CN206722881U - A kind of underground mine roadway grouting wall for grouting structure - Google Patents

A kind of underground mine roadway grouting wall for grouting structure Download PDF

Info

Publication number
CN206722881U
CN206722881U CN201720433810.5U CN201720433810U CN206722881U CN 206722881 U CN206722881 U CN 206722881U CN 201720433810 U CN201720433810 U CN 201720433810U CN 206722881 U CN206722881 U CN 206722881U
Authority
CN
China
Prior art keywords
barricade
working face
pipe
grouting
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720433810.5U
Other languages
Chinese (zh)
Inventor
李万涛
王文才
王磊
刘辉
张立鹏
胡振鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HBIS Co Ltd
Original Assignee
HBIS Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HBIS Co Ltd filed Critical HBIS Co Ltd
Priority to CN201720433810.5U priority Critical patent/CN206722881U/en
Application granted granted Critical
Publication of CN206722881U publication Critical patent/CN206722881U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

A kind of underground mine roadway grouting wall for grouting structure is the utility model is related to, belongs to underground mine tunnel technical field.Technical scheme is:Include concrete, valve(2), detection pipe(3), barricade, tapping pipe(6), high-pressure ball valve(7)With tunnel working face(9), tunnel working face(9)Front be provided with barricade, barricade and tunnel working face(9)Between be provided with concrete, the bottom of barricade is provided with the tapping pipes of more parallel arrangements(6), keep off coping and be provided with a detection pipe(3), the tapping pipe(6)And detection pipe(3)One end all extend to tunnel working face(9)It is interior, tapping pipe(6)And detection pipe(3)The other end be located at outside barricade, tapping pipe(6)Barricade outside one end be provided with high-pressure ball valve(7), detection pipe(3)Barricade outside one end be provided with valve(2).The beneficial effects of the utility model are:Avoid after the working face crack water outlet of tunnel, the problem of Water outburst treatment is difficult, long in time limit, costly.

Description

A kind of underground mine roadway grouting wall for grouting structure
Technical field
With the utility model is related to the abundant flood of a kind of underground mine roadway grouting wall for grouting structure, especially water content The wall body structure of lower mine working, belong to underground mine tunnel wall body structure technical field.
Background technology
In cranny development, aqueous abundant underground mine, tunnelling construction how waterproof, turn into engineering constraint build into Degree and the most outstanding problem of investment.During this kind of underground mine roadway construction, use " has pick to visit, has doubtful ratio to control, first more Dug after controlling " principle organizing construction, the detection of forward probe instrument or bore detecting are carried out before construction, it is found that front is present After analysis of possibility of water inrush, then adopt an effective measure and carry out work of harnessing the river.
It is one of effective method for administering tunnel water burst to carry out crack grouting using the slip casting such as cement medium, ordinary circumstance Under be to drilling of giving a farfetched interpretation in front of working face, high-pressure medium, effect of the medium in pressure are injected into drilling using high-pressure injection pump Under, it can enter in rock fracture, after supersolidification, play a part of blocking crack and block water burst.
This method needs the intact rock of reserved certain distance, as the rock cap of slip casting, play stop highly pressurised liquid along Working face sprays and causes the effect to fall flat.
In work progress, if after certain tunnel blasting terminates, crack of the water burst along working face sprays, such as still take with Upper method carries out slip casting operation, then slip casting medium can spray under the effect of the pressure, cause material along the crack of working face Waste, and the crack in front of working face because partial pressure by working face nearby discharge, do not reach reservation pressure, construction effect is not It is preferable.Therefore, it is necessary to study a kind of measure, Artificial Rock cap can be used as, ensures that slip casting effect produces a desired effect.
Utility model content
The utility model purpose is to provide a kind of underground mine roadway grouting wall for grouting structure, after tunnelling water outlet, It is close to rock cap of the tunnel work surface construction barricade as slip casting, ensures that slip casting is carried out in order, solve present in background technology Problem.
The technical solution of the utility model is:
A kind of underground mine roadway grouting wall for grouting structure, includes concrete, valve, detection pipe, barricade, tapping pipe, height Pressure ball valve and tunnel working face, the front of tunnel working face are provided with barricade, coagulation are provided between the barricade and tunnel working face Soil, the bottom of barricade are provided with the tapping pipe of more parallel arrangements, and gear coping is provided with a detection pipe, the tapping pipe and inspection One end of test tube is all extended in the working face of tunnel, and the other end of tapping pipe and detection pipe is located at outside barricade, the barricade of tapping pipe Outer one end is provided with high-pressure ball valve, and one end outside the barricade of detection pipe is provided with valve.
The barricade includes the packed barricade of bottom and the top barricade on top, and the packed barricade of the bottom is by packed material Material, which is built by laying bricks or stones, to be formed, and the top barricade on top is formed by brick masonry.
The packed barricade of the bottom is built by laying bricks or stones by bag of cement to be formed.
The tapping pipe is fixed on packed barricade.
It is packed in the men working of tunnel working face first after the working face crack water outlet of tunnel using the utility model The aperture of barricade, and the pre-buried tapping pipe in packed barricade, the distance between packed barricade and tunnel working face and tapping pipe, Quantity calculates according to grouting design.After the completion of packed Retaining wall, concrete is filled into the space of formation, treat with it is packed When wall height is identical, stop filling.Brick masonry top barricade is used on packed barricade, is stopped apart from 10-20cm at the top of tunnel Only, continue to fill concrete into the space of formation, until identical with top wall height.The top installation inspection of barricade on top Test tube, then with concrete shotcrete machine, the injecting jet concrete into upper space, the filling concrete and tunnel for making bottom pushes up Portion combine it is closely knit, after concrete curing is completed, reaches design strength, it is possible to which shutoff valve door seal blocks up water burst.
The beneficial effects of the utility model are:Avoid after tunnel working face crack water outlet is run into, Water outburst treatment difficulty, The problem of long in time limit, costly.
Brief description of the drawings
Fig. 1 is the utility model front view;
Fig. 2 is the utility model top view;
Fig. 3 is the utility model side view;
In figure:1st, gunite concrete;2nd, valve;3rd, detection pipe;4th, concrete is filled;5th, top barricade;6th, tapping pipe;7、 High-pressure ball valve;8th, packed barricade;9th, tunnel working face.
Embodiment
Below in conjunction with accompanying drawing, by example, the utility model is described in further detail.
Referring to the drawings 1,2,3, a kind of underground mine roadway grouting wall for grouting structure, concrete, valve 2, detection pipe are included 3rd, barricade, tapping pipe 6, high-pressure ball valve 7 and tunnel working face 9, the front of tunnel working face 9 are provided with barricade, the barricade and lane Concrete is provided between road working face 9, the bottom of barricade is provided with the tapping pipe 6 of more parallel arrangements, and gear coping is provided with one One end of root detection pipe 3, the tapping pipe 6 and detection pipe 3 is all extended in tunnel working face 9, tapping pipe 6 and detection pipe 3 The other end is located at outside barricade, and one end outside the barricade of tapping pipe 6 is provided with high-pressure ball valve 7, and one end outside the barricade of detection pipe 3 is provided with Valve 2.
In the present embodiment, in tunnelling work progress, as water burst occurs in tunnel working face 9 after explosion, then need Water burst is administered using the method for slip casting.First, packed barricade 8, packed barricade are built by laying bricks or stones in the front certain distance of tunnel working face 9 8 can use the material such as bagged cement or packed sand, and the pre-buried more tapping pipes 6 being arranged in parallel in packed barricade 8, Then to the space filling concrete between packed barricade 8 and tunnel working face 9.Treat that the top of concrete and packed barricade 8 is high When spending identical, stop filling.Continue to use brick and masonry of cement mortar top barricade 5, height construction is to apart from 10- at the top of tunnel 20cm positions.To the space filling concrete between top barricade 5 and tunnel working face 9, to the height phase with top barricade 5 Together.Then a piece detection pipe 3, the injecting jet concrete into space, until filling are installed in the upper space of top barricade 5 Concrete is closely knit with being completely attached at the top of tunnel.Treat that concrete passes through curing cycle, after reaching predetermined strength, be first shut off sluicing The valve of pipe 6, after the air inside barricade excludes completely, the valve 2 of detection pipe 3 is turned off, then according to the slip casting of routine Design, perforated on barricade to tunnel working face, carry out slip casting operation.

Claims (4)

1. a kind of underground mine roadway grouting wall for grouting structure, it is characterised in that include concrete, valve(2), detection pipe(3)、 Barricade, tapping pipe(6), high-pressure ball valve(7)With tunnel working face(9), tunnel working face(9)Front be provided with barricade, the gear Wall and tunnel working face(9)Between be provided with concrete, the bottom of barricade is provided with the tapping pipes of more parallel arrangements(6), barricade Top is provided with a detection pipe(3), the tapping pipe(6)And detection pipe(3)One end all extend to tunnel working face(9)It is interior, Tapping pipe(6)And detection pipe(3)The other end be located at outside barricade, tapping pipe(6)Barricade outside one end be provided with high-pressure ball valve (7), detection pipe(3)Barricade outside one end be provided with valve(2).
A kind of 2. underground mine roadway grouting wall for grouting structure according to claim 1, it is characterised in that the barricade bag Packed barricade containing bottom(8)With the top barricade on top(5), the packed barricade of the bottom(8)Built by laying bricks or stones by prebagged material and Into the top barricade on top(5)Formed by brick masonry.
3. a kind of underground mine roadway grouting wall for grouting structure according to claim 2, it is characterised in that the bottom Packed barricade(8)Built by laying bricks or stones and formed by bag of cement.
A kind of 4. underground mine roadway grouting wall for grouting structure according to claim 2, it is characterised in that the tapping pipe (6)It is fixed on packed barricade(8)On.
CN201720433810.5U 2017-04-24 2017-04-24 A kind of underground mine roadway grouting wall for grouting structure Expired - Fee Related CN206722881U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720433810.5U CN206722881U (en) 2017-04-24 2017-04-24 A kind of underground mine roadway grouting wall for grouting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720433810.5U CN206722881U (en) 2017-04-24 2017-04-24 A kind of underground mine roadway grouting wall for grouting structure

Publications (1)

Publication Number Publication Date
CN206722881U true CN206722881U (en) 2017-12-08

Family

ID=60505398

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720433810.5U Expired - Fee Related CN206722881U (en) 2017-04-24 2017-04-24 A kind of underground mine roadway grouting wall for grouting structure

Country Status (1)

Country Link
CN (1) CN206722881U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111119996A (en) * 2019-12-30 2020-05-08 西安科技大学 Method for preventing water burst and sand burst in coal mining
CN112031811A (en) * 2020-07-22 2020-12-04 济南力稳岩土工程有限公司 System and method for blocking cliff through water burst and grouting

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111119996A (en) * 2019-12-30 2020-05-08 西安科技大学 Method for preventing water burst and sand burst in coal mining
CN111119996B (en) * 2019-12-30 2021-07-02 西安科技大学 Method for preventing water burst and sand burst in coal mining
CN112031811A (en) * 2020-07-22 2020-12-04 济南力稳岩土工程有限公司 System and method for blocking cliff through water burst and grouting

Similar Documents

Publication Publication Date Title
AU2020101047A4 (en) Method for filling underground cavity in bedrock by grouting and hydraulic filling device
CN104453913B (en) A kind of Shaft Stopes front pre-grouting method
CN107165652B (en) A kind of tunnel monoblock type collapse after construction method
CN105201448B (en) Block water slip casting method for blocking in a kind of high-pressure high-flow water gushing channelway
CN107605498B (en) Construction method for horizontal grouting reinforcement structure of end head of shield tunnel in water-rich sandy pebble stratum
CN108060908A (en) Water-rich sand layer long range horizontal orientation drilling grouting and reinforcing technology under groups of building
CN100510274C (en) Construction method of enclosing level rotary-jet pile hole-mouth using double-liquid slip jection method
CN103334770A (en) Construction method of superhigh water pressure water-affluent crushed zones of long-large counter-slope tunnels
CN105350953A (en) Measuring method for coal seam gas pressure in complicated geological condition
CN105715296A (en) Blowing sand backfill and grouting construction method of tunnel crossing coal mine goaf
CN106121722A (en) A kind of method quickly constructing fire dam
CN109778835A (en) A kind of displaced type rotary jet grouting stratum consolidation method
CN110195604B (en) Construction method for tunnel main tunnel TBM (tunnel boring machine) tunneling section
CN207974823U (en) A kind of grouting pipeline structure of deep hole grouting
CN205422815U (en) Big flood underground mine tunnel waterwall
CN106320354A (en) Anti-seepage construction method for karst cave development stratum under overburden
CN110469332B (en) Advanced support consolidation method for tunnel penetrating through debris flow accumulation body
CN101793154A (en) Method for grouting for stopping up water by using geological parameters of tunnel surrounding rocks and setting relief holes
CN105672241A (en) Device and method for treating deep seismic subsidence loess by combination of loess breakage by air injection and loess squeezing by air bag
CN105064280A (en) Tunnel underground river water burst blockage construction method
CN206722881U (en) A kind of underground mine roadway grouting wall for grouting structure
CN113027483A (en) Shield tunnel broken zone stratum grouting reinforcement equipment and grouting reinforcement method thereof
CN105649655A (en) Device used for grouting reinforcement from interior of shield tunneling machine to peripheral stratum
CN105257309A (en) Tool changing construction method for in-chamber grouting of earth pressure balance shield machine in sand bed
CN111287769A (en) Tunnel surrounding rock advanced grouting reinforcement structure and construction method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171208