CN206752987U - A kind of trowel - Google Patents
A kind of trowel Download PDFInfo
- Publication number
- CN206752987U CN206752987U CN201720411099.3U CN201720411099U CN206752987U CN 206752987 U CN206752987 U CN 206752987U CN 201720411099 U CN201720411099 U CN 201720411099U CN 206752987 U CN206752987 U CN 206752987U
- Authority
- CN
- China
- Prior art keywords
- wall
- bottom wall
- plate
- location
- antetheca
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
A kind of trowel, body including trowel, it is characterized in that, the body of trowel includes the scraper plate with vertical recess for scraping projection on cement screedn by bottom, the body of trowel also includes being used for the mud box for containing cement mortar, mud box includes the first casing, first casing includes the first bottom wall, the first antetheca and the first rear wall being connected with the first bottom wall, first antetheca and the first rear wall are connected to the front end of first bottom wall and the rear end of the first bottom wall, the first groove of the upward splendid attire cement mortar of notch is constituted between first antetheca and the first rear wall and first bottom wall, the top of first antetheca and the first rear wall are respectively arranged with the first support base and the second support base, it is connected between first support base and the second support base by first handle.The cement screedn efficiency that effectively prevent floating ground in the prior art is low, cause the cement mortar being affixed with ceramic tile towards surrounding heave the defects of.
Description
Technical field
It the utility model is related to claying technical field, and in particular to a kind of trowel, more particularly to a kind of multi-functional mud foam
Son.
Background technology
Existing trowel, it is the manual work for being used for building the plane operations such as ground, metope, ceiling among architectural engineering
Tool.Trowel has a bottom plate, is fitted with first handle, during use bricklayer hold first handle, by pastes such as mortars
Be compacted, catch up with it is flat.
And it is current, architectural ground of building by laying bricks or stones needs the cement mortar bedding cushion for paving ceramic tile, it is also desirable to which the mud used is smeared
Son carrys out floating cement screedn, cement mortar can only be often inserted on the ground, then again with existing trowel come floating
Cement screedn, the higher workmen of technology is thus needed, speed and quality can be improved.And toward filling out on ground
Entering cement mortar needs multiple types of tools, and time-consuming, laborious, efficiency is low, plus the higher workmen of technology is needed, could complete
Ensure speed and quality.So inevitably make it that the cement screedn efficiency on floating ground is low.
And on the other hand, tile laying often appears in tile laying in cement on smooth cement screedn
Can cause when on mortar surface layer the cement mortar being affixed with ceramic tile towards surrounding heave the problem of.
The content of the invention
To solve the above problems, the utility model provides a kind of trowel and its method, prior art effectively prevent
In floating ground cement screedn efficiency it is low, cause the cement mortar being affixed with ceramic tile towards surrounding heave the defects of.
In order to overcome deficiency of the prior art, the utility model provides the solution party of a kind of trowel and its method
Case, it is specific as follows:
A kind of trowel, includes the body of trowel, and the body of the trowel is included by bottom in cement sand pulp
The scraper plate 2 with vertical recess 1 of projection is scraped on layer.
Further, the body of the trowel also includes being used for the mud box 3 for containing cement mortar, and the mud box 3 includes
First casing 4, the first antetheca 6 and the first rear wall 7 that first casing 4 includes the first bottom wall 5, is connected with the first bottom wall 5, institute
State the first antetheca 6 and the first rear wall 7 is connected to the front end of first bottom wall 5 and the rear end of the first bottom wall 5, described first
The first groove of the upward splendid attire cement mortar of notch, institute are constituted between the rear wall 7 of antetheca 6 and first and first bottom wall 5
State the top of the first antetheca 6 and the first rear wall 7 is respectively arranged with the first support base 45 and the second support base 46, first support
It is connected between the support base 46 of seat 45 and second by first handle 47.
Further, the top of first antetheca 6 is connected with the first location-plate 8 to rear projection, first rear wall 7
Top be connected with the second location-plate 9 to front projection, from the roof of first location-plate 8 to first location-plate 8
Bottom wall is provided with the first positioning hole 10, and it is fixed to be provided with second from the bottom wall of roof to second location-plate 9 of second location-plate 9
Position hole 11.
Further, the body of the trowel also includes the first screeding device, and first screeding device includes first
Carriage, first carriage include the second bottom wall 12, the second antetheca 13 being connected with the second bottom wall 12, the first roof 16,
The rear wall 15 of right wall 14 and second, the rear wall 15 of the second antetheca 13 and second be connected to second bottom wall 12 front end and
The rear end of second bottom wall 15, the front end of the right wall 14 and the rear end of the right wall 14 respectively with the right-hand member of the second antetheca 13 and
The right-hand member of two rear walls 15 is connected, and the bottom of the right wall 14 is connected with the right-hand member of second bottom wall 12, first top
Wall 16 is covered in the top on the top of second antetheca 13, the top of right wall 14 and the second rear wall 15, first roof 16
Left end Intermediate Gray it is jagged, the right-hand member of the breach is connected with first baffle 17 straight up, the bottom of the right wall 14
Uniform intervals are dispersed with some first vertical recesses 1 from front to back, are just between the two neighboring first vertical recess 1
First scraping blade of rectangular-shape, some first are provided with the bottom wall from the roof of second bottom wall 12 to second bottom wall 12
Through hole 22, some first through holes 22 equidistant arrangement from front to back, between adjacent two the first through holes 22 between
The front end at the interval between size two first through holes 22 identical and adjacent with the width size of first scraping blade
First scraped with this with the front end of first scraping blade respectively the rear end at the interval between two the first through holes 22 adjacent with this
The rear end of piece is connected, and first box house inside first carriage with being connected.
Further, the top of second antetheca 13 is connected with the 3rd location-plate 18 to rear projection, after described second
The top of wall 15 is connected with the 4th location-plate 19 to front projection, from the roof of the 3rd location-plate 18 to the described 3rd positioning
The bottom wall of plate 18 is provided with the 3rd positioning hole 20, is opened from the bottom wall of roof to the 4th location-plate 19 of the 4th location-plate 19
There is the 4th positioning hole 21.
Further, first bolt sequentially pass through first positioning hole 10 and the 3rd positioning hole 20 from top to bottom and
With the first nut bolt, second bolt sequentially pass through second positioning hole 11 and the 4th positioning hole 21 from top to bottom and
With the second nut bolt, the tip contact of first nut is on the bottom wall of the 3rd location-plate 18 and second spiral shell
Female tip contact enables the first bolt and the second bolt fixed the 3rd respectively on the bottom wall of the 4th location-plate 19
Moved to the left or to the right in position hole and the 4th positioning hole, so as to drive the first carriage to move to the left or to the right.
Further, the mud box 3 also includes the second casing 202, second casing 202 include the 3rd bottom wall 23, with
The 3rd antetheca 24 and the 3rd rear wall 25 of 3rd bottom wall 23 connection, the 3rd antetheca 24 and the 3rd rear wall 25 are connected to institute
State the front end of the 3rd bottom wall 23 and the rear end of the 3rd bottom wall 23, the 3rd antetheca 24 and the 3rd rear wall 25 and the 3rd bottom wall
The second groove for containing cement mortar, the left end of the right-hand member of second casing 202 and first casing 4 are constituted between 23
Be connected and the inside of second casing 202 be connected with the inside of first casing 4, second casing with it is described
First casing tilts connection.
Further, the top of the 3rd antetheca 24 is connected with the 5th location-plate 26 to rear projection, after the described 3rd
The top of wall 25 is connected with the 6th location-plate 27 to front projection, from the roof of the 5th location-plate 26 to the described 5th positioning
The bottom wall of plate 26 is provided with the 5th positioning hole 28, is opened from the bottom wall of roof to the 6th location-plate 27 of the 6th location-plate 27
There is the 6th positioning hole 29.
Further, the body of the trowel also includes the second screeding device, and second screeding device includes second
Carriage, second carriage include the 4th bottom wall 30, the 4th antetheca 31 being connected with the 4th bottom wall 30, the second roof 32,
The rear wall 34 of left wall 33 and the 4th, the 4th antetheca 31 and the 4th rear wall 34 be connected to the 4th bottom wall 30 front end and
The rear end of 4th bottom wall 30, the front end of the left wall 33 and the rear end of the left wall 33 respectively with the right-hand member of the 4th antetheca 31 and
The right-hand member of four rear walls 34 is connected, and the bottom of the left wall 33 is connected with the left end of the 4th bottom wall 34, second top
Wall 32 is covered in the top, the top of left wall 33 and the top of the 4th rear wall 34 of the 4th antetheca 31, second roof 32
Right-hand member Intermediate Gray it is jagged, the left end of the breach is connected with second baffle 35 straight up, the bottom of the left wall 33
Uniform intervals are dispersed with some second vertical recesses from front to back, are just length between the two neighboring second vertical recess
Second scraping blade of cube shape, some second are provided with the bottom wall from the roof of the 4th bottom wall 34 to the 4th bottom wall 34 and is passed through
Through hole 37, some second through holes 37 equidistant arrangement from front to back, the interval between adjacent two the second through holes 37
The front end at the interval between size two the second through holes 37 identical and adjacent with the width size of second scraping blade with
The rear end at the interval between two adjacent second through holes 37 respectively with the front end of second scraping blade and second scraping blade
Rear end be connected, the support bar 38 of a triangular prism shape, the support bar are also connected with the right wall of each second scraping blade
38 width size is identical with the width size of second scraping blade and the bottom wall of the support bar 38 is embedded in adjacent two the
In interval between two through holes 37, second box house inside second carriage with being connected.
Further, the top of the 4th antetheca 31 is connected with the 7th location-plate 39 to rear projection, after the described 4th
The top of wall 34 is connected with the 8th location-plate 40 to front projection, from the roof of the 7th location-plate 39 to the described 7th positioning
The bottom wall of plate 39 is provided with the 7th positioning hole 41, is opened from the bottom wall of roof to the 8th location-plate 40 of the 8th location-plate 40
There is the 8th positioning hole 42.
Further, the 3rd bolt sequentially pass through the 5th positioning hole 28 and the 7th positioning hole 41 from top to bottom and
With the 3rd nut bolt, the 4th bolt sequentially pass through the 6th positioning hole 29 and the 8th positioning hole 48 from top to bottom and
With the 4th nut bolt, the tip contact of the 3rd nut is on the bottom wall of the 7th location-plate 39 and the 4th spiral shell
Female tip contact enables the 3rd bolt and the 4th bolt fixed the 7th respectively on the bottom wall of the 8th location-plate 40
Moved to the left or to the right in position hole and the 8th positioning hole, so as to drive the second carriage to move to the left or to the right.
The beneficial effects of the utility model are:
Scraper plate can scrape the consistent recessed road of equidistant and shape size in the cement mortar for be flowed into ground, then recessed being formed
The cement mortar surface laying ceramic tile on road;Thus allowing ceramic tile, the cement mortar in recessed roadside is just filled out when extruding cement mortar
Be charged in recessed road, eliminate or reduce cement mortar towards surrounding heave the problem of.The cement screedn on such floating ground
Efficiency high and easy to operate.
Brief description of the drawings
Fig. 1 is the schematic diagram of the separating component of the body of the trowel of the present utility model for eliminating support bar.
Fig. 2 is the side structure schematic view of support bar of the present utility model.
Fig. 3 is the principle schematic of connecting rod of the present utility model.
Embodiment
The utility model is described further below in conjunction with drawings and examples.
Embodiment 1
1- Fig. 3 is understood with reference to the accompanying drawings, the trowel of the present embodiment, includes the body of trowel, the body of the trowel
The scraper plate 2 with vertical recess 1 including scraping projection on cement screedn by bottom.
The body of the trowel also includes being used for the mud box 3 for containing cement mortar, and the mud box 3 includes the first casing 4,
The first antetheca 6 and the first rear wall 7 that first casing 4 includes the first bottom wall 5, is connected with the first bottom wall 5, first antetheca
6 and first rear wall 7 be connected to the front end of first bottom wall 5 and the rear end of the first bottom wall 5, first antetheca 6 and
The first groove of the upward splendid attire cement mortar of notch, first antetheca are constituted between one rear wall 7 and first bottom wall 5
6 top and the first rear wall 7 are respectively arranged with the first support base 45 and the second support base 46, first support base 45 and second
It is connected between support base 46 by first handle 47.First bottom wall of first casing 4 is rectangular-shape and the first bottom wall
For horizontal wall surface.The rear wall 7 of first antetheca 6 and first is the vertical plate of rectangular-shape.The first handle 47 is cylinder
Shape.
The top of first antetheca 6 is connected with the first location-plate 8 to rear projection, the top of first rear wall 7 with
Connect to the second location-plate 9 of front projection, be provided with from the bottom wall of roof to first location-plate 8 of first location-plate 8
First positioning hole 10, the second positioning hole 11 is provided with from the bottom wall of roof to second location-plate 9 of second location-plate 9.
The location-plate 9 of first location-plate 8 and second is rectangular-shape, and the positioning hole 11 of the first positioning hole 10 and second is circle
Column.
The body of the trowel also includes the first screeding device, and first screeding device includes the first carriage, institute
Stating the first carriage includes the second bottom wall 12, the second antetheca 13 being connected with the second bottom wall 12, the first roof 16, right wall 14 and the
Two rear walls 15, the rear wall 15 of the second antetheca 13 and second are connected to front end and the second bottom wall 15 of second bottom wall 12
Rear end, the front end of the right wall 14 and the rear end of the right wall 14 respectively with the right-hand member of the second antetheca 13 and the second rear wall 15
Right-hand member is connected, and the bottom of the right wall 14 is connected with the right-hand member of second bottom wall 12, and first roof 16 is covered in
The top on the top of second antetheca 13, the top of right wall 14 and the second rear wall 15, among the left end of first roof 16
With jagged, the right-hand member of the breach is connected with first baffle 17 straight up, and the bottom of the right wall 14 is equal from front to back
It is even to be intervally distributed with some first vertical recesses 1, just it is rectangular-shape between the two neighboring first vertical recess 1
First scraping blade, some first through holes 22 are provided with the bottom wall from the roof of second bottom wall 12 to second bottom wall 12,
Some first through holes 22 equidistant arrangement from front to back, gap size and institute between adjacent two the first through holes 22
The front end for stating the interval between identical and adjacent two the first through holes 22 of width size of the first scraping blade is adjacent with this
The rear end at the interval between two the first through holes 22 respectively with the front end of first scraping blade and the rear end phase of first scraping blade
Even, first box house inside first carriage with being connected.Second bottom wall 12 is rectangular-shape and second
Bottom wall is horizontal wall surface, and second antetheca 13, the rear wall 15 of right wall 14 and second are the vertical plate of rectangular-shape, described first
Roof 16 is rectangular-shape structure.The first vertical recess is rectangular-shape.First through hole is rectangular-shape.It is all
The first vertical recess 1 shape size it is consistent.
The top of second antetheca 13 is connected with the 3rd location-plate 18 to rear projection, the top of second rear wall 15
It is connected with the 4th location-plate 19 to front projection, from the roof of the 3rd location-plate 18 to the bottom wall of the 3rd location-plate 18
The 3rd positioning hole 20 is provided with, the 4th positioning is provided with from the bottom wall of roof to the 4th location-plate 19 of the 4th location-plate 19
Hole 21.3rd location-plate 18 and the 4th location-plate 19 are rectangular-shape, the 3rd positioning hole 20 and the 4th positioning hole
21 be rectangular-shape.
First bolt sequentially pass through first positioning hole 10 and the 3rd positioning hole 20 from top to bottom and with the first spiral shell
Parent phase is spirally connected, second bolt sequentially pass through second positioning hole 11 and the 4th positioning hole 21 from top to bottom and with the second spiral shell
Parent phase is spirally connected, the tip contact of first nut on the bottom wall of the 3rd location-plate 18 and second nut top
Contact enables the first bolt and the second bolt respectively in the 3rd positioning hole and the on the bottom wall of the 4th location-plate 19
Moved to the left or to the right in four positioning holes, so as to drive the first carriage to move to the left or to the right.
The operation principle of the trowel, it is specific as follows:
Step 1:When needing directly to fill out cement mortar on the ground, just first the 3rd bolt and the 4th bolt respectively from the
Back-out in three nuts and the 4th nut, then second carriage is unloaded from the second casing and removed;
Step 2:Then first baffle 17 is promoted to the right or to the right to make the first bolt and the second bolt fixed the 3rd respectively
To the right or it is moved to the left in position hole and the 4th positioning hole, first case is departed to adjust some first through holes 22 with this
Body 4 and the size of exposed part, so it can depart from described first by such some first through holes 22 of regulation
Casing 4 and the size of exposed part flow out to up to the big of the amount of the cement mortar on ground to adjust from the first through hole 22
It is small, after the size of regulation to the exposed part of setting, cement mortar is filled up into the casing 202 of the first casing 4 and second;
Step 3:Keep the bottom wall of first casing 4 for horizontality and by the bottom wall of first casing 4 and ground
It is in contact, and second casing is tilted with first casing and is connected so that the cement mortar in the second casing just promotes
Cement mortar in first casing is flowed into the first carriage, and the cement mortar being flowed into the first carriage is just passed through from first
Through hole is flowed into ground;
Step 4:Then hold first handle to be moved to the left, the first scraper plate just can be on the cement mortar on ground be flowed into
The consistent recessed road of equidistant and shape size is scraped, then ceramic tile is laid on the cement mortar surface for forming recessed road;It can thus allow porcelain
When extruding cement mortar, the cement mortar in recessed roadside is filled with recessed road brick, eliminates or reduce cement mortar towards surrounding
The problem of heaving.The efficiency high of the cement screedn on such floating ground and easy to operate.
The present embodiment has the beneficial effect that:
Scraper plate can scrape the consistent recessed road of equidistant and shape size in the cement mortar for be flowed into ground, then recessed being formed
The cement mortar surface laying ceramic tile on road;Thus allowing ceramic tile, the cement mortar in recessed roadside is just filled out when extruding cement mortar
Be charged in recessed road, eliminate or reduce cement mortar towards surrounding heave the problem of.The cement screedn on such floating ground
Efficiency high and easy to operate.
Embodiment 2
1- Fig. 3 is understood with reference to the accompanying drawings, the trowel of the present embodiment, includes the body of trowel, the body of the trowel
The scraper plate 2 with vertical recess 1 including scraping projection on cement screedn by bottom.
The body of the trowel also includes being used for the mud box 3 for containing cement mortar, and the mud box 3 includes the first casing 4,
The first antetheca 6 and the first rear wall 7 that first casing 4 includes the first bottom wall 5, is connected with the first bottom wall 5, first antetheca
6 and first rear wall 7 be connected to the front end of first bottom wall 5 and the rear end of the first bottom wall 5, first antetheca 6 and
The first groove of the upward splendid attire cement mortar of notch, first antetheca are constituted between one rear wall 7 and first bottom wall 5
6 top and the first rear wall 7 are respectively arranged with the first support base 45 and the second support base 46, first support base 45 and second
It is connected between support base 46 by first handle 47.First bottom wall of first casing 4 is rectangular-shape and the first bottom wall
For horizontal wall surface.The rear wall 7 of first antetheca 6 and first is the vertical plate of rectangular-shape.The first handle 47 is cylinder
Shape.
The top of first antetheca 6 is connected with the first location-plate 8 to rear projection, the top of first rear wall 7 with
Connect to the second location-plate 9 of front projection, be provided with from the bottom wall of roof to first location-plate 8 of first location-plate 8
First positioning hole 10, the second positioning hole 11 is provided with from the bottom wall of roof to second location-plate 9 of second location-plate 9.
The location-plate 9 of first location-plate 8 and second is rectangular-shape, and the positioning hole 11 of the first positioning hole 10 and second is circle
Column.
The body of the trowel also includes the first screeding device, and first screeding device includes the first carriage, institute
Stating the first carriage includes the second bottom wall 12, the second antetheca 13 being connected with the second bottom wall 12, the first roof 16, right wall 14 and the
Two rear walls 15, the rear wall 15 of the second antetheca 13 and second are connected to front end and the second bottom wall 15 of second bottom wall 12
Rear end, the front end of the right wall 14 and the rear end of the right wall 14 respectively with the right-hand member of the second antetheca 13 and the second rear wall 15
Right-hand member is connected, and the bottom of the right wall 14 is connected with the right-hand member of second bottom wall 12, and first roof 16 is covered in
The top on the top of second antetheca 13, the top of right wall 14 and the second rear wall 15, among the left end of first roof 16
With jagged, the right-hand member of the breach is connected with first baffle 17 straight up, and the bottom of the right wall 14 is equal from front to back
It is even to be intervally distributed with some first vertical recesses 1, just it is rectangular-shape between the two neighboring first vertical recess 1
First scraping blade, some first through holes 22 are provided with the bottom wall from the roof of second bottom wall 12 to second bottom wall 12,
Some first through holes 22 equidistant arrangement from front to back, gap size and institute between adjacent two the first through holes 22
The front end for stating the interval between identical and adjacent two the first through holes 22 of width size of the first scraping blade is adjacent with this
The rear end at the interval between two the first through holes 22 respectively with the front end of first scraping blade and the rear end phase of first scraping blade
Even, first box house inside first carriage with being connected.Second bottom wall 12 is rectangular-shape and second
Bottom wall is horizontal wall surface, and second antetheca 13, the rear wall 15 of right wall 14 and second are the vertical plate of rectangular-shape, described first
Roof 16 is rectangular-shape structure.The first vertical recess is rectangular-shape.First through hole is rectangular-shape.It is all
The first vertical recess 1 shape size it is consistent.
The top of second antetheca 13 is connected with the 3rd location-plate 18 to rear projection, the top of second rear wall 15
It is connected with the 4th location-plate 19 to front projection, from the roof of the 3rd location-plate 18 to the bottom wall of the 3rd location-plate 18
The 3rd positioning hole 20 is provided with, the 4th positioning is provided with from the bottom wall of roof to the 4th location-plate 19 of the 4th location-plate 19
Hole 21.3rd location-plate 18 and the 4th location-plate 19 are rectangular-shape, the 3rd positioning hole 20 and the 4th positioning hole
21 be rectangular-shape.
First bolt sequentially pass through first positioning hole 10 and the 3rd positioning hole 20 from top to bottom and with the first spiral shell
Parent phase is spirally connected, second bolt sequentially pass through second positioning hole 11 and the 4th positioning hole 21 from top to bottom and with the second spiral shell
Parent phase is spirally connected, the tip contact of first nut on the bottom wall of the 3rd location-plate 18 and second nut top
Contact enables the first bolt and the second bolt respectively in the 3rd positioning hole and the on the bottom wall of the 4th location-plate 19
Moved to the left or to the right in four positioning holes, so as to drive the first carriage to move to the left or to the right.
The mud box 3 also includes the second casing 202, and second casing 202 includes the 3rd bottom wall 23 and the 3rd bottom wall 23
The 3rd antetheca 24 and the 3rd rear wall 25 of connection, the 3rd antetheca 24 and the 3rd rear wall 25 are connected to the 3rd bottom wall
23 front end and the rear end of the 3rd bottom wall 23, formed between the 3rd antetheca 24 and the 3rd rear wall 25 and the 3rd bottom wall 23
Contain the second groove of cement mortar, the right-hand member of second casing 202 be connected with the left end of first casing 4 and
The inside of second casing 202 is connected with the inside of first casing 4, second casing and the first casing phase
Tilt connection.3rd bottom wall of second casing 202 is rectangular-shape.3rd antetheca and the 3rd rear wall are cuboid
Shape.The scope of the angle for tilting connection is 120 degree to 160 degree.
The top of 3rd antetheca 24 is connected with the 5th location-plate 26 to rear projection, the top of the 3rd rear wall 25
It is connected with the 6th location-plate 27 to front projection, from the roof of the 5th location-plate 26 to the bottom wall of the 5th location-plate 26
The 5th positioning hole 28 is provided with, the 6th positioning is provided with from the bottom wall of roof to the 6th location-plate 27 of the 6th location-plate 27
Hole 29.5th location-plate 26 and the 6th location-plate 27 are rectangular-shape, the 5th positioning hole 28 and the 6th positioning hole
29 be cylindric.
The body of the trowel also includes the second screeding device, and second screeding device includes the second carriage, institute
Stating the second carriage includes the 4th bottom wall 30, the 4th antetheca 31 being connected with the 4th bottom wall 30, the second roof 32, left wall 33 and the
Four rear walls 34, the 4th antetheca 31 and the 4th rear wall 34 are connected to front end and the 4th bottom wall 30 of the 4th bottom wall 30
Rear end, the front end of the left wall 33 and the rear end of the left wall 33 respectively with the right-hand member of the 4th antetheca 31 and the 4th rear wall 34
Right-hand member is connected, and the bottom of the left wall 33 is connected with the left end of the 4th bottom wall 34, and second roof 32 is covered in
Top, the top of left wall 33 and the top of the 4th rear wall 34 of 4th antetheca 31, among the right-hand member of second roof 32
With jagged, the left end of the breach is connected with second baffle 35 straight up, and the bottom of the left wall 33 is equal from front to back
It is even to be intervally distributed with some second vertical recesses, just it is the of rectangular-shape between the two neighboring second vertical recess
Two scraping blades, some second through holes 37 are provided with the bottom wall from the roof of the 4th bottom wall 34 to the 4th bottom wall 34, institute
State some second through holes 37 equidistant arrangement from front to back, the gap size between adjacent two the second through holes 37 with it is described
The front end at the interval between two identical and adjacent the second through holes 37 of the width size of the second scraping blade it is adjacent with this two
The rear end at the interval between individual second through hole 37 is connected with the front end of second scraping blade with the rear end of second scraping blade respectively,
The support bar 38 of a triangular prism shape, the width size of the support bar 38 are also connected with the right wall of each second scraping blade
The bottom wall of identical with the width size of second scraping blade and described support bar 38 be embedded in two adjacent the second through holes 37 it
Between interval in, second box house inside second carriage with being connected.4th bottom wall 34 is cuboid
Shape, the 4th antetheca 31, the rear wall 34 of left wall 33 and the 4th are the vertical plate of rectangular-shape, and second roof 32 is rectangular
Body shape structure.The second vertical recess is rectangular-shape.Second through hole is rectangular-shape.All second is vertical recessed
The shape size of mouth is consistent.The first vertical recess and the second vertical recess just constitute vertical recess 1.The support bar
The distance between 38 sizes are identical with the width size of each grid for the waffle slab laid on the ground.
The top of 4th antetheca 31 is connected with the 7th location-plate 39 to rear projection, the top of the 4th rear wall 34
It is connected with the 8th location-plate 40 to front projection, from the roof of the 7th location-plate 39 to the bottom wall of the 7th location-plate 39
The 7th positioning hole 41 is provided with, the 8th positioning is provided with from the bottom wall of roof to the 8th location-plate 40 of the 8th location-plate 40
Hole 42.7th location-plate 39 and the 8th location-plate 40 are rectangular-shape, the 7th positioning hole 41 and the 8th positioning hole
42 be rectangular-shape.
3rd bolt sequentially pass through the 5th positioning hole 28 and the 7th positioning hole 41 from top to bottom and with the 3rd spiral shell
Parent phase is spirally connected, the 4th bolt sequentially pass through the 6th positioning hole 29 and the 8th positioning hole 48 from top to bottom and with the 4th spiral shell
Parent phase is spirally connected, the tip contact of the 3rd nut on the bottom wall of the 7th location-plate 39 and the 4th nut top
Contact enables the 3rd bolt and the 4th bolt respectively in the 7th positioning hole and the on the bottom wall of the 8th location-plate 40
Moved to the left or to the right in eight positioning holes, so as to drive the second carriage to move to the left or to the right.
The operation principle of the trowel, it is specific as follows:
Step 1:When needing directly to fill out cement mortar on the ground, just first the 3rd bolt and the 4th bolt respectively from the
Back-out in three nuts and the 4th nut, then second carriage is unloaded from the second casing and removed;
Step 2:Then first baffle 17 is promoted to the right or to the right to make the first bolt and the second bolt fixed the 3rd respectively
To the right or it is moved to the left in position hole and the 4th positioning hole, first case is departed to adjust some first through holes 22 with this
Body 4 and the size of exposed part, so it can depart from described first by such some first through holes 22 of regulation
Casing 4 and the size of exposed part flow out to up to the big of the amount of the cement mortar on ground to adjust from the first through hole 22
It is small, after the size of regulation to the exposed part of setting, cement mortar is filled up into the casing 202 of the first casing 4 and second;
Step 3:Keep the bottom wall of first casing 4 for horizontality and by the bottom wall of first casing 4 and ground
It is in contact, and second casing is tilted with first casing and is connected so that the cement mortar in the second casing just promotes
Cement mortar in first casing is flowed into the first carriage, and the cement mortar being flowed into the first carriage is just passed through from first
Through hole is flowed into ground;
Step 4:Then hold first handle to be moved to the left, the first scraper plate just can be on the cement mortar on ground be flowed into
The consistent recessed road of equidistant and shape size is scraped, then ceramic tile is laid on the cement mortar surface for forming recessed road;It can thus allow porcelain
When extruding cement mortar, the cement mortar in recessed roadside is filled with recessed road brick, eliminates or reduce cement mortar towards surrounding
The problem of heaving.The efficiency high of the cement screedn on such floating ground and easy to operate.
Step 5:If fill out cement mortar again after first setting up waffle slab on the ground, just first the first bolt and second
Bolt is back-outed from the first nut and the second nut respectively, and then first carriage is unloaded from the first casing and removed;
Step 6:Then second baffle 35 is promoted to the right or to the right to make the 3rd bolt and the 4th bolt fixed the 7th respectively
To the right or it is moved to the left in position hole and the 8th positioning hole, second case is departed to adjust some second through holes 37 with this
Body 202 and the size of exposed part, described the can be so departed from by such some second through holes 37 of regulation
Two casings 202 and the size of exposed part flow out to up to the amount of the cement mortar on ground to adjust from the second through hole 37
Size, after the size of the exposed part of setting is arrived in regulation, cement bonded sand is filled up into the casing 202 of the first casing 4 and second
Slurry;
Step 7:Keep the bottom wall of second casing 202 for horizontality and by the bottom wall of second casing 202 with
Waffle slab is in contact and so that the bottom wall of support bar 38 faces downwards the Grid Edge of the grid of waffle slab, and second casing
Tilt and be connected so that the cement mortar in the first casing just promotes the cement mortar in the second casing with first casing
It is flowed into the second carriage, the cement mortar being flowed into the second carriage is just flowed into ground from the second through hole;
Step 8:Then hold first handle to move right, the second scraper plate just can be on the cement mortar on ground be flowed into
The consistent recessed road of equidistant and shape size is scraped, then ceramic tile is laid on the cement mortar surface for forming recessed road;It can thus allow porcelain
When extruding cement mortar, the cement mortar in recessed roadside is filled with recessed road brick, eliminates or reduce cement mortar towards surrounding
The problem of heaving.The efficiency high of the cement screedn on such floating ground and easy to operate.
The present embodiment has the beneficial effect that:
Scraper plate can scrape the consistent recessed road of equidistant and shape size in the cement mortar for be flowed into ground, then recessed being formed
The cement mortar surface laying ceramic tile on road;Thus allowing ceramic tile, the cement mortar in recessed roadside is just filled out when extruding cement mortar
Be charged in recessed road, eliminate or reduce cement mortar towards surrounding heave the problem of.The cement screedn on such floating ground
Efficiency high and easy to operate.
Embodiment 3
1- Fig. 3 is understood with reference to the accompanying drawings, the trowel of the present embodiment, includes the body of trowel, the body of the trowel
The scraper plate 2 with vertical recess 1 including scraping projection on cement screedn by bottom.
The body of the trowel also includes being used for the mud box 3 for containing cement mortar, and the mud box 3 includes the first casing 4,
The first antetheca 6 and the first rear wall 7 that first casing 4 includes the first bottom wall 5, is connected with the first bottom wall 5, first antetheca
6 and first rear wall 7 be connected to the front end of first bottom wall 5 and the rear end of the first bottom wall 5, first antetheca 6 and
The first groove of the upward splendid attire cement mortar of notch, first antetheca are constituted between one rear wall 7 and first bottom wall 5
6 top and the first rear wall 7 are respectively arranged with the first support base 45 and the second support base 46, first support base 45 and second
It is connected between support base 46 by first handle 47.First bottom wall of first casing 4 is rectangular-shape and the first bottom wall
For horizontal wall surface.The rear wall 7 of first antetheca 6 and first is the vertical plate of rectangular-shape.The first handle 47 is cylinder
Shape.
The top of first antetheca 6 is connected with the first location-plate 8 to rear projection, the top of first rear wall 7 with
Connect to the second location-plate 9 of front projection, be provided with from the bottom wall of roof to first location-plate 8 of first location-plate 8
First positioning hole 10, the second positioning hole 11 is provided with from the bottom wall of roof to second location-plate 9 of second location-plate 9.
The location-plate 9 of first location-plate 8 and second is rectangular-shape, and the positioning hole 11 of the first positioning hole 10 and second is circle
Column.
The body of the trowel also includes the first screeding device, and first screeding device includes the first carriage, institute
Stating the first carriage includes the second bottom wall 12, the second antetheca 13 being connected with the second bottom wall 12, the first roof 16, right wall 14 and the
Two rear walls 15, the rear wall 15 of the second antetheca 13 and second are connected to front end and the second bottom wall 15 of second bottom wall 12
Rear end, the front end of the right wall 14 and the rear end of the right wall 14 respectively with the right-hand member of the second antetheca 13 and the second rear wall 15
Right-hand member is connected, and the bottom of the right wall 14 is connected with the right-hand member of second bottom wall 12, and first roof 16 is covered in
The top on the top of second antetheca 13, the top of right wall 14 and the second rear wall 15, among the left end of first roof 16
With jagged, the right-hand member of the breach is connected with first baffle 17 straight up, and the bottom of the right wall 14 is equal from front to back
It is even to be intervally distributed with some first vertical recesses 1, just it is rectangular-shape between the two neighboring first vertical recess 1
First scraping blade, some first through holes 22 are provided with the bottom wall from the roof of second bottom wall 12 to second bottom wall 12,
Some first through holes 22 equidistant arrangement from front to back, gap size and institute between adjacent two the first through holes 22
The front end for stating the interval between identical and adjacent two the first through holes 22 of width size of the first scraping blade is adjacent with this
The rear end at the interval between two the first through holes 22 respectively with the front end of first scraping blade and the rear end phase of first scraping blade
Even, first box house inside first carriage with being connected.Second bottom wall 12 is rectangular-shape and second
Bottom wall is horizontal wall surface, and second antetheca 13, the rear wall 15 of right wall 14 and second are the vertical plate of rectangular-shape, described first
Roof 16 is rectangular-shape structure.The first vertical recess is rectangular-shape.First through hole is rectangular-shape.It is all
The first vertical recess 1 shape size it is consistent.
The top of second antetheca 13 is connected with the 3rd location-plate 18 to rear projection, the top of second rear wall 15
It is connected with the 4th location-plate 19 to front projection, from the roof of the 3rd location-plate 18 to the bottom wall of the 3rd location-plate 18
The 3rd positioning hole 20 is provided with, the 4th positioning is provided with from the bottom wall of roof to the 4th location-plate 19 of the 4th location-plate 19
Hole 21.3rd location-plate 18 and the 4th location-plate 19 are rectangular-shape, the 3rd positioning hole 20 and the 4th positioning hole
21 be rectangular-shape.
First bolt sequentially pass through first positioning hole 10 and the 3rd positioning hole 20 from top to bottom and with the first spiral shell
Parent phase is spirally connected, second bolt sequentially pass through second positioning hole 11 and the 4th positioning hole 21 from top to bottom and with the second spiral shell
Parent phase is spirally connected, the tip contact of first nut on the bottom wall of the 3rd location-plate 18 and second nut top
Contact enables the first bolt and the second bolt respectively in the 3rd positioning hole and the on the bottom wall of the 4th location-plate 19
Moved to the left or to the right in four positioning holes, so as to drive the first carriage to move to the left or to the right.
The mud box 3 also includes the second casing 202, and second casing 202 includes the 3rd bottom wall 23 and the 3rd bottom wall 23
The 3rd antetheca 24 and the 3rd rear wall 25 of connection, the 3rd antetheca 24 and the 3rd rear wall 25 are connected to the 3rd bottom wall
23 front end and the rear end of the 3rd bottom wall 23, formed between the 3rd antetheca 24 and the 3rd rear wall 25 and the 3rd bottom wall 23
Contain the second groove of cement mortar, the right-hand member of second casing 202 be connected with the left end of first casing 4 and
The inside of second casing 202 is connected with the inside of first casing 4, second casing and the first casing phase
Tilt connection.3rd bottom wall of second casing 202 is rectangular-shape.3rd antetheca and the 3rd rear wall are cuboid
Shape.The scope of the angle for tilting connection is 120 degree to 160 degree.
The top of 3rd antetheca 24 is connected with the 5th location-plate 26 to rear projection, the top of the 3rd rear wall 25
It is connected with the 6th location-plate 27 to front projection, from the roof of the 5th location-plate 26 to the bottom wall of the 5th location-plate 26
The 5th positioning hole 28 is provided with, the 6th positioning is provided with from the bottom wall of roof to the 6th location-plate 27 of the 6th location-plate 27
Hole 29.5th location-plate 26 and the 6th location-plate 27 are rectangular-shape, the 5th positioning hole 28 and the 6th positioning hole
29 be cylindric.
The body of the trowel also includes the second screeding device, and second screeding device includes the second carriage, institute
Stating the second carriage includes the 4th bottom wall 30, the 4th antetheca 31 being connected with the 4th bottom wall 30, the second roof 32, left wall 33 and the
Four rear walls 34, the 4th antetheca 31 and the 4th rear wall 34 are connected to front end and the 4th bottom wall 30 of the 4th bottom wall 30
Rear end, the front end of the left wall 33 and the rear end of the left wall 33 respectively with the right-hand member of the 4th antetheca 31 and the 4th rear wall 34
Right-hand member is connected, and the bottom of the left wall 33 is connected with the left end of the 4th bottom wall 34, and second roof 32 is covered in
Top, the top of left wall 33 and the top of the 4th rear wall 34 of 4th antetheca 31, among the right-hand member of second roof 32
With jagged, the left end of the breach is connected with second baffle 35 straight up, and the bottom of the left wall 33 is equal from front to back
It is even to be intervally distributed with some second vertical recesses, just it is the of rectangular-shape between the two neighboring second vertical recess
Two scraping blades, some second through holes 37 are provided with the bottom wall from the roof of the 4th bottom wall 34 to the 4th bottom wall 34, institute
State some second through holes 37 equidistant arrangement from front to back, the gap size between adjacent two the second through holes 37 with it is described
The front end at the interval between two identical and adjacent the second through holes 37 of the width size of the second scraping blade it is adjacent with this two
The rear end at the interval between individual second through hole 37 is connected with the front end of second scraping blade with the rear end of second scraping blade respectively,
The support bar 38 of a triangular prism shape, the width size of the support bar 38 are also connected with the right wall of each second scraping blade
The bottom wall of identical with the width size of second scraping blade and described support bar 38 be embedded in two adjacent the second through holes 37 it
Between interval in, second box house inside second carriage with being connected.4th bottom wall 34 is cuboid
Shape, the 4th antetheca 31, the rear wall 34 of left wall 33 and the 4th are the vertical plate of rectangular-shape, and second roof 32 is rectangular
Body shape structure.The second vertical recess is rectangular-shape.Second through hole is rectangular-shape.All second is vertical recessed
The shape size of mouth is consistent.The first vertical recess and the second vertical recess just constitute vertical recess 1.The support bar
The distance between 38 sizes are identical with the width size of each grid for the waffle slab laid on the ground.
The top of 4th antetheca 31 is connected with the 7th location-plate 39 to rear projection, the top of the 4th rear wall 34
It is connected with the 8th location-plate 40 to front projection, from the roof of the 7th location-plate 39 to the bottom wall of the 7th location-plate 39
The 7th positioning hole 41 is provided with, the 8th positioning is provided with from the bottom wall of roof to the 8th location-plate 40 of the 8th location-plate 40
Hole 42.7th location-plate 39 and the 8th location-plate 40 are rectangular-shape, the 7th positioning hole 41 and the 8th positioning hole
42 be rectangular-shape.
3rd bolt sequentially pass through the 5th positioning hole 28 and the 7th positioning hole 41 from top to bottom and with the 3rd spiral shell
Parent phase is spirally connected, the 4th bolt sequentially pass through the 6th positioning hole 29 and the 8th positioning hole 48 from top to bottom and with the 4th spiral shell
Parent phase is spirally connected, the tip contact of the 3rd nut on the bottom wall of the 7th location-plate 39 and the 4th nut top
Contact enables the 3rd bolt and the 4th bolt respectively in the 7th positioning hole and the on the bottom wall of the 8th location-plate 40
Moved to the left or to the right in eight positioning holes, so as to drive the second carriage to move to the left or to the right.
The operation principle of the trowel, it is specific as follows:
Step 1:When needing directly to fill out cement mortar on the ground, just first the 3rd bolt and the 4th bolt respectively from the
Back-out in three nuts and the 4th nut, then second carriage is unloaded from the second casing and removed;
Step 2:Then first baffle 17 is promoted to the right or to the right to make the first bolt and the second bolt fixed the 3rd respectively
To the right or it is moved to the left in position hole and the 4th positioning hole, first case is departed to adjust some first through holes 22 with this
Body 4 and the size of exposed part, so it can depart from described first by such some first through holes 22 of regulation
Casing 4 and the size of exposed part flow out to up to the big of the amount of the cement mortar on ground to adjust from the first through hole 22
It is small, after the size of regulation to the exposed part of setting, cement mortar is filled up into the casing 202 of the first casing 4 and second;
Step 3:Keep the bottom wall of first casing 4 for horizontality and by the bottom wall of first casing 4 and ground
It is in contact, and second casing is tilted with first casing and is connected so that the cement mortar in the second casing just promotes
Cement mortar in first casing is flowed into the first carriage, and the cement mortar being flowed into the first carriage is just passed through from first
Through hole is flowed into ground;
Step 4:Then hold first handle to be moved to the left, the first scraper plate just can be on the cement mortar on ground be flowed into
The consistent recessed road of equidistant and shape size is scraped, then ceramic tile is laid on the cement mortar surface for forming recessed road;It can thus allow porcelain
When extruding cement mortar, the cement mortar in recessed roadside is filled with recessed road brick, eliminates or reduce cement mortar towards surrounding
The problem of heaving.The efficiency high of the cement screedn on such floating ground and easy to operate.
Step 5:If fill out cement mortar again after first setting up waffle slab on the ground, just first the first bolt and second
Bolt is back-outed from the first nut and the second nut respectively, and then first carriage is unloaded from the first casing and removed;
Step 6:Then second baffle 35 is promoted to the right or to the right to make the 3rd bolt and the 4th bolt fixed the 7th respectively
To the right or it is moved to the left in position hole and the 8th positioning hole, second case is departed to adjust some second through holes 37 with this
Body 202 and the size of exposed part, described the can be so departed from by such some second through holes 37 of regulation
Two casings 202 and the size of exposed part flow out to up to the amount of the cement mortar on ground to adjust from the second through hole 37
Size, after the size of the exposed part of setting is arrived in regulation, cement bonded sand is filled up into the casing 202 of the first casing 4 and second
Slurry;
Step 7:Keep the bottom wall of second casing 202 for horizontality and by the bottom wall of second casing 202 with
Waffle slab is in contact and so that the bottom wall of support bar 38 faces downwards the Grid Edge of the grid of waffle slab, and second casing
Tilt and be connected so that the cement mortar in the first casing just promotes the cement mortar in the second casing with first casing
It is flowed into the second carriage, the cement mortar being flowed into the second carriage is just flowed into ground from the second through hole;
Step 8:Then hold first handle to move right, the second scraper plate just can be on the cement mortar on ground be flowed into
The consistent recessed road of equidistant and shape size is scraped, then ceramic tile is laid on the cement mortar surface for forming recessed road;It can thus allow porcelain
When extruding cement mortar, the cement mortar in recessed roadside is filled with recessed road brick, eliminates or reduce cement mortar towards surrounding
The problem of heaving.The efficiency high of the cement screedn on such floating ground and easy to operate.
The present embodiment has the beneficial effect that:
Scraper plate can scrape the consistent recessed road of equidistant and shape size in the cement mortar for be flowed into ground, then recessed being formed
The cement mortar surface laying ceramic tile on road;Thus allowing ceramic tile, the cement mortar in recessed roadside is just filled out when extruding cement mortar
Be charged in recessed road, eliminate or reduce cement mortar towards surrounding heave the problem of.The cement screedn on such floating ground
Efficiency high and easy to operate.
After unloading and removing the first carriage or the second carriage, the first carriage or second are often supported moulding
It is placed in the box body of rectangular-shape to prevent from being stained, and box body is often fixed on second handle and gripped with facilitating, second handle
The mode of upper fixed bin body is fixed for the roof of second handle and the bottom phase welding of box body, because box body is usually due to box body
Need to separate to be safeguarded with second handle, but separating welding fixed structure can allow second handle impaired or even can not continue
Use, increase expenses.
Described to unload the first carriage removed or the second carriage is placed in the box body of rectangular-shape, the box body is fixed
On second handle, the bottom integration of the box body 24 is connected to the connecting rod S2, the second handle S1 of straight quadrangular shape
For quadrangular shape, the connecting rod S2 is linked with the second handle S1 by bracing beam S3, and the bracing beam S3 weldings exist
One end of the second handle S1, the bracing beam S3 are quadrangular shape, are carried in the bracing beam S3 and penetrate it from the top of it
The blocked hole of bottom, the clamping joint S4, the clamping joint S4 that clamping with its interference fits in the blocked hole are fused to connection
Bar S2 bottom, the clamping joint S4 set the first location equipment to be positioned with second with the coupled position between the bracing beam S3
Equipment, first location equipment include being fused to a pair of mirror images of the bracing beam S3 and second handle S1 positions between
First connection sheet S5 of distribution melts with the second connection sheet S6 between being connected to a pair of connection sheet S5, the second connection sheet S6
One side that the connecting rod S2 is in the second handle S1 positions is connected to, second location equipment includes being located at the connection
For bar S2 with the first spacer S7 of the clamping joint S4 coupled positions and with its second corresponding spacer S8, described first is fixed
Bit slice S7 is located at the second spacer S8 top, and each autogenous weldings of the first spacer S7 are in the connecting rod S2, the clamping
Head S4 both sides and with one side opposite the second handle S1, each autogenous weldings of the second spacer S8 are in the connection
Bar S3 both sides one side relative with the second handle S1.
The first connection sheet S5 passes through leading screw with opposite silk hole is provided between the second connection sheet S6 between the silk hole
Silk is connected together.
The first spacer S7 is with opposite silk hole is provided between the second spacer S8, via leading screw between the silk hole
Silk is connected together.
This framework is uncomplicated, and it is good to be coupled firm performance because with silk connect with clamping as mode, such framework
For the framework that can be disassembled, so can efficiently lift assembling speed during utilization, following dimension to box body is easier in addition
Shield and recycling, reduce charge costs.
The utility model is described in a manner of brief description of the drawings above, it will be understood by those of skill in the art that this
It is open to be not limited to embodiments described above, in the case of without departing from the scope of the utility model, can make a variety of changes,
Change and replace.
Claims (9)
1. a kind of trowel, include the body of trowel, it is characterised in that the body of the trowel is included by bottom in water
The scraper plate with vertical recess of projection is scraped on cement mortar surface layer.
2. trowel according to claim 1, it is characterised in that the body of the trowel also includes being used for containing cement
The mud box of mortar, the mud box include the first casing, first casing include the first bottom wall, be connected with the first bottom wall first
Antetheca and the first rear wall, first antetheca and the first rear wall are connected to front end and the first bottom wall of first bottom wall
Rear end, the of the upward splendid attire cement mortar of notch is constituted between first antetheca and the first rear wall and first bottom wall
One groove, the top of first antetheca and the first rear wall are respectively arranged with the first support base and the second support base, and described first
It is connected between support base and the second support base by first handle.
3. trowel according to claim 2, it is characterised in that the top of first antetheca and first to rear projection
Location-plate is connected, and the top of first rear wall is connected with the second location-plate to front projection, from the top of first location-plate
The bottom wall of wall to first location-plate is provided with the first positioning hole, from the roof of second location-plate to second location-plate
Bottom wall be provided with the second positioning hole.
4. trowel according to claim 3, it is characterised in that the body of the trowel also includes the first scraper plate and filled
Put, first screeding device includes the first carriage, and first carriage includes the second bottom wall, is connected with the second bottom wall
Second antetheca, the first roof, right wall and the second rear wall, second antetheca and the second rear wall are connected to second bottom wall
Front end and the second bottom wall rear end, the rear end of the front end of the right wall and the right wall respectively with the right-hand member of the second antetheca and
The right-hand member of two rear walls is connected, and the bottom of the right wall is connected with the right-hand member of second bottom wall, the first roof covering
On the top on the top of second antetheca, the top of right wall and the second rear wall, with scarce among the left end of first roof
Mouthful, the right-hand member of the breach is connected with first baffle straight up, and uniform intervals are distributed from front to back for the bottom of the right wall
The some first vertical recesses, be just the first scraping blade of rectangular-shape between the two neighboring first vertical recess, from described
The roof of second bottom wall is to some first through holes are provided with the bottom wall of second bottom wall, and some first through holes are before
Equidistant arrangement backward, the gap size between adjacent two the first through holes is identical with the width size of first scraping blade,
And the interval between two first through holes adjacent with this of the front end at the interval between two adjacent the first through holes
Rear end is connected with the front end of first scraping blade with the rear end of first scraping blade respectively, first box house and described first
It is connected inside carriage.
5. trowel according to claim 4, it is characterised in that the top of second antetheca and the to rear projection the 3rd
Location-plate is connected, and the top of second rear wall is connected with the 4th location-plate to front projection, from the top of the 3rd location-plate
The bottom wall of wall to the 3rd location-plate is provided with the 3rd positioning hole, from the roof of the 4th location-plate to the 4th location-plate
Bottom wall be provided with the 4th positioning hole.
6. trowel according to claim 5, it is characterised in that it is fixed that the first bolt sequentially passes through described first from top to bottom
Position hole and the 3rd positioning hole and sequentially pass through second positioning hole and the from top to bottom with the first nut bolt, the second bolt
Four positioning holes and with the second nut bolt, the tip contact of first nut is on the 3rd location-plate bottom wall and institute
The tip contact for stating the second nut enables the first bolt and the second bolt to exist respectively on the bottom wall of the 4th location-plate
Moved to the left or to the right in 3rd positioning hole and the 4th positioning hole, so as to drive the first carriage to move to the left or to the right.
7. trowel according to claim 6, it is characterised in that the mud box also includes the second casing, second case
The 3rd antetheca and the 3rd rear wall that body includes the 3rd bottom wall, is connected with the 3rd bottom wall, the 3rd antetheca and the 3rd the rear wall difference
It is connected to the front end of the 3rd bottom wall and the rear end of the 3rd bottom wall, the 3rd antetheca and the 3rd rear wall and the 3rd bottom wall
Between constitute the second groove for containing cement mortar, the right-hand member of second casing is connected with the left end of first casing
And the inside of second casing is connected with the inside of first casing, second casing and the first casing phase
Tilt connection.
8. trowel according to claim 7, it is characterised in that the top of the 3rd antetheca and the to rear projection the 5th
Location-plate is connected, and the top of the 3rd rear wall is connected with the 6th location-plate to front projection, from the top of the 5th location-plate
The bottom wall of wall to the 5th location-plate is provided with the 5th positioning hole, from the roof of the 6th location-plate to the 6th location-plate
Bottom wall be provided with the 6th positioning hole.
9. trowel according to claim 8, it is characterised in that the body of the trowel also includes the second scraper plate and filled
Put, second screeding device includes the second carriage, and second carriage includes the 4th bottom wall, is connected with the 4th bottom wall
4th antetheca, the second roof, left wall and the 4th rear wall, the 4th antetheca and the 4th rear wall are connected to the 4th bottom wall
Front end and the 4th bottom wall rear end, the rear end of the front end of the left wall and the left wall respectively with the right-hand member of the 4th antetheca and
The right-hand member of four rear walls is connected, and the bottom of the left wall is connected with the left end of the 4th bottom wall, the second roof covering
On the top of the 4th antetheca, the top of left wall and the top of the 4th rear wall, with scarce among the right-hand member of second roof
Mouthful, the left end of the breach is connected with second baffle straight up, and uniform intervals are distributed from front to back for the bottom of the left wall
The some second vertical recesses, be just the second scraping blade of rectangular-shape between the two neighboring second vertical recess, from described
The roof of 4th bottom wall is to some second through holes are provided with the bottom wall of the 4th bottom wall, and some second through holes are before
Equidistant arrangement backward, the gap size between adjacent two the second through holes is identical with the width size of second scraping blade,
And the interval between two second through holes adjacent with this of the front end at the interval between two adjacent the second through holes
Rear end is connected with the front end of second scraping blade with the rear end of second scraping blade respectively, in the right wall of each second scraping blade also
Be connected to the support bar of a triangular prism shape, the width size of the support bar it is identical with the width size of second scraping blade and
The bottom wall of the support bar is embedded in the interval between two adjacent the second through holes, second box house and described the
It is connected inside two carriages;
The top of 4th antetheca is connected with the 7th location-plate to rear projection, the top of the 4th rear wall with to front projection
The 8th location-plate connection, be provided with the 7th positioning hole from the bottom wall of roof to the 7th location-plate of the 7th location-plate,
The 8th positioning hole is provided with from the bottom wall of roof to the 8th location-plate of the 8th location-plate;
3rd bolt sequentially pass through the 5th positioning hole and the 7th positioning hole from top to bottom and with the 3rd nut bolt, the 4th
Bolt sequentially pass through the 6th positioning hole and the 8th positioning hole from top to bottom and with the 4th nut bolt, the 3rd nut
Tip contact on the 7th location-plate bottom wall and the 4th nut tip contact in the 8th location-plate
The 3rd bolt and the 4th bolt is enabled to be moved to the left or to the right in the 7th positioning hole and the 8th positioning hole respectively on bottom wall,
So as to drive the second carriage to move to the left or to the right.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720411099.3U CN206752987U (en) | 2017-04-19 | 2017-04-19 | A kind of trowel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720411099.3U CN206752987U (en) | 2017-04-19 | 2017-04-19 | A kind of trowel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206752987U true CN206752987U (en) | 2017-12-15 |
Family
ID=60614313
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720411099.3U Expired - Fee Related CN206752987U (en) | 2017-04-19 | 2017-04-19 | A kind of trowel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206752987U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107060298A (en) * | 2017-04-19 | 2017-08-18 | 彭程 | A kind of trowel and its method |
CN110206285A (en) * | 2019-07-04 | 2019-09-06 | 广东博智林机器人有限公司 | A kind of Pulp scraping device |
-
2017
- 2017-04-19 CN CN201720411099.3U patent/CN206752987U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107060298A (en) * | 2017-04-19 | 2017-08-18 | 彭程 | A kind of trowel and its method |
CN107060298B (en) * | 2017-04-19 | 2023-09-19 | 彭程 | Trowel and method thereof |
CN110206285A (en) * | 2019-07-04 | 2019-09-06 | 广东博智林机器人有限公司 | A kind of Pulp scraping device |
CN110206285B (en) * | 2019-07-04 | 2021-02-09 | 广东博智林机器人有限公司 | Slurry scraping device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206752987U (en) | A kind of trowel | |
CN111576121A (en) | Floor tile paving structure and floor tile paving construction process | |
CN109930781A (en) | A kind of accomodation ground construction method | |
CN212389031U (en) | Mortar spreader for mortar joints of masonry | |
CN107268959A (en) | One kind perfusion tile laying method and auxiliary frame | |
CN109024987A (en) | Construction method is poured after a kind of toilet shear wall | |
CN108708559A (en) | Build the grey auxiliary tool of paving and its application method by laying bricks or stones | |
CN107060298A (en) | A kind of trowel and its method | |
CN207829495U (en) | Control the combination tool of building wall level, vertical mortar joint plumpness and thickness | |
CN113882565B (en) | Assembly type unit ceramic brick dry-hanging curtain wall system and construction method thereof | |
CN213449381U (en) | Gap jointing device is built by laying bricks or stones to landscape building | |
CN214658575U (en) | Plastering device for housing construction | |
CN211815972U (en) | A extract template component for concrete core wall | |
CN111005583B (en) | Wall building block transverse mortar joint and vertical mortar joint control device | |
CN220377894U (en) | Mortar spreading and pointing integrated machine for masonry of filled wall | |
CN106245828A (en) | The method of construction of heat insulation integrated body of wall | |
CN216682639U (en) | Steel frame mortar mould for quickly building concrete hollow concrete building block | |
CN212002377U (en) | Be used for aerated block to build instrument for jointing by laying bricks or stones | |
CN211396685U (en) | Brick pushing device suitable for wall building | |
CN210263983U (en) | Mortar spreading device | |
CN212027177U (en) | Brick wall masonry mold | |
CN219411916U (en) | Quick mortar laying tool | |
CN211473463U (en) | Device for controlling thickness of horizontal masonry mortar joint | |
CN218467170U (en) | Horizontal mortar spreading device for wall | |
CN209369227U (en) | Ceramic tile spreads frame for intangling net |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171215 |
|
CF01 | Termination of patent right due to non-payment of annual fee |