CN206752758U - Decoration device and partition wall - Google Patents
Decoration device and partition wall Download PDFInfo
- Publication number
- CN206752758U CN206752758U CN201720387772.4U CN201720387772U CN206752758U CN 206752758 U CN206752758 U CN 206752758U CN 201720387772 U CN201720387772 U CN 201720387772U CN 206752758 U CN206752758 U CN 206752758U
- Authority
- CN
- China
- Prior art keywords
- decoration device
- decoration
- partition wall
- pedestal
- installation passage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Finishing Walls (AREA)
Abstract
The utility model discloses a kind of decoration device and partition wall, the decoration device includes a body extended along a first direction, the pipeline installation passage extended along a first direction is provided with the body, the body includes the pedestal and decoration being detachably connected, wall connecting portion is provided with the pedestal, the pipeline installation passage is arranged at the connecting portion of the pedestal and decoration.Decoration device and partition wall provided by the utility model; decoration device is connected on partition wall by wall connecting portion; pipeline installation passage is set in the inside of decoration device simultaneously; on the one hand it can be so arranged according to the actual requirements on metope; it is and easy to maintenance; still further aspect, the overall appearance for not interfering with partition wall of decoration device, and pipeline can be effectively protected.
Description
Technical field
It the utility model is related to Building technology, and in particular to a kind of decoration device and partition wall.
Background technology
Light partition wall obtains relatively broad application because its is in light weight, saves the advantages that area.The overwhelming majority, pacifying
After dress light partition wall need that various pipelines, such as power pipeline, communication line are installed.Set in the prior art on light partition wall
Putting pipeline mainly has two ways:One is prefabricated, i.e., pipeline passway is processed in partition wall in advance, after partition wall installation terminates
Directly pipeline is arranged into pipeline passway;Secondly be bright road cabling, i.e., it is direct according to demand after partition wall installation terminates
Pipeline is fixed on the metope of partition wall, such as by snapping connection on metope.
It is in place of the deficiencies in the prior art, the pipeline passway of prefabricated can not be changed, and it can not be tackled under different situations
Various live cabling demands, in addition its safeguard and change also extremely inconvenience, it is necessary to demolish walls;Bright road cabling can influence metope entirety
Decorative effect, aesthetics is poor, and degree of safety is relatively low.
Utility model content
The purpose of this utility model is to provide a kind of decoration device and partition wall, with the above-mentioned weak point in solution technology.
To achieve these goals, the utility model provides following technical scheme:
A kind of decoration device for partition wall, including a body extended along a first direction, it is provided with the body
The pipeline installation passage extended along a first direction, the body include the pedestal and decoration being detachably connected, the pedestal
On be provided with wall connecting portion, the pipeline installation passage is arranged at the connecting portion of the pedestal and decoration.
Above-mentioned decoration device, the pedestal include bottom plate, are arranged at two side plates of opposite sides on the bottom plate, and two
The individual side plate and bottom plate surround the pipeline installation passage.
Above-mentioned decoration device, the decoration include top plate, extension are provided with the opposite sides of the top plate,
On the direction of the metope of the partition wall, the extension covers the pedestal.
Above-mentioned decoration device, the first protrusion is set on the side relative with the pipeline installation passage on the side plate
Portion, the second protuberance for stretching into the pipeline installation passage, first protuberance and the second protrusion are provided with the top plate
Portion's phase clamping.
Above-mentioned decoration device, the end of the extension and the bottom plate are located in same level.
Above-mentioned decoration device, multiple floors are provided with the side of the pipeline installation passage on the side plate.
Above-mentioned decoration device, when the bottom plate is fixed on the partition wall, one of them described floor fits in institute
State on the metope of partition wall.
Above-mentioned decoration device, one of them described floor are fitted on the top plate.
A kind of partition wall, including wall and the decoration being connected on the wall, the above-mentioned decoration device of the decoration.
In the above-mentioned technical solutions, the decoration device provided by the utility model for partition wall, it passes through wall connecting portion
It is connected on partition wall, while pipeline installation passage is set in the inside of decoration device, so on the one hand can be according to the actual requirements
It is arranged on metope, and easy to maintenance, still further aspect, the overall appearance for not interfering with partition wall of decoration device, and energy
It is effectively protected pipeline.
Because above-mentioned decoration device has above-mentioned technique effect, the partition wall comprising the decoration device should also have corresponding skill
Art effect.
Brief description of the drawings
, below will be to institute in embodiment in order to illustrate more clearly of the embodiment of the present application or technical scheme of the prior art
The accompanying drawing needed to use is briefly described, it should be apparent that, drawings in the following description are only described in the utility model
Some embodiments, for those of ordinary skill in the art, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is the structural representation for the partition wall that the utility model embodiment provides.
Description of reference numerals:
1st, partition wall;2nd, pipeline installation passage;3rd, pedestal;4th, decoration;5th, wall connecting portion;6th, extension;7th, first is convex
Go out portion;8th, the second protuberance;9th, floor.
Embodiment
In order that those skilled in the art more fully understands the technical solution of the utility model, below in conjunction with accompanying drawing pair
The utility model is further detailed.
As shown in figure 1, a kind of decoration device for partition wall 1 that the utility model embodiment provides, including one along the
The body of one direction extension, is provided with the pipeline installation passage 2 extended along a first direction in the body, the body includes
The pedestal 3 and decoration 4 being detachably connected, wall connecting portion 5 are provided with the pedestal 3, the pipeline installation passage 2 is set
In the pedestal 3 and the connecting portion of decoration 4.
Specifically, the decoration device that the present embodiment provides has double action, one is for connecting up, secondly being used for partition wall
The decorative appearance of 1 metope.The body of decoration device extends along a first direction, and its internal pipeline pipe laying also extends first
Direction extends, and during installation, first direction is the direction of routing for needing pipeline to be mounted.Body includes the pedestal being detachably connected
3 and decoration 4, both clampings, it is spirally connected or is attached by other detachable connections in the prior art, wherein,
Pedestal 3 is used for the metope for connecting partition wall 1, i.e. being fixed to decoration device entirety on metope, is provided with wall connecting portion
5, wall connecting portion 5 can be spiro connection structure, interface arrangment, riveted structure etc., and pedestal 3 is connected to by wall connecting portion 5
On wall, decoration 4 is connected on pedestal 3, on the one hand, and it forms pipeline installation passage 2 to install pipeline between pedestal 3,
As being provided with groove on pedestal 3, decoration 4, which is covered on groove, causes groove to turn into pipeline installation passage 2;Or decoration
Groove is provided with 4, it forms pipeline installation passage 2 after fitting on pedestal 3;It is respectively provided with again or on pedestal 3 and decoration 4
There are groove, two grooves that pipeline installation passage 2 is integrally formed after being affixed.The outer surface of decoration 4 is decorative cover, such as color and wall
The consistent structure in face, or the structure mutually arranged in pairs or groups with metope in profile and color, its specific profile and color can be according to realities
Border demand is designed.
The decoration device for partition wall 1 that the utility model embodiment provides, it is connected to partition wall by wall connecting portion 5
On 1, while pipeline installation passage 2 is set in the inside of decoration device, so on the one hand can be according to the actual requirements on metope
It is arranged, and easy to maintenance, still further aspect, the overall appearance for not interfering with partition wall 1 of decoration device, and can effectively protect
Pillar line.
In the present embodiment, it is preferred that the pedestal 3 includes bottom plate, is arranged at two sides of opposite sides on the bottom plate
Plate, two side plates and bottom plate surround the pipeline installation passage 2, and bottom plate and two side plates surround U-shaped structure, U-shaped structure
Bottom be fixed on pedestal 3, the inside of U-shaped structure is pipeline installation passage 2, simple for structure, easy for installation.
In the present embodiment, it is furthermore preferred that the decoration 4 includes top plate, it is provided with the opposite sides of the top plate
Extension 6, on the direction of the metope of the partition wall 1, the extension 6 covers the pedestal 3, the top of decoration 4
The bottom plate of plate and pedestal 3 is oppositely arranged, and as pipeline installation passage 2, top plate and extension 6 cover decoration device between the two
Can only see top plate and extension 6 in use after other parts, so installation, can not see other parts, top plate and
Extension 6 collectively forms the decorative parts of decoration device so that the decorative effect of decoration 4 is more preferable.
In the present embodiment, further preferably, the end of the extension 6 and the bottom plate are located in same level, that is, exist
Installation terminate after, the end of extension 6 be connected to as bottom plate on the metope of partition wall 1, in this way, top plate, extension 6 and wall
Face forms a closing space so that extension 6 has a sealing function, so as to protect the other parts of decoration device not to be pollinated
The invasion of dirt etc..
In the present embodiment, further, first is set on the side relative with the pipeline installation passage 2 on the side plate
Protuberance 7, the second protuberance 8 for stretching into the pipeline installation passage 2, the He of the first protuberance 7 are provided with the top plate
The phase clamping of second protuberance 8, the first protuberance 7 and the second protuberance 8 are interface arrangment, so realize decoration 4 and pedestal 3
It is detachably connected, is positioned when setting to the inside of pipeline installation passage 2 by Detachable connection structure and cause and install more convenient.
In the present embodiment, further, on the side plate away from the pipeline installation passage 2 side on be provided with it is multiple
Floor 9, floor 9 are used for the intensity for lifting pedestal 3.Further, when the bottom plate is fixed on the partition wall 1, wherein
One floor 9 is fitted on the metope of the partition wall 1.The floor 9 is additionally operable to be lifted the bonding strength of pedestal 3 and metope.
Further, one of them described floor 9 is fitted on the top plate, is so lifted the contact area of top plate and pedestal 3, is made
The connection for obtaining top plate and pedestal 3 is more firm.
The utility model embodiment also provides a kind of partition wall 1, including wall and the decoration 4 that is connected on the wall,
The above-mentioned decoration device of the decoration 4.Because above-mentioned decoration device has above-mentioned technique effect, comprising the decoration device every
Wall 1 should also have corresponding technique effect.
Some one exemplary embodiments of the present utility model are only described by way of explanation above, undoubtedly, for
One of ordinary skill in the art, can be with a variety of in the case of without departing from spirit and scope of the present utility model
Mode is modified to described embodiment.Therefore, above-mentioned accompanying drawing and description are inherently illustrative, should not be construed as
Limitation to the utility model claims protection domain.
Claims (9)
1. a kind of decoration device for partition wall, it is characterised in that including a body extended along a first direction, the body
The pipeline installation passage extended along a first direction is inside provided with, the body includes the pedestal and decoration being detachably connected,
Wall connecting portion is provided with the pedestal, the pipeline installation passage is arranged at the connecting portion of the pedestal and decoration.
2. decoration device according to claim 1, it is characterised in that the pedestal includes bottom plate, is arranged at the bottom plate
Two side plates of upper opposite sides, two side plates and bottom plate surround the pipeline installation passage.
3. decoration device according to claim 2, it is characterised in that the decoration includes top plate, the phase of the top plate
To being provided with extension on both sides, on the direction of the metope of the partition wall, the extension covers the pedestal.
4. decoration device according to claim 3, it is characterised in that relative with the pipeline installation passage on the side plate
Side on the first protuberance is set, the second protuberance for stretching into the pipeline installation passage is provided with the top plate, it is described
First protuberance and the second protuberance phase clamping.
5. decoration device according to claim 3, it is characterised in that the end of the extension and the bottom plate are positioned at same
On one horizontal plane.
6. decoration device according to claim 3, it is characterised in that away from the pipeline installation passage on the side plate
Multiple floors are provided with side.
7. decoration device according to claim 6, it is characterised in that when the bottom plate is fixed on the partition wall, its
In a floor fit on the metope of the partition wall.
8. decoration device according to claim 6, it is characterised in that one of them described floor fits in the top plate
On.
9. a kind of partition wall, including wall and the decoration that is connected on the wall, it is characterised in that the decoration right will
Seek the decoration device described in any one of 1-8.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720387772.4U CN206752758U (en) | 2017-04-13 | 2017-04-13 | Decoration device and partition wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720387772.4U CN206752758U (en) | 2017-04-13 | 2017-04-13 | Decoration device and partition wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206752758U true CN206752758U (en) | 2017-12-15 |
Family
ID=60614054
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720387772.4U Active CN206752758U (en) | 2017-04-13 | 2017-04-13 | Decoration device and partition wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206752758U (en) |
-
2017
- 2017-04-13 CN CN201720387772.4U patent/CN206752758U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206752758U (en) | Decoration device and partition wall | |
CN204059625U (en) | A kind of heat-insulation energy-saving building | |
CN204665022U (en) | A kind of composite and multi-purpose lighting | |
CN205422011U (en) | One -piece type sunshine room of light | |
CN207194251U (en) | Split curtain wall system waterproof construction | |
CN204886045U (en) | Electromagnetic interference resistance's cable testing bridge | |
CN204024280U (en) | Hinge under a kind of refrigerator | |
CN204139472U (en) | A kind of waterproof open-type lighting roof retractable roof system | |
CN204454141U (en) | The integrated rise of a kind of many trolleys is from standard knot | |
CN207405813U (en) | A kind of anti-crack and anti-seepage type heat-insulating wall structure | |
CN203716443U (en) | Ultrathin heat insulation decoration integrated plate installation system | |
CN205118436U (en) | Lid formula water pipe installation mechanism for interior decoration | |
CN104295118A (en) | Mobile bath room | |
CN204551179U (en) | There is the stadium terrace of the pre-buried pipeline of cable | |
CN205135646U (en) | Tunnel structure | |
CN204704781U (en) | A kind of bulb socket and outdoor lights string thereof | |
CN204059686U (en) | The exposed frame curtain wall system that a kind of Split energy-saving connects | |
CN107327055A (en) | The bright frame system of glass curtain wall | |
CN203891509U (en) | Connecting structure of overflow groove in detachable swimming pool | |
CN207484780U (en) | A kind of photovoltaic energy-saving building curtain wall of PLC controls | |
CN206053729U (en) | A kind of good sliding window of the high water resistance of intensity easy for installation | |
CN203480945U (en) | Sealed suspension insulator | |
CN204059624U (en) | A kind of novel heat-insulation energy-saving building thing | |
CN208251381U (en) | A kind of energy-saving waterproof curtain wall | |
CN203924553U (en) | Improved decorative panel for building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |