CN206724281U - Thermoelectricity decouples peak regulation system - Google Patents

Thermoelectricity decouples peak regulation system Download PDF

Info

Publication number
CN206724281U
CN206724281U CN201720734116.7U CN201720734116U CN206724281U CN 206724281 U CN206724281 U CN 206724281U CN 201720734116 U CN201720734116 U CN 201720734116U CN 206724281 U CN206724281 U CN 206724281U
Authority
CN
China
Prior art keywords
heat
network
heating
peak regulation
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720734116.7U
Other languages
Chinese (zh)
Inventor
崔华
杨豫森
徐波
谭智
陈辉
展望
陈超
朱明志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing HEMPEL Electric Power Technology Co., Ltd.
Original Assignee
Hempel Thermal Development Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=60511974&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=CN206724281(U) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Hempel Thermal Development Ltd filed Critical Hempel Thermal Development Ltd
Priority to CN201720734116.7U priority Critical patent/CN206724281U/en
Priority to PCT/CN2017/099591 priority patent/WO2018233024A1/en
Application granted granted Critical
Publication of CN206724281U publication Critical patent/CN206724281U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D19/00Details
    • F24D19/10Arrangement or mounting of control or safety devices
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K17/00Using steam or condensate extracted or exhausted from steam engine plant
    • F01K17/02Using steam or condensate extracted or exhausted from steam engine plant for heating purposes, e.g. industrial, domestic
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D12/00Other central heating systems
    • F24D12/02Other central heating systems having more than one heat source
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B10/00Integration of renewable energy sources in buildings
    • Y02B10/70Hybrid systems, e.g. uninterruptible or back-up power supplies integrating renewable energies
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]
    • Y02B30/52Heat recovery pumps, i.e. heat pump based systems or units able to transfer the thermal energy from one area of the premises or part of the facilities to a different one, improving the overall efficiency

Abstract

It the utility model is related to a kind of thermoelectricity decoupling peak regulation system, including steam power plant's heat supply is drawn gas heat supply network heating system, heating network system, it is characterised in that:Also include power network and peak regulation of power plant control platform and heat supply network stores heat release operational management platform, comprise additionally at least one of circulating water afterheat heat pump recovering system, electric boiler heating system.When power network peak regulation of power plant control platform described in thermoelectricity decoupling peak regulation system sends peak regulation instruction, power plant converts electrical energy into heat energy and is sent into heat distribution pipe network by starting electric boiler and circulating water heat pump, and heat supply network, which stores heat release control platform, to be responsible for controlling the overall heating of a pipe network and secondary pipe network to reach the purpose of pipe network accumulation of heat.Abandon wind by heat pump and electric boiler consumption and abandon light peak regulation power, steam power plant thermoelectricity can decouple completely, make it possible that the pure condensate of steam power plant runs depth peak regulation, not only thermal power plant can be made to be subsidized by depth peak regulation, and the security that pipe network accumulation of heat ensures heat supply can be passed through.

Description

Thermoelectricity decouples peak regulation system
Technical field
It the utility model is related to and utilize pipe network energy storage and power network depth Peak Shaving, more particularly to winter steam power plant utilizes electricity Boiler and heat pump realize electric load depth Peak Shaving by pipe network accumulation of heat.
Background technology
It is rich in Chinese three northern areas of China electricity market capacity, combustion engine, water-storage etc. can peaking power source it is rare, peak load regulation network It is particularly thorny between fired power generating unit flexibility, the scarce capacity of the new energy such as power network consumption wind-powered electricity generation, photoelectricity and nuclear power, abandon wind and abandon Optical phenomenon is serious.In order to solve these problems, northeast electricity prison office has put into effect Tohoku Electric Power assistant service trading rules, with this The implementation of policy, increasing steam power plant realize thermoelectricity decoupling and the depth peak regulation in winter by thermoelectricity flexibility technology. Wherein, by effects of electrical boiler with heat storage system come peak regulation, turn into influences a kind of minimum peak regulation to unit operation in numerous solutions Mode is decoupled with thermoelectricity.
In addition, absorption or compression heat pump has been gone up by many steam power plants in north city carries out circulating water afterheat using increase The correlation engineering project of Winter heat supply.And electric boiler, circulating water afterheat are drawn gas using the heat supply of heat pump and steam power plant and collectively constituted The heat source system of heat distribution pipe network.
Prior art participates in peak regulation using soil source cold-storage and thermal storage system and device, such as Application No. 201620107121.0 Chinese patent, there is provided a kind of soil source cold-storage and thermal storage system and device for the hot peak regulation of steam power plant, including except Conventional thermoelectric Outside factory's generating and heat supply necessary devices, in addition to ground heat exchanger, lithium bromide absorption type heat pump unit, closed cooling tower.Should In the prior art, the temperature of cooling-tower circulating water, later-stage utilization cooling-tower circulating water pair are reduced during summer first with underground cold Soil carries out accumulation of heat;The heat stored during winter using the extraction of lithium bromide absorption type heat pump unit, is provided for concentrated supply of heating in the city Heat, later-stage utilization closed cooling tower carry out cold-storage.Though the prior art combines soil source cold-storage and thermal storage and absorption type heat Pumping exothermic heat, but used regenerative apparatus can not meet the adjustable actual demand of power bracket, and also cost is higher, Exist system heat storage capacity difference it is low with peak modulation capacity the problem of.And for example application number CN201320413060.7 Chinese patent, Provide it is a kind of with earth source heat pump, water accumulation of energy and the compound cold and heat source system of recuperation of heat, including accumulating type earth source heat pump unit, Cold/heat supply earth source heat pump unit, recovery type heat earth source heat pump unit, cold-storage and thermal storage pond, fire cistern, water source heat exchange Device, energy storage pool heat exchanger, cold-storage water pump, let cool water pump, be chilled water pump, cooling water pump, peak regulation water pump, domestic hot-water's pump, latent Water pump, water intake well, inverted well, water knockout drum, water collector and domestic hot-water's heat storage can.Though the patent stores ground source heat pump technology, water Energy technology and heat pump heat recovery technology are integrated, but cooling, the customer group of heat supply are confined to Intra-cell, can not meet Large area heat supply, the demand of accumulation of heat.
Utility model content
The utility model combines pipe network energy storage and electric boiler, heat pump and the heat supply three kinds of thermals source that draw gas, and realizes heat The thermoelectricity decoupling of power plant.Using electric boiler and electric compression heat pump consumption generated energy, so as to reduce electricity volume, it is possible to achieve heat It peak regulation of power plant, both can effectively alleviate regenerative resource consumption predicament, the substantially buret net accumulation of heat storage of heating water can be realized again Can, future will possess wide market development prospect.
In order to overcome problems of the prior art, technical scheme is used by the utility model:A kind of thermal electrolysis Coupling peak regulation system, including steam power plant's heat supply are drawn gas heat supply network heating system, heating network system, in addition to power network and peak regulation of power plant control Platform and heat supply network processed store heat release operational management platform, comprise additionally in circulating water afterheat heat pump recovering system, electric boiler heating system At least one of.
Preferably, the heating network system includes heating network, a secondary heating pipe network, and positioned at once supplying The thermal substation of hot pipe network and secondary heating pipe network joining place.
Any of the above-described scheme is preferably, a heating network and heat supply draw gas heat supply network heating system, more than recirculated water Heat driven heat pump recovery system, electric boiler heating system are connected by aqueduct;Secondary cycle is set on heating network Pump.
Any of the above-described scheme is preferably, and the secondary heating pipe network is connected with user terminal, on the secondary heating pipe network Circulating pump is set.
Any of the above-described scheme is preferably, and power network and the peak regulation of power plant control platform includes grid dispatching center and power plant Centralized control center, grid dispatching center are entered according to the online demand and power grid electric service condition of wind-powered electricity generation photovoltaic in regional power grid Row Real-Time Scheduling, scheduling signals are transferred to centralized control center of power plant, centralized control center of power plant assigns peak load regulation network instruction, passes through control The run time of electric boiler and circulating water afterheat heat pump and operation power, and regulation and control heat exchangers for district heating are run to control heat supply to take out The amount of drawing gas of gas, convert electrical energy into heat energy and be sent into heat distribution pipe network, so as to carry out peak load regulation network.
Any of the above-described scheme is preferably, and the heat supply network stores fortune of the heat release operational management stage+module in a heating network Seek the heat supply network centralized control center of unit, the amount of stored heat of a responsible heating network and the control strategy of charge and discharge heat.
Any of the above-described scheme is preferably, and the heat supply network, which stores heat release operational management platform, can also be arranged on secondary heating tube The heat supply network centralized control center or residential property control centre of the unit of operation of net, responsible region secondary heating pipe network and end building The control strategy of amount of stored heat and charge and discharge heat.
Any of the above-described scheme is preferably, steam power plant's heat supply draw gas heat supply network heating system include station boiler, take out it is solidifying Steam turbine, condenser, heat exchangers for district heating and its connecting pipe;The heat exchangers for district heating is connected with a heating network, is once supplied Circulating pump is set on hot pipe network.
Any of the above-described scheme is preferably, and the circulating water afterheat source of the circulating water afterheat heat pump recovering system is including double The large cooling column of the extraction condensing type steam power plant of shaped form, or the recirculated water air cooling system of Chou Ning steam power plants.
Any of the above-described scheme is preferably, and the circulating water afterheat heat pump recovering system includes steam-powered absorption type heat The electric compression heat pump of pump and/or driven by power.
Any of the above-described scheme is preferably, and in heat exchangers for district heating heat supply water supply and water return pipeline, is connected by multiple threeways Multiple laterals, the lateral add hot water conveying pipe as the heat supply network of the absorption heat pump and electric compression heat pump Road, it is connected respectively with the water inlet and delivery port of absorption heat pump and electric compression heat pump.
Any of the above-described scheme is preferably, the circulating water outlet and recirculated water of the absorption heat pump and electric compression heat pump Circulating water pipeline of the entrance respectively with cooling tower or recirculated water air cooling system is connected.
Any of the above-described scheme is preferably, and high-temperature steam caused by station boiler, which enters, in steam power plant takes out condensing turbine, passes through Cross a steam turbine heat supply part of drawing gas and be transported to heat exchangers for district heating, circulation water for heating is heated, another part is as driving Thermal source enters absorption heat pump;Gas turbine exhaust gas is condensed into condensate into condenser and utilized as recirculated water, absorption heat pump Driving steam reclaims to the heat of recirculated water cold source energy, while runs consumption electricity, or is used as driving by the use of electric power Power, the heat of recirculated water cold source energy is reclaimed by electric compression heat pump.Steam drive absorption heat pump and electric compression heat pump, Two kinds of heat pumps can individually be implemented or two kinds of heat pumps are combined, so as to realize the recirculated water of steam power plant to a certain degree Waste heat recovery and thermoelectricity decoupling and thermoelectricity flexibility peak regulation.Circulating cooling water afterheat is used for heat supply(Heating, domestic hot-water etc.), The thermal pollution of water evaporation loss and environment caused by power plant cooling water radiating can not only be reduced, and heating can be alleviated and brought Combustion gas and the nervous situation of electric power resource, furthermore it is also possible to reduce the cold source energy of power plant cycle, improve power plant cycle thermal effect Rate.Meanwhile the cascade utilization of the energy is realized, a large amount of fuel are saved, improve the comprehensive utilization of energy rate of thermal power plant.
Any of the above-described scheme is preferably, and the electric boiler heating system includes high-field electrode boiler and/or high pressure solid Thermal storage electric boiler.
Any of the above-described scheme is preferably, and the high-field electrode boiler includes high-voltage fence and access system, high-field electrode Wiring, electrode boiler body, plate type heat exchanger, electrode boiler water circulating pump, temperature control system and its connecting pipe.High-field electrode pot Stove has can the electrodeless advantage for adjusting power.
Any of the above-described scheme is preferably, and the high pressure solid thermal storage electric boiler includes high-voltage fence and access system, electricity Hinder heating wire or resistance plate, high-temperature heat accumulation magnesia brick, high temperature air circulating fan, high efficiency air water- to-water heat exchanger, solid heat storage grill pan Stove water circulating pump, temperature control system and its connecting pipe.High pressure solid thermal storage electric boiler have high voltage, it is high-power, can accumulation of heat Feature.High pressure solid thermal storage electric boiler has sufficiently large energy-storage system, can be stored up in the period of the low power consumptions such as night Can, and in peak of power consumption, feed water heating and energy supply are carried out, this advantage solves annual peak regulation and wind-powered electricity generation low ebb consumption simultaneously Problem.
Any of the above-described scheme is preferably, and high-tension electricity generates heat heating high-temperature heat accumulation magnesia brick so as to reality by the resistance plate Existing accumulation of heat.
One or more high-field electrode boilers, one or more high pressures can be included in above-mentioned electric boiler heating system simultaneously Solid heat storage electric boiler.Two kinds of electric boilers are applied simultaneously, can integrate the advantages of playing two kinds of electric boilers each, high-field electrode pot Stove voltage change is smooth, power network is impacted small, and high pressure solid thermal storage electric boiler has that heat storage capacity is big, the small spy of floor space Point.
Any of the above-described scheme is preferably, and the heating network system thermal storage and energy accumulation integrally lifts a heat supply by night The mean temperature of pipe network realizes, or integrally lifted by night the mean temperature of a heating network and secondary heating pipe network come Realize, or mean temperature and the end building accumulation of heat of a heating network and secondary heating pipe network are integrally lifted by night To realize.End building accumulation of heat, which refers to, utilizes the heat supply network water system accumulation of heat in user terminal building.
Any of the above-described scheme is preferably, and the thermal source of the heating network system draws gas heat supply network heating from steam power plant's heat supply System, by extracted steam from turbine accumulation of heat, and/or the heat pump from circulating water afterheat heat pump recovering system, and/or from electricity The electric boiler heat release of boiler heating system, to realize steam power plant's thermoelectricity decoupling.Thermoelectricity decouples peak regulation system
Many steam power plants in the north are realized by building large-scale accumulation of heat water pot or solid and phase change heat storage material at present Thermoelectricity decouples, but the requirement such as these facility input costs and construction, place is higher, and many existing steam power plants are without implementation bar Part, but the precondition of the external heat supply of all steam power plants is that it necessarily connects large-scale centralized heating network, with reference to described above sheet Utility model has advantages below compared to prior art:
1)By using existing central heating network(Including hot in heating network, secondary heating pipe network and a building Net water system)Accumulation of heat cost well below large-scale accumulation of heat water pot, solid heat storage and other phase change energy storage technologies, its security Much larger than accumulation of heat water pot, solid heat storage and phase-change accumulation energy.
2)Winter, electric boiler electric power storage heating and circulating water afterheat are the optimal emergency powers of heating system using two thermals source Thermal source, improve the reliability of heat supply.
3)With building for progressively implementing for the policies such as peak regulation service charge, time-of-use tariffs, particularly future electrical energy spot market The appearance of vertical and negative rate for incorporation into the power network, will necessarily promote the depth peak regulation demand of steam power plant, following market development space will be got over Come bigger.
Brief description of the drawings
Fig. 1 is the signal for the preferred embodiment of peak regulation control platform one that peak regulation system is decoupled according to thermoelectricity of the present utility model Figure.
Fig. 2 is the schematic diagram for the preferred embodiment that peak regulation system is decoupled according to thermoelectricity of the present utility model.
Illustrate:
1- station boilers, 2- take out condensing turbine, 3- condensers, 4- cooling towers, 5- heat exchangers for district heatings, 6- absorption heat pumps, 7- electricity compression heat pumps, 8- circulating pumps, 9- electrode boilers, 10- solid heat storage electric boilers, 11- electric control valves, 12- thermal substations, 13- temp probes, 14-secondary cycle pump, 15- power networks and peak regulation of power plant control platform, 16- grid dispatching centers, 17- power plant Centralized control center, 18- heat supply networks store heat release operational management platform, 19- heat supply networks centralized control center, the heat supply of 20- steam power plants draw gas heat supply network heating System, 21- circulating water afterheat heat pump recovering systems, 22- electric boiler heating systems.
Embodiment
In order to be further understood that utility model content of the present utility model, below in conjunction with specific embodiment to this practicality New to be described in more detail, embodiment only has exemplary effect to the utility model, without any restrictions Effect;The insubstantial modifications that any those skilled in the art make on the basis of the utility model, it should all belong to this practicality Novel protected scope.
Embodiment 1
As depicted in figs. 1 and 2, a kind of thermoelectricity decoupling peak regulation system, including steam power plant's heat supply draw gas heat supply network heating system 20, Heating network system, in addition to power network and peak regulation of power plant control platform 15 and heat supply network store heat release operational management platform 18, recirculated water Residual heat pump recovery system 21 and electric boiler heating system 22.
In the present embodiment, the heating network system includes heating network, a secondary heating pipe network, and positioned at one The thermal substation 12 of secondary heating network and secondary heating pipe network joining place.
In the present embodiment, draw gas heat supply network heating system, circulating water afterheat heat pump of a heating network and heat supply returns Receipts system 21, electric boiler heating system 22 are connected by aqueduct;Secondary cycle pump 8 is set on heating network.
In the present embodiment, the secondary heating pipe network is connected with user terminal, and circulation is set on the secondary heating pipe network Pump 8.
In the present embodiment, power network and the peak regulation of power plant control platform 15 includes grid dispatching center 16 and power plant's collection control Center 17, grid dispatching center 16 are entered according to the online demand and power grid electric service condition of wind-powered electricity generation photovoltaic in regional power grid Row Real-Time Scheduling, scheduling signals are transferred to centralized control center of power plant 17, centralized control center of power plant 17 assigns peak load regulation network instruction, passed through The run time and operation power of electric boiler and circulating water afterheat heat pump, and regulation and control heat exchangers for district heating 5 is controlled to run to control The amount of drawing gas of heat supply pumping, convert electrical energy into heat energy and be sent into heat distribution pipe network, so as to carry out peak load regulation network.
In the present embodiment, the heat supply network stores the unit of operation that heat release operational management platform 18 is arranged on a heating network Heat supply network centralized control center 19, be responsible for the amount of stored heat of heating network and the control strategy of charge and discharge heat.
In the present embodiment, the heat supply network, which stores heat release operational management platform 18, can also be arranged on the fortune of secondary heating pipe network The heat supply network centralized control center 19 or residential property control centre of unit are sought, is responsible for the accumulation of heat of region secondary heating pipe network and end building The control strategy of amount and charge and discharge heat.
In the present embodiment, steam power plant's heat supply draw gas heat supply network heating system 20 include station boiler 1, take out condensing turbine 2nd, condenser 3, heat exchangers for district heating 5 and its connecting pipe;The heat exchangers for district heating 5 is connected with a heating network, a heat supply Circulating pump 8 is set on pipe network.
In the present embodiment, the circulating water afterheat source of the circulating water afterheat heat pump recovering system 21 includes hyperbolic-type Extraction condensing type steam power plant large cooling column 4, or the recirculated water air cooling system of Chou Ning steam power plants.
In the present embodiment, the circulating water afterheat heat pump recovering system 21 includes the steam-powered He of absorption heat pump 6 The electric compression heat pump 7 of driven by power.
In the present embodiment, in the heat supply water supply of heat exchangers for district heating 5 and water return pipeline, connected respectively by multiple threeways multiple Lateral, the lateral heat water conveyance conduit as the heat supply network of the absorption heat pump 6 and electric compression heat pump 7, It is connected respectively with the water inlet and delivery port of absorption heat pump 6 and electric compression heat pump.
In the present embodiment, the circulating water outlet of the absorption heat pump 6 and electric compression heat pump 7 and circulation water inlet point Circulating water pipeline not with cooling tower 4 or recirculated water air cooling system is connected.
In the present embodiment, high-temperature steam caused by station boiler 1 is into condensing turbine 2 is taken out in steam power plant, by steamer A machine heat supply part of drawing gas is transported to heat exchangers for district heating 5, circulation water for heating is heated, another part enters as driving heat source Enter absorption heat pump 6;Gas turbine exhaust gas is condensed into condensate into condenser 3 and utilizes driving as recirculated water, absorption heat pump 6 Steam reclaims to the heat of recirculated water cold source energy, while runs consumption electricity, or by the use of electric power as driving force, leads to Overvoltage contracting formula heat pump 7 reclaims the heat of recirculated water cold source energy.Steam drive absorption heat pump 6 and electric compression heat pump 7, two Kind of heat pump can individually be implemented or two kinds of heat pumps are combined, so as to realize to a certain degree more than the recirculated water of steam power plant Recuperation of heat and thermoelectricity decoupling and thermoelectricity flexibility peak regulation.Circulating cooling water afterheat is used for heat supply heating, domestic hot-water etc., not only The thermal pollution of water evaporation loss and environment caused by power plant cooling water radiating can be reduced, and heating can be alleviated and bring combustion gas With the nervous situation of electric power resource, furthermore it is also possible to reduce the cold source energy of power plant cycle, the power plant cycle thermal efficiency is improved.Together When, the cascade utilization of the energy is realized, saves a large amount of fuel, improves the comprehensive utilization of energy rate of thermal power plant.
In the present embodiment, the electric boiler heating system 22 includes high-field electrode boiler 9 and/or high pressure solid hot stored electric Boiler 10.
In the present embodiment, the high-field electrode boiler 9 includes high-voltage fence and access system, high-field electrode wiring, electricity The body of pole boiler 9, plate type heat exchanger, the water circulating pump of electrode boiler 9, temperature control system and its connecting pipe.High-field electrode boiler 9 has Having can the electrodeless advantage for adjusting power.
In the present embodiment, the high pressure solid thermal storage electric boiler 10 includes high-voltage fence and access system, resistance heating Silk or resistance plate, high-temperature heat accumulation magnesia brick, high temperature air circulating fan, high efficiency air water- to-water heat exchanger, solid heat storage electric boiler 10 follow Ring water pump, temperature control system and its connecting pipe.High pressure solid thermal storage electric boiler 10 have high voltage, it is high-power, can accumulation of heat spy Point.High pressure solid thermal storage electric boiler 10 has sufficiently large energy-storage system, can be stored up in the period of the low power consumptions such as night Can, and in peak of power consumption, feed water heating and energy supply are carried out, this advantage solves annual peak regulation and wind-powered electricity generation low ebb consumption simultaneously Problem.
In the present embodiment, high-tension electricity generates heat heating high-temperature heat accumulation magnesia brick so as to realize accumulation of heat by the resistance plate.
Can include one or more high-field electrode boilers 9 in above-mentioned electric boiler heating system 22 simultaneously, and one or Multiple high pressure solid thermal storage electric boilers 10.Two kinds of electric boilers are applied simultaneously, can integrate the advantages of playing two kinds of electric boilers each, The voltage change of high-field electrode boiler 9 is smooth, small to power network impact, and high pressure solid thermal storage electric boiler 10 is big with heat storage capacity, The characteristics of floor space is small.
In the present embodiment, the heating network system thermal storage and energy accumulation integrally lifts the flat of heating network by night Equal temperature realizes, or integrally lifts by night the mean temperature of a heating network and secondary heating pipe network to realize, or Mean temperature and the end building accumulation of heat of a heating network and secondary heating pipe network are integrally lifted by night to realize. End building accumulation of heat, which refers to, utilizes the heat supply network water system accumulation of heat in user terminal building.
In the present embodiment, the thermal source of the heating network system draws gas heat supply network heating system 20 from steam power plant's heat supply, By extracted steam from turbine accumulation of heat, the heat pump from circulating water afterheat heat pump recovering system 21, and from grill pan stove heat The electric boiler heat release of system 22, to realize steam power plant's thermoelectricity decoupling.Thermoelectricity decouples peak regulation system
Embodiment 2
Embodiment 2 is similar to Example 1, except that, a kind of thermoelectricity decoupling peak regulation system in embodiment 2, including Draw gas heat supply network heating system 20, heating network system, power network and peak regulation of power plant control platform 15 and heat supply network of steam power plant's heat supply stores and put Hot operational management platform 18, circulating water afterheat heat pump recovering system 21.
In the present embodiment, the heating network system includes heating network, a secondary heating pipe network, and positioned at one The thermal substation 12 of secondary heating network and secondary heating pipe network joining place.
In the present embodiment, draw gas heat supply network heating system, circulating water afterheat heat pump of a heating network and heat supply returns Receipts system 21 is connected by aqueduct;Secondary cycle pump 8 is set on heating network.
In the present embodiment, the secondary heating pipe network is connected with user terminal, and circulation is set on the secondary heating pipe network Pump 8.
In the present embodiment, power network and the peak regulation of power plant control platform 15 includes grid dispatching center 16 and power plant's collection control Center 17, grid dispatching center 16 are entered according to the online demand and power grid electric service condition of wind-powered electricity generation photovoltaic in regional power grid Row Real-Time Scheduling, scheduling signals are transferred to centralized control center of power plant 17, centralized control center of power plant 17 assigns peak load regulation network instruction, passed through The run time and operation power of circulating water afterheat heat pump, and regulation and control heat exchangers for district heating 5 is controlled to run to control heat supply to be evacuated The amount of drawing gas, convert electrical energy into heat energy be sent into heat distribution pipe network, so as to carry out peak load regulation network.
In the present embodiment, the heat supply network stores the unit of operation that heat release operational management platform 18 is arranged on a heating network Heat supply network centralized control center 19, be responsible for the amount of stored heat of heating network and the control strategy of charge and discharge heat.
In the present embodiment, the heat supply network, which stores heat release operational management platform 18, can also be arranged on the fortune of secondary heating pipe network The heat supply network centralized control center 19 or residential property control centre of unit are sought, is responsible for the accumulation of heat of region secondary heating pipe network and end building The control strategy of amount and charge and discharge heat.
In the present embodiment, steam power plant's heat supply draw gas heat supply network heating system 20 include station boiler 1, take out condensing turbine 2nd, condenser 3, heat exchangers for district heating 5 and its connecting pipe;The heat exchangers for district heating 5 is connected with a heating network, a heat supply Circulating pump 8 is set on pipe network.
In the present embodiment, the circulating water afterheat source of the circulating water afterheat heat pump recovering system 21 includes hyperbolic-type Extraction condensing type steam power plant large cooling column 4, or the recirculated water air cooling system of Chou Ning steam power plants.
In the present embodiment, the circulating water afterheat heat pump recovering system 21 includes the steam-powered He of absorption heat pump 6 The electric compression heat pump 7 of driven by power.
In the present embodiment, in the heat supply water supply of heat exchangers for district heating 5 and water return pipeline, connected respectively by multiple threeways multiple Lateral, the lateral heat water conveyance conduit as the heat supply network of the absorption heat pump 6 and electric compression heat pump 7, It is connected respectively with the water inlet and delivery port of absorption heat pump 6 and electric compression heat pump.
In the present embodiment, the circulating water outlet of the absorption heat pump 6 and electric compression heat pump 7 and circulation water inlet point Circulating water pipeline not with cooling tower 4 or recirculated water air cooling system is connected.
In the present embodiment, high-temperature steam caused by station boiler 1 is into condensing turbine 2 is taken out in steam power plant, by steamer A machine heat supply part of drawing gas is transported to heat exchangers for district heating 5, circulation water for heating is heated, another part enters as driving heat source Enter absorption heat pump 6;Gas turbine exhaust gas is condensed into condensate into condenser 3 and utilizes driving as recirculated water, absorption heat pump 6 Steam reclaims to the heat of recirculated water cold source energy, while runs consumption electricity, or by the use of electric power as driving force, leads to Overvoltage contracting formula heat pump 7 reclaims the heat of recirculated water cold source energy.Steam drive absorption heat pump 6 and electric compression heat pump 7, two Kind of heat pump can individually be implemented or two kinds of heat pumps are combined, so as to realize to a certain degree more than the recirculated water of steam power plant Recuperation of heat and thermoelectricity decoupling and thermoelectricity flexibility peak regulation.Circulating cooling water afterheat is used for heat supply heating, domestic hot-water etc., not only The thermal pollution of water evaporation loss and environment caused by power plant cooling water radiating can be reduced, and heating can be alleviated and bring combustion gas With the nervous situation of electric power resource, furthermore it is also possible to reduce the cold source energy of power plant cycle, the power plant cycle thermal efficiency is improved.Together When, the cascade utilization of the energy is realized, saves a large amount of fuel, improves the comprehensive utilization of energy rate of thermal power plant.
In the present embodiment, the heating network system thermal storage and energy accumulation integrally lifts the flat of heating network by night Equal temperature realizes, or integrally lifts by night the mean temperature of a heating network and secondary heating pipe network to realize, or Mean temperature and the end building accumulation of heat of a heating network and secondary heating pipe network are integrally lifted by night to realize. End building accumulation of heat, which refers to, utilizes the heat supply network water system accumulation of heat in user terminal building.
In the present embodiment, the thermal source of the heating network system draws gas heat supply network heating system 20 from steam power plant's heat supply, By extracted steam from turbine accumulation of heat, and the heat pump from circulating water afterheat heat pump recovering system 21, to realize steam power plant's thermoelectricity Decoupling.
Embodiment 3
A kind of thermoelectricity decouples peak regulation system, including steam power plant's heat supply is drawn gas heat supply network heating system 20, heating network system, electricity Net and peak regulation of power plant control platform 15 and heat supply network store heat release operational management platform 18 and electric boiler heating system 22.
In the present embodiment, the heating network system includes heating network, a secondary heating pipe network, and positioned at one The thermal substation 12 of secondary heating network and secondary heating pipe network joining place.
In the present embodiment, a heating network is connected with electric boiler heating system 22 by aqueduct;It is described Secondary cycle pump 8 is set on heating network.
In the present embodiment, the secondary heating pipe network is connected with user terminal, and circulation is set on the secondary heating pipe network Pump 8.
In the present embodiment, power network and the peak regulation of power plant control platform 15 includes grid dispatching center 16 and power plant's collection control Center 17, grid dispatching center 16 are entered according to the online demand and power grid electric service condition of wind-powered electricity generation photovoltaic in regional power grid Row Real-Time Scheduling, scheduling signals are transferred to centralized control center of power plant 17, centralized control center of power plant 17 assigns peak load regulation network instruction, passed through The run time and operation power of electric boiler and circulating water afterheat heat pump, and regulation and control heat exchangers for district heating 5 is controlled to run to control The amount of drawing gas of heat supply pumping, convert electrical energy into heat energy and be sent into heat distribution pipe network, so as to carry out peak load regulation network.
In the present embodiment, the heat supply network stores the unit of operation that heat release operational management platform 18 is arranged on a heating network Heat supply network centralized control center 19, be responsible for the amount of stored heat of heating network and the control strategy of charge and discharge heat.
In the present embodiment, the heat supply network, which stores heat release operational management platform 18, can also be arranged on the fortune of secondary heating pipe network The heat supply network centralized control center 19 or residential property control centre of unit are sought, is responsible for the accumulation of heat of region secondary heating pipe network and end building The control strategy of amount and charge and discharge heat.
In the present embodiment, steam power plant's heat supply draw gas heat supply network heating system 20 include station boiler 1, take out condensing turbine 2nd, condenser 3, heat exchangers for district heating 5 and its connecting pipe;The heat exchangers for district heating 5 is connected with a heating network, a heat supply Circulating pump 8 is set on pipe network.
In the present embodiment, the electric boiler heating system 22 includes high-field electrode boiler 9 and/or high pressure solid hot stored electric Boiler 10.
In the present embodiment, the high-field electrode boiler 9 includes high-voltage fence and access system, high-field electrode wiring, electricity The body of pole boiler 9, plate type heat exchanger, the water circulating pump of electrode boiler 9, temperature control system and its connecting pipe.High-field electrode boiler 9 has Having can the electrodeless advantage for adjusting power.
In the present embodiment, the high pressure solid thermal storage electric boiler 10 includes high-voltage fence and access system, resistance heating Silk or resistance plate, high-temperature heat accumulation magnesia brick, high temperature air circulating fan, high efficiency air water- to-water heat exchanger, solid heat storage electric boiler 10 follow Ring water pump, temperature control system and its connecting pipe.High pressure solid thermal storage electric boiler 10 have high voltage, it is high-power, can accumulation of heat spy Point.High pressure solid thermal storage electric boiler 10 has sufficiently large energy-storage system, can be stored up in the period of the low power consumptions such as night Can, and in peak of power consumption, feed water heating and energy supply are carried out, this advantage solves annual peak regulation and wind-powered electricity generation low ebb consumption simultaneously Problem.
In the present embodiment, high-tension electricity generates heat heating high-temperature heat accumulation magnesia brick so as to realize accumulation of heat by the resistance plate.
Can include one or more high-field electrode boilers 9 in above-mentioned electric boiler heating system 22 simultaneously, and one or Multiple high pressure solid thermal storage electric boilers 10.Two kinds of electric boilers are applied simultaneously, can integrate the advantages of playing two kinds of electric boilers each, The voltage change of high-field electrode boiler 9 is smooth, small to power network impact, and high pressure solid thermal storage electric boiler 10 is big with heat storage capacity, The characteristics of floor space is small.
In the present embodiment, the heating network system thermal storage and energy accumulation integrally lifts the flat of heating network by night Equal temperature realizes, or integrally lifts by night the mean temperature of a heating network and secondary heating pipe network to realize, or Mean temperature and the end building accumulation of heat of a heating network and secondary heating pipe network are integrally lifted by night to realize. End building accumulation of heat, which refers to, utilizes the heat supply network water system accumulation of heat in user terminal building.
In the present embodiment, the thermal source of the heating network system draws gas heat supply network heating system 20 from steam power plant's heat supply, By extracted steam from turbine accumulation of heat, and the electric boiler heat release from electric boiler heating system 22, to realize steam power plant's thermoelectricity decoupling.
Embodiment 4
Embodiment 4 is similar to Example 1, except that, steam power plant's heat supply is drawn gas the heat of heat supply network heating system 20 Source can come from gas fired-boiler, coal-burning boiler, the electric boiler of pipe network side, air-source, water resource heat pump thermal source, or other thermoelectricity connection Produce any one or more in unit.
Embodiment 5
Embodiment 5 is similar to Example 1, except that, the return water of described pipe network of heat supply network is only added by heat supply network Hot device 5 and grill pan stove heat, electric boiler therein can be high-field electrode boiler 9 or one kind in solid heat storage electric boiler 10 or Combination.
Although the utility model, those skilled in the art has shown and described referring particularly to its preferred embodiment It is appreciated that the various changes that can be made in form and details are new without departing from this practicality described in appended claims The scope of type.It is described in detail above in association with specific embodiment of the utility model, but is not to limit of the present utility model System.Every foundation the technical essence of the utility model still falls within this practicality to any simple modification made for any of the above embodiments The protection domain of new technique scheme.

Claims (17)

1. a kind of thermoelectricity decouples peak regulation system, including steam power plant's heat supply is drawn gas heat supply network heating system (20), heating network system, its It is characterised by:Also include power network and peak regulation of power plant control platform (15) and heat supply network stores heat release operational management platform (18), wrap in addition Include at least one of circulating water afterheat heat pump recovering system (21), electric boiler heating system (22).
2. thermoelectricity according to claim 1 decouples peak regulation system, it is characterised in that:The heating network system is included once Heating network, secondary heating pipe network, and positioned at a heating network and the thermal substation (12) of secondary heating pipe network joining place.
3. thermoelectricity according to claim 2 decouples peak regulation system, it is characterised in that:Heating network is taken out with heat supply Vapour heat supply network heating system, circulating water afterheat heat pump recovering system (21), electric boiler heating system (22) are connected by aqueduct; Circulating pump (8) and electric control valve (11) are set on heating network.
4. thermoelectricity according to claim 2 decouples peak regulation system, it is characterised in that:The secondary heating pipe network and user terminal Connect, temp probe (13) and secondary cycle pump (8) are set on the secondary heating pipe network.
5. thermoelectricity according to claim 1 decouples peak regulation system, it is characterised in that:The heat supply network, which stores heat release operational management, puts down Platform (18) is arranged on the heat supply network centralized control center (19) of the unit of operation of a heating network, is responsible for the amount of stored heat of a heating network With the control strategy of charge and discharge heat.
6. thermoelectricity according to claim 5 decouples peak regulation system, it is characterised in that:The heat supply network, which stores heat release operational management, puts down Platform (18) can also be arranged on the heat supply network centralized control center (19) or residential property control centre of the unit of operation of secondary heating pipe network, It is responsible for the amount of stored heat of region secondary heating pipe network and end building and the control strategy of charge and discharge heat.
7. thermoelectricity according to claim 1 decouples peak regulation system, it is characterised in that:Steam power plant's heat supply heat supply network that draws gas adds Hot systems (20) include station boiler (1), take out condensing turbine (2), condenser (3), heat exchangers for district heating (5) and its connecting pipe; The heat exchangers for district heating (5) is connected with a heating network, and circulating pump (8) is set on a heating network.
8. thermoelectricity according to claim 1 decouples peak regulation system, it is characterised in that:The circulating water afterheat heat pump recovery system The circulating water afterheat source of system (21) includes the large cooling column (4) of the extraction condensing type steam power plant of hyperbolic-type, or Chou Ning steam power plants Recirculated water air cooling system.
9. thermoelectricity according to claim 8 decouples peak regulation system, it is characterised in that:The circulating water afterheat heat pump recovery system System (21) includes steam-powered absorption heat pump (6) and/or electric compression heat pump (7) of driven by power.
10. thermoelectricity according to claim 9 decouples peak regulation system, it is characterised in that:Heat exchangers for district heating (5) heat supply supply water and On water return pipeline, multiple laterals are connected by multiple threeways, the lateral is as the absorption heat pump (6) and electricity The heat supply network heating water conveyance conduit of compression heat pump (7), enter water with absorption heat pump (6) and electric compression heat pump (7) respectively Mouth connects with delivery port.
11. thermoelectricity according to claim 10 decouples peak regulation system, it is characterised in that:The absorption heat pump (6) and electricity The circulating water outlet of compression heat pump (7) and circulation water inlet respectively with cooling tower (4) or the recirculated water of recirculated water air cooling system Pipeline connects.
12. any one thermoelectricity decoupling peak regulation system according to claim 7~11, it is characterised in that:It is electric in steam power plant High-temperature steam of standing caused by boiler (1), which enters, takes out condensing turbine (2), is transported to heat supply network by a steam turbine heat supply part of drawing gas and adds Hot device (5), heats to circulation water for heating, and another part enters absorption heat pump (6) as driving heat source;Gas turbine exhaust gas Condensate is condensed into condenser (3) to utilize as recirculated water, absorption heat pump (6) and drive steam to recirculated water cold source energy Heat reclaimed, while run consumption electricity, or by the use of electric power as driving force, pass through electric compression heat pump (7) and return Receive the heat of recirculated water cold source energy.
13. thermoelectricity according to claim 1 decouples peak regulation system, it is characterised in that:The electric boiler heating system (22) Including high-field electrode boiler (9) and/or high pressure solid thermal storage electric boiler (10).
14. thermoelectricity according to claim 13 decouples peak regulation system, it is characterised in that:High-field electrode boiler (9) bag Include high-voltage fence and access system, high-field electrode wiring, electrode boiler body, plate type heat exchanger, electrode boiler (9) recirculated water Pump, temperature control system and its connecting pipe.
15. decouple peak regulation system according to the thermoelectricity described in claim 13, it is characterised in that:The high pressure solid thermal storage electric boiler (10) high-voltage fence and access system, resistive heater or resistance plate, high-temperature heat accumulation magnesia brick, high temperature air circulated air are included Machine, high efficiency air water- to-water heat exchanger, solid heat storage electric boiler water circulating pump, temperature control system and its connecting pipe.
16. decouple peak regulation system according to the thermoelectricity described in claim 15, it is characterised in that:High-tension electricity is sent out by the resistance plate Heat heats high-temperature heat accumulation magnesia brick so as to realize accumulation of heat.
17. decouple peak regulation system according to the thermoelectricity described in claim 1, it is characterised in that:The thermal source of the heating network system comes Draw gas heat supply network heating system (20) from steam power plant's heat supply, returned by extracted steam from turbine accumulation of heat, and/or from circulating water afterheat heat pump The heat pump of receipts system (21), and/or the electric boiler heat release from electric boiler heating system (22), to realize steam power plant's thermoelectricity Decoupling.
CN201720734116.7U 2017-06-22 2017-06-22 Thermoelectricity decouples peak regulation system Active CN206724281U (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201720734116.7U CN206724281U (en) 2017-06-22 2017-06-22 Thermoelectricity decouples peak regulation system
PCT/CN2017/099591 WO2018233024A1 (en) 2017-06-22 2017-08-30 Thermoelectric decoupling peak load regulating system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720734116.7U CN206724281U (en) 2017-06-22 2017-06-22 Thermoelectricity decouples peak regulation system

Publications (1)

Publication Number Publication Date
CN206724281U true CN206724281U (en) 2017-12-08

Family

ID=60511974

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720734116.7U Active CN206724281U (en) 2017-06-22 2017-06-22 Thermoelectricity decouples peak regulation system

Country Status (2)

Country Link
CN (1) CN206724281U (en)
WO (1) WO2018233024A1 (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107166484A (en) * 2017-04-20 2017-09-15 赫普热力发展有限公司 Thermoelectricity decouples peak regulation system
CN108375059A (en) * 2018-01-16 2018-08-07 南京友智科技有限公司 Peak regulation control method of high-voltage electrode boiler system
CN108443957A (en) * 2018-02-26 2018-08-24 南京友智科技有限公司 The peak regulation heat supply method that a kind of big thermoelecrtic, hold over system jointly control
CN108625911A (en) * 2018-03-29 2018-10-09 东北电力大学 A kind of therrmodynamic system promoting thermal power plant unit electricity output regulating power
CN108692352A (en) * 2018-08-17 2018-10-23 国电龙源电力技术工程有限责任公司 Heating system and method suitable for steam power plant's peak tune
CN110469835A (en) * 2019-07-30 2019-11-19 西安交通大学 Thermoelectricity decoupled system and operation method based on absorption heat pump and thermal storage equipment
CN111520808A (en) * 2020-03-09 2020-08-11 华电电力科学研究院有限公司 Complex combined heat and power heating system based on low-temperature waste heat recovery and electric heating load adjusting method
CN114060111A (en) * 2021-11-09 2022-02-18 西安热工研究院有限公司 Liquid compressed air energy storage method and system for utilizing waste heat of circulating water of thermal power generating unit

Families Citing this family (29)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109724139A (en) * 2019-02-25 2019-05-07 江苏双良低碳产业技术研究院有限公司 A kind of remote thermoelectricity decoupling peak regulation of fired power generating unit and central heating and cooling system
CN109827166A (en) * 2019-04-09 2019-05-31 北京国电蓝天节能科技开发有限公司 A kind of power plant thermal system
CN109974064A (en) * 2019-04-16 2019-07-05 南京金合能源材料有限公司 Mobile phase-change heat accumulation system based on the heating of charging pile electricity
CN110500637A (en) * 2019-06-27 2019-11-26 华电郑州机械设计研究院有限公司 A kind of Gateway Station in Heating Network system using thermal power plant condenser steam exhaust
CN110566295B (en) * 2019-07-27 2021-11-26 华电电力科学研究院有限公司 Double-unit coupling peak shaving method and device based on power plant electricity and heat load cooperative scheduling
CN110318832B (en) * 2019-08-02 2024-01-23 西安西热节能技术有限公司 Water spray temperature reduction thermal power cogeneration unit thermal electrolytic coupling operation system
CN110608072A (en) * 2019-08-26 2019-12-24 国家电投集团电站运营技术(北京)有限公司 Thermodynamic system for quick load response of heat supply unit and regulation and control method
CN110631112B (en) * 2019-09-11 2023-11-28 上海发电设备成套设计研究院有限责任公司 Steam energy storage peak shaving system and method for heat supply unit
CN112780371B (en) * 2019-11-11 2022-10-21 大唐环境产业集团股份有限公司 Thermoelectric decoupling system and working method
CN111256192B (en) * 2020-03-18 2024-02-23 青岛达能环保设备股份有限公司 Comprehensive frequency modulation peak regulation system for coal-fired power plant
CN112016186A (en) * 2020-07-09 2020-12-01 中国农业大学 Annual wind curtailment and light curtailment rate calculation method based on random scene construction
CN112085352A (en) * 2020-08-21 2020-12-15 国网辽宁省电力有限公司经济技术研究院 Flexible thermal power plant day-ahead market time-sharing quotation optimization method and system
NL2026341B1 (en) * 2020-08-25 2022-04-29 Sdg Bv Heating assembly, method of heating a building
CN112081633B (en) * 2020-09-29 2024-03-29 中国大唐集团科学技术研究院有限公司西北电力试验研究院 Device for realizing back pressure reduction and waste heat utilization of direct air cooling unit
CN115142919A (en) * 2021-03-30 2022-10-04 宁夏电投西夏热电有限公司 Zero-power network access peak shaving method based on low-pressure cylinder zero-output combined electrode boiler
CN113627033A (en) * 2021-08-27 2021-11-09 西安热工研究院有限公司 Heat preservation and power regulation capacity improvement method and system for heating cogeneration unit
CN113983845B (en) * 2021-11-10 2022-06-24 西藏康盛能源开发有限公司 Steam energy storage device utilizing off-peak electricity and control method thereof
CN114017148A (en) * 2021-11-23 2022-02-08 河北鲲能电力工程咨询有限公司 Peak regulation method for large coal-electricity steam heat storage power generation
CN114046557A (en) * 2021-11-29 2022-02-15 清华大学 Cogeneration flexibility adjusting device and operation method thereof
CN114440296A (en) * 2021-12-10 2022-05-06 山西大唐国际云冈热电有限责任公司 Large-temperature-difference central heating system and heating method
CN114607479B (en) * 2022-03-17 2023-11-07 西安热工研究院有限公司 Energy storage peak regulation system for recovering waste heat of thermal power plant thermodynamic system
CN114659094A (en) * 2022-04-22 2022-06-24 上海锅炉厂有限公司 Thermoelectric decoupling system and method based on boiler superheated steam shunting
CN114963275B (en) * 2022-04-25 2023-10-13 国能三河发电有限责任公司 Coal-fired heat supply unit
CN115031283B (en) * 2022-04-28 2023-11-03 哈尔滨工业大学 Thermoelectric flexible storage and supply system and operation method thereof
CN115507347A (en) * 2022-08-23 2022-12-23 贵州电网有限责任公司 Electric brewing energy storage device and energy storage method thereof
CN115417467B (en) * 2022-08-31 2024-03-19 华能国际电力股份有限公司 Water-heat cogeneration system based on heat storage device and operation method
CN115899797A (en) * 2022-10-14 2023-04-04 天津大学 Power generation and heat supply control system
CN115727384B (en) * 2022-11-07 2024-02-06 华电电力科学研究院有限公司 Heating system for realizing peak shaving and cross-season heat storage of thermoelectric unit and operation method
CN116412566B (en) * 2023-02-07 2024-01-26 华能济南黄台发电有限公司 Cold energy storage system for centralized cold supply of urban thermal power plant

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1292106A1 (en) * 1985-10-03 1987-02-23 Белорусское Отделение Всесоюзного Государственного Научно-Исследовательского И Проектно-Конструкторского Института По Промышленной Энергетике И Рациональному Использованию В Промышленности Топлива,Электрической И Тепловой Энергии И Вторичных Энергетических Ресурсов Method of controlling fuel-fired steam plant load when it is assigned for isolated operation in emergency conditions
CN201449552U (en) * 2009-05-21 2010-05-05 山东电力研究院 Power plant agc control system
CN101950962B (en) * 2010-08-24 2012-05-23 西安交通大学 System and method for saving energy and shaving peak by coordinating cogeneration set and wind energy generator set
TW201314019A (en) * 2011-09-19 2013-04-01 Environmental Prot Administration Executive Yuan Development of an energy storage system for heating, cooling and power tri-generation
CN103953966B (en) * 2014-05-16 2017-05-03 中国科学院工程热物理研究所 High-capacity heat storage system and high-capacity heat storage method for increasing wind energy absorption
CN105180247A (en) * 2015-08-26 2015-12-23 朱杰 Central heating system and method with heat accumulation peak regulation function
CN106678931A (en) * 2017-03-07 2017-05-17 赫普热力发展有限公司 System for thermal power plant peak regulation through combination of cross-seasonal natural water heat storage with electrode boiler
CN106839513A (en) * 2017-03-07 2017-06-13 赫普热力发展有限公司 Electric power plant circulating water residual heat pump utilizes the energy conserving system combined with natural water accumulation of heat
CN206648147U (en) * 2017-03-07 2017-11-17 赫普热力发展有限公司 The accumulation of heat peak regulation system that solid heat storage electric boiler and across season natural water combine
CN106894855B (en) * 2017-04-01 2017-12-08 晟源高科(北京)科技有限公司 It is a kind of that transformation and operation method are decoupled based on the thermoelectricity of heat source side and heat supply network comprehensive adjustment
CN107166484A (en) * 2017-04-20 2017-09-15 赫普热力发展有限公司 Thermoelectricity decouples peak regulation system

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107166484A (en) * 2017-04-20 2017-09-15 赫普热力发展有限公司 Thermoelectricity decouples peak regulation system
CN108375059A (en) * 2018-01-16 2018-08-07 南京友智科技有限公司 Peak regulation control method of high-voltage electrode boiler system
CN108375059B (en) * 2018-01-16 2019-09-24 南京友智科技有限公司 Peak regulation control method of high-voltage electrode boiler system
CN108443957A (en) * 2018-02-26 2018-08-24 南京友智科技有限公司 The peak regulation heat supply method that a kind of big thermoelecrtic, hold over system jointly control
CN108625911A (en) * 2018-03-29 2018-10-09 东北电力大学 A kind of therrmodynamic system promoting thermal power plant unit electricity output regulating power
CN108692352A (en) * 2018-08-17 2018-10-23 国电龙源电力技术工程有限责任公司 Heating system and method suitable for steam power plant's peak tune
CN110469835A (en) * 2019-07-30 2019-11-19 西安交通大学 Thermoelectricity decoupled system and operation method based on absorption heat pump and thermal storage equipment
CN111520808A (en) * 2020-03-09 2020-08-11 华电电力科学研究院有限公司 Complex combined heat and power heating system based on low-temperature waste heat recovery and electric heating load adjusting method
CN111520808B (en) * 2020-03-09 2021-04-13 华电电力科学研究院有限公司 Complex combined heat and power heating system based on low-temperature waste heat recovery and electric heating load adjusting method
CN114060111A (en) * 2021-11-09 2022-02-18 西安热工研究院有限公司 Liquid compressed air energy storage method and system for utilizing waste heat of circulating water of thermal power generating unit

Also Published As

Publication number Publication date
WO2018233024A1 (en) 2018-12-27

Similar Documents

Publication Publication Date Title
CN206724281U (en) Thermoelectricity decouples peak regulation system
CN107166484A (en) Thermoelectricity decouples peak regulation system
CN206739398U (en) A kind of thermal power cogeneration central heating system based on absorption heat exchange
CN206656340U (en) The depth peak regulation system that electrode boiler combines with condensate heating
CN212157096U (en) Peak-regulating and frequency-modulating system for solid heat storage power generation of thermal power plant
CN102359739B (en) Gas-steam circulation heating-electricity-cooling combined supply system and method for thermal power plant with zero energy loss rate
CN206648147U (en) The accumulation of heat peak regulation system that solid heat storage electric boiler and across season natural water combine
CN206669847U (en) Steam power plant provides multiple forms of energy to complement each other in region energy micro-grid system
CN106765448A (en) A kind of energy-saving heating system for reducing heat supply return water temperature
CN106839513A (en) Electric power plant circulating water residual heat pump utilizes the energy conserving system combined with natural water accumulation of heat
CN104197396B (en) Method and system for cross-season utilization of waste heat of thermal power plants
CN202470194U (en) Centralized heat storage electric heating system
CN101738002A (en) Energy system of solar energy composite ground source heat pump and application thereof
CN106678931A (en) System for thermal power plant peak regulation through combination of cross-seasonal natural water heat storage with electrode boiler
CN106613531A (en) Photovoltaic photo-thermal integrated circulation system for greenhouse
CN206611233U (en) A kind of oil gas field distribution is provided multiple forms of energy to complement each other energy micro-grid system
CN113390075A (en) Thermal power plant solid heat storage power generation peak regulation and frequency modulation system and working method
CN106096248B (en) The selection method of best heating system under varying environment
CN208186476U (en) Electrode boiler combines heat accumulation water pot power grid depth peak regulation system
CN209540991U (en) A kind of thermal power plant unit thermoelectricity decoupled system
CN114001494A (en) Medium-deep geothermal energy combined cold and heat supply system and method
CN207196597U (en) Thermal power plant's peak regulation system of across season natural water accumulation of heat combination electrode boiler
CN210717768U (en) Heat supply network initial station system utilizing exhaust steam of condenser of thermal power plant
CN104675459B (en) Distributed busbar protection
CN203978518U (en) A kind of renewable energy sources public service system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180720

Address after: 100176 Beijing Beijing economic and Technological Development Zone, Chuang Chuang thirteen Street 18 building 12, 5 floors 503 rooms.

Patentee after: Beijing HEMPEL Electric Power Technology Co., Ltd.

Address before: 100176 Beijing Daxing District Beijing economic and Technological Development Zone, Chuang Chuang thirteen Street 18 hospital 12 Building 2 floors 201 rooms.

Patentee before: HEMPEL thermal development Ltd

TR01 Transfer of patent right