in logistics area and stream of people area successively to half between preparation The Polluted area of Polluted area, the first P3 core spaces and the 2nd P3 core spaces is gradually transitions the cleaning region of wash and disinfectant house.
The logistics area is provided with by central control room and provided with being formed between the logistics between the 3rd buffering between the 3rd buffering The 3rd pair of door leaf pass-through box got in touch between preparation.
The stream of people area between coat dressing cubicle, protective garment dressing cubicle and spray sterilization protective garment by forming, and the coat is more Dressing Room be provided with lead to spray sterilization protective garment between second buffering between and shower cabinet sliding door;The spray sterilization protective garment Between be provided with second pair of door leaf pass-through box being got in touch between preparation;It is respectively equipped between the protective garment dressing cubicle and spray sterilization protective garment Towards the air lock and sliding door between preparation.
Double door leafs high-pressure sterilizing pot, transfer disinfection room and emergency evacuation outlet, the transfer disinfection room are provided between the preparation Provided with the sliding door towards wash and disinfectant house.
The first P3 core spaces and the 2nd P3 core spaces are respectively equipped with the sliding door between the first buffering towards between preparing With first pair of door leaf pass-through box.
The cup is provided with the gate control system that personnel come in and go out.
The wash and disinfectant house is provided with dirt outlets.
The utility model has the stream of people, logistics, dirt stream clear compared with prior art, has a safety feature, floor space Small, logistics is reasonable, and production operation is more convenient, and design meets standard, specification, can meet the reality of clinical, diagnosis, teaching and research Test, safe and reliable, energy-saving and emission-reduction, to biology laboratory engineering construction, there is certain directive significance.
Brief description of the drawings
Fig. 1 is the utility model structure diagram;
Fig. 2 is implementation illustration;
Fig. 3 is experiment flow schematic diagram of the present utility model.
Embodiment
Refering to accompanying drawing 1, the utility model by cup 1, logistics area 2, stream of people area 3, prepare between the 4, the first P3 core spaces 5, wash Between disappearing 6 and the 2nd P3 core spaces 7 form, between the preparation 4 be T-shape planar structure, its axial both sides respectively with the first P3 The P3 core spaces 7 of core space 5 and the 2nd are set up in parallel;The logistics area 2 and stream of people area 3 are disposed in parallel in close to 4 side between preparation;Institute State wash and disinfectant house 6 be next to the first P3 core spaces 5, prepare between 4 and the side of the 2nd P3 core spaces 7;The cup 1 is next to Logistics area 2 and the side of stream of people area 3, make bio-safety experiment from the cleaning region in logistics area 2 and stream of people area 3 successively between preparation 4 The Polluted area in Semi-Contaminated Zone domain, the first P3 core spaces 5 and the 2nd P3 core spaces 7 is gradually transitions the cleaning region of wash and disinfectant house 6.
Refering to accompanying drawing 2, the logistics area 2 forms by central control room 22 and provided between 21 logistics between the 3rd buffering 23, 21 are provided with 4 the 3rd pair of door leaf pass-through box 24 got in touch between preparation between 3rd buffering.
The stream of people area 3 is formed by between coat dressing cubicle 31, protective garment dressing cubicle 33 and spray sterilization protective garment 34, described Coat dressing cubicle 31, which is provided with, leads between spray sterilization protective garment between 34 the second buffering 32 and two shower cabinets 37;The spray disappears 34 are provided with the 4 second pair of door leaf pass-through box 36 got in touch between preparation between malicious protective garment;The protective garment dressing cubicle 33 and spray sterilize 34 are respectively equipped with the air lock 35 towards between preparation 4 between protective garment.
4 are provided with emergency evacuation outlet 43 and double door leaf high-pressure sterilizing pots 41 towards transfer disinfection room 42 between the preparation;Institute State cup 1 and be provided with the gate control system 11 that personnel come in and go out;The wash and disinfectant house 6 is provided with dirt outlets 61.
The first P3 core spaces 5 and the 2nd P3 core spaces 7 are respectively equipped with 71 and the between towards between preparing 4 the first buffering A pair of door leaf pass-through box 51.
Refering to accompanying drawing 3, the utility model by cup 1, logistics area 2, stream of people area 3, prepare between the 4, the first P3 core spaces 5, wash Between disappearing 6 and the 2nd contaminated area for forming of P3 core spaces 7, Semi-Contaminated Zone and the functional area of clear area three, the personnel of being correspondingly provided with go out Gate control system 11, emergency evacuation outlet/large scale equipment gateway 43 and the dirt outlets 61 entered.Each function of three functional areas Between operating room empirically the order of flow close to being connected, from contaminated area, Semi-Contaminated Zone, clear area air pressure successively from negative Malleation is pressed onto, is stepped up.
The contaminated area is 71, first pairs of door leaf pass-through boxes between the first P3 core spaces 5 and the 2nd P3 core spaces 7 and the first buffering 51 compositions, the first P3 core spaces 5 and the main laboratory that the 2nd P3 core spaces 7 are direct operational hazards biotic factor, its cleanliness factor For 7 or 8 grades, normally operate and carried out in Biohazard Safety Equipment, interior is not easy to pollute, but has the possibility seriously polluted, the pollution Single or multiple P3 core spaces can be set for negative pressure in area, along flow from the P3 core spaces 5 of cup 1 to the first and the 2nd P3 core spaces 7, its room pressure reduces successively, it is ensured that the nuisance of P3 core spaces will not pass through air pollution perimeter.
34, the 3rd pairs of door leaf pass-through boxes, 24, second pairs of door leafs pass between 4 and spray sterilization protective garment between preparation for the Semi-Contaminated Zone Pass window 36, air lock 35, double door leaf high-pressure sterilizing pots 41 and transfer disinfection room 42 to form, play assistant experiment and decay in the lab The effect of pollution, normal operating are typically not susceptible to test the pollution of the factor, but the possibility of potential pollution be present.
The clear area is 21, central control room 22,23, coat between logistics between cup 1, wash and disinfectant house 6, the 3rd buffering 32, protective garment dressing cubicle 33, shower cabinet 37 and transfer disinfection room 42 form between the buffering of dressing cubicle 31, second, and the clear area is people Member, logistics, dirt flow into or out and monitored the auxiliary facility of Semi-Contaminated Zone and contaminated area, and any reality will not occur in normal operating The pollution of the factor is tested, personnel special need not can protect.
Experimenter enters coat dressing cubicle 31 and protective garment dressing cubicle 33 from the cup 1 of clear area, enters through air lock 35 Enter 4 between the preparation of Semi-Contaminated Zone, then by between the first buffering 71 the first P3 core spaces 5 or the 2nd P3 core spaces for entering contaminated areas 7 carry out the experimental implementation of bio-safety.After terminating experiment, personnel exit contaminated area between the first buffering 71, from Semi-Contaminated Zone 4 through between the buffering of shower cabinet 37, second 32 and coat through 34 between the entrance spray sterilization protective garment of air lock 35, then changing one's clothes between preparation Room 31, laboratory is exited by cup 1.
Test article by between logistics 23 to be entered by the 3rd pair of door leaf pass-through box 24 4 between the preparation of Semi-Contaminated Zone, then by the A pair of door leaf pass-through box 51 enters the first P3 core spaces 5 of contaminated area or the 2nd P3 core spaces 7 carry out the experimental implementation of bio-safety. Article after experiment sends out reality after the sterilization processing of double door leafs high-pressure sterilizing pot 41 and transfer disinfection room 42 by wash and disinfectant house 6 Test room;Protective garment after experiment returns through air lock 35, and by between spray sterilization protective garment 34 and second pair of door leaf pass-through box 36 Return 4 between preparing, then sent out after the sterilization processing of double door leafs high-pressure sterilizing pot 41 and transfer disinfection room 42 by wash and disinfectant house 6 Laboratory.
Experimental facilities is entered by emergency evacuation outlet 43 prepare between 4, when the first P3 core spaces 5 or the 2nd P3 core spaces 7 When experimental implementation occurs unexpected, experimenter can exit Experimental Area by between the first buffering 71, and by between preparation 4 from urgent Emergency exit 43 is fled from.
The relevant criterion and code requirement that the utility model is tested by bio-safety, to three functional areas carry out sections of experiment Reasonable, safe and reliable layout is learned, makes each Zou Qi roads of " stream of people ", " logistics " and " dirt stream " and clear.More than Simply the utility model is further described, to the clean rank inside each function room, blast, humiture, ventilation time Number, water, electricity, room height, illumination, finishing material, equipment the content such as put and do not reflect that all is the equivalent reality of the utility model Apply, be intended to be limited solely by within the right of this patent.

Claims (7)

1. a kind of biocontainment laboratory layout structure, including cup, prepare between, the first P3 core spaces, the 2nd P3 core spaces and Wash and disinfectant house, it is characterised in that between preparation use T-shape planar structure, its axial both sides respectively with the first P3 core spaces and second The process layout that P3 core spaces are set up in parallel, logistics area and stream of people area, which are disposed in parallel in close to side between preparation, wash and disinfectant house, to be arranged on Logistics area and stream of people area side are next to, makes biology with the 2nd P3 core spaces side, cup close between the first P3 core spaces, preparation Safety experiment is from the cleaning region in logistics area and stream of people area successively to the Semi-Contaminated Zone domain between preparation, the first P3 core spaces and second The Polluted area of P3 core spaces is gradually transitions the cleaning region of wash and disinfectant house.
2. biocontainment laboratory layout structure according to claim 1, it is characterised in that the logistics area is controlled by center Room and provided with being formed between the logistics between the 3rd buffering, being provided with the 3rd pair of door leaf being got in touch between preparation between the 3rd buffering transmits Window.
3. biocontainment laboratory layout structure according to claim 1, it is characterised in that the stream of people area is changed one's clothes by coat Formed between room, protective garment dressing cubicle and spray sterilization protective garment, the coat dressing cubicle, which is provided with, to be led between spray sterilization protective garment Second buffering between and shower cabinet sliding door;The second pair of door leaf got in touch between preparation is provided between the spray sterilization protective garment Pass-through box;The air lock and sliding door being respectively equipped between the protective garment dressing cubicle and spray sterilization protective garment towards between preparing.
4. biocontainment laboratory layout structure according to claim 1, it is characterised in that it is high that double door leafs are provided between the preparation Autoclave, transfer disinfection room and emergency evacuation outlet, the transfer disinfection room is pressed to be provided with the sliding door towards wash and disinfectant house.
5. biocontainment laboratory layout structure according to claim 1, it is characterised in that the first P3 core spaces and Two P3 core spaces are respectively equipped with sliding door and first pair of door leaf pass-through box between the first buffering towards between preparing.
6. biocontainment laboratory layout structure according to claim 1, it is characterised in that the cup comes in and goes out provided with personnel Gate control system.
7. biocontainment laboratory layout structure according to claim 1, it is characterised in that the wash and disinfectant house goes out provided with dirt Mouthful.
CN201720618071.7U 2017-05-31 2017-05-31 A kind of biocontainment laboratory layout structure Withdrawn - After Issue CN206769475U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720618071.7U CN206769475U (en) 2017-05-31 2017-05-31 A kind of biocontainment laboratory layout structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720618071.7U CN206769475U (en) 2017-05-31 2017-05-31 A kind of biocontainment laboratory layout structure

Publications (1)

Publication Number Publication Date
CN206769475U true CN206769475U (en) 2017-12-19

Family

ID=60639180

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720618071.7U Withdrawn - After Issue CN206769475U (en) 2017-05-31 2017-05-31 A kind of biocontainment laboratory layout structure

Country Status (1)

Country Link
CN (1) CN206769475U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106978918A (en) * 2017-05-31 2017-07-25 中船第九设计研究院工程有限公司 A kind of biocontainment laboratory process layout design

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106978918A (en) * 2017-05-31 2017-07-25 中船第九设计研究院工程有限公司 A kind of biocontainment laboratory process layout design
CN106978918B (en) * 2017-05-31 2023-06-20 中船第九设计研究院工程有限公司 Biological safety laboratory process layout design

Similar Documents

Publication Publication Date Title
CN106978918A (en) A kind of biocontainment laboratory process layout design
Gola et al. Indoor air quality in inpatient environments: a systematic review on factors that influence chemical pollution in inpatient wards
Mousavi et al. COVID-19 outbreak and hospital air quality: a systematic review of evidence on air filtration and recirculation
Beggs et al. The ventilation of multiple-bed hospital wards: review and analysis
King et al. Bioaerosol deposition in single and two-bed hospital rooms: a numerical and experimental study
CN105498866B (en) CCN biocontainment laboratories
CN206769475U (en) A kind of biocontainment laboratory layout structure
CN107965174A (en) A kind of Animal Lab. process layout design
CN110761594B (en) Clinical cell preparation engineering environment barrier system
JP5814069B2 (en) Pollutant contamination exclusion facility
CN214576015U (en) Vehicle-mounted shelter laboratory system
Picot-Guéraud et al. En-suite bathrooms in protected haematology wards: a source of filamentous fungal contamination?
CN106988567B (en) A kind of design method of Experiment on Microbiology process layout
Lai et al. Bioaerosols and hospital infections
Udomiaye et al. A review of sustainable design strategies for infection prevention and control (IPC) in public buildings
CN107965167A (en) Cell preparation laboratory design scheme
CN113006543A (en) Negative pressure mobile ward
Phillips et al. Laboratory design for microbiological safety
CN206385855U (en) High integration complete property analysis detection basic equipment laboratory building module
CN206082557U (en) Bio -safety cabinet
Fréalle et al. Fungal aero-decontamination efficacy of mobile air-treatment systems
CN216921543U (en) Experimental shelter for infectious disease detection
Lacanna Planning strategies for nosocomial infection control
Adewale et al. Mitigating COVID-19 Risk Through Architectural Design Strategies
Ching An empirical drag coefficient model for simulating the dispersion and deposition of bioaerosol particles in ventilated environments

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20171219

Effective date of abandoning: 20230620

AV01 Patent right actively abandoned

Granted publication date: 20171219

Effective date of abandoning: 20230620

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned