CN206751225U - New lifting and lifeline integrated apparatus - Google Patents
New lifting and lifeline integrated apparatus Download PDFInfo
- Publication number
- CN206751225U CN206751225U CN201720615163.XU CN201720615163U CN206751225U CN 206751225 U CN206751225 U CN 206751225U CN 201720615163 U CN201720615163 U CN 201720615163U CN 206751225 U CN206751225 U CN 206751225U
- Authority
- CN
- China
- Prior art keywords
- crossbeam
- lifeline
- extension rod
- vertical beam
- integrated apparatus
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 18
- 239000010959 steel Substances 0.000 claims abstract description 18
- 239000000725 suspension Substances 0.000 claims abstract description 10
- 238000004804 winding Methods 0.000 claims description 2
- 238000009434 installation Methods 0.000 abstract description 4
- 230000009977 dual effect Effects 0.000 abstract description 2
- 238000000034 method Methods 0.000 description 3
- 238000010276 construction Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Abstract
The utility model discloses a kind of new lifting and lifeline integrated apparatus, including suspension bracket, the suspension bracket includes at least two parallel vertical beams, the top of each vertical beam is fixed on the ceiling by chassis, each vertical beam bottom is connected with crossbeam, and downward extension rod is provided at both ends with positioned at crossbeam, and extension rod sets hole for hoist with crossbeam junction, drawing has steel wire rope between each extension rod, is set with safety buckle on a steel cord.It is integrated with lifeline function to realize lifting, saves space.The device cleverly combines the equipment hoisting involved by generator outlet enclosed busbar overhaul of the equipments and personal security rope overlap joint dual requirementses together, has greatly saved installation space.
Description
Technical field
The utility model belongs to hanging device technical field, and in particular to a kind of new lifting is integrally disguised with lifeline
Put.
Background technology
Equipment suspension centre is arranged on roof weight bearing area, and position is very high, and operating personnel can not touch by ladder, uses
Get up to be inconvenient, and operating personnel's safety rope nowhere mounts in operation process, potential safety hazard be present.New lifting and life
Line integrated apparatus can realize that the lifting of three-phase bus flap arrangement mounts demand with operating personnel safety rope in work progress,
Meet the requirement for having reached construction safety while hoisting function again.
Legacy equipment suspension centre is arranged on roof weight bearing area, and position is very high, and operating personnel can not touch by ladder,
Use and be inconvenient, and operating personnel's safety rope nowhere mounts in operation process, potential safety hazard be present.
Utility model content:
The utility model provide it is a kind of solve existing hanging device because position is very high, use and be inconvenient, ask
Topic, and the existing hanging device operating personnel's safety rope in operation process of solution nowhere mount, and the problem of potential safety hazard be present, carry
A kind of high new lifting and lifeline integrated apparatus, advantage are fairly obvious.
The technical scheme of use:A kind of new lifting and lifeline integrated apparatus, including suspension bracket, the suspension bracket are included extremely
Few two parallel vertical beams, the top of each vertical beam are fixed on the ceiling by chassis, and each vertical beam bottom is connected with crossbeam, is located at
Crossbeam is provided at both ends with downward extension rod, and extension rod sets hole for hoist with crossbeam junction, and being pulled between each extension rod has steel
Cord, safety buckle is set with a steel cord.
Each vertical beam is configured to the sleeve structure to stretch up and down, and set holding position is provided with positioning hole and installed
Wear pin.
The crossbeam is configured to the flexible sleeve structure in left and right, and set holding position is provided with positioning hole and installed
Wear pin.
The stage casing of the crossbeam sets hole for hoist, and the stage casing of steel wire rope is passed through in the hole for hoist in the stage casing.
Tensioning wheel and locking pin are installed on extension rod, the wirerope-winding between extension rod is on tensioning wheel.
The beneficial effects of the utility model:It is integrated with lifeline function to realize lifting, saves space.The device is skilful
It is wonderful by the equipment hoisting involved by generator outlet enclosed busbar overhaul of the equipments and personal security rope overlap joint dual requirementses melt for
One, has greatly saved installation space.
Device is highly moderate, and boom hoisting installation and safety rope overlap joint are very convenient.Boom hoisting is according to scope of operation elevation
Select vertical beam length dimension so that the height of device is adapted to operating personnel to install boom hoisting or safety rope just, very convenient.
Brief description of the drawings:
Fig. 1 is structural representation of the present utility model.
Label in figure, 1 is crossbeam, and 2 be vertical beam, and 3 be chassis, and 4 be extension rod, and 5 be hole for hoist, and 6 be steel wire rope, and 7 be to hang
Rope, 8 be safety buckle.
Embodiment:
Embodiment:A kind of new lifting and lifeline integrated apparatus, referring to Fig. 1, suspension bracket includes two or more parallel
Vertical beam 2, the top of each vertical beam 2 is fixed on the ceiling by chassis 3 and expansion bolt.Each bottom of vertical beam 2 is connected with level
Crossbeam 1, downward extension rod 4 is provided at both ends with positioned at crossbeam 1.Extension rod 4 sets hole for hoist 5 with the junction of crossbeam 1, respectively prolongs
Drawing has steel wire rope 6 between boom 4, and safety buckle is set with steel wire rope 6.
To improve the scope of application of the device, in each vertical beam 2 sleeve structure that stretches up and down can be configured to, and
Set holding position, which is provided with positioning hole and is provided with, wears pin.The flexible sleeve structure in left and right can also be configured in crossbeam 1,
And it is provided with positioning hole in set holding position and is provided with and wear pin.Now, tensioning wheel and locking pin, position are installed on extension rod 4
Steel wire rope 6 between extension rod 4 is wrapped on tensioning wheel, when adjusting 1 length of crossbeam, tensioning wheel loosen make steel wire rope 6 with
The length of crossbeam 1 adapts to, and then locks tensioning wheel again.
It can in addition contain set hole for hoist 5 in the stage casing of crossbeam 1, the stage casing of steel wire rope 6 passes through the hole for hoist 5 in the stage casing
It is interior.
Specifically, crossbeam 1 and vertical beam 2 are I-shaped steel material, and vertical beam 2 is welded on the both sides of crossbeam 1, the top of vertical beam 2 welding side
For shape steel plate as chassis 3, steel plate corner is provided with bolt hole, and suspension bracket is fixed on roof load receiving part by expansion bolt by bolt hole
Position.Crossbeam 1 length spans, three buses, a lifting hole(eyelet) is provided with corresponding bus midline, facilitates the installation of tackles, steel wire
Rope 6 is fixed on below the both ends of crossbeam 1, has 15cm distances apart from crossbeam 1, the lifeline as the installing of operating personnel's safety rope.Make
Boom hoisting is obtained while hoisting function is met but also with the function of operating personnel's safety rope overlap joint, personnel can be fully ensured that
Construction safety.
Claims (5)
1. a kind of new lifting and lifeline integrated apparatus, including suspension bracket, it is characterized in that:It is flat that the suspension bracket includes at least two
Capable vertical beam, the top of each vertical beam are fixed on the ceiling by chassis, and each vertical beam bottom is connected with crossbeam, positioned at crossbeam both ends
Downward extension rod is provided with, extension rod sets hole for hoist with crossbeam junction, and being pulled between each extension rod has steel wire rope, in steel
Safety buckle is set with cord.
2. new lifting according to claim 1 and lifeline integrated apparatus, it is characterized in that:Each vertical beam is arranged to
The sleeve structure that can be stretched up and down, and be provided with positioning hole in set holding position and be provided with and wear pin.
3. new lifting according to claim 1 and lifeline integrated apparatus, it is characterized in that:The crossbeam is arranged to
The flexible sleeve structure in enough left and right, and be provided with positioning hole in set holding position and be provided with and wear pin.
4. new lifting and lifeline integrated apparatus according to claim any one of 1-3, it is characterized in that:The crossbeam
Stage casing hole for hoist is set, the stage casing of steel wire rope is through in the hole for hoist in the stage casing.
5. new lifting according to claim 3 and lifeline integrated apparatus, it is characterized in that:It is provided with extension rod
Tensioning wheel and locking pin, the wirerope-winding between extension rod is on tensioning wheel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720615163.XU CN206751225U (en) | 2017-05-31 | 2017-05-31 | New lifting and lifeline integrated apparatus |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720615163.XU CN206751225U (en) | 2017-05-31 | 2017-05-31 | New lifting and lifeline integrated apparatus |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206751225U true CN206751225U (en) | 2017-12-15 |
Family
ID=60620463
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720615163.XU Active CN206751225U (en) | 2017-05-31 | 2017-05-31 | New lifting and lifeline integrated apparatus |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206751225U (en) |
-
2017
- 2017-05-31 CN CN201720615163.XU patent/CN206751225U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103613031B (en) | Voltage transformer simple and easy hoisting device | |
CN103086279A (en) | Vertical transportation construction method for building construction | |
CN205653091U (en) | Many davits tower crane | |
CN202997425U (en) | Hoisting device capable of replacing suspension type insulator chain under electrified state | |
CN204150943U (en) | A kind of Novel hook device | |
CN202358850U (en) | Light lift-type cantilever crane | |
CN206751225U (en) | New lifting and lifeline integrated apparatus | |
CN203562695U (en) | Pulley suspension device of power transmission tower cross-arm angle iron | |
CN113209513A (en) | Protective suspension device for transformer safety maintenance and use method | |
CN203750064U (en) | Portable safety belt fixing device for power equipment framework | |
CN209038922U (en) | Large-span glass hanging device | |
CN208327216U (en) | A kind of suspension electric hoist | |
CN203475318U (en) | Cable-clamp-free hanging appliance used for anchoring stay cable at tower end in cable bent tower steel anchor beam area | |
CN201174560Y (en) | Elevated DC feeding power supplying apparatus | |
CN206827933U (en) | The overhead explosion-proof crane of robot type cutting machine | |
CN202657825U (en) | Device for lifting guyed tower in integrally assembled mode | |
CN204251234U (en) | For the Multifunctional aloft-work hoisting crane of wind-power electricity generation machine overhauling, maintenance | |
CN204984238U (en) | Electrical power emergency repair ladder | |
CN209306856U (en) | Small-sized separation type electrical hoisting apparatus | |
CN203699783U (en) | Hanging bracket fixed with wire pole | |
CN207775368U (en) | A kind of interim cross-slot bus structure for aluminium electrolytic tank device | |
CN203423430U (en) | Insulator maintenance device | |
CN203319620U (en) | Portable jack | |
CN206915597U (en) | The overhead explosion-proof crane of hanging object anti-rock is played with the flexible wire saws of stretching | |
CN201809046U (en) | Hoisting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |