CN107060298A - A kind of trowel and its method - Google Patents

A kind of trowel and its method Download PDF

Info

Publication number
CN107060298A
CN107060298A CN201710256192.6A CN201710256192A CN107060298A CN 107060298 A CN107060298 A CN 107060298A CN 201710256192 A CN201710256192 A CN 201710256192A CN 107060298 A CN107060298 A CN 107060298A
Authority
CN
China
Prior art keywords
bottom wall
wall
plate
casing
location
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710256192.6A
Other languages
Chinese (zh)
Other versions
CN107060298B (en
Inventor
彭程
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710256192.6A priority Critical patent/CN107060298B/en
Publication of CN107060298A publication Critical patent/CN107060298A/en
Application granted granted Critical
Publication of CN107060298B publication Critical patent/CN107060298B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/02Implements for finishing work on buildings for applying plasticised masses to surfaces, e.g. plastering walls
    • E04F21/16Implements for after-treatment of plaster or the like before it has hardened or dried, e.g. smoothing-tools, profile trowels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/20Implements for finishing work on buildings for laying flooring
    • E04F21/24Implements for finishing work on buildings for laying flooring of masses made in situ, e.g. smoothing tools
    • E04F21/241Elongated smoothing blades or plates, e.g. screed apparatus
    • E04F21/244Elongated smoothing blades or plates, e.g. screed apparatus with means to adjust the working angle of the leveling blade or plate

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

A kind of trowel and its method, body including trowel, it is characterized in that, the body of trowel includes the scraper plate with vertical recess for scraping projection on cement screedn by bottom, the body of trowel also includes the mud box for being used for containing cement mortar, mud box includes the first casing, first casing includes the first bottom wall, the first antetheca and the first rear wall being connected with the first bottom wall, first antetheca and the first rear wall are connected to the front end of first bottom wall and the rear end of the first bottom wall, the first groove of the splendid attire cement mortar of notch upwards is constituted between first antetheca and the first rear wall and first bottom wall, the top of first antetheca and the first rear wall are respectively arranged with the first support base and the second support base, it is connected between first support base and the second support base by first handle.The cement screedn inefficiency on floating ground in the prior art, the defect for causing the cement mortar being affixed with ceramic tile to be heaved towards surrounding are effectively prevent with reference to its method.

Description

A kind of trowel and its method
Technical field
The present invention relates to claying technical field, and in particular to a kind of trowel and its method, more particularly to a kind of multi-functional Mud foam and its method.
Background technology
Existing trowel, is the manual work for being used for building the plane operations such as ground, metope, ceiling among architectural engineering Tool.Trowel has a bottom plate, is fitted with first handle, and first handle is held in bricklayer when using, by pastes such as mortars It is compacted, catches up with flat.
And it is current, architectural ground of building by laying bricks or stones needs the cement mortar bedding cushion for paving ceramic tile, it is also desirable to which the mud used is smeared Son carrys out floating cement screedn, cement mortar can only be often inserted on the ground, then again with existing trowel come floating Cement screedn, is so accomplished by the higher workmen of technology, can improve speed and quality.And toward filling out on ground Entering cement mortar needs multiple types of tools, and time-consuming, laborious, inefficiency adds the workmen for needing technology higher, could completed Ensure speed and quality.So inevitably cause the cement screedn inefficiency on floating ground.
And on the other hand, tile laying appears in tile laying in cement on smooth cement screedn, often Can cause when on mortar surface layer the cement mortar being affixed with ceramic tile towards surrounding heave the problem of.
The content of the invention
To solve the above problems, the invention provides a kind of trowel and its method, effectively prevent and smear in the prior art The cement screedn inefficiency of plane earth, the defect for causing the cement mortar being affixed with ceramic tile to be heaved towards surrounding.
In order to overcome deficiency of the prior art, the invention provides a kind of trowel and its solution of method, tool Body is as follows:
A kind of trowel, includes the body of trowel, and the body of the trowel is included by bottom in cement sand pulp The scraper plate 2 with vertical recess 1 of projection is scraped on layer.
Further, the body of the trowel also includes the mud box 3 for being used for containing cement mortar, and the mud box 3 includes First casing 4, the first antetheca 6 and the first rear wall 7 that first casing 4 includes the first bottom wall 5, is connected with the first bottom wall 5, institute State the first antetheca 6 and the first rear wall 7 is connected to the front end of first bottom wall 5 and the rear end of the first bottom wall 5, described first The first groove of the splendid attire cement mortar of notch upwards, institute are constituted between the rear wall 7 of antetheca 6 and first and first bottom wall 5 The top and the first rear wall 7 for stating the first antetheca 6 are respectively arranged with the first support base 45 and the second support base 46, first support It is connected between the support base 46 of seat 45 and second by first handle 47.
Further, the top of first antetheca 6 is connected with the first location-plate 8 to rear projection, first rear wall 7 Top be connected with the second location-plate 9 to front projection, from the roof of first location-plate 8 to first location-plate 8 Bottom wall is provided with the first positioning hole 10, and being provided with second from the bottom wall of roof to second location-plate 9 of second location-plate 9 determines Position hole 11.
Further, the body of the trowel also includes the first screeding device, and first screeding device includes first Carriage, first carriage include the second bottom wall 12, the second antetheca 13 being connected with the second bottom wall 12, the first roof 16, The rear wall 15 of right wall 14 and second, the rear wall 15 of the second antetheca 13 and second be connected to second bottom wall 12 front end and The rear end of second bottom wall 15, the front end of the right wall 14 and the rear end of the right wall 14 respectively with the right-hand member of the second antetheca 13 and The right-hand member of two rear walls 15 is connected, and the bottom of the right wall 14 is connected with the right-hand member of second bottom wall 12, first top Wall 16 is covered in the top on the top, the top of right wall 14 and the second rear wall 15 of second antetheca 13, first roof 16 Left end Intermediate Gray it is jagged, the right-hand member of the breach is connected with first baffle 17 straight up, the bottom of the right wall 14 Uniform intervals, which are dispersed between some first vertical recesses 1, the two neighboring first vertical recess 1, from front to back is just First scraping blade of rectangular-shape, some first are provided with from bottom wall of the roof of second bottom wall 12 to second bottom wall 12 Between between through hole 22, some first through holes 22 equidistant arrangement from front to back, two adjacent the first through holes 22 The front end at the interval between size two first through holes 22 identical and adjacent with the width size of first scraping blade First scraped with this with the front end of first scraping blade respectively the rear end at the interval between two the first through holes 22 adjacent with this The rear end of piece is connected, and first box house inside first carriage with being connected.
Further, the top of second antetheca 13 is connected with the 3rd location-plate 18 to rear projection, after described second The top of wall 15 is connected with the 4th location-plate 19 to front projection, from the roof of the 3rd location-plate 18 to the described 3rd positioning The bottom wall of plate 18 is provided with the 3rd positioning hole 20, is opened from the bottom wall of roof to the 4th location-plate 19 of the 4th location-plate 19 There is the 4th positioning hole 21.
Further, first bolt sequentially pass through first positioning hole 10 and the 3rd positioning hole 20 from top to bottom and With the first nut bolt, second bolt sequentially pass through second positioning hole 11 and the 4th positioning hole 21 from top to bottom and With the second nut bolt, the tip contact of first nut is on the bottom wall of the 3rd location-plate 18 and second spiral shell Female tip contact enables the first bolt and the second bolt fixed the 3rd respectively on the bottom wall of the 4th location-plate 19 Moved to the left or to the right in position hole and the 4th positioning hole, so as to drive the first carriage to move to the left or to the right.
Further, the mud box 3 also include the second casing 202, second casing 202 include the 3rd bottom wall 23, with The 3rd antetheca 24 and the 3rd rear wall 25 of 3rd bottom wall 23 connection, the 3rd antetheca 24 and the 3rd rear wall 25 are connected to institute State the front end of the 3rd bottom wall 23 and the rear end of the 3rd bottom wall 23, the 3rd antetheca 24 and the 3rd rear wall 25 and the 3rd bottom wall The second groove for containing cement mortar, the left end of the right-hand member of second casing 202 and first casing 4 are constituted between 23 Be connected and the inside of second casing 202 be connected with the inside of first casing 4, second casing with it is described First casing tilts connection.
Further, the top of the 3rd antetheca 24 is connected with the 5th location-plate 26 to rear projection, after the described 3rd The top of wall 25 is connected with the 6th location-plate 27 to front projection, from the roof of the 5th location-plate 26 to the described 5th positioning The bottom wall of plate 26 is provided with the 5th positioning hole 28, is opened from the bottom wall of roof to the 6th location-plate 27 of the 6th location-plate 27 There is the 6th positioning hole 29.
Further, the body of the trowel also includes the second screeding device, and second screeding device includes second Carriage, second carriage include the 4th bottom wall 30, the 4th antetheca 31 being connected with the 4th bottom wall 30, the second roof 32, The rear wall 34 of left wall 33 and the 4th, the 4th antetheca 31 and the 4th rear wall 34 be connected to the 4th bottom wall 30 front end and The rear end of 4th bottom wall 30, the front end of the left wall 33 and the rear end of the left wall 33 respectively with the right-hand member of the 4th antetheca 31 and The right-hand member of four rear walls 34 is connected, and the bottom of the left wall 33 is connected with the left end of the 4th bottom wall 34, second top Wall 32 is covered in the top on the top, the top of left wall 33 and the 4th rear wall 34 of the 4th antetheca 31, second roof 32 Right-hand member Intermediate Gray it is jagged, the left end of the breach is connected with second baffle 35 straight up, the bottom of the left wall 33 Uniform intervals are dispersed between some second vertical recesses, the two neighboring second vertical recess just as length from front to back Second scraping blade of cube shape, from bottom wall of the roof of the 4th bottom wall 34 to the 4th bottom wall 34 being provided with some second passes through Interval between through hole 37, some second through holes 37 equidistant arrangement from front to back, two adjacent the second through holes 37 The front end at the interval between size two the second through holes 37 identical and adjacent with the width size of second scraping blade with The rear end at the interval between two adjacent second through holes 37 respectively with the front end of second scraping blade and second scraping blade Rear end be connected, the support bar 38 of a triangular prism shape, the support bar are also connected with the right wall of each second scraping blade 38 width size is identical with the width size of second scraping blade and bottom wall of the support bar 38 is embedded in adjacent two the In interval between two through holes 37, second box house inside second carriage with being connected.
Further, the top of the 4th antetheca 31 is connected with the 7th location-plate 39 to rear projection, after the described 4th The top of wall 34 is connected with the 8th location-plate 40 to front projection, from the roof of the 7th location-plate 39 to the described 7th positioning The bottom wall of plate 39 is provided with the 7th positioning hole 41, is opened from the bottom wall of roof to the 8th location-plate 40 of the 8th location-plate 40 There is the 8th positioning hole 42.
Further, the 3rd bolt sequentially pass through the 5th positioning hole 28 and the 7th positioning hole 41 from top to bottom and With the 3rd nut bolt, the 4th bolt sequentially pass through the 6th positioning hole 29 and the 8th positioning hole 48 from top to bottom and With the 4th nut bolt, the tip contact of the 3rd nut is on the bottom wall of the 7th location-plate 39 and the 4th spiral shell Female tip contact enables the 3rd bolt and the 4th bolt fixed the 7th respectively on the bottom wall of the 8th location-plate 40 Moved to the left or to the right in position hole and the 8th positioning hole, so as to drive the second carriage to move to the left or to the right.
Further, the method for the trowel, specific as follows:
Step 1:When needing directly to fill out cement mortar on the ground, just first the 3rd bolt and the 4th bolt respectively from the Back-out in three nuts and the 4th nut, then second carriage is unloaded from the second casing and removed;
Step 2:Then first baffle 17 is promoted to the right or to the right to make the first bolt and the second bolt fixed the 3rd respectively To the right or it is moved to the left in position hole and the 4th positioning hole, some first through holes 22 is adjusted with this and depart from first case After body 4 and the size of exposed part, the size of regulation to the exposed part of setting, toward the case of the first casing 4 and second Cement mortar is filled up in body 202;
Step 3:Keep the bottom wall of first casing 4 for horizontality and by the bottom wall of first casing 4 and ground It is in contact, and second casing is tilted with first casing and is connected so that the cement mortar in the second casing is just promoted Cement mortar in first casing is flowed into the first carriage, and the cement mortar being flowed into the first carriage is just passed through from first Through hole is flowed into ground;
Step 4:Then hold first handle to be moved to the left, the first scraper plate can be just flowed into the cement mortar on ground The consistent recessed road of equidistant and shape size is scraped, then ceramic tile is laid on the cement mortar surface for forming recessed road;
Step 5:If first fill out cement mortar again after erection waffle slab on the ground, just first the first bolt and second Bolt is back-outed from the first nut and the second nut respectively, and then first carriage is unloaded from the first casing and removed;
Step 6:Then second baffle 35 is promoted to the right or to the right to make the 3rd bolt and the 4th bolt fixed the 7th respectively To the right or it is moved to the left in position hole and the 8th positioning hole, some second through holes 37 is adjusted with this and depart from second case After body 202 and the size of exposed part, the size of regulation to the exposed part of setting, toward first casing 4 and second Cement mortar is filled up in casing 202;
Step 7:Keep the bottom wall of second casing 202 for horizontality and by the bottom wall of second casing 202 with Waffle slab is in contact and so that the bottom wall of support bar 38 faces downwards the Grid Edge of the grid of waffle slab, and second casing Tilt and be connected so that the cement mortar in the first casing just promotes the cement mortar in the second casing with first casing It is flowed into the second carriage, the cement mortar being flowed into the second carriage is just flowed into ground from the second through hole;
Step 8:Then hold first handle to move right, the second scraper plate can be just flowed into the cement mortar on ground The consistent recessed road of equidistant and shape size is scraped, then ceramic tile is laid on the cement mortar surface for forming recessed road.
Beneficial effects of the present invention are:
Scraper plate can scrape the consistent recessed road of equidistant and shape size in the cement mortar for be flowed into ground, then recessed being formed The cement mortar surface laying ceramic tile on road;It can thus allow ceramic tile when extruding cement mortar, the cement mortar in recessed roadside is just filled out Be charged in recessed road, eliminate or reduce cement mortar towards surrounding heave the problem of.The cement screedn on such floating ground Efficiency high and easy to operate.
Brief description of the drawings
Fig. 1 is the schematic diagram of the separating component of the body of the trowel for eliminating support bar of the present invention.
Fig. 2 is the side structure schematic view of the support bar of the present invention.
Fig. 3 is the principle schematic of the connecting rod of the present invention.
Embodiment
The present invention is described further below in conjunction with drawings and examples.
Embodiment 1
1- Fig. 3 understands that the trowel of the present embodiment includes the body of trowel, the body of the trowel with reference to the accompanying drawings The scraper plate 2 with vertical recess 1 including scraping projection on cement screedn by bottom.
The body of the trowel also includes the mud box 3 for being used for containing cement mortar, and the mud box 3 includes the first casing 4, The first antetheca 6 and the first rear wall 7 that first casing 4 includes the first bottom wall 5, is connected with the first bottom wall 5, first antetheca 6 and first rear wall 7 be connected to the front end of first bottom wall 5 and the rear end of the first bottom wall 5, first antetheca 6 and The first groove of the splendid attire cement mortar of notch upwards, first antetheca are constituted between one rear wall 7 and first bottom wall 5 6 top and the first rear wall 7 are respectively arranged with the first support base 45 and the second support base 46, first support base 45 and second It is connected between support base 46 by first handle 47.First bottom wall of first casing 4 is rectangular-shape and the first bottom wall For horizontal wall surface.The rear wall 7 of first antetheca 6 and first is the vertical plate of rectangular-shape.The first handle 47 is cylinder Shape.
The top of first antetheca 6 is connected with the first location-plate 8 to rear projection, the top of first rear wall 7 with Connect, be provided with from the bottom wall of roof to first location-plate 8 of first location-plate 8 to the second location-plate 9 of front projection First positioning hole 10, the second positioning hole 11 is provided with from the bottom wall of roof to second location-plate 9 of second location-plate 9. The location-plate 9 of first location-plate 8 and second is rectangular-shape, and the positioning hole 11 of the first positioning hole 10 and second is circle Column.
The body of the trowel also includes the first screeding device, and first screeding device includes the first carriage, institute Stating the first carriage includes the second bottom wall 12, the second antetheca 13 being connected with the second bottom wall 12, the first roof 16, right wall 14 and the Two rear walls 15, the rear wall 15 of the second antetheca 13 and second is connected to front end and the second bottom wall 15 of second bottom wall 12 Rear end, the front end of the right wall 14 and the rear end of the right wall 14 respectively with the right-hand member of the second antetheca 13 and the second rear wall 15 Right-hand member is connected, and the bottom of the right wall 14 is connected with the right-hand member of second bottom wall 12, and first roof 16 is covered in In the middle of the top on the top of second antetheca 13, the top of right wall 14 and the second rear wall 15, the left end of first roof 16 With jagged, the right-hand member of the breach is connected with first baffle 17 straight up, and the bottom of the right wall 14 is equal from front to back It is even to be intervally distributed between some first vertical recesses 1, the two neighboring first vertical recess 1 just as rectangular-shape First scraping blade, some first through holes 22 are provided with from bottom wall of the roof of second bottom wall 12 to second bottom wall 12, Gap size and institute between some first through holes 22 equidistant arrangement from front to back, two adjacent the first through holes 22 The front end for stating interval between identical and adjacent two the first through holes 22 of width size of the first scraping blade is adjacent with this The rear end at the interval between two the first through holes 22 respectively with the front end of first scraping blade and the rear end phase of first scraping blade Even, first box house inside first carriage with being connected.Second bottom wall 12 is rectangular-shape and second Bottom wall is horizontal wall surface, and second antetheca 13, the rear wall 15 of right wall 14 and second are the vertical plate of rectangular-shape, described first Roof 16 is rectangular-shape structure.The first vertical recess is rectangular-shape.First through hole is rectangular-shape.It is all The first vertical recess 1 shape size it is consistent.
The top of second antetheca 13 is connected with the 3rd location-plate 18 to rear projection, the top of second rear wall 15 It is connected with the 4th location-plate 19 to front projection, from the roof of the 3rd location-plate 18 to the bottom wall of the 3rd location-plate 18 The 3rd positioning hole 20 is provided with, the 4th positioning is provided with from the bottom wall of roof to the 4th location-plate 19 of the 4th location-plate 19 Hole 21.3rd location-plate 18 and the 4th location-plate 19 are rectangular-shape, the 3rd positioning hole 20 and the 4th positioning hole 21 be rectangular-shape.
First bolt sequentially pass through first positioning hole 10 and the 3rd positioning hole 20 from top to bottom and with the first spiral shell Parent phase is spirally connected, second bolt sequentially pass through second positioning hole 11 and the 4th positioning hole 21 from top to bottom and with the second spiral shell Parent phase is spirally connected, the tip contact of first nut on the bottom wall of the 3rd location-plate 18 and second nut top Contact enables the first bolt and the second bolt respectively in the 3rd positioning hole and the on the bottom wall of the 4th location-plate 19 Moved to the left or to the right in four positioning holes, so as to drive the first carriage to move to the left or to the right.
The method of the trowel, it is specific as follows:
Step 1:When needing directly to fill out cement mortar on the ground, just first the 3rd bolt and the 4th bolt respectively from the Back-out in three nuts and the 4th nut, then second carriage is unloaded from the second casing and removed;
Step 2:Then first baffle 17 is promoted to the right or to the right to make the first bolt and the second bolt fixed the 3rd respectively To the right or it is moved to the left in position hole and the 4th positioning hole, some first through holes 22 is adjusted with this and depart from first case Body 4 and the size of exposed part, so can depart from described first by such some first through holes 22 of regulation Casing 4 and the size of exposed part are flowed out to up to the big of the amount of the cement mortar on ground to adjust from the first through hole 22 It is small, after the size of regulation to the exposed part of setting, cement mortar is filled up into the casing 202 of the first casing 4 and second;
Step 3:Keep the bottom wall of first casing 4 for horizontality and by the bottom wall of first casing 4 and ground It is in contact, and second casing is tilted with first casing and is connected so that the cement mortar in the second casing is just promoted Cement mortar in first casing is flowed into the first carriage, and the cement mortar being flowed into the first carriage is just passed through from first Through hole is flowed into ground;
Step 4:Then hold first handle to be moved to the left, the first scraper plate can be just flowed into the cement mortar on ground The consistent recessed road of equidistant and shape size is scraped, then ceramic tile is laid on the cement mortar surface for forming recessed road;It can thus allow porcelain Brick is when extruding cement mortar, and the cement mortar in recessed roadside is filled with recessed road, eliminates or reduce cement mortar towards surrounding The problem of heaving.The efficiency high of the cement screedn on such floating ground and easy to operate.
The present embodiment has the beneficial effect that:
Scraper plate can scrape the consistent recessed road of equidistant and shape size in the cement mortar for be flowed into ground, then recessed being formed The cement mortar surface laying ceramic tile on road;It can thus allow ceramic tile when extruding cement mortar, the cement mortar in recessed roadside is just filled out Be charged in recessed road, eliminate or reduce cement mortar towards surrounding heave the problem of.The cement screedn on such floating ground Efficiency high and easy to operate.
Embodiment 2
1- Fig. 3 understands that the trowel of the present embodiment includes the body of trowel, the body of the trowel with reference to the accompanying drawings The scraper plate 2 with vertical recess 1 including scraping projection on cement screedn by bottom.
The body of the trowel also includes the mud box 3 for being used for containing cement mortar, and the mud box 3 includes the first casing 4, The first antetheca 6 and the first rear wall 7 that first casing 4 includes the first bottom wall 5, is connected with the first bottom wall 5, first antetheca 6 and first rear wall 7 be connected to the front end of first bottom wall 5 and the rear end of the first bottom wall 5, first antetheca 6 and The first groove of the splendid attire cement mortar of notch upwards, first antetheca are constituted between one rear wall 7 and first bottom wall 5 6 top and the first rear wall 7 are respectively arranged with the first support base 45 and the second support base 46, first support base 45 and second It is connected between support base 46 by first handle 47.First bottom wall of first casing 4 is rectangular-shape and the first bottom wall For horizontal wall surface.The rear wall 7 of first antetheca 6 and first is the vertical plate of rectangular-shape.The first handle 47 is cylinder Shape.
The top of first antetheca 6 is connected with the first location-plate 8 to rear projection, the top of first rear wall 7 with Connect, be provided with from the bottom wall of roof to first location-plate 8 of first location-plate 8 to the second location-plate 9 of front projection First positioning hole 10, the second positioning hole 11 is provided with from the bottom wall of roof to second location-plate 9 of second location-plate 9. The location-plate 9 of first location-plate 8 and second is rectangular-shape, and the positioning hole 11 of the first positioning hole 10 and second is circle Column.
The body of the trowel also includes the first screeding device, and first screeding device includes the first carriage, institute Stating the first carriage includes the second bottom wall 12, the second antetheca 13 being connected with the second bottom wall 12, the first roof 16, right wall 14 and the Two rear walls 15, the rear wall 15 of the second antetheca 13 and second is connected to front end and the second bottom wall 15 of second bottom wall 12 Rear end, the front end of the right wall 14 and the rear end of the right wall 14 respectively with the right-hand member of the second antetheca 13 and the second rear wall 15 Right-hand member is connected, and the bottom of the right wall 14 is connected with the right-hand member of second bottom wall 12, and first roof 16 is covered in In the middle of the top on the top of second antetheca 13, the top of right wall 14 and the second rear wall 15, the left end of first roof 16 With jagged, the right-hand member of the breach is connected with first baffle 17 straight up, and the bottom of the right wall 14 is equal from front to back It is even to be intervally distributed between some first vertical recesses 1, the two neighboring first vertical recess 1 just as rectangular-shape First scraping blade, some first through holes 22 are provided with from bottom wall of the roof of second bottom wall 12 to second bottom wall 12, Gap size and institute between some first through holes 22 equidistant arrangement from front to back, two adjacent the first through holes 22 The front end for stating interval between identical and adjacent two the first through holes 22 of width size of the first scraping blade is adjacent with this The rear end at the interval between two the first through holes 22 respectively with the front end of first scraping blade and the rear end phase of first scraping blade Even, first box house inside first carriage with being connected.Second bottom wall 12 is rectangular-shape and second Bottom wall is horizontal wall surface, and second antetheca 13, the rear wall 15 of right wall 14 and second are the vertical plate of rectangular-shape, described first Roof 16 is rectangular-shape structure.The first vertical recess is rectangular-shape.First through hole is rectangular-shape.It is all The first vertical recess 1 shape size it is consistent.
The top of second antetheca 13 is connected with the 3rd location-plate 18 to rear projection, the top of second rear wall 15 It is connected with the 4th location-plate 19 to front projection, from the roof of the 3rd location-plate 18 to the bottom wall of the 3rd location-plate 18 The 3rd positioning hole 20 is provided with, the 4th positioning is provided with from the bottom wall of roof to the 4th location-plate 19 of the 4th location-plate 19 Hole 21.3rd location-plate 18 and the 4th location-plate 19 are rectangular-shape, the 3rd positioning hole 20 and the 4th positioning hole 21 be rectangular-shape.
First bolt sequentially pass through first positioning hole 10 and the 3rd positioning hole 20 from top to bottom and with the first spiral shell Parent phase is spirally connected, second bolt sequentially pass through second positioning hole 11 and the 4th positioning hole 21 from top to bottom and with the second spiral shell Parent phase is spirally connected, the tip contact of first nut on the bottom wall of the 3rd location-plate 18 and second nut top Contact enables the first bolt and the second bolt respectively in the 3rd positioning hole and the on the bottom wall of the 4th location-plate 19 Moved to the left or to the right in four positioning holes, so as to drive the first carriage to move to the left or to the right.
The mud box 3 also includes the second casing 202, and second casing 202 includes the 3rd bottom wall 23 and the 3rd bottom wall 23 The 3rd antetheca 24 and the 3rd rear wall 25 of connection, the 3rd antetheca 24 and the 3rd rear wall 25 are connected to the 3rd bottom wall 23 front end and the rear end of the 3rd bottom wall 23, are constituted between the 3rd antetheca 24 and the 3rd rear wall 25 and the 3rd bottom wall 23 Contain the second groove of cement mortar, the right-hand member of second casing 202 be connected with the left end of first casing 4 and The inside of second casing 202 is connected with the inside of first casing 4, second casing and the first casing phase Tilt connection.3rd bottom wall of second casing 202 is rectangular-shape.3rd antetheca and the 3rd rear wall are cuboid Shape.The scope of the angle for tilting connection is 120 degree to 160 degree.
The top of 3rd antetheca 24 is connected with the 5th location-plate 26 to rear projection, the top of the 3rd rear wall 25 It is connected with the 6th location-plate 27 to front projection, from the roof of the 5th location-plate 26 to the bottom wall of the 5th location-plate 26 The 5th positioning hole 28 is provided with, the 6th positioning is provided with from the bottom wall of roof to the 6th location-plate 27 of the 6th location-plate 27 Hole 29.5th location-plate 26 and the 6th location-plate 27 are rectangular-shape, the 5th positioning hole 28 and the 6th positioning hole 29 be cylindric.
The body of the trowel also includes the second screeding device, and second screeding device includes the second carriage, institute Stating the second carriage includes the 4th bottom wall 30, the 4th antetheca 31 being connected with the 4th bottom wall 30, the second roof 32, left wall 33 and the Four rear walls 34, the 4th antetheca 31 and the 4th rear wall 34 are connected to front end and the 4th bottom wall 30 of the 4th bottom wall 30 Rear end, the front end of the left wall 33 and the rear end of the left wall 33 respectively with the right-hand member of the 4th antetheca 31 and the 4th rear wall 34 Right-hand member is connected, and the bottom of the left wall 33 is connected with the left end of the 4th bottom wall 34, and second roof 32 is covered in In the middle of the top on the top of the 4th antetheca 31, the top of left wall 33 and the 4th rear wall 34, the right-hand member of second roof 32 With jagged, the left end of the breach is connected with second baffle 35 straight up, and the bottom of the left wall 33 is equal from front to back It is even be intervally distributed between some second vertical recesses, the two neighboring second vertical recess just for rectangular-shape the Two scraping blades, are provided with some second through holes 37, institute from bottom wall of the roof of the 4th bottom wall 34 to the 4th bottom wall 34 State gap size between some second through holes 37 equidistant arrangement from front to back, two adjacent the second through holes 37 with it is described The front end at the interval between two identical and adjacent the second through holes 37 of the width size of the second scraping blade it is adjacent with this two The rear end at the interval between individual second through hole 37 is connected with the front end of second scraping blade with the rear end of second scraping blade respectively, The support bar 38 of a triangular prism shape, the width size of the support bar 38 are also connected with the right wall of each second scraping blade The bottom wall of identical with the width size of second scraping blade and described support bar 38 be embedded in two adjacent the second through holes 37 it Between interval in, second box house inside second carriage with being connected.4th bottom wall 34 is cuboid Shape, the 4th antetheca 31, the rear wall 34 of left wall 33 and the 4th are the vertical plate of rectangular-shape, and second roof 32 is rectangular Body shape structure.The second vertical recess is rectangular-shape.Second through hole is rectangular-shape.All second is vertical recessed The shape size of mouth is consistent.The first vertical recess and the second vertical recess just constitute vertical recess 1.The support bar The distance between 38 sizes are identical with the width size of each grid for the waffle slab laid on the ground.
The top of 4th antetheca 31 is connected with the 7th location-plate 39 to rear projection, the top of the 4th rear wall 34 It is connected with the 8th location-plate 40 to front projection, from the roof of the 7th location-plate 39 to the bottom wall of the 7th location-plate 39 The 7th positioning hole 41 is provided with, the 8th positioning is provided with from the bottom wall of roof to the 8th location-plate 40 of the 8th location-plate 40 Hole 42.7th location-plate 39 and the 8th location-plate 40 are rectangular-shape, the 7th positioning hole 41 and the 8th positioning hole 42 be rectangular-shape.
3rd bolt sequentially pass through the 5th positioning hole 28 and the 7th positioning hole 41 from top to bottom and with the 3rd spiral shell Parent phase is spirally connected, the 4th bolt sequentially pass through the 6th positioning hole 29 and the 8th positioning hole 48 from top to bottom and with the 4th spiral shell Parent phase is spirally connected, the tip contact of the 3rd nut on the bottom wall of the 7th location-plate 39 and the 4th nut top Contact enables the 3rd bolt and the 4th bolt respectively in the 7th positioning hole and the on the bottom wall of the 8th location-plate 40 Moved to the left or to the right in eight positioning holes, so as to drive the second carriage to move to the left or to the right.
The method of the trowel, it is specific as follows:
Step 1:When needing directly to fill out cement mortar on the ground, just first the 3rd bolt and the 4th bolt respectively from the Back-out in three nuts and the 4th nut, then second carriage is unloaded from the second casing and removed;
Step 2:Then first baffle 17 is promoted to the right or to the right to make the first bolt and the second bolt fixed the 3rd respectively To the right or it is moved to the left in position hole and the 4th positioning hole, some first through holes 22 is adjusted with this and depart from first case Body 4 and the size of exposed part, so can depart from described first by such some first through holes 22 of regulation Casing 4 and the size of exposed part are flowed out to up to the big of the amount of the cement mortar on ground to adjust from the first through hole 22 It is small, after the size of regulation to the exposed part of setting, cement mortar is filled up into the casing 202 of the first casing 4 and second;
Step 3:Keep the bottom wall of first casing 4 for horizontality and by the bottom wall of first casing 4 and ground It is in contact, and second casing is tilted with first casing and is connected so that the cement mortar in the second casing is just promoted Cement mortar in first casing is flowed into the first carriage, and the cement mortar being flowed into the first carriage is just passed through from first Through hole is flowed into ground;
Step 4:Then hold first handle to be moved to the left, the first scraper plate can be just flowed into the cement mortar on ground The consistent recessed road of equidistant and shape size is scraped, then ceramic tile is laid on the cement mortar surface for forming recessed road;It can thus allow porcelain Brick is when extruding cement mortar, and the cement mortar in recessed roadside is filled with recessed road, eliminates or reduce cement mortar towards surrounding The problem of heaving.The efficiency high of the cement screedn on such floating ground and easy to operate.
Step 5:If first fill out cement mortar again after erection waffle slab on the ground, just first the first bolt and second Bolt is back-outed from the first nut and the second nut respectively, and then first carriage is unloaded from the first casing and removed;
Step 6:Then second baffle 35 is promoted to the right or to the right to make the 3rd bolt and the 4th bolt fixed the 7th respectively To the right or it is moved to the left in position hole and the 8th positioning hole, some second through holes 37 is adjusted with this and depart from second case Body 202 and the size of exposed part, can so depart from described the by such some second through holes 37 of regulation Two casings 202 and the size of exposed part are flowed out to up to the amount of the cement mortar on ground to adjust from the second through hole 37 After size, the size of regulation to the exposed part of setting, cement bonded sand is filled up into the casing 202 of the first casing 4 and second Slurry;
Step 7:Keep the bottom wall of second casing 202 for horizontality and by the bottom wall of second casing 202 with Waffle slab is in contact and so that the bottom wall of support bar 38 faces downwards the Grid Edge of the grid of waffle slab, and second casing Tilt and be connected so that the cement mortar in the first casing just promotes the cement mortar in the second casing with first casing It is flowed into the second carriage, the cement mortar being flowed into the second carriage is just flowed into ground from the second through hole;
Step 8:Then hold first handle to move right, the second scraper plate can be just flowed into the cement mortar on ground The consistent recessed road of equidistant and shape size is scraped, then ceramic tile is laid on the cement mortar surface for forming recessed road;It can thus allow porcelain Brick is when extruding cement mortar, and the cement mortar in recessed roadside is filled with recessed road, eliminates or reduce cement mortar towards surrounding The problem of heaving.The efficiency high of the cement screedn on such floating ground and easy to operate.
The present embodiment has the beneficial effect that:
Scraper plate can scrape the consistent recessed road of equidistant and shape size in the cement mortar for be flowed into ground, then recessed being formed The cement mortar surface laying ceramic tile on road;It can thus allow ceramic tile when extruding cement mortar, the cement mortar in recessed roadside is just filled out Be charged in recessed road, eliminate or reduce cement mortar towards surrounding heave the problem of.The cement screedn on such floating ground Efficiency high and easy to operate.
Embodiment 3
1- Fig. 3 understands that the trowel of the present embodiment includes the body of trowel, the body of the trowel with reference to the accompanying drawings The scraper plate 2 with vertical recess 1 including scraping projection on cement screedn by bottom.
The body of the trowel also includes the mud box 3 for being used for containing cement mortar, and the mud box 3 includes the first casing 4, The first antetheca 6 and the first rear wall 7 that first casing 4 includes the first bottom wall 5, is connected with the first bottom wall 5, first antetheca 6 and first rear wall 7 be connected to the front end of first bottom wall 5 and the rear end of the first bottom wall 5, first antetheca 6 and The first groove of the splendid attire cement mortar of notch upwards, first antetheca are constituted between one rear wall 7 and first bottom wall 5 6 top and the first rear wall 7 are respectively arranged with the first support base 45 and the second support base 46, first support base 45 and second It is connected between support base 46 by first handle 47.First bottom wall of first casing 4 is rectangular-shape and the first bottom wall For horizontal wall surface.The rear wall 7 of first antetheca 6 and first is the vertical plate of rectangular-shape.The first handle 47 is cylinder Shape.
The top of first antetheca 6 is connected with the first location-plate 8 to rear projection, the top of first rear wall 7 with Connect, be provided with from the bottom wall of roof to first location-plate 8 of first location-plate 8 to the second location-plate 9 of front projection First positioning hole 10, the second positioning hole 11 is provided with from the bottom wall of roof to second location-plate 9 of second location-plate 9. The location-plate 9 of first location-plate 8 and second is rectangular-shape, and the positioning hole 11 of the first positioning hole 10 and second is circle Column.
The body of the trowel also includes the first screeding device, and first screeding device includes the first carriage, institute Stating the first carriage includes the second bottom wall 12, the second antetheca 13 being connected with the second bottom wall 12, the first roof 16, right wall 14 and the Two rear walls 15, the rear wall 15 of the second antetheca 13 and second is connected to front end and the second bottom wall 15 of second bottom wall 12 Rear end, the front end of the right wall 14 and the rear end of the right wall 14 respectively with the right-hand member of the second antetheca 13 and the second rear wall 15 Right-hand member is connected, and the bottom of the right wall 14 is connected with the right-hand member of second bottom wall 12, and first roof 16 is covered in In the middle of the top on the top of second antetheca 13, the top of right wall 14 and the second rear wall 15, the left end of first roof 16 With jagged, the right-hand member of the breach is connected with first baffle 17 straight up, and the bottom of the right wall 14 is equal from front to back It is even to be intervally distributed between some first vertical recesses 1, the two neighboring first vertical recess 1 just as rectangular-shape First scraping blade, some first through holes 22 are provided with from bottom wall of the roof of second bottom wall 12 to second bottom wall 12, Gap size and institute between some first through holes 22 equidistant arrangement from front to back, two adjacent the first through holes 22 The front end for stating interval between identical and adjacent two the first through holes 22 of width size of the first scraping blade is adjacent with this The rear end at the interval between two the first through holes 22 respectively with the front end of first scraping blade and the rear end phase of first scraping blade Even, first box house inside first carriage with being connected.Second bottom wall 12 is rectangular-shape and second Bottom wall is horizontal wall surface, and second antetheca 13, the rear wall 15 of right wall 14 and second are the vertical plate of rectangular-shape, described first Roof 16 is rectangular-shape structure.The first vertical recess is rectangular-shape.First through hole is rectangular-shape.It is all The first vertical recess 1 shape size it is consistent.
The top of second antetheca 13 is connected with the 3rd location-plate 18 to rear projection, the top of second rear wall 15 It is connected with the 4th location-plate 19 to front projection, from the roof of the 3rd location-plate 18 to the bottom wall of the 3rd location-plate 18 The 3rd positioning hole 20 is provided with, the 4th positioning is provided with from the bottom wall of roof to the 4th location-plate 19 of the 4th location-plate 19 Hole 21.3rd location-plate 18 and the 4th location-plate 19 are rectangular-shape, the 3rd positioning hole 20 and the 4th positioning hole 21 be rectangular-shape.
First bolt sequentially pass through first positioning hole 10 and the 3rd positioning hole 20 from top to bottom and with the first spiral shell Parent phase is spirally connected, second bolt sequentially pass through second positioning hole 11 and the 4th positioning hole 21 from top to bottom and with the second spiral shell Parent phase is spirally connected, the tip contact of first nut on the bottom wall of the 3rd location-plate 18 and second nut top Contact enables the first bolt and the second bolt respectively in the 3rd positioning hole and the on the bottom wall of the 4th location-plate 19 Moved to the left or to the right in four positioning holes, so as to drive the first carriage to move to the left or to the right.
The mud box 3 also includes the second casing 202, and second casing 202 includes the 3rd bottom wall 23 and the 3rd bottom wall 23 The 3rd antetheca 24 and the 3rd rear wall 25 of connection, the 3rd antetheca 24 and the 3rd rear wall 25 are connected to the 3rd bottom wall 23 front end and the rear end of the 3rd bottom wall 23, are constituted between the 3rd antetheca 24 and the 3rd rear wall 25 and the 3rd bottom wall 23 Contain the second groove of cement mortar, the right-hand member of second casing 202 be connected with the left end of first casing 4 and The inside of second casing 202 is connected with the inside of first casing 4, second casing and the first casing phase Tilt connection.3rd bottom wall of second casing 202 is rectangular-shape.3rd antetheca and the 3rd rear wall are cuboid Shape.The scope of the angle for tilting connection is 120 degree to 160 degree.
The top of 3rd antetheca 24 is connected with the 5th location-plate 26 to rear projection, the top of the 3rd rear wall 25 It is connected with the 6th location-plate 27 to front projection, from the roof of the 5th location-plate 26 to the bottom wall of the 5th location-plate 26 The 5th positioning hole 28 is provided with, the 6th positioning is provided with from the bottom wall of roof to the 6th location-plate 27 of the 6th location-plate 27 Hole 29.5th location-plate 26 and the 6th location-plate 27 are rectangular-shape, the 5th positioning hole 28 and the 6th positioning hole 29 be cylindric.
The body of the trowel also includes the second screeding device, and second screeding device includes the second carriage, institute Stating the second carriage includes the 4th bottom wall 30, the 4th antetheca 31 being connected with the 4th bottom wall 30, the second roof 32, left wall 33 and the Four rear walls 34, the 4th antetheca 31 and the 4th rear wall 34 are connected to front end and the 4th bottom wall 30 of the 4th bottom wall 30 Rear end, the front end of the left wall 33 and the rear end of the left wall 33 respectively with the right-hand member of the 4th antetheca 31 and the 4th rear wall 34 Right-hand member is connected, and the bottom of the left wall 33 is connected with the left end of the 4th bottom wall 34, and second roof 32 is covered in In the middle of the top on the top of the 4th antetheca 31, the top of left wall 33 and the 4th rear wall 34, the right-hand member of second roof 32 With jagged, the left end of the breach is connected with second baffle 35 straight up, and the bottom of the left wall 33 is equal from front to back It is even be intervally distributed between some second vertical recesses, the two neighboring second vertical recess just for rectangular-shape the Two scraping blades, are provided with some second through holes 37, institute from bottom wall of the roof of the 4th bottom wall 34 to the 4th bottom wall 34 State gap size between some second through holes 37 equidistant arrangement from front to back, two adjacent the second through holes 37 with it is described The front end at the interval between two identical and adjacent the second through holes 37 of the width size of the second scraping blade it is adjacent with this two The rear end at the interval between individual second through hole 37 is connected with the front end of second scraping blade with the rear end of second scraping blade respectively, The support bar 38 of a triangular prism shape, the width size of the support bar 38 are also connected with the right wall of each second scraping blade The bottom wall of identical with the width size of second scraping blade and described support bar 38 be embedded in two adjacent the second through holes 37 it Between interval in, second box house inside second carriage with being connected.4th bottom wall 34 is cuboid Shape, the 4th antetheca 31, the rear wall 34 of left wall 33 and the 4th are the vertical plate of rectangular-shape, and second roof 32 is rectangular Body shape structure.The second vertical recess is rectangular-shape.Second through hole is rectangular-shape.All second is vertical recessed The shape size of mouth is consistent.The first vertical recess and the second vertical recess just constitute vertical recess 1.The support bar The distance between 38 sizes are identical with the width size of each grid for the waffle slab laid on the ground.
The top of 4th antetheca 31 is connected with the 7th location-plate 39 to rear projection, the top of the 4th rear wall 34 It is connected with the 8th location-plate 40 to front projection, from the roof of the 7th location-plate 39 to the bottom wall of the 7th location-plate 39 The 7th positioning hole 41 is provided with, the 8th positioning is provided with from the bottom wall of roof to the 8th location-plate 40 of the 8th location-plate 40 Hole 42.7th location-plate 39 and the 8th location-plate 40 are rectangular-shape, the 7th positioning hole 41 and the 8th positioning hole 42 be rectangular-shape.
3rd bolt sequentially pass through the 5th positioning hole 28 and the 7th positioning hole 41 from top to bottom and with the 3rd spiral shell Parent phase is spirally connected, the 4th bolt sequentially pass through the 6th positioning hole 29 and the 8th positioning hole 48 from top to bottom and with the 4th spiral shell Parent phase is spirally connected, the tip contact of the 3rd nut on the bottom wall of the 7th location-plate 39 and the 4th nut top Contact enables the 3rd bolt and the 4th bolt respectively in the 7th positioning hole and the on the bottom wall of the 8th location-plate 40 Moved to the left or to the right in eight positioning holes, so as to drive the second carriage to move to the left or to the right.
The method of the trowel, it is specific as follows:
Step 1:When needing directly to fill out cement mortar on the ground, just first the 3rd bolt and the 4th bolt respectively from the Back-out in three nuts and the 4th nut, then second carriage is unloaded from the second casing and removed;
Step 2:Then first baffle 17 is promoted to the right or to the right to make the first bolt and the second bolt fixed the 3rd respectively To the right or it is moved to the left in position hole and the 4th positioning hole, some first through holes 22 is adjusted with this and depart from first case Body 4 and the size of exposed part, so can depart from described first by such some first through holes 22 of regulation Casing 4 and the size of exposed part are flowed out to up to the big of the amount of the cement mortar on ground to adjust from the first through hole 22 It is small, after the size of regulation to the exposed part of setting, cement mortar is filled up into the casing 202 of the first casing 4 and second;
Step 3:Keep the bottom wall of first casing 4 for horizontality and by the bottom wall of first casing 4 and ground It is in contact, and second casing is tilted with first casing and is connected so that the cement mortar in the second casing is just promoted Cement mortar in first casing is flowed into the first carriage, and the cement mortar being flowed into the first carriage is just passed through from first Through hole is flowed into ground;
Step 4:Then hold first handle to be moved to the left, the first scraper plate can be just flowed into the cement mortar on ground The consistent recessed road of equidistant and shape size is scraped, then ceramic tile is laid on the cement mortar surface for forming recessed road;It can thus allow porcelain Brick is when extruding cement mortar, and the cement mortar in recessed roadside is filled with recessed road, eliminates or reduce cement mortar towards surrounding The problem of heaving.The efficiency high of the cement screedn on such floating ground and easy to operate.
Step 5:If first fill out cement mortar again after erection waffle slab on the ground, just first the first bolt and second Bolt is back-outed from the first nut and the second nut respectively, and then first carriage is unloaded from the first casing and removed;
Step 6:Then second baffle 35 is promoted to the right or to the right to make the 3rd bolt and the 4th bolt fixed the 7th respectively To the right or it is moved to the left in position hole and the 8th positioning hole, some second through holes 37 is adjusted with this and depart from second case Body 202 and the size of exposed part, can so depart from described the by such some second through holes 37 of regulation Two casings 202 and the size of exposed part are flowed out to up to the amount of the cement mortar on ground to adjust from the second through hole 37 After size, the size of regulation to the exposed part of setting, cement bonded sand is filled up into the casing 202 of the first casing 4 and second Slurry;
Step 7:Keep the bottom wall of second casing 202 for horizontality and by the bottom wall of second casing 202 with Waffle slab is in contact and so that the bottom wall of support bar 38 faces downwards the Grid Edge of the grid of waffle slab, and second casing Tilt and be connected so that the cement mortar in the first casing just promotes the cement mortar in the second casing with first casing It is flowed into the second carriage, the cement mortar being flowed into the second carriage is just flowed into ground from the second through hole;
Step 8:Then hold first handle to move right, the second scraper plate can be just flowed into the cement mortar on ground The consistent recessed road of equidistant and shape size is scraped, then ceramic tile is laid on the cement mortar surface for forming recessed road;It can thus allow porcelain Brick is when extruding cement mortar, and the cement mortar in recessed roadside is filled with recessed road, eliminates or reduce cement mortar towards surrounding The problem of heaving.The efficiency high of the cement screedn on such floating ground and easy to operate.
The present embodiment has the beneficial effect that:
Scraper plate can scrape the consistent recessed road of equidistant and shape size in the cement mortar for be flowed into ground, then recessed being formed The cement mortar surface laying ceramic tile on road;It can thus allow ceramic tile when extruding cement mortar, the cement mortar in recessed roadside is just filled out Be charged in recessed road, eliminate or reduce cement mortar towards surrounding heave the problem of.The cement screedn on such floating ground Efficiency high and easy to operate.
After unloading and removing the first carriage or the second carriage, the first carriage or second are often supported moulding It is placed in the box body of rectangular-shape to prevent from being stained, and box body is often fixed on second handle to facilitate gripping, second handle The mode of upper fixed bin body is fixed for the roof of second handle with the bottom phase welding of box body, because box body is usually due to box body Need to separate to be safeguarded with second handle, but separating welding fixed structure can allow second handle impaired or even can not continue Use, increase expenses.
Described to unload the first carriage removed or the second carriage is placed in the box body of rectangular-shape, the box body is fixed On second handle, the bottom integration of the box body 24 is connected to the connecting rod S2, the second handle S1 of straight quadrangular shape For quadrangular shape, the connecting rod S2 is linked with the second handle S1 by bracing beam S3, and the bracing beam S3 weldings exist One end of the second handle S1, the bracing beam S3 is quadrangular shape, is carried in the bracing beam S3 and penetrates it from the top of it The clamping joint S4, the clamping joint S4 that clamping with its interference fits in the blocked hole of bottom, the blocked hole are fused to connection Bar S2 bottom, the clamping joint S4 sets the first location equipment to be positioned with second with the coupled position between the bracing beam S3 Equipment, first location equipment includes being fused to a pair of mirror images of the bracing beam S3 and second handle S1 positions between First connection sheet S5 of distribution is molten with the second connection sheet S6, the second connection sheet S6 between being connected to a pair of connection sheet S5 One side that the connecting rod S2 is in the second handle S1 positions is connected to, second location equipment includes being located at the connection Bar S2 is with the first spacer S7 of the clamping joint S4 coupled positions and with its second corresponding spacer S8, and described first determines Bit slice S7 is located at the second spacer S8 top, and each autogenous weldings of the first spacer S7 are in the connecting rod S2, the clamping Head S4 both sides and with one side opposite the second handle S1, each autogenous weldings of the second spacer S8 are coupled described Bar S3 both sides one side relative with the second handle S1.
The first connection sheet S5 be provided between the second connection sheet S6 between opposite silk hole, the silk hole pass through leading screw Silk is connected together.
The first spacer S7 is provided between opposite silk hole, the silk hole via leading screw between the second spacer S8 Silk is connected together.
This framework is uncomplicated, and the firm performance of connection is good, because being connect and mode as clamping, such framework with silk For the framework that can be disassembled, so can efficiently lift assembling speed during utilization, following dimension to box body is easier in addition Shield and recycling, reduce charge costs.
The present invention is described in the way of brief description of the drawings above, it will be understood by those of skill in the art that the disclosure Embodiments described above is not limited to, in the case of without departing from the scope of the present invention, can make a variety of changes, change and replace Change.

Claims (10)

1. a kind of trowel, includes the body of trowel, it is characterised in that the body of the trowel is included by bottom in water The scraper plate with vertical recess of projection is scraped on cement mortar surface layer.
2. trowel according to claim 1, it is characterised in that the body of the trowel also includes being used for containing cement The mud box of mortar, the mud box include the first casing, first casing include the first bottom wall, be connected with the first bottom wall first Antetheca and the first rear wall, first antetheca and the first rear wall are connected to front end and the first bottom wall of first bottom wall Rear end, constitutes the of the splendid attire cement mortar of notch upwards between first antetheca and the first rear wall and first bottom wall One groove, the top of first antetheca and the first rear wall are respectively arranged with the first support base and the second support base, described first It is connected between support base and the second support base by first handle.
3. trowel according to claim 2, it is characterised in that the top of first antetheca and first to rear projection Location-plate is connected, and the top of first rear wall is connected with the second location-plate to front projection, from the top of first location-plate The bottom wall of wall to first location-plate is provided with the first positioning hole, from the roof of second location-plate to second location-plate Bottom wall be provided with the second positioning hole.
4. trowel according to claim 3, it is characterised in that the body of the trowel also includes the first scraper plate and filled Put, first screeding device includes the first carriage, first carriage includes the second bottom wall, is connected with the second bottom wall Second antetheca, the first roof, right wall and the second rear wall, second antetheca and the second rear wall are connected to second bottom wall Front end and the second bottom wall rear end, the rear end of the front end of the right wall and the right wall respectively with the right-hand member of the second antetheca and The right-hand member of two rear walls is connected, and the bottom of the right wall is connected with the right-hand member of second bottom wall, the first roof covering With scarce in the middle of top on the top, the top of right wall and the second rear wall of second antetheca, the left end of first roof Mouthful, the right-hand member of the breach is connected with first baffle straight up, and uniform intervals are distributed from front to back for the bottom of the right wall The first scraping blade just for rectangular-shape between some first vertical recesses, the two neighboring first vertical recess, from The roof of second bottom wall is to being provided with some first through holes, some first through holes on the bottom wall of second bottom wall Gap size and the width size phase of first scraping blade between equidistant arrangement from front to back, two adjacent the first through holes Together, the interval between two first through holes adjacent with this of the front end at the interval and between two adjacent the first through holes Rear end be connected respectively with the front end of first scraping blade with the rear end of first scraping blade, first box house and described the It is connected inside one carriage.
5. trowel according to claim 4, it is characterised in that the top of second antetheca and the to rear projection the 3rd Location-plate is connected, and the top of second rear wall is connected with the 4th location-plate to front projection, from the top of the 3rd location-plate The bottom wall of wall to the 3rd location-plate is provided with the 3rd positioning hole, from the roof of the 4th location-plate to the 4th location-plate Bottom wall be provided with the 4th positioning hole.
6. trowel according to claim 5, it is characterised in that first bolt sequentially passes through described from top to bottom One positioning hole and the 3rd positioning hole and with the first nut bolt, second bolt sequentially pass through from top to bottom described second determine Position hole and the 4th positioning hole and with the second nut bolt, the tip contact of first nut is in the 3rd location-plate bottom wall The tip contact of upper and described second nut enables the first bolt and the second bolt on the bottom wall of the 4th location-plate It is enough to be moved to the left or to the right in the 3rd positioning hole and the 4th positioning hole respectively, so as to drive the first carriage to the left or to Move right.
7. trowel according to claim 6, it is characterised in that the mud box also includes the second casing, second case The 3rd antetheca and the 3rd rear wall that body includes the 3rd bottom wall, is connected with the 3rd bottom wall, the 3rd antetheca and the 3rd the rear wall difference It is connected to the front end of the 3rd bottom wall and the rear end of the 3rd bottom wall, the 3rd antetheca and the 3rd rear wall and the 3rd bottom wall Between constitute the second groove for containing cement mortar, the right-hand member of second casing is connected with the left end of first casing And the inside of second casing is connected with the inside of first casing, second casing and the first casing phase Tilt connection.
8. trowel according to claim 7, it is characterised in that the top of the 3rd antetheca and the to rear projection the 5th Location-plate is connected, and the top of the 3rd rear wall is connected with the 6th location-plate to front projection, from the top of the 5th location-plate The bottom wall of wall to the 5th location-plate is provided with the 5th positioning hole, from the roof of the 6th location-plate to the 6th location-plate Bottom wall be provided with the 6th positioning hole.
9. trowel according to claim 8, it is characterised in that the body of the trowel also includes the second scraper plate and filled Put, second screeding device includes the second carriage, second carriage includes the 4th bottom wall, is connected with the 4th bottom wall 4th antetheca, the second roof, left wall and the 4th rear wall, the 4th antetheca and the 4th rear wall are connected to the 4th bottom wall Front end and the 4th bottom wall rear end, the rear end of the front end of the left wall and the left wall respectively with the right-hand member of the 4th antetheca and The right-hand member of four rear walls is connected, and the bottom of the left wall is connected with the left end of the 4th bottom wall, the second roof covering With scarce in the middle of top on the top, the top of left wall and the 4th rear wall of the 4th antetheca, the right-hand member of second roof Mouthful, the left end of the breach is connected with second baffle straight up, and uniform intervals are distributed from front to back for the bottom of the left wall The second scraping blade just for rectangular-shape between some second vertical recesses, the two neighboring second vertical recess, from The roof of 4th bottom wall is to being provided with some second through holes, some second through holes on the bottom wall of the 4th bottom wall Gap size and the width size phase of second scraping blade between equidistant arrangement from front to back, two adjacent the second through holes Together, the interval between two second through holes adjacent with this of the front end at the interval and between two adjacent the second through holes Rear end be connected respectively with the front end of second scraping blade with the rear end of second scraping blade, in the right wall of each second scraping blade The support bar of a triangular prism shape is also connected with, the width size of the support bar is identical with the width size of second scraping blade And the bottom wall of the support bar is embedded in the interval between adjacent two the second through holes, second box house with it is described It is connected inside second carriage;
The top of 4th antetheca is connected with the 7th location-plate to rear projection, the top of the 4th rear wall with to front projection The 8th location-plate connection, be provided with the 7th positioning hole from the bottom wall of roof to the 7th location-plate of the 7th location-plate, The 8th positioning hole is provided with from the bottom wall of roof to the 8th location-plate of the 8th location-plate;
3rd bolt sequentially pass through the 5th positioning hole and the 7th positioning hole from top to bottom and with the 3rd nut bolt, 4th bolt sequentially pass through the 6th positioning hole and the 8th positioning hole from top to bottom and with the 4th nut bolt, it is described The tip contact of 3rd nut on the 7th location-plate bottom wall and the 4th nut tip contact the described 8th Enable on the bottom wall of location-plate the 3rd bolt and the 4th bolt respectively in the 7th positioning hole and the 8th positioning hole to the left or Move right, so as to drive the second carriage to move to the left or to the right.
10. the method for trowel according to claim 9, it is characterised in that specific as follows:
Step 1:When needing directly to fill out cement mortar on the ground, just first the 3rd bolt and the 4th bolt respectively from the 3rd spiral shell Back-out in female and the 4th nut, then second carriage is unloaded from the second casing and removed;
Step 2:Then promote first baffle to the right or to the right allow the first bolt and the second bolt respectively in the 3rd positioning hole and To the right or it is moved to the left in 4th positioning hole, some first through holes is adjusted with this and depart from first casing and exposed Part size, regulation to setting exposed part size after, fill up water into first casing and the second casing Cement mortar;
Step 3:The bottom wall of first casing is kept for horizontality and touches the bottom wall of first casing with ground, And second casing is tilted with first casing and is connected so that the cement mortar in the second casing just promotes the first case Cement mortar in body is flowed into the first carriage, is flowed into the cement mortar in the first carriage just from the first through hole stream Enter to ground;
Step 4:Then hold first handle to be moved to the left, the first scraper plate can just be scraped in the cement mortar for be flowed into ground The consistent recessed road of equidistant and shape size, then lay ceramic tile on the cement mortar surface for forming recessed road;
Step 5:If first fill out cement mortar again after erection waffle slab on the ground, just first the first bolt and the second bolt Back-out respectively from the first nut and the second nut, then first carriage is unloaded from the first casing and removed;
Step 6:Then promote second baffle to the right or to the right allow the 3rd bolt and the 4th bolt respectively in the 7th positioning hole and To the right or it is moved to the left in 8th positioning hole, some second through holes is adjusted with this and depart from second casing and exposed Part size, regulation to setting exposed part size after, fill up water into first casing and the second casing Cement mortar;
Step 7:Keep the bottom wall of second casing for horizontality and by the bottom wall of second casing 202 and waffle slab phase Contact and the bottom wall of support bar is caused to face the Grid Edge of the grid of waffle slab, and second casing and described first downwards Casing tilts connection so that the cement mortar in the first casing just promotes the cement mortar in the second casing to be flowed into second In carriage, the cement mortar being flowed into the second carriage is just flowed into ground from the second through hole;
Step 8:Then hold first handle to move right, the second scraper plate can just be scraped in the cement mortar for be flowed into ground The consistent recessed road of equidistant and shape size, then lay ceramic tile on the cement mortar surface for forming recessed road.
CN201710256192.6A 2017-04-19 2017-04-19 Trowel and method thereof Active CN107060298B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710256192.6A CN107060298B (en) 2017-04-19 2017-04-19 Trowel and method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710256192.6A CN107060298B (en) 2017-04-19 2017-04-19 Trowel and method thereof

Publications (2)

Publication Number Publication Date
CN107060298A true CN107060298A (en) 2017-08-18
CN107060298B CN107060298B (en) 2023-09-19

Family

ID=59600370

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710256192.6A Active CN107060298B (en) 2017-04-19 2017-04-19 Trowel and method thereof

Country Status (1)

Country Link
CN (1) CN107060298B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1072734A1 (en) * 1999-07-30 2001-01-31 Roydon Charles Southby Improved adhesive spreader
CN201649576U (en) * 2009-12-28 2010-11-24 黄效红 Plaster hopper of plastering machine
CN203684608U (en) * 2013-11-27 2014-07-02 重庆思贝肯节能技术开发有限公司 Plastering plate
CN203821794U (en) * 2014-03-14 2014-09-10 三一汽车制造有限公司 Wall screeding device
CN205330116U (en) * 2016-01-29 2016-06-22 杨修东 Trowel
CN206071011U (en) * 2016-08-26 2017-04-05 中铁十一局集团第四工程有限公司 A kind of spreading device for floor tile paving
CN206752987U (en) * 2017-04-19 2017-12-15 彭程 A kind of trowel

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1072734A1 (en) * 1999-07-30 2001-01-31 Roydon Charles Southby Improved adhesive spreader
CN201649576U (en) * 2009-12-28 2010-11-24 黄效红 Plaster hopper of plastering machine
CN203684608U (en) * 2013-11-27 2014-07-02 重庆思贝肯节能技术开发有限公司 Plastering plate
CN203821794U (en) * 2014-03-14 2014-09-10 三一汽车制造有限公司 Wall screeding device
CN205330116U (en) * 2016-01-29 2016-06-22 杨修东 Trowel
CN206071011U (en) * 2016-08-26 2017-04-05 中铁十一局集团第四工程有限公司 A kind of spreading device for floor tile paving
CN206752987U (en) * 2017-04-19 2017-12-15 彭程 A kind of trowel

Also Published As

Publication number Publication date
CN107060298B (en) 2023-09-19

Similar Documents

Publication Publication Date Title
CN206752987U (en) A kind of trowel
CN109930781A (en) A kind of accomodation ground construction method
CN108708559A (en) Build the grey auxiliary tool of paving and its application method by laying bricks or stones
CN107268959A (en) One kind perfusion tile laying method and auxiliary frame
CN212389031U (en) Mortar spreader for mortar joints of masonry
CN109024987A (en) Construction method is poured after a kind of toilet shear wall
CN110306770A (en) A kind of ceramic tile steamed bun knife laying method
CN107060298A (en) A kind of trowel and its method
CN207829495U (en) Control the combination tool of building wall level, vertical mortar joint plumpness and thickness
CN104746521B (en) The application of oversized cross-section slope cushion layer constructing structure
CN206844389U (en) Building blocks wall structure
CN111005583B (en) Wall building block transverse mortar joint and vertical mortar joint control device
CN110469131B (en) Ash spreading and seam scraping integrated construction device and method for wall masonry
CN211815972U (en) A extract template component for concrete core wall
CN221073560U (en) Mortar joint thickness control device for aerated concrete block
CN209741632U (en) Small dimension stone material rule jointing instrument of mating formation
CN206873960U (en) The adjustable mobile rapid construction mortar of one kind builds device by laying bricks or stones
CN216682639U (en) Steel frame mortar mould for quickly building concrete hollow concrete building block
CN110748034A (en) Hollow wall construction process
CN209369227U (en) Ceramic tile spreads frame for intangling net
CN212002377U (en) Be used for aerated block to build instrument for jointing by laying bricks or stones
CN215107032U (en) Mortar strickle-off ruler for paving bricks
CN212027177U (en) Brick wall masonry mold
CN210685270U (en) Ceramic tile paving and hanging frame
CN210622030U (en) Sand-free concrete sandwich wall structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant