CN204551179U - There is the stadium terrace of the pre-buried pipeline of cable - Google Patents
There is the stadium terrace of the pre-buried pipeline of cable Download PDFInfo
- Publication number
- CN204551179U CN204551179U CN201520179226.2U CN201520179226U CN204551179U CN 204551179 U CN204551179 U CN 204551179U CN 201520179226 U CN201520179226 U CN 201520179226U CN 204551179 U CN204551179 U CN 204551179U
- Authority
- CN
- China
- Prior art keywords
- piece
- tubule
- basal layer
- little chi
- terrace
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Road Paving Structures (AREA)
Abstract
The utility model relates to stadium terrace, there is the stadium terrace of the pre-buried pipeline of cable, it comprises basal layer and surface course, described basal layer is cement floor, surface course is the layer of polyurethane or plastic grain layer that bond together, longitudinal more piece longitudinal tubule (L tubule) road is equipped with in the middle of described basal layer, more piece longitudinal tubule (L tubule) has little Chi to connect between road, it is lid above little Chi, it is one piece of surface course above lid, horizontal more piece horizontal pipe is equipped with in the middle of described basal layer, more piece horizontal pipe is connected between little Chi, inside described little Chi, pulley is installed, such stadium terrace has to be laid conveniently, safety, the advantage be convenient for changing, also there is cable laying more labour-saving advantage.
Description
Technical field
The utility model relates to stadium terrace.
Background technology
Stadium terrace is the activity space of sportsman, movable personnel, stadium usually needs carry out some activities; In prior art, stadium terrace does not have the pre-buried pipeline of cable, during use, needs to lay temporarily, has troublesome shortcoming, also have installation hidden danger in addition, cable laying is had below the terrace of stadium easily aging, the shortcoming that can not change.
Summary of the invention
The purpose of this utility model is exactly for above-mentioned shortcoming, provide a kind of and lay conveniently, safely, the stadium terrace that is convenient for changing---there is the stadium terrace of the pre-buried pipeline of cable
Technical solution adopted in the utility model realizes like this: the stadium terrace with the pre-buried pipeline of cable, it comprises basal layer and surface course, described basal layer is cement floor, surface course is the layer of polyurethane or plastic grain layer that bond together, it is characterized in that: in the middle of described basal layer, be equipped with longitudinal more piece longitudinal tubule (L tubule) road, more piece longitudinal tubule (L tubule) has little Chi to connect between road, is lid above little Chi, is one piece of surface course above lid.
Say further, be equipped with horizontal more piece horizontal pipe in the middle of described basal layer, more piece horizontal pipe is connected between little Chi.
Say further, inside described little Chi, pulley is installed.
The beneficial effects of the utility model are: such stadium terrace have lay convenient, safely, the advantage that is convenient for changing;
Be equipped with horizontal more piece horizontal pipe in the middle of described basal layer, more piece horizontal pipe is connected between little Chi, can realizes netted connection, has and uses advantage more easily;
Inside described little Chi, pulley is installed, there is cable laying more labour-saving advantage.
Accompanying drawing explanation
Fig. 1 is the cross section plan structure schematic diagram at basal layer place of the present utility model.
Fig. 2 is the vertical section structure schematic diagram at little Chi place.
Wherein: 1, basal layer 2, surface course 3, longitudinal tubule (L tubule) road 4, little Chi 5, horizontal pipe 6, pulley.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model will be further described.
As shown in Figure 1, 2, there is the stadium terrace of the pre-buried pipeline of cable, it comprises basal layer 1 and surface course 2, described basal layer is cement floor, surface course is the layer of polyurethane or plastic grain layer that bond together, it is characterized in that: be equipped with longitudinal more piece longitudinal tubule (L tubule) road in the middle of described basal layer, have little Chi 4 to connect between more piece longitudinal tubule (L tubule) road 3, being lid above little Chi, is one piece of surface course above lid.
Say further, be equipped with horizontal more piece horizontal pipe 5 in the middle of described basal layer, more piece horizontal pipe is connected between little Chi.
Say further, be provided with pulley 6 inside described little Chi, pulley changes direction firmly when cable laying.
The foregoing is only specific embodiment of the utility model, but architectural feature of the present utility model is not limited to this, any those skilled in the art is in field of the present utility model, and the change done or modification are all encompassed in the scope of the claims of the present utility model.
Claims (3)
1. there is the stadium terrace of the pre-buried pipeline of cable, it comprises basal layer and surface course, described basal layer is cement floor, surface course is the layer of polyurethane or plastic grain layer that bond together, it is characterized in that: in the middle of described basal layer, be equipped with longitudinal more piece longitudinal tubule (L tubule) road, more piece longitudinal tubule (L tubule) has little Chi to connect between road, is lid above little Chi, is one piece of surface course above lid.
2. stadium according to claim 1 terrace, is characterized in that: be equipped with horizontal more piece horizontal pipe in the middle of described basal layer, more piece horizontal pipe is connected between little Chi.
3. stadium according to claim 1 and 2 terrace, is characterized in that: be provided with pulley inside described little Chi.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520179226.2U CN204551179U (en) | 2015-03-30 | 2015-03-30 | There is the stadium terrace of the pre-buried pipeline of cable |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520179226.2U CN204551179U (en) | 2015-03-30 | 2015-03-30 | There is the stadium terrace of the pre-buried pipeline of cable |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204551179U true CN204551179U (en) | 2015-08-12 |
Family
ID=53826315
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520179226.2U Expired - Fee Related CN204551179U (en) | 2015-03-30 | 2015-03-30 | There is the stadium terrace of the pre-buried pipeline of cable |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204551179U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112211221A (en) * | 2020-09-17 | 2021-01-12 | 熊莉 | Municipal road and construction operation method |
-
2015
- 2015-03-30 CN CN201520179226.2U patent/CN204551179U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112211221A (en) * | 2020-09-17 | 2021-01-12 | 熊莉 | Municipal road and construction operation method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203256774U (en) | Underground cable trench construction structure for electric engineering | |
CN202498720U (en) | Traction machine for plastic pipes | |
CN204551179U (en) | There is the stadium terrace of the pre-buried pipeline of cable | |
CN201672159U (en) | Waterproof-ground penetrating structure for pipes | |
CN204282158U (en) | Water drainage skid wood floor bolck | |
CN204282409U (en) | Novel ater-casting transverse crack control structure | |
CN204243626U (en) | Cable unwinding device | |
CN203403691U (en) | Floor slab reinforcing device | |
CN203145058U (en) | Basement buried collector pipe structure | |
CN201738338U (en) | Basement post-cast strip structure | |
CN205153392U (en) | Install ceramic tile structure of floor drain fast | |
CN203946245U (en) | Sanitary unit base | |
CN203200798U (en) | Waterproof structure for basement post-cast strip | |
CN204238519U (en) | Extension waterproofing materials | |
CN204403621U (en) | A kind of connection pipe fitting | |
CN205276768U (en) | Mushroom slate fixing system | |
CN205205880U (en) | Underpass polyurethane composite waterproof structure | |
CN204946960U (en) | A kind of accumulator plant | |
CN104234197A (en) | Container portable house | |
CN204492890U (en) | Warpage preventing draining blind pipe | |
CN204311606U (en) | A kind of footing reinforced body of wall | |
CN205777409U (en) | Overlength reinforced concrete bent structure middle orbit movable scaffold | |
CN204372366U (en) | High strength wire rope braiding skeleton thermoplastic polyethylene flexible composite pipe | |
CN204187128U (en) | A kind of cable testing bridge threeway underframe | |
CN204328234U (en) | A kind of sewer assembly |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150812 Termination date: 20160330 |
|
CF01 | Termination of patent right due to non-payment of annual fee |