CN205777409U - Overlength reinforced concrete bent structure middle orbit movable scaffold - Google Patents

Overlength reinforced concrete bent structure middle orbit movable scaffold Download PDF

Info

Publication number
CN205777409U
CN205777409U CN201620500493.XU CN201620500493U CN205777409U CN 205777409 U CN205777409 U CN 205777409U CN 201620500493 U CN201620500493 U CN 201620500493U CN 205777409 U CN205777409 U CN 205777409U
Authority
CN
China
Prior art keywords
steel
steel platform
platform
reinforced concrete
external scaffolding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620500493.XU
Other languages
Chinese (zh)
Inventor
周权
何昌杰
覃川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Bureau Third Construction Co Ltd
Original Assignee
China Construction Fifth Bureau Third Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fifth Bureau Third Construction Co Ltd filed Critical China Construction Fifth Bureau Third Construction Co Ltd
Priority to CN201620500493.XU priority Critical patent/CN205777409U/en
Application granted granted Critical
Publication of CN205777409U publication Critical patent/CN205777409U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of overlength reinforced concrete bent structure middle orbit movable scaffold, ground is provided with the 2 elongated groove steel rail in roads (1), elongated groove steel rail (1) is provided with steel platform (2), the bottom of steel platform (2) is provided with steel pulley (3), steel platform (2) passes through steel pulley (3) in the upper level sliding back and forth of elongated groove steel rail (1), steel platform (2) top is provided with support body connecting rod (6), the side of steel platform (2) is provided with unloads support plate (4), unload and hold in the palm (5) while unloading is installed on support plate (4), the two ends of steel platform (2) are provided with tie-beam (7), tie-beam (7) is passed through with bolts between multiple stage steel platform (2);External scaffolding system (9) is arranged on steel platform (2) by support body connecting rod (6).This utility model is a kind of to make the overlength reinforced concrete bent structure middle orbit movable scaffold that simple, dependable performance, installation are convenient, with low cost.

Description

Overlength reinforced concrete bent structure middle orbit movable scaffold
Technical field
This utility model relates to a kind of scaffold, particularly relates to a kind of overlength reinforcing bar Concrete bent construction orbit movable scaffold.
Background technology
In building engineering structure work progress, conventional two-row console model external scaffolding System is applied the most universal as construction operation platform and safeguard procedures.But it is conventional Double console model external scaffolding sets up trouble, takies substantial amounts of steel pipe and spends a large amount of Human resources, economy and the feature of environmental protection are poor.Reinforcing bar especially for overlength mixes Solidifying soil bent structure, the highest (typically within 20m), length is the longest by (100 Rice is with in up to 300 meters, the most longer), mostly take cross construction operation, If entirety sets up double console model external scaffolding, cost is high, progress is slow, practicality Difference.
Utility model content
Technical problem to be solved in the utility model is to provide one and can significantly subtract The input of frame material in few engineering, and greatly reduce and set up dismounting labour cost, simultaneously Structure support body can also be as the overlength reinforced concrete bent structure middle of decoration support body Orbit movable scaffold.
In order to solve above-mentioned technical problem, the overlength reinforcing bar that this utility model provides mixes Solidifying soil bent structure orbit movable scaffold, including external scaffolding system, ground Being provided with the 2 elongated groove steel rails in road, described elongated groove steel rail is provided with at least One steel platform, the bottom of every described steel platform is provided with steel pulley, described Steel platform by described steel pulley level on described elongated groove steel rail Sliding back and forth, every described steel platform upper is provided with support body connecting rod, every The side of described steel platform is provided with in the position of described steel pulley and unloads support plate, Described unloading is held in the palm with being provided with unloading on support plate, the two ends of every described steel platform It is provided with tie-beam, is adopted by described tie-beam between the steel platform described in multiple stage It is connected with;Described external scaffolding system is pacified by described support body connecting rod It is contained on described steel platform.
Many group sliding wall attaching rods it are provided with in described external scaffolding system;Described Horizontal high-strength steel cord it is fixed with between side and the body of wall of external scaffolding system.
The side of described external scaffolding system is pressed between the every 3.6m of height and body of wall It is fixed with horizontal wire rope.
The size of every described steel platform is 6m × 1.05m.
The overlength reinforced concrete bent structure middle track using technique scheme moves Dynamic formula scaffold, elongated twice groove is laid on the ground corresponding in external scaffolding position Steel track;Processing and fabricating multiple stage steel platform as required, the size of every steel platform For 6m × 1.05m, steel platform two ends arrange tie-beam and connect between steel platform; Steel mesa base arranges steel assembly pulley, and assembly pulley can level slide in orbit; Steel platform upper arranges support body connecting rod, is used for setting up external scaffolding system;Steel is sliding Wheel side arranges and unloads support plate, uses ground torr unloading;Support body side is structurally by height Spending the horizontal wire rope of every 3m fixed diameter 20, strain with tensioner, two ends are used Flitch pave guarantee steel wire rope from structural plane 100m m, for support body when sliding Attached wall, it is ensured that support body does not topples.
Using utility model, set up rapid and convenient, construction makes simple, and save time province Work, low-carbon environment-friendly, cost-effective.There is extraordinary economy and practicality, Can popularity in the industry.
In sum, this utility model is a kind of to greatly reduce frame material in engineering Putting into, and greatly reduce and set up dismounting labour cost, structure support body can also be made simultaneously For decoration support body with and to make simple, dependable performance, installation convenient, with low cost Overlength reinforced concrete bent structure middle orbit movable scaffold.
Accompanying drawing explanation
Fig. 1 is structure schematic front view of the present utility model.
Fig. 2 is structure schematic top plan view of the present utility model.
Fig. 3 is the structure left view schematic diagram of external scaffolding system of the present utility model.
Detailed description of the invention
With detailed description of the invention, this utility model is made further below in conjunction with the accompanying drawings Explanation.
See Fig. 1, Fig. 2 and Fig. 3, overlength reinforced concrete bent structure middle track Traveling centering, ground is provided with the 2 elongated groove steel rails in road 1, elongated channel-section steel Track 1 is provided with at least one steel platform 2, and the size of every steel platform 2 is 6m × 1.05m, the bottom of every steel platform 2 is provided with steel pulley 3, and steel platform 2 leads to Cross steel pulley 3 level sliding back and forth on elongated groove steel rail 1, every steel platform 2 tops are provided with support body connecting rod 6, and the side of every steel platform 2 is at steel pulley 3 Position be provided with and unload support plate 4, unload and hold in the palm 5 while unloading is installed, often on support plate 4 The two ends of platform steel platform 2 are provided with tie-beam 7, pass through between multiple stage steel platform 2 Tie-beam 7 is with bolts;External scaffolding system 9 is by support body connecting rod 6 It is arranged on steel platform 2.
Further, external scaffolding system 9 is provided with many group sliding wall attaching rods 8; The side of external scaffolding system 9 is fixed with water by between the every 3.6m of height and body of wall Flat high-strength steel cord.
See Fig. 1, Fig. 2 and Fig. 3, be embodied as follows: before structure construction, The elongated groove steel rail of twice 1 is laid on the ground corresponding in external scaffolding position;According to Need processing and fabricating multiple stage steel platform 2, the size of every steel platform 2 be 6m × 1.05m, every steel platform 2 two ends arrange tie-beam 7 and connect between steel platform 2 Connect;It is provided with steel pulley 3 bottom every steel platform 2, can be at elongated groove steel rail On 1, level is slided;Every steel platform 2 top arranges the body connecting rod that frame 500 is high 6, it is used for setting up external scaffolding system 9;Steel pulley 3 side is provided with unloads support plate 4, Use torr 5 unloading of unloading ground;Unloading 5 liters are held in the palm when external scaffolding system 9 is slided Get up, slide and after putting in place, hold in the palm to unloading 5 decline unloadings, set by specification regulation simultaneously Put fixing wall connecting rod 8 and be connected with structure fixing;External scaffolding system 9 is provided with cunning Move wall attaching rod 8;It is solid that the every 3.6m of height is structurally pressed in external scaffolding system 9 side Surely having horizontal wire rope, strain with tensioner, two ends flitch paves and guarantees steel wire Restrict from structural plane 100mm, for external scaffolding system 9 when sliding with structure Attachment, it is ensured that support body is stablized anti-locking system and toppled.
Steel platform 2 selects the combination of many product according to construction deployment demand.This operating platform After being applied to reinforced concrete structure construction, back sliding can be applied to masonry and exterior wall dress Decorations construction.

Claims (4)

1. an overlength reinforced concrete bent structure middle orbit movable scaffold, Including external scaffolding system (9), it is characterized in that: ground is provided with the 2 elongated grooves in road Steel track (1), described elongated groove steel rail (1) is provided with at least one steel Platform (2), the bottom of every described steel platform (2) is provided with steel pulley (3), Described steel platform (2) passes through described steel pulley (3) at described elongated groove The upper level sliding back and forth of steel track (1), every described steel platform (2) top Being provided with support body connecting rod (6), the side of every described steel platform (2) exists The position of described steel pulley (3) is provided with unloads support plate (4), and described unloads support plate (4) hold in the palm (5) while unloading is installed on, the two ends of every described steel platform (2) It is provided with tie-beam (7), by described between the steel platform (2) described in multiple stage Tie-beam (7) with bolts;Described external scaffolding system (9) is led to Cross described support body connecting rod (6) to be arranged on described steel platform (2).
Overlength reinforced concrete bent structure middle rail the most according to claim 1 Road traveling centering, is characterized in that: in described external scaffolding system (9) It is provided with many groups sliding wall attaching rod (8);Described external scaffolding system (9) Horizontal high-strength steel cord it is fixed with between side and body of wall.
Overlength reinforced concrete bent structure middle rail the most according to claim 2 Road traveling centering, is characterized in that: described external scaffolding system (9) Side is by being fixed with horizontal high-strength steel cord between the every 3.6m of height and body of wall.
Overlength reinfored concrete line frame the most according to claim 1 and 2 is tied Structure orbit movable scaffold, is characterized in that: every described steel platform (2) Size be 6m × 1.05m.
CN201620500493.XU 2016-05-30 2016-05-30 Overlength reinforced concrete bent structure middle orbit movable scaffold Expired - Fee Related CN205777409U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620500493.XU CN205777409U (en) 2016-05-30 2016-05-30 Overlength reinforced concrete bent structure middle orbit movable scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620500493.XU CN205777409U (en) 2016-05-30 2016-05-30 Overlength reinforced concrete bent structure middle orbit movable scaffold

Publications (1)

Publication Number Publication Date
CN205777409U true CN205777409U (en) 2016-12-07

Family

ID=57408673

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620500493.XU Expired - Fee Related CN205777409U (en) 2016-05-30 2016-05-30 Overlength reinforced concrete bent structure middle orbit movable scaffold

Country Status (1)

Country Link
CN (1) CN205777409U (en)

Similar Documents

Publication Publication Date Title
CN203961992U (en) Portable full framing chassis
CN103741831B (en) High-strength steel column-common girder steel-low-yield bracing members triple seismic fortification high-performance steel structural system and method for designing thereof
CN203701323U (en) High-intensity steel column-common steel beam-low-yield-point steel support trebling earthquake fortification high-performance steel structure system
CN206290286U (en) A kind of subway pipe-line system construction support frame
CN104989121B (en) A kind of steel slideway jacking architecture adding-floor device
CN205777409U (en) Overlength reinforced concrete bent structure middle orbit movable scaffold
CN205171344U (en) Flexible precast concrete decking structure for draw bridge
CN204393000U (en) Kiwi fruit tree garden sectional shelf-unit
CN203461720U (en) Simple cantilever hoisting machine
CN205088798U (en) Two -way sliding support node of H shaped steel roof beam with two -way limit function
CN201801954U (en) Irregular self-stress tension integral structure
CN101906817A (en) Irregular self-stress tension integral structure
CN204826727U (en) Reinforcing bar processing protection canopy that can dismantle, has enough to meet need
CN105155772B (en) Beam string structure based on bamboo structure
CN209066661U (en) A kind of curtain wall shock bracket
CN206128100U (en) Basic formwork device of dysmorphism
CN203242962U (en) Existing railway line crossing frame for overhead line relocation and transformation construction
CN206438424U (en) A kind of bridge strengthening device with shock insulation function
CN204551179U (en) There is the stadium terrace of the pre-buried pipeline of cable
CN204283198U (en) A kind of aerial ladder engineering machinery and ladder thereof
CN205153127U (en) Stabilize steel construction
CN205046938U (en) Covering or awning on a car, boat, etc. room
CN204022286U (en) Transfer crane is without corbel type door frame
CN203332214U (en) Base frame structure of mobile police service room
CN103174258B (en) Antiskid device of beam string structure supporting rod

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161207

Termination date: 20210530

CF01 Termination of patent right due to non-payment of annual fee