CN206707386U - A kind of electric power tower fixed structure - Google Patents

A kind of electric power tower fixed structure Download PDF

Info

Publication number
CN206707386U
CN206707386U CN201720101223.6U CN201720101223U CN206707386U CN 206707386 U CN206707386 U CN 206707386U CN 201720101223 U CN201720101223 U CN 201720101223U CN 206707386 U CN206707386 U CN 206707386U
Authority
CN
China
Prior art keywords
steel tower
support column
tower
electric power
metalling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720101223.6U
Other languages
Chinese (zh)
Inventor
汪梅
周欣
王岗
杨帆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Shuaiyi Steel Structure Co Ltd
Original Assignee
Qingdao Shuaiyi Steel Structure Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Shuaiyi Steel Structure Co Ltd filed Critical Qingdao Shuaiyi Steel Structure Co Ltd
Priority to CN201720101223.6U priority Critical patent/CN206707386U/en
Application granted granted Critical
Publication of CN206707386U publication Critical patent/CN206707386U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

The utility model discloses a kind of electric power tower fixed structure, including steel tower main body, metalling, longitudinal tie and pull bar connection end, the lower end support of the steel tower main body is connected with support column under steel tower, support column landfill is in metalling under the steel tower, and it is filled with concrete layer in the bottom connecting rod of support column bottom under steel tower, the left and right ends of the metalling are soil horizon, metalling upper surface place vertical with support column under steel tower is disposed with first step and second step, the pull bar connection end is placed in steel tower main body, and pull bar connection end tilts with longitudinal tie and connected.The electric power tower fixed structure, it is designed with reference to the structure of present electric power tower, in view of the requirement of steel tower, need a stable bottom structure, so as to ensure the safe to use of whole steel tower, whole fixed structure carries out the consolidation process in structure under steel tower on support column, be attached processing by metalling and concrete layer, stability is very strong.

Description

A kind of electric power tower fixed structure
Technical field
Steel tower fixing device technical field is the utility model is related to, specially a kind of electric power tower fixed structure.
Background technology
Electric power tower, i.e. iron tower of power transmission line, are generally divided into shape:Wine glass-shaped, cathead, upper font, dry font With five kinds of barrel shape, have by purposes point:Anchor support, tangent tower, angle tower, transposition tower(Restringing phase position tower), terminal tower With crossover tower etc., their the various towers that are structurally characterized in that belong to space truss structure, rod member mainly by single equal leg angle or Angle steel composition is combined, material typically uses Q235(A3F)And Q345(16Mn)Two kinds, connected between rod member and use rough bolt, leaned on Bolt is made up of by Shear connection, whole tower angle steel, junction steel plate and bolt, and individual part such as column foot etc. is welded by several blocks of steel plates Into a sub-assembly, therefore galvanizing anti-corrosion, transport and construction erection are extremely convenient.For exhaling the high steel tower in below 60m, Steel tower sets pin to follow closely wherein in a main material, and tower operation is stepped on convenient construction operating personnel.
But existing iron tower structure compares simple, the stabilization in bottom by two oblique connecting rods progress ground It is fixed, but overall understructure is unstable, exist certain using dangerous, need to carry out now for the situation related The design improvement of iron tower structure.
Utility model content
The purpose of this utility model is to provide a kind of electric power tower fixed structure, to solve to propose in above-mentioned background technology Existing iron tower structure it is simple, the problem of stability is not strong.
To achieve the above object, the utility model provides following technical scheme:A kind of electric power tower fixed structure, including iron Tower main body, metalling, longitudinal tie and pull bar connection end, the lower end support of the steel tower main body are connected with support column under steel tower, And the bottom of support column is vertically connected with bottom connecting rod under steel tower, support column landfill is in metalling under the steel tower, and iron Concrete layer is filled with tower in the bottom connecting rod of support column bottom, the left and right ends of the metalling are soil horizon, described Metalling upper surface place vertical with support column under steel tower is disposed with first step and second step, the pull bar connection end peace Put in steel tower main body, and pull bar connection end tilts with longitudinal tie and connected, its longitudinal tie is consolidated by fixing bolt and pull bar The effect of fixed end is fixed in soil horizon.
Preferably, support column is diagonally attached between diagonally opposing corner by oblique drawbar under the steel tower.
Preferably, it is attached under the bottom connecting rod and steel tower between support column by way of welding, and both It is high intensity steel body structure.
Preferably, the front end of the longitudinal tie is provided with bending hook, and longitudinal tie is on steel tower main body or so pair Title is provided with two.
Preferably, the front end of the pull bar connection end is reserved with link.
Preferably, the bending hook is fastened on link.
Compared with prior art, the beneficial effects of the utility model are:The electric power tower fixed structure, with reference to present electric power The structure of steel tower is designed, it is contemplated that the requirement of steel tower is, it is necessary to a stable bottom structure, so as to ensure whole iron Safe to use, consolidation process of the whole fixed structure under steel tower on support column in progress structure, by metalling with mixing of tower Solidifying soil layer is attached processing, and stability is very strong.
Brief description of the drawings
Fig. 1 is the utility model structure diagram;
Fig. 2 is the utility model longitudinal tie and pull bar connection end structure connection diagram;
Fig. 3 is the utility model overlooking the structure diagram.
In figure:1st, steel tower main body, 2, support column under steel tower, 3, oblique drawbar, 4, metalling, 5, soil horizon, 6, bottom connects Extension bar, 7, concrete layer, 8, first step, 9, second step, 10, longitudinal tie, 1001, bending hook, 11, pull bar connection End, 1101, link, 12, fixing bolt, 13, pull bar fixing end.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
Fig. 1-3 are referred to, the utility model provides a kind of technical scheme:A kind of electric power tower fixed structure, including steel tower Support column 2, oblique drawbar 3, metalling 4, soil horizon 5, bottom connecting rod 6, concrete layer 7, first step under main body 1, steel tower 8th, second step 9, longitudinal tie 10, pull bar connection end 11, fixing bolt 12, pull bar fixing end 13, the lower end branch of steel tower main body 1 Support is connected with support column 2 under steel tower, and the bottom of support column 2 is vertically connected with bottom connecting rod 6 under steel tower, support column under steel tower 2 landfills are filled with concrete layer 7 under steel tower in metalling 4 in the bottom connecting rod 6 of the bottom of support column 2, are supported under steel tower Post 2 is diagonally attached between diagonally opposing corner by oblique drawbar 3 so that and support column 2 obtains vertical stable placement under steel tower, The left and right ends of metalling 4 are soil horizon 5, and the upper surface of metalling 4 is disposed with First with 2 vertical place of support column under steel tower Rank 8 and second step 9, it is attached between support column 2 by way of welding under bottom connecting rod 6 and steel tower, and both of which For high intensity steel body structure, overall contact area of ground is improved, stability is improved, and pull bar connection end 11 is placed in iron In tower main body 1, and pull bar connection end 11 tilts with longitudinal tie 10 and connected, and its longitudinal tie 10 passes through fixing bolt 12 and pull bar The effect of fixing end 13 is fixed in soil horizon 5, and the front end of pull bar connection end 11 is reserved with link 1101, before longitudinal tie 10 End is provided with bending hook 1001, and longitudinal tie 10 is symmetrically set with two on steel tower main body 1, bending hook 1001 It is fastened on link 1101 so that overall structure obtains stabilization.
Operation principle:, it is necessary to be carried out to whole fixed structure in structure before using the electric power tower fixed structure Simple knowledge, whole fixed structure mainly include support column 2, oblique drawbar 3, bottom connecting rod 6 and longitudinal tie 10 under steel tower Four parts, steel tower main body 1 are supported under steel tower in the presence of support column 2, are consolidated in the presence of oblique drawbar 3 Fixed, the lower end of support column 2 is mounted with bottom connecting rod 6 under steel tower in addition, and overall consolidate is carried out by the concrete layer 7 of filling It is fixed, longitudinal tie 10 and pull bar connection end 11 are then subjected to oblique connection, longitudinal tie 10 is consolidated in fixing bolt 12 and pull bar It is fixed in the presence of fixed end 13 so that the stability of whole steel tower main body 1 is further enhanced, like this whole electric power The structure of steel tower obtains stable set so that the safety in utilization of electric power tower is guaranteed.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from principle of the present utility model and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of electric power tower fixed structure, including steel tower main body(1), metalling(4), longitudinal tie(10)With pull bar connection end (11), it is characterised in that:The steel tower main body(1)Lower end support be connected with support column under steel tower(2), and support column under steel tower (2)Bottom be vertically connected with bottom connecting rod(6), support column under the steel tower(2)Landfill is in metalling(4)In, and steel tower Lower support column(2)The bottom connecting rod of bottom(6)On be filled with concrete layer(7), the metalling(4)Left and right ends for soil Earth layer(5), the metalling(4)Upper surface and support column under steel tower(2)Vertical place is disposed with first step(8)With second Step(9), the pull bar connection end(11)It is placed in steel tower main body(1)On, and pull bar connection end(11)With longitudinal tie(10) Tilt connection, its longitudinal tie(10)Pass through fixing bolt(12)With pull bar fixing end(13)Effect be fixed on soil horizon(5) In.
A kind of 2. electric power tower fixed structure according to claim 1, it is characterised in that:Support column under the steel tower(2) Diagonally pass through oblique drawbar between diagonally opposing corner(3)It is attached.
A kind of 3. electric power tower fixed structure according to claim 1, it is characterised in that:The bottom connecting rod(6)With Support column under steel tower(2)Between be attached by way of welding, and both are high strength steel body structure.
A kind of 4. electric power tower fixed structure according to claim 1, it is characterised in that:The longitudinal tie(10)Before End is provided with bending hook(1001), and longitudinal tie(10)On steel tower main body(1)It is symmetrically set with two.
A kind of 5. electric power tower fixed structure according to claim 1, it is characterised in that:The pull bar connection end(11)'s Front end is reserved with link(1101).
A kind of 6. electric power tower fixed structure according to claim 4, it is characterised in that:The bending hook(1001)Card Close in link(1101)On.
CN201720101223.6U 2017-01-24 2017-01-24 A kind of electric power tower fixed structure Expired - Fee Related CN206707386U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720101223.6U CN206707386U (en) 2017-01-24 2017-01-24 A kind of electric power tower fixed structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720101223.6U CN206707386U (en) 2017-01-24 2017-01-24 A kind of electric power tower fixed structure

Publications (1)

Publication Number Publication Date
CN206707386U true CN206707386U (en) 2017-12-05

Family

ID=60471939

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720101223.6U Expired - Fee Related CN206707386U (en) 2017-01-24 2017-01-24 A kind of electric power tower fixed structure

Country Status (1)

Country Link
CN (1) CN206707386U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109184591A (en) * 2018-09-06 2019-01-11 中建三局集团有限公司 A kind of Spiral digging machine gets rid of native auxiliary tool
CN112854844A (en) * 2021-01-13 2021-05-28 朱鹏杰 Combined stereo garage
CN113914701A (en) * 2021-11-01 2022-01-11 峻江建设有限公司 Anti-toppling iron tower capable of being applied to soft soil

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109184591A (en) * 2018-09-06 2019-01-11 中建三局集团有限公司 A kind of Spiral digging machine gets rid of native auxiliary tool
CN112854844A (en) * 2021-01-13 2021-05-28 朱鹏杰 Combined stereo garage
CN113914701A (en) * 2021-11-01 2022-01-11 峻江建设有限公司 Anti-toppling iron tower capable of being applied to soft soil

Similar Documents

Publication Publication Date Title
CN206707386U (en) A kind of electric power tower fixed structure
CN203096598U (en) Outer cladding type steel-concrete combined structure beam bridge overturn-resistant device
CN206956567U (en) A kind of bridge coping template support
CN105821887B (en) A kind of stand column pile installation method constructed in boulder bed
CN205604080U (en) Building construction platform
CN203361183U (en) Power transmission tower foundation
CN207453133U (en) A kind of huge diagonal brace node structure of steel construction
CN203924097U (en) Electric power pylon foundation connection structure
CN205954972U (en) Steel structure floor slab
CN209369359U (en) A kind of material distributing machine and steel platform connection structure of climbing
CN209244372U (en) A kind of high intensity wind resistance electric power tower
CN209261322U (en) A kind of indirect dry cooling tower X-type rod structure
CN207994992U (en) A kind of immobilizing foundation of plane roof photovoltaic module
CN107044132A (en) A kind of construction method of quake-resistant safety ground
CN106522260A (en) Iron tower foundation for frozen soil foundation
CN208502311U (en) A kind of strap bracing means of beam, rod structure
CN207260288U (en) A kind of new arcuation drainage ditch cover plate
CN206942288U (en) A kind of electric power tower
CN206707030U (en) A kind of eccentric joint of cross steel concrete column and steel framed concrete beam
CN206289532U (en) A kind of Bailey beam hinged-support
CN206438836U (en) A kind of foundation ditch guardrail
CN207582328U (en) It is a kind of that there is the structure for consolidating the body of a bridge
CN206815673U (en) Reinforcing ferroconcrete prop
CN209384520U (en) A kind of connecting joint structure of square steel tube concrete column and reinforced concrete foundation
CN207004543U (en) A kind of tunnel vault supporting construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171205

Termination date: 20210124