CN206722881U - A kind of underground mine roadway grouting wall for grouting structure - Google Patents
A kind of underground mine roadway grouting wall for grouting structure Download PDFInfo
- Publication number
- CN206722881U CN206722881U CN201720433810.5U CN201720433810U CN206722881U CN 206722881 U CN206722881 U CN 206722881U CN 201720433810 U CN201720433810 U CN 201720433810U CN 206722881 U CN206722881 U CN 206722881U
- Authority
- CN
- China
- Prior art keywords
- barricade
- working face
- pipe
- grouting
- tunnel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010079 rubber tapping Methods 0.000 claims abstract description 26
- 238000001514 detection method Methods 0.000 claims abstract description 23
- 239000004567 concrete Substances 0.000 claims abstract description 21
- 239000011449 brick Substances 0.000 claims description 9
- 239000000463 material Substances 0.000 claims description 5
- 239000004568 cement Substances 0.000 claims description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 14
- 230000010485 coping Effects 0.000 abstract description 3
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 238000007569 slipcasting Methods 0.000 description 10
- 238000010276 construction Methods 0.000 description 7
- 230000000694 effects Effects 0.000 description 6
- 239000011435 rock Substances 0.000 description 5
- 238000000034 method Methods 0.000 description 4
- 239000007921 spray Substances 0.000 description 3
- 230000015572 biosynthetic process Effects 0.000 description 2
- 238000005553 drilling Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000007689 inspection Methods 0.000 description 2
- 239000011378 shotcrete Substances 0.000 description 2
- 238000005422 blasting Methods 0.000 description 1
- 230000000903 blocking effect Effects 0.000 description 1
- 239000011083 cement mortar Substances 0.000 description 1
- 230000015271 coagulation Effects 0.000 description 1
- 238000005345 coagulation Methods 0.000 description 1
- 238000004880 explosion Methods 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 239000000523 sample Substances 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 239000000243 solution Substances 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
A kind of underground mine roadway grouting wall for grouting structure is the utility model is related to, belongs to underground mine tunnel technical field.Technical scheme is:Include concrete, valve(2), detection pipe(3), barricade, tapping pipe(6), high-pressure ball valve(7)With tunnel working face(9), tunnel working face(9)Front be provided with barricade, barricade and tunnel working face(9)Between be provided with concrete, the bottom of barricade is provided with the tapping pipes of more parallel arrangements(6), keep off coping and be provided with a detection pipe(3), the tapping pipe(6)And detection pipe(3)One end all extend to tunnel working face(9)It is interior, tapping pipe(6)And detection pipe(3)The other end be located at outside barricade, tapping pipe(6)Barricade outside one end be provided with high-pressure ball valve(7), detection pipe(3)Barricade outside one end be provided with valve(2).The beneficial effects of the utility model are:Avoid after the working face crack water outlet of tunnel, the problem of Water outburst treatment is difficult, long in time limit, costly.
Description
Technical field
With the utility model is related to the abundant flood of a kind of underground mine roadway grouting wall for grouting structure, especially water content
The wall body structure of lower mine working, belong to underground mine tunnel wall body structure technical field.
Background technology
In cranny development, aqueous abundant underground mine, tunnelling construction how waterproof, turn into engineering constraint build into
Degree and the most outstanding problem of investment.During this kind of underground mine roadway construction, use " has pick to visit, has doubtful ratio to control, first more
Dug after controlling " principle organizing construction, the detection of forward probe instrument or bore detecting are carried out before construction, it is found that front is present
After analysis of possibility of water inrush, then adopt an effective measure and carry out work of harnessing the river.
It is one of effective method for administering tunnel water burst to carry out crack grouting using the slip casting such as cement medium, ordinary circumstance
Under be to drilling of giving a farfetched interpretation in front of working face, high-pressure medium, effect of the medium in pressure are injected into drilling using high-pressure injection pump
Under, it can enter in rock fracture, after supersolidification, play a part of blocking crack and block water burst.
This method needs the intact rock of reserved certain distance, as the rock cap of slip casting, play stop highly pressurised liquid along
Working face sprays and causes the effect to fall flat.
In work progress, if after certain tunnel blasting terminates, crack of the water burst along working face sprays, such as still take with
Upper method carries out slip casting operation, then slip casting medium can spray under the effect of the pressure, cause material along the crack of working face
Waste, and the crack in front of working face because partial pressure by working face nearby discharge, do not reach reservation pressure, construction effect is not
It is preferable.Therefore, it is necessary to study a kind of measure, Artificial Rock cap can be used as, ensures that slip casting effect produces a desired effect.
Utility model content
The utility model purpose is to provide a kind of underground mine roadway grouting wall for grouting structure, after tunnelling water outlet,
It is close to rock cap of the tunnel work surface construction barricade as slip casting, ensures that slip casting is carried out in order, solve present in background technology
Problem.
The technical solution of the utility model is:
A kind of underground mine roadway grouting wall for grouting structure, includes concrete, valve, detection pipe, barricade, tapping pipe, height
Pressure ball valve and tunnel working face, the front of tunnel working face are provided with barricade, coagulation are provided between the barricade and tunnel working face
Soil, the bottom of barricade are provided with the tapping pipe of more parallel arrangements, and gear coping is provided with a detection pipe, the tapping pipe and inspection
One end of test tube is all extended in the working face of tunnel, and the other end of tapping pipe and detection pipe is located at outside barricade, the barricade of tapping pipe
Outer one end is provided with high-pressure ball valve, and one end outside the barricade of detection pipe is provided with valve.
The barricade includes the packed barricade of bottom and the top barricade on top, and the packed barricade of the bottom is by packed material
Material, which is built by laying bricks or stones, to be formed, and the top barricade on top is formed by brick masonry.
The packed barricade of the bottom is built by laying bricks or stones by bag of cement to be formed.
The tapping pipe is fixed on packed barricade.
It is packed in the men working of tunnel working face first after the working face crack water outlet of tunnel using the utility model
The aperture of barricade, and the pre-buried tapping pipe in packed barricade, the distance between packed barricade and tunnel working face and tapping pipe,
Quantity calculates according to grouting design.After the completion of packed Retaining wall, concrete is filled into the space of formation, treat with it is packed
When wall height is identical, stop filling.Brick masonry top barricade is used on packed barricade, is stopped apart from 10-20cm at the top of tunnel
Only, continue to fill concrete into the space of formation, until identical with top wall height.The top installation inspection of barricade on top
Test tube, then with concrete shotcrete machine, the injecting jet concrete into upper space, the filling concrete and tunnel for making bottom pushes up
Portion combine it is closely knit, after concrete curing is completed, reaches design strength, it is possible to which shutoff valve door seal blocks up water burst.
The beneficial effects of the utility model are:Avoid after tunnel working face crack water outlet is run into, Water outburst treatment difficulty,
The problem of long in time limit, costly.
Brief description of the drawings
Fig. 1 is the utility model front view;
Fig. 2 is the utility model top view;
Fig. 3 is the utility model side view;
In figure:1st, gunite concrete;2nd, valve;3rd, detection pipe;4th, concrete is filled;5th, top barricade;6th, tapping pipe;7、
High-pressure ball valve;8th, packed barricade;9th, tunnel working face.
Embodiment
Below in conjunction with accompanying drawing, by example, the utility model is described in further detail.
Referring to the drawings 1,2,3, a kind of underground mine roadway grouting wall for grouting structure, concrete, valve 2, detection pipe are included
3rd, barricade, tapping pipe 6, high-pressure ball valve 7 and tunnel working face 9, the front of tunnel working face 9 are provided with barricade, the barricade and lane
Concrete is provided between road working face 9, the bottom of barricade is provided with the tapping pipe 6 of more parallel arrangements, and gear coping is provided with one
One end of root detection pipe 3, the tapping pipe 6 and detection pipe 3 is all extended in tunnel working face 9, tapping pipe 6 and detection pipe 3
The other end is located at outside barricade, and one end outside the barricade of tapping pipe 6 is provided with high-pressure ball valve 7, and one end outside the barricade of detection pipe 3 is provided with
Valve 2.
In the present embodiment, in tunnelling work progress, as water burst occurs in tunnel working face 9 after explosion, then need
Water burst is administered using the method for slip casting.First, packed barricade 8, packed barricade are built by laying bricks or stones in the front certain distance of tunnel working face 9
8 can use the material such as bagged cement or packed sand, and the pre-buried more tapping pipes 6 being arranged in parallel in packed barricade 8,
Then to the space filling concrete between packed barricade 8 and tunnel working face 9.Treat that the top of concrete and packed barricade 8 is high
When spending identical, stop filling.Continue to use brick and masonry of cement mortar top barricade 5, height construction is to apart from 10- at the top of tunnel
20cm positions.To the space filling concrete between top barricade 5 and tunnel working face 9, to the height phase with top barricade 5
Together.Then a piece detection pipe 3, the injecting jet concrete into space, until filling are installed in the upper space of top barricade 5
Concrete is closely knit with being completely attached at the top of tunnel.Treat that concrete passes through curing cycle, after reaching predetermined strength, be first shut off sluicing
The valve of pipe 6, after the air inside barricade excludes completely, the valve 2 of detection pipe 3 is turned off, then according to the slip casting of routine
Design, perforated on barricade to tunnel working face, carry out slip casting operation.
Claims (4)
1. a kind of underground mine roadway grouting wall for grouting structure, it is characterised in that include concrete, valve(2), detection pipe(3)、
Barricade, tapping pipe(6), high-pressure ball valve(7)With tunnel working face(9), tunnel working face(9)Front be provided with barricade, the gear
Wall and tunnel working face(9)Between be provided with concrete, the bottom of barricade is provided with the tapping pipes of more parallel arrangements(6), barricade
Top is provided with a detection pipe(3), the tapping pipe(6)And detection pipe(3)One end all extend to tunnel working face(9)It is interior,
Tapping pipe(6)And detection pipe(3)The other end be located at outside barricade, tapping pipe(6)Barricade outside one end be provided with high-pressure ball valve
(7), detection pipe(3)Barricade outside one end be provided with valve(2).
A kind of 2. underground mine roadway grouting wall for grouting structure according to claim 1, it is characterised in that the barricade bag
Packed barricade containing bottom(8)With the top barricade on top(5), the packed barricade of the bottom(8)Built by laying bricks or stones by prebagged material and
Into the top barricade on top(5)Formed by brick masonry.
3. a kind of underground mine roadway grouting wall for grouting structure according to claim 2, it is characterised in that the bottom
Packed barricade(8)Built by laying bricks or stones and formed by bag of cement.
A kind of 4. underground mine roadway grouting wall for grouting structure according to claim 2, it is characterised in that the tapping pipe
(6)It is fixed on packed barricade(8)On.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720433810.5U CN206722881U (en) | 2017-04-24 | 2017-04-24 | A kind of underground mine roadway grouting wall for grouting structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720433810.5U CN206722881U (en) | 2017-04-24 | 2017-04-24 | A kind of underground mine roadway grouting wall for grouting structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206722881U true CN206722881U (en) | 2017-12-08 |
Family
ID=60505398
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720433810.5U Expired - Fee Related CN206722881U (en) | 2017-04-24 | 2017-04-24 | A kind of underground mine roadway grouting wall for grouting structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206722881U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111119996A (en) * | 2019-12-30 | 2020-05-08 | 西安科技大学 | Method for preventing water burst and sand burst in coal mining |
CN112031811A (en) * | 2020-07-22 | 2020-12-04 | 济南力稳岩土工程有限公司 | System and method for blocking cliff through water burst and grouting |
-
2017
- 2017-04-24 CN CN201720433810.5U patent/CN206722881U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111119996A (en) * | 2019-12-30 | 2020-05-08 | 西安科技大学 | Method for preventing water burst and sand burst in coal mining |
CN111119996B (en) * | 2019-12-30 | 2021-07-02 | 西安科技大学 | Method for preventing water burst and sand burst in coal mining |
CN112031811A (en) * | 2020-07-22 | 2020-12-04 | 济南力稳岩土工程有限公司 | System and method for blocking cliff through water burst and grouting |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU2020101047A4 (en) | Method for filling underground cavity in bedrock by grouting and hydraulic filling device | |
CN104453913B (en) | A kind of Shaft Stopes front pre-grouting method | |
CN107165652B (en) | A kind of tunnel monoblock type collapse after construction method | |
CN105201448B (en) | Block water slip casting method for blocking in a kind of high-pressure high-flow water gushing channelway | |
CN107605498B (en) | Construction method for horizontal grouting reinforcement structure of end head of shield tunnel in water-rich sandy pebble stratum | |
CN108060908A (en) | Water-rich sand layer long range horizontal orientation drilling grouting and reinforcing technology under groups of building | |
CN100510274C (en) | Construction method of enclosing level rotary-jet pile hole-mouth using double-liquid slip jection method | |
CN103334770A (en) | Construction method of superhigh water pressure water-affluent crushed zones of long-large counter-slope tunnels | |
CN105350953A (en) | Measuring method for coal seam gas pressure in complicated geological condition | |
CN105715296A (en) | Blowing sand backfill and grouting construction method of tunnel crossing coal mine goaf | |
CN106121722A (en) | A kind of method quickly constructing fire dam | |
CN109778835A (en) | A kind of displaced type rotary jet grouting stratum consolidation method | |
CN110195604B (en) | Construction method for tunnel main tunnel TBM (tunnel boring machine) tunneling section | |
CN207974823U (en) | A kind of grouting pipeline structure of deep hole grouting | |
CN205422815U (en) | Big flood underground mine tunnel waterwall | |
CN106320354A (en) | Anti-seepage construction method for karst cave development stratum under overburden | |
CN110469332B (en) | Advanced support consolidation method for tunnel penetrating through debris flow accumulation body | |
CN101793154A (en) | Method for grouting for stopping up water by using geological parameters of tunnel surrounding rocks and setting relief holes | |
CN105672241A (en) | Device and method for treating deep seismic subsidence loess by combination of loess breakage by air injection and loess squeezing by air bag | |
CN105064280A (en) | Tunnel underground river water burst blockage construction method | |
CN206722881U (en) | A kind of underground mine roadway grouting wall for grouting structure | |
CN113027483A (en) | Shield tunnel broken zone stratum grouting reinforcement equipment and grouting reinforcement method thereof | |
CN105649655A (en) | Device used for grouting reinforcement from interior of shield tunneling machine to peripheral stratum | |
CN105257309A (en) | Tool changing construction method for in-chamber grouting of earth pressure balance shield machine in sand bed | |
CN111287769A (en) | Tunnel surrounding rock advanced grouting reinforcement structure and construction method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171208 |