CN105821887B - A kind of stand column pile installation method constructed in boulder bed - Google Patents
A kind of stand column pile installation method constructed in boulder bed Download PDFInfo
- Publication number
- CN105821887B CN105821887B CN201610209396.XA CN201610209396A CN105821887B CN 105821887 B CN105821887 B CN 105821887B CN 201610209396 A CN201610209396 A CN 201610209396A CN 105821887 B CN105821887 B CN 105821887B
- Authority
- CN
- China
- Prior art keywords
- stand column
- vertical
- column pile
- supporting plate
- pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D13/00—Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/18—Bulkheads or similar walls made solely of concrete in situ
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/46—Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
The invention discloses a kind of stand column pile installation method constructed in boulder bed, it is desirable to provide one kind can not only preferably complete stand column pile of being constructed in boulder bed, meets the requirement of horizontal shore is transmitted in column pile bearing foundation ditch vertical load and moment of flexure;Canal formula can also be cut to the stand column pile installation method constructed in boulder bed that the displacement soil produced during cement soil continuous wall or cement-soil stirring pile construction is used.It comprises the following steps successively:A:Vertical perforate is carried out in foundation ditch bottom surface using rig and forms column stake holes;B:Stand column pile is placed in column stake holes;C:During canal formula cuts cement soil continuous wall or cement-soil stirring pile construction, canal formula is cut to the displacement soil produced during cement soil continuous wall or cement-soil stirring pile construction and is filled into column stake holes.
Description
Technical field
The present invention relates to a kind of stand column pile installation method, and in particular to one kind is applied to cut cement soil continuous wall in canal formula
Or the stand column pile installation method constructed in boulder bed applied during cement-soil stirring pile construction.
Background technology
In order to ensure underground structure and foundation ditch surrounding enviroment safety, it is necessary to foundation pit side-wall and around using support, plus
Gu etc. safeguard procedures.Building foundation pit supporting generally include around margin of foundation pit set enclose purlin beam and it is some be arranged on enclose purlin beam it
Between horizontal shore and stand column pile constitute.Stand column pile is connected provided with support supporting piece constitutes supporter, for supporting in foundation ditch
Vertical load and moment of flexure that horizontal shore is transmitted.
The stand column pile of current foundation ditch is typically to be constituted using shaped steel, and shaped steel is pressed into structure in foundation ditch by the way of piling
Into the stand column pile for supporting horizontal shore;But for boulder bed, it is more than 30 centimetres of erratic boulders especially in the presence of more
In the foundation ditch on continental deposit stratum, current this column pile construction method is difficult to apply, and construction reluctantly is also difficult to ensure that stand column pile
Stability.In view of this, how to design a kind of preferably in boulder bed and can be mixed with the stratum of erratic boulder and carry out stand column pile
Construction be necessary.
The content of the invention
The invention aims to overcome the deficiencies in the prior art there is provided it is a kind of constructed in boulder bed it is vertical
Stanchion installation method, it can not only preferably complete stand column pile of being constructed in boulder bed, meet level in column pile bearing foundation ditch
Vertical load and the requirement of moment of flexure that support beam is transmitted;Canal formula can also be cut cement soil continuous wall or cement mixing method is applied
The displacement soil produced during work is used, and is conducive to environmental protection, saves the energy and resource.
The technical scheme is that:
A kind of stand column pile installation method constructed in boulder bed, comprises the following steps successively:
A:Vertical perforate is carried out in foundation ditch bottom surface using rig and forms column stake holes;
B:Stand column pile is placed in column stake holes;
C:During canal formula cuts cement soil continuous wall or cement-soil stirring pile construction, canal formula is cut into soil cement continuous
The displacement soil produced during wall or cement-soil stirring pile construction is filled into column stake holes.
The stand column pile installation method that this programme is constructed in boulder bed can not only preferably complete to construct in boulder bed and stand
Stanchion, and the displacement soil produced during canal formula cutting cement soil continuous wall or cement-soil stirring pile construction can be subject to profit
With environmental protection is conducive to, the energy and resource are saved.
Importantly, because canal formula cuts the displacement produced during cement soil continuous wall or cement-soil stirring pile construction
Soil not only in cut cement soil continuous wall or Soil-cement containing the cobble in the layer of original place, husky and clay, and containing canal formula
The cement of stake(Cement content reaches the native mass percent 20%-25% of displacement, and cement stirs with cobble, husky and clay);
Compared with common concrete, not only there is the displacement soil cobble in the sticky consolidation of cement, and displacement soil also to have
There is certain skeletal support effect, thus reliable fastening i.e. support is formed replacing the stanchion that can be opposed after soil solidifies, so that
Horizontal shore is transmitted in effectively supporting foundation ditch vertical load and moment of flexure.
Preferably, stand column pile is the square tube that cross section is square, the stand column pile is vertically auxiliary provided with rotary and telescopic
Help supporting mechanism, the vertical auxiliary support mechanism of rotary and telescopic include the vertical axles being rotatably provided in stand column pile and
Two be arranged on stand column pile bottom telescoping support structure, and two telescoping support symmetrical configurations are distributed in the phase of vertical axles
To both sides, the telescoping support structure include being arranged on vertical supporting plate in stand column pile bottom, it is some from bottom to top successively
The transverse horizontal supporting plate that is distributed on vertical supporting plate and it is some be arranged on stand column pile side and with transverse horizontal supporting plate one
One corresponding guide through hole, the vertical supporting plate and parallel, the transverse horizontal in stand column pile side where guide through hole
The end of supporting plate passes through corresponding guide through hole;The vertical axles are provided with least one expanding structure, expanding structure position
Between the vertical supporting plate of two telescoping support structures, expanding structure includes two horizontal braces being arranged in vertical axles
Bar, and two triatic stays are symmetrically distributed in vertical axles both sides;Also include A1 steps between the step A and step B:
A1:Rotating vertical axles makes triatic stay parallel with vertical supporting plate, then that transverse horizontal supporting plate is past vertical
Elapsed in stanchion, untill vertical supporting plate is resisted against in vertical axles;
It is further comprising the steps of after the step C:
D:Vertical axles and triatic stay are rotated, vertical supporting plate is strutted by triatic stay, so that by transverse horizontal
Supporting plate is toward extrapolated, untill vertical supporting plate is resisted against the medial surface of stand column pile.
Preferably, the upper end of vertical axles is located in the top of stand column pile, vertical axles, set above stand column pile
Have in horizontal inserted link through hole, the horizontal inserted link through hole and be inserted with action bars.
Preferably, being provided with upper vertical axle sleeve in the top of stand column pile, stand column pile bottom is provided with lower vertical axle sleeve, described perpendicular
D-axis bar is plugged in vertical axle sleeve and lower vertical axle sleeve.
Preferably, the top of stand column pile is provided with the support pressure pin perpendicular with stand column pile.
The beneficial effects of the invention are as follows:Stand column pile of being constructed in boulder bed can not only be preferably completed, stand column pile branch is met
Hold the requirement of vertical load that horizontal shore in foundation ditch transmits and moment of flexure;Canal formula can also be cut cement soil continuous wall or water
The displacement soil produced during soil mixing pile construction is used, and is conducive to environmental protection, saves the energy and resource.
Brief description of the drawings
Fig. 1 is that the neutral stanchion of the embodiment of the present invention 1 uses the stand column pile installation method constructed in boulder bed to install latter
Plant structural representation.
Fig. 2 be the stand column pile of the embodiment of the present invention 2 transverse horizontal supporting plate move inside after a kind of structural representation.
Fig. 3 is a kind of structural representation of the transverse horizontal supporting plate of the stand column pile of the embodiment of the present invention 2 toward after overhanging.
Fig. 4 is that the stand column pile of the embodiment of the present invention 2 uses the stand column pile installation method constructed in boulder bed to install latter
Plant structural representation.
In figure:Stand column pile 1, displacement soil 2, supports pressure pin 3, action bars 4, upper vertical axle sleeve 5, vertical axles 6, triatic stay
7, telescoping support structure 8, vertical supporting plate 81, transverse horizontal supporting plate 82, lower vertical axle sleeve 9.
Embodiment
The present invention is described in further detail with embodiment below in conjunction with the accompanying drawings:
Embodiment 1:As shown in figure 1, a kind of stand column pile installation method constructed in boulder bed includes stand column pile 1.Column
The top of stake is provided with the support pressure pin 3 perpendicular with stand column pile.
The stand column pile installation method constructed in boulder bed comprises the following steps successively:
A:Vertical perforate is carried out in foundation ditch bottom surface using rig and forms column stake holes.
B:Stand column pile is placed in column stake holes, and there is gap between the lower end of stand column pile and the bottom surface of column stake holes.
C:During canal formula cuts cement soil continuous wall or cement-soil stirring pile construction, canal formula is cut into soil cement continuous
The displacement soil 2 produced during wall or cement-soil stirring pile construction is filled into column stake holes.
Embodiment 2:A kind of stand column pile installation method constructed in boulder bed includes stand column pile.As shown in Figure 2, Figure 4 shows, stand
The top of stanchion is provided with the support pressure pin 3 perpendicular with stand column pile.Stand column pile is the square tube that cross section is square.Set in stand column pile
There is the vertical auxiliary support mechanism of rotary and telescopic.The vertical auxiliary support mechanism of rotary and telescopic includes being rotatably provided in stand column pile
Interior vertical axles 6 and two telescoping support structures 8 for being arranged on stand column pile bottom, and two telescoping support symmetrical configurations point
Opposite sides of the cloth in vertical axles.Upper vertical axle sleeve 5 is provided with the top of stand column pile.Stand column pile bottom is provided with lower vertical axle sleeve
9.Vertical axles are plugged in vertical axle sleeve and lower vertical axle sleeve.The upper end of vertical axles is located at the top of stand column pile.Vertically
Horizontal inserted link through hole is provided with axostylus axostyle, positioned at the top of stand column pile.Action bars 4 is inserted with horizontal inserted link through hole.
Vertical supporting plate 81 that telescoping support structure includes being arranged in stand column pile bottom, some divide successively from bottom to top
Transverse horizontal supporting plate 82 of the cloth on vertical supporting plate and it is some be arranged on stand column pile side and with transverse horizontal supporting plate one
One corresponding guide through hole.Vertical supporting plate is parallel with the stand column pile side where guide through hole.Same telescoping support knot
The transverse horizontal supporting plate of structure is located at the opposite sides of vertical supporting plate with vertical axles.The end of transverse horizontal supporting plate is passed through
Corresponding guide through hole.
Vertical axles are provided with two expanding structures.Expanding structure be located at two telescoping support structures vertical supporting plate it
Between.Expanding structure includes two triatic stays 7 being arranged in vertical axles, and two triatic stays are symmetrically distributed in vertical axes
Bar both sides.
The stand column pile installation method constructed in boulder bed of the present embodiment, comprises the following steps successively:
A:Vertical perforate is carried out in foundation ditch bottom surface using rig and forms column stake holes.
A1:Make triatic stay parallel with vertical supporting plate as shown in Fig. 2 rotating vertical axles by action bars, then
By transverse horizontal supporting plate toward passage in stand column pile, untill vertical supporting plate is resisted against in vertical axles.
B:Stand column pile is placed in column stake holes;The bottom of stand column pile be located at stand column pile hole in, and the lower end of stand column pile with
There is gap between the bottom surface of column stake holes.
C:During canal formula cuts cement soil continuous wall or cement-soil stirring pile construction, canal formula is cut into soil cement continuous
The displacement soil produced during wall or cement-soil stirring pile construction is filled into column stake holes.
As shown in Fig. 2 due in step C transverse horizontal supporting plate elapsed toward in stand column pile, make most horizontal water
Flat supporting plate is located in stand column pile, so in perfusion displacement soil to during in column stake holes, displacement soil can smoothly by
Column stake holes is sufficient filling with;Ensure that opposition stanchion forms reliable fastening;Avoid making to put because of the stop of transverse horizontal supporting plate
Soil removal and replacement can not be sufficient filling with column stake holes(Influenceed more when especially area of the transverse horizontal supporting plate outside stand column pile is larger
Greatly)So that the displacement soil stanchion that can not oppose forms reliable fastening, causes what horizontal shore in column pile bearing foundation ditch was transmitted
The problem of ability of vertical load and moment of flexure is reduced.
D:Vertical axles and triatic stay are rotated by action bars, vertical supporting plate are strutted by triatic stay, so that
By transverse horizontal supporting plate toward extrapolated, untill vertical supporting plate is resisted against the medial surface of stand column pile;Then take out operation
Bar.
As shown in Figure 3, Figure 4, column stake holes has been sufficient filling with due to replacing soil in step C, now, led in D steps
Rotation vertical axles and triatic stay are crossed by transverse horizontal supporting plate toward extrapolated, and in embedded displacement soil;It can so protect
On the premise of card displacement soil is sufficient filling with column stake holes, make outside stand column pile(Positioned at column stake holes)Horizontal supporting plate area use up
Possible increase, so that vertical load and the energy of moment of flexure that greatly horizontal shore is transmitted in raising column pile bearing foundation ditch
Power.
Claims (4)
1. a kind of stand column pile installation method constructed in boulder bed, it is characterized in that, comprise the following steps successively:
A:Vertical perforate is carried out in foundation ditch bottom surface using rig and forms column stake holes;
B:Stand column pile is placed in column stake holes;
C:During canal formula cuts cement soil continuous wall or cement-soil stirring pile construction, by canal formula cut cement soil continuous wall or
The displacement soil produced during cement-soil stirring pile construction is filled into column stake holes;
The stand column pile is the square tube that cross section is square, and the stand column pile is provided with the vertical Auxiliary support machine of rotary and telescopic
Structure, the vertical auxiliary support mechanism of rotary and telescopic includes the vertical axles being rotatably provided in stand column pile and two settings
Telescoping support structure in stand column pile bottom, and two telescoping support symmetrical configurations are distributed in the opposite sides of vertical axles,
Vertical supporting plate that the telescoping support structure includes being arranged in stand column pile bottom, some it is sequentially distributed from bottom to top perpendicular
To the transverse horizontal supporting plate in supporting plate and it is some be arranged on stand column pile side and it is one-to-one with transverse horizontal supporting plate
Guide through hole, the vertical supporting plate is parallel with the stand column pile side where guide through hole, the transverse horizontal supporting plate
End passes through corresponding guide through hole;The vertical axles are provided with least one expanding structure, and expanding structure is located at two and stretched
Between the vertical supporting plate of formula supporting construction, expanding structure includes two triatic stays being arranged in vertical axles, and two
Triatic stay is symmetrically distributed in vertical axles both sides;Also include A1 steps between the step A and step B:
A1:Rotating vertical axles makes triatic stay parallel with vertical supporting plate, then by transverse horizontal supporting plate toward stand column pile
Interior passage, untill vertical supporting plate is resisted against in vertical axles;
It is further comprising the steps of after the step C:
D:Vertical axles and triatic stay are rotated, is strutted vertical supporting plate by triatic stay, so that transverse horizontal be supported
Plate is toward extrapolated, untill vertical supporting plate is resisted against the medial surface of stand column pile.
2. a kind of stand column pile installation method constructed in boulder bed according to claim 1, it is characterized in that, it is described vertical
The upper end of axostylus axostyle is located in the top of stand column pile, vertical axles, is provided with horizontal inserted link through hole, the water positioned at the top of stand column pile
Action bars is inserted with plug flat rod through-hole.
3. a kind of stand column pile installation method constructed in boulder bed according to claim 1 or 2, it is characterized in that, it is described
Upper vertical axle sleeve is provided with the top of stand column pile, stand column pile bottom is provided with lower vertical axle sleeve, and the vertical axles are plugged in perpendicular
In d-axis set and lower vertical axle sleeve.
4. a kind of stand column pile installation method constructed in boulder bed according to claim 1 or 2, it is characterized in that, it is described
The top of stand column pile is provided with the support pressure pin perpendicular with stand column pile.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610209396.XA CN105821887B (en) | 2016-04-05 | 2016-04-05 | A kind of stand column pile installation method constructed in boulder bed |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610209396.XA CN105821887B (en) | 2016-04-05 | 2016-04-05 | A kind of stand column pile installation method constructed in boulder bed |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105821887A CN105821887A (en) | 2016-08-03 |
CN105821887B true CN105821887B (en) | 2017-09-26 |
Family
ID=56526670
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610209396.XA Active CN105821887B (en) | 2016-04-05 | 2016-04-05 | A kind of stand column pile installation method constructed in boulder bed |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105821887B (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106545012B (en) * | 2016-10-21 | 2019-03-22 | 开普天(上海)国际贸易有限公司 | Steel column guide pipe insertion technique |
CN109371990A (en) * | 2018-11-12 | 2019-02-22 | 贵州大学 | A kind of mine slope supporting increasing fastness |
CN110512866B (en) * | 2019-08-14 | 2024-04-26 | 中交二航局第四工程有限公司 | Construction structure and construction method for supporting beam |
CN113216199B (en) * | 2021-03-28 | 2022-10-04 | 山东正元建设工程有限责任公司 | Pile beam vertical anchor supporting structure for foundation pit supporting |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002180457A (en) * | 2000-12-11 | 2002-06-26 | Kubota Corp | Processing method for constructional sludge |
CN1162588C (en) * | 2002-07-25 | 2004-08-18 | 上海隧道工程股份有限公司 | Technology for building up vertical column pile by insertion method |
CN103352457A (en) * | 2013-07-20 | 2013-10-16 | 陈炯辉 | Soft foundation reinforcing method |
CN104652445B (en) * | 2013-11-22 | 2016-08-17 | 中冶天工上海十三冶建设有限公司 | Deep basal pit one one post steel lattice column positioner and construction method thereof |
CN104532843B (en) * | 2014-12-26 | 2016-08-24 | 中国一冶集团有限公司 | A kind of steel column location straightening method of stand column pile |
-
2016
- 2016-04-05 CN CN201610209396.XA patent/CN105821887B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN105821887A (en) | 2016-08-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105821887B (en) | A kind of stand column pile installation method constructed in boulder bed | |
CN206768834U (en) | A kind of deep basal pit combined support structure | |
CN206495241U (en) | A kind of new waterproof construction of anti-float anchor rod | |
CN203174619U (en) | Reverse raft concrete terrace | |
CN103882869A (en) | Inclined supporting pile structure for foundation pit support and construction method thereof | |
CN205975658U (en) | Steel platform tower crane foundation | |
CN206071096U (en) | The underpinning device of load bearing wall in brick mix structure | |
CN107227741A (en) | Basement supporting construction | |
CN203034476U (en) | Tower crane base structure in type of combination of steel latticework columns and concrete bearing platform shaped like Chinese character 'hui' | |
CN101725147A (en) | Construction process of first-inserting last-jetting type steel churning pile enclosing structure under low net space | |
CN206873459U (en) | A kind of large-span steel-reinforced concrete foundation ditch support system | |
CN216515701U (en) | Miniature stake raft board combination foundation structure | |
CN206667263U (en) | A kind of foundation pit supporting construction | |
CN105507330A (en) | Foundation pit support structure and construction method thereof | |
CN206015511U (en) | One implant post steel pipe column | |
CN104878763B (en) | Main building basement supporting construction with annex | |
CN108005086A (en) | A kind of high buttress counter pull type inclined support structure for pattern foundation pit supporting structure | |
CN107974876A (en) | Existing railway increases road construction dike multiline pile earth-retaining construction | |
CN207974140U (en) | A kind of limited high-order double bearing platform construction elevators basis of engineering specifications | |
CN106988361A (en) | Pick machine is repaiied in a kind of square hole stake | |
CN207143914U (en) | A kind of relief well assistance platform sets up structure | |
CN207405640U (en) | Stake film is combined cofferdam with soil | |
CN107165155B (en) | Disturbance device and its construction method for structural soft soil | |
CN206053345U (en) | A kind of pump line support meanss | |
CN206033069U (en) | Tower crane overlength anchorage device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: 310000 Room 1101, 6 Blocks, Chuangzhi Green Valley Development Center, Jianggan District, Hangzhou City, Zhejiang Province Patentee after: Dongtong Geotechnical Technology Co., Ltd. Address before: 310000 East Hangzhou Building, 59 Chengxing Road, Jianggan District, Hangzhou City, Zhejiang Province, 27th Floor Patentee before: Dongtong Geotechnical Technology (Hangzhou) Co., Ltd. |