CN105821887B - A kind of stand column pile installation method constructed in boulder bed - Google Patents

A kind of stand column pile installation method constructed in boulder bed Download PDF

Info

Publication number
CN105821887B
CN105821887B CN201610209396.XA CN201610209396A CN105821887B CN 105821887 B CN105821887 B CN 105821887B CN 201610209396 A CN201610209396 A CN 201610209396A CN 105821887 B CN105821887 B CN 105821887B
Authority
CN
China
Prior art keywords
stand column
vertical
column pile
supporting plate
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610209396.XA
Other languages
Chinese (zh)
Other versions
CN105821887A (en
Inventor
胡焕
胡琦
朱浩源
张治纯
郑奎浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dongtong Geotechnical Technology Co., Ltd.
Original Assignee
DONGTONG GEOTECHNICAL TECHNOLOGY (HANGZHOU) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DONGTONG GEOTECHNICAL TECHNOLOGY (HANGZHOU) Co Ltd filed Critical DONGTONG GEOTECHNICAL TECHNOLOGY (HANGZHOU) Co Ltd
Priority to CN201610209396.XA priority Critical patent/CN105821887B/en
Publication of CN105821887A publication Critical patent/CN105821887A/en
Application granted granted Critical
Publication of CN105821887B publication Critical patent/CN105821887B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D13/00Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/18Bulkheads or similar walls made solely of concrete in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/46Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The invention discloses a kind of stand column pile installation method constructed in boulder bed, it is desirable to provide one kind can not only preferably complete stand column pile of being constructed in boulder bed, meets the requirement of horizontal shore is transmitted in column pile bearing foundation ditch vertical load and moment of flexure;Canal formula can also be cut to the stand column pile installation method constructed in boulder bed that the displacement soil produced during cement soil continuous wall or cement-soil stirring pile construction is used.It comprises the following steps successively:A:Vertical perforate is carried out in foundation ditch bottom surface using rig and forms column stake holes;B:Stand column pile is placed in column stake holes;C:During canal formula cuts cement soil continuous wall or cement-soil stirring pile construction, canal formula is cut to the displacement soil produced during cement soil continuous wall or cement-soil stirring pile construction and is filled into column stake holes.

Description

A kind of stand column pile installation method constructed in boulder bed
Technical field
The present invention relates to a kind of stand column pile installation method, and in particular to one kind is applied to cut cement soil continuous wall in canal formula Or the stand column pile installation method constructed in boulder bed applied during cement-soil stirring pile construction.
Background technology
In order to ensure underground structure and foundation ditch surrounding enviroment safety, it is necessary to foundation pit side-wall and around using support, plus Gu etc. safeguard procedures.Building foundation pit supporting generally include around margin of foundation pit set enclose purlin beam and it is some be arranged on enclose purlin beam it Between horizontal shore and stand column pile constitute.Stand column pile is connected provided with support supporting piece constitutes supporter, for supporting in foundation ditch Vertical load and moment of flexure that horizontal shore is transmitted.
The stand column pile of current foundation ditch is typically to be constituted using shaped steel, and shaped steel is pressed into structure in foundation ditch by the way of piling Into the stand column pile for supporting horizontal shore;But for boulder bed, it is more than 30 centimetres of erratic boulders especially in the presence of more In the foundation ditch on continental deposit stratum, current this column pile construction method is difficult to apply, and construction reluctantly is also difficult to ensure that stand column pile Stability.In view of this, how to design a kind of preferably in boulder bed and can be mixed with the stratum of erratic boulder and carry out stand column pile Construction be necessary.
The content of the invention
The invention aims to overcome the deficiencies in the prior art there is provided it is a kind of constructed in boulder bed it is vertical Stanchion installation method, it can not only preferably complete stand column pile of being constructed in boulder bed, meet level in column pile bearing foundation ditch Vertical load and the requirement of moment of flexure that support beam is transmitted;Canal formula can also be cut cement soil continuous wall or cement mixing method is applied The displacement soil produced during work is used, and is conducive to environmental protection, saves the energy and resource.
The technical scheme is that:
A kind of stand column pile installation method constructed in boulder bed, comprises the following steps successively:
A:Vertical perforate is carried out in foundation ditch bottom surface using rig and forms column stake holes;
B:Stand column pile is placed in column stake holes;
C:During canal formula cuts cement soil continuous wall or cement-soil stirring pile construction, canal formula is cut into soil cement continuous The displacement soil produced during wall or cement-soil stirring pile construction is filled into column stake holes.
The stand column pile installation method that this programme is constructed in boulder bed can not only preferably complete to construct in boulder bed and stand Stanchion, and the displacement soil produced during canal formula cutting cement soil continuous wall or cement-soil stirring pile construction can be subject to profit With environmental protection is conducive to, the energy and resource are saved.
Importantly, because canal formula cuts the displacement produced during cement soil continuous wall or cement-soil stirring pile construction Soil not only in cut cement soil continuous wall or Soil-cement containing the cobble in the layer of original place, husky and clay, and containing canal formula The cement of stake(Cement content reaches the native mass percent 20%-25% of displacement, and cement stirs with cobble, husky and clay); Compared with common concrete, not only there is the displacement soil cobble in the sticky consolidation of cement, and displacement soil also to have There is certain skeletal support effect, thus reliable fastening i.e. support is formed replacing the stanchion that can be opposed after soil solidifies, so that Horizontal shore is transmitted in effectively supporting foundation ditch vertical load and moment of flexure.
Preferably, stand column pile is the square tube that cross section is square, the stand column pile is vertically auxiliary provided with rotary and telescopic Help supporting mechanism, the vertical auxiliary support mechanism of rotary and telescopic include the vertical axles being rotatably provided in stand column pile and Two be arranged on stand column pile bottom telescoping support structure, and two telescoping support symmetrical configurations are distributed in the phase of vertical axles To both sides, the telescoping support structure include being arranged on vertical supporting plate in stand column pile bottom, it is some from bottom to top successively The transverse horizontal supporting plate that is distributed on vertical supporting plate and it is some be arranged on stand column pile side and with transverse horizontal supporting plate one One corresponding guide through hole, the vertical supporting plate and parallel, the transverse horizontal in stand column pile side where guide through hole The end of supporting plate passes through corresponding guide through hole;The vertical axles are provided with least one expanding structure, expanding structure position Between the vertical supporting plate of two telescoping support structures, expanding structure includes two horizontal braces being arranged in vertical axles Bar, and two triatic stays are symmetrically distributed in vertical axles both sides;Also include A1 steps between the step A and step B:
A1:Rotating vertical axles makes triatic stay parallel with vertical supporting plate, then that transverse horizontal supporting plate is past vertical Elapsed in stanchion, untill vertical supporting plate is resisted against in vertical axles;
It is further comprising the steps of after the step C:
D:Vertical axles and triatic stay are rotated, vertical supporting plate is strutted by triatic stay, so that by transverse horizontal Supporting plate is toward extrapolated, untill vertical supporting plate is resisted against the medial surface of stand column pile.
Preferably, the upper end of vertical axles is located in the top of stand column pile, vertical axles, set above stand column pile Have in horizontal inserted link through hole, the horizontal inserted link through hole and be inserted with action bars.
Preferably, being provided with upper vertical axle sleeve in the top of stand column pile, stand column pile bottom is provided with lower vertical axle sleeve, described perpendicular D-axis bar is plugged in vertical axle sleeve and lower vertical axle sleeve.
Preferably, the top of stand column pile is provided with the support pressure pin perpendicular with stand column pile.
The beneficial effects of the invention are as follows:Stand column pile of being constructed in boulder bed can not only be preferably completed, stand column pile branch is met Hold the requirement of vertical load that horizontal shore in foundation ditch transmits and moment of flexure;Canal formula can also be cut cement soil continuous wall or water The displacement soil produced during soil mixing pile construction is used, and is conducive to environmental protection, saves the energy and resource.
Brief description of the drawings
Fig. 1 is that the neutral stanchion of the embodiment of the present invention 1 uses the stand column pile installation method constructed in boulder bed to install latter Plant structural representation.
Fig. 2 be the stand column pile of the embodiment of the present invention 2 transverse horizontal supporting plate move inside after a kind of structural representation.
Fig. 3 is a kind of structural representation of the transverse horizontal supporting plate of the stand column pile of the embodiment of the present invention 2 toward after overhanging.
Fig. 4 is that the stand column pile of the embodiment of the present invention 2 uses the stand column pile installation method constructed in boulder bed to install latter Plant structural representation.
In figure:Stand column pile 1, displacement soil 2, supports pressure pin 3, action bars 4, upper vertical axle sleeve 5, vertical axles 6, triatic stay 7, telescoping support structure 8, vertical supporting plate 81, transverse horizontal supporting plate 82, lower vertical axle sleeve 9.
Embodiment
The present invention is described in further detail with embodiment below in conjunction with the accompanying drawings:
Embodiment 1:As shown in figure 1, a kind of stand column pile installation method constructed in boulder bed includes stand column pile 1.Column The top of stake is provided with the support pressure pin 3 perpendicular with stand column pile.
The stand column pile installation method constructed in boulder bed comprises the following steps successively:
A:Vertical perforate is carried out in foundation ditch bottom surface using rig and forms column stake holes.
B:Stand column pile is placed in column stake holes, and there is gap between the lower end of stand column pile and the bottom surface of column stake holes.
C:During canal formula cuts cement soil continuous wall or cement-soil stirring pile construction, canal formula is cut into soil cement continuous The displacement soil 2 produced during wall or cement-soil stirring pile construction is filled into column stake holes.
Embodiment 2:A kind of stand column pile installation method constructed in boulder bed includes stand column pile.As shown in Figure 2, Figure 4 shows, stand The top of stanchion is provided with the support pressure pin 3 perpendicular with stand column pile.Stand column pile is the square tube that cross section is square.Set in stand column pile There is the vertical auxiliary support mechanism of rotary and telescopic.The vertical auxiliary support mechanism of rotary and telescopic includes being rotatably provided in stand column pile Interior vertical axles 6 and two telescoping support structures 8 for being arranged on stand column pile bottom, and two telescoping support symmetrical configurations point Opposite sides of the cloth in vertical axles.Upper vertical axle sleeve 5 is provided with the top of stand column pile.Stand column pile bottom is provided with lower vertical axle sleeve 9.Vertical axles are plugged in vertical axle sleeve and lower vertical axle sleeve.The upper end of vertical axles is located at the top of stand column pile.Vertically Horizontal inserted link through hole is provided with axostylus axostyle, positioned at the top of stand column pile.Action bars 4 is inserted with horizontal inserted link through hole.
Vertical supporting plate 81 that telescoping support structure includes being arranged in stand column pile bottom, some divide successively from bottom to top Transverse horizontal supporting plate 82 of the cloth on vertical supporting plate and it is some be arranged on stand column pile side and with transverse horizontal supporting plate one One corresponding guide through hole.Vertical supporting plate is parallel with the stand column pile side where guide through hole.Same telescoping support knot The transverse horizontal supporting plate of structure is located at the opposite sides of vertical supporting plate with vertical axles.The end of transverse horizontal supporting plate is passed through Corresponding guide through hole.
Vertical axles are provided with two expanding structures.Expanding structure be located at two telescoping support structures vertical supporting plate it Between.Expanding structure includes two triatic stays 7 being arranged in vertical axles, and two triatic stays are symmetrically distributed in vertical axes Bar both sides.
The stand column pile installation method constructed in boulder bed of the present embodiment, comprises the following steps successively:
A:Vertical perforate is carried out in foundation ditch bottom surface using rig and forms column stake holes.
A1:Make triatic stay parallel with vertical supporting plate as shown in Fig. 2 rotating vertical axles by action bars, then By transverse horizontal supporting plate toward passage in stand column pile, untill vertical supporting plate is resisted against in vertical axles.
B:Stand column pile is placed in column stake holes;The bottom of stand column pile be located at stand column pile hole in, and the lower end of stand column pile with There is gap between the bottom surface of column stake holes.
C:During canal formula cuts cement soil continuous wall or cement-soil stirring pile construction, canal formula is cut into soil cement continuous The displacement soil produced during wall or cement-soil stirring pile construction is filled into column stake holes.
As shown in Fig. 2 due in step C transverse horizontal supporting plate elapsed toward in stand column pile, make most horizontal water Flat supporting plate is located in stand column pile, so in perfusion displacement soil to during in column stake holes, displacement soil can smoothly by Column stake holes is sufficient filling with;Ensure that opposition stanchion forms reliable fastening;Avoid making to put because of the stop of transverse horizontal supporting plate Soil removal and replacement can not be sufficient filling with column stake holes(Influenceed more when especially area of the transverse horizontal supporting plate outside stand column pile is larger Greatly)So that the displacement soil stanchion that can not oppose forms reliable fastening, causes what horizontal shore in column pile bearing foundation ditch was transmitted The problem of ability of vertical load and moment of flexure is reduced.
D:Vertical axles and triatic stay are rotated by action bars, vertical supporting plate are strutted by triatic stay, so that By transverse horizontal supporting plate toward extrapolated, untill vertical supporting plate is resisted against the medial surface of stand column pile;Then take out operation Bar.
As shown in Figure 3, Figure 4, column stake holes has been sufficient filling with due to replacing soil in step C, now, led in D steps Rotation vertical axles and triatic stay are crossed by transverse horizontal supporting plate toward extrapolated, and in embedded displacement soil;It can so protect On the premise of card displacement soil is sufficient filling with column stake holes, make outside stand column pile(Positioned at column stake holes)Horizontal supporting plate area use up Possible increase, so that vertical load and the energy of moment of flexure that greatly horizontal shore is transmitted in raising column pile bearing foundation ditch Power.

Claims (4)

1. a kind of stand column pile installation method constructed in boulder bed, it is characterized in that, comprise the following steps successively:
A:Vertical perforate is carried out in foundation ditch bottom surface using rig and forms column stake holes;
B:Stand column pile is placed in column stake holes;
C:During canal formula cuts cement soil continuous wall or cement-soil stirring pile construction, by canal formula cut cement soil continuous wall or The displacement soil produced during cement-soil stirring pile construction is filled into column stake holes;
The stand column pile is the square tube that cross section is square, and the stand column pile is provided with the vertical Auxiliary support machine of rotary and telescopic Structure, the vertical auxiliary support mechanism of rotary and telescopic includes the vertical axles being rotatably provided in stand column pile and two settings Telescoping support structure in stand column pile bottom, and two telescoping support symmetrical configurations are distributed in the opposite sides of vertical axles, Vertical supporting plate that the telescoping support structure includes being arranged in stand column pile bottom, some it is sequentially distributed from bottom to top perpendicular To the transverse horizontal supporting plate in supporting plate and it is some be arranged on stand column pile side and it is one-to-one with transverse horizontal supporting plate Guide through hole, the vertical supporting plate is parallel with the stand column pile side where guide through hole, the transverse horizontal supporting plate End passes through corresponding guide through hole;The vertical axles are provided with least one expanding structure, and expanding structure is located at two and stretched Between the vertical supporting plate of formula supporting construction, expanding structure includes two triatic stays being arranged in vertical axles, and two Triatic stay is symmetrically distributed in vertical axles both sides;Also include A1 steps between the step A and step B:
A1:Rotating vertical axles makes triatic stay parallel with vertical supporting plate, then by transverse horizontal supporting plate toward stand column pile Interior passage, untill vertical supporting plate is resisted against in vertical axles;
It is further comprising the steps of after the step C:
D:Vertical axles and triatic stay are rotated, is strutted vertical supporting plate by triatic stay, so that transverse horizontal be supported Plate is toward extrapolated, untill vertical supporting plate is resisted against the medial surface of stand column pile.
2. a kind of stand column pile installation method constructed in boulder bed according to claim 1, it is characterized in that, it is described vertical The upper end of axostylus axostyle is located in the top of stand column pile, vertical axles, is provided with horizontal inserted link through hole, the water positioned at the top of stand column pile Action bars is inserted with plug flat rod through-hole.
3. a kind of stand column pile installation method constructed in boulder bed according to claim 1 or 2, it is characterized in that, it is described Upper vertical axle sleeve is provided with the top of stand column pile, stand column pile bottom is provided with lower vertical axle sleeve, and the vertical axles are plugged in perpendicular In d-axis set and lower vertical axle sleeve.
4. a kind of stand column pile installation method constructed in boulder bed according to claim 1 or 2, it is characterized in that, it is described The top of stand column pile is provided with the support pressure pin perpendicular with stand column pile.
CN201610209396.XA 2016-04-05 2016-04-05 A kind of stand column pile installation method constructed in boulder bed Active CN105821887B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610209396.XA CN105821887B (en) 2016-04-05 2016-04-05 A kind of stand column pile installation method constructed in boulder bed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610209396.XA CN105821887B (en) 2016-04-05 2016-04-05 A kind of stand column pile installation method constructed in boulder bed

Publications (2)

Publication Number Publication Date
CN105821887A CN105821887A (en) 2016-08-03
CN105821887B true CN105821887B (en) 2017-09-26

Family

ID=56526670

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610209396.XA Active CN105821887B (en) 2016-04-05 2016-04-05 A kind of stand column pile installation method constructed in boulder bed

Country Status (1)

Country Link
CN (1) CN105821887B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106545012B (en) * 2016-10-21 2019-03-22 开普天(上海)国际贸易有限公司 Steel column guide pipe insertion technique
CN109371990A (en) * 2018-11-12 2019-02-22 贵州大学 A kind of mine slope supporting increasing fastness
CN110512866B (en) * 2019-08-14 2024-04-26 中交二航局第四工程有限公司 Construction structure and construction method for supporting beam
CN113216199B (en) * 2021-03-28 2022-10-04 山东正元建设工程有限责任公司 Pile beam vertical anchor supporting structure for foundation pit supporting

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002180457A (en) * 2000-12-11 2002-06-26 Kubota Corp Processing method for constructional sludge
CN1162588C (en) * 2002-07-25 2004-08-18 上海隧道工程股份有限公司 Technology for building up vertical column pile by insertion method
CN103352457A (en) * 2013-07-20 2013-10-16 陈炯辉 Soft foundation reinforcing method
CN104652445B (en) * 2013-11-22 2016-08-17 中冶天工上海十三冶建设有限公司 Deep basal pit one one post steel lattice column positioner and construction method thereof
CN104532843B (en) * 2014-12-26 2016-08-24 中国一冶集团有限公司 A kind of steel column location straightening method of stand column pile

Also Published As

Publication number Publication date
CN105821887A (en) 2016-08-03

Similar Documents

Publication Publication Date Title
CN105821887B (en) A kind of stand column pile installation method constructed in boulder bed
CN206768834U (en) A kind of deep basal pit combined support structure
CN206495241U (en) A kind of new waterproof construction of anti-float anchor rod
CN203174619U (en) Reverse raft concrete terrace
CN103882869A (en) Inclined supporting pile structure for foundation pit support and construction method thereof
CN205975658U (en) Steel platform tower crane foundation
CN206071096U (en) The underpinning device of load bearing wall in brick mix structure
CN107227741A (en) Basement supporting construction
CN203034476U (en) Tower crane base structure in type of combination of steel latticework columns and concrete bearing platform shaped like Chinese character 'hui'
CN101725147A (en) Construction process of first-inserting last-jetting type steel churning pile enclosing structure under low net space
CN206873459U (en) A kind of large-span steel-reinforced concrete foundation ditch support system
CN216515701U (en) Miniature stake raft board combination foundation structure
CN206667263U (en) A kind of foundation pit supporting construction
CN105507330A (en) Foundation pit support structure and construction method thereof
CN206015511U (en) One implant post steel pipe column
CN104878763B (en) Main building basement supporting construction with annex
CN108005086A (en) A kind of high buttress counter pull type inclined support structure for pattern foundation pit supporting structure
CN107974876A (en) Existing railway increases road construction dike multiline pile earth-retaining construction
CN207974140U (en) A kind of limited high-order double bearing platform construction elevators basis of engineering specifications
CN106988361A (en) Pick machine is repaiied in a kind of square hole stake
CN207143914U (en) A kind of relief well assistance platform sets up structure
CN207405640U (en) Stake film is combined cofferdam with soil
CN107165155B (en) Disturbance device and its construction method for structural soft soil
CN206053345U (en) A kind of pump line support meanss
CN206033069U (en) Tower crane overlength anchorage device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 310000 Room 1101, 6 Blocks, Chuangzhi Green Valley Development Center, Jianggan District, Hangzhou City, Zhejiang Province

Patentee after: Dongtong Geotechnical Technology Co., Ltd.

Address before: 310000 East Hangzhou Building, 59 Chengxing Road, Jianggan District, Hangzhou City, Zhejiang Province, 27th Floor

Patentee before: Dongtong Geotechnical Technology (Hangzhou) Co., Ltd.