CN104532843B - A kind of steel column location straightening method of stand column pile - Google Patents
A kind of steel column location straightening method of stand column pile Download PDFInfo
- Publication number
- CN104532843B CN104532843B CN201410823394.0A CN201410823394A CN104532843B CN 104532843 B CN104532843 B CN 104532843B CN 201410823394 A CN201410823394 A CN 201410823394A CN 104532843 B CN104532843 B CN 104532843B
- Authority
- CN
- China
- Prior art keywords
- steel
- column
- roller bearing
- steel column
- location
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 164
- 239000010959 steel Substances 0.000 title claims abstract description 164
- 238000000034 method Methods 0.000 title claims abstract description 31
- 230000007246 mechanism Effects 0.000 claims abstract description 18
- 230000002787 reinforcement Effects 0.000 claims abstract description 4
- 239000002689 soil Substances 0.000 claims description 7
- 238000005096 rolling process Methods 0.000 claims description 6
- 210000003437 trachea Anatomy 0.000 claims description 5
- 230000003014 reinforcing effect Effects 0.000 claims description 3
- 239000004576 sand Substances 0.000 claims 1
- 239000004575 stone Substances 0.000 claims 1
- 238000010276 construction Methods 0.000 abstract description 14
- 238000004519 manufacturing process Methods 0.000 abstract description 3
- 230000000694 effects Effects 0.000 description 3
- 230000001105 regulatory effect Effects 0.000 description 3
- TVEXGJYMHHTVKP-UHFFFAOYSA-N 6-oxabicyclo[3.2.1]oct-3-en-7-one Chemical compound C1C2C(=O)OC1C=CC2 TVEXGJYMHHTVKP-UHFFFAOYSA-N 0.000 description 1
- 206010003694 Atrophy Diseases 0.000 description 1
- 230000037444 atrophy Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D13/00—Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
- E02D13/04—Guide devices; Guide frames
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
The present invention relates to a kind of steel column location straightening method of stand column pile.It is characterized in that it comprises the steps: 1) prepare stand column pile steel column location machine straightening device: stand column pile steel column location machine straightening device include 2 groups location bar straightening mechanisms;Described location bar straightening mechanism includes steel wire, annular air-pocket, steel pipe clip, ring-shaped clip, the first roller bearing, the second roller bearing, the 3rd roller bearing, the 4th roller bearing, ratchet, directive wheel;2) after column stake holes completes, positioning action platform is installed in aperture;3) steel reinforcement cage made, steel column are hung in column stake holes from operating platform respectively;4) being adjusted the top of steel column, the bottom of steel column is by pawl wheel movement about the steel wire of tensioning of four direction, front and back on ground, thus the perpendicularity of adjusting post finally ensures the perpendicularity of column;5) disturbing concrete;Remove.The method is easy to operate, location is reliable, the simple in construction of the device used, easily manufacture, reusable.
Description
Technical field
The present invention relates to a kind of steel column location straightening method of stand column pile.
Background technology
Constantly expansion, the continuous atrophy of land used along with city size so that construction site is narrow and cutting depth
The situations such as increase occur, conventional suitable way substantially embodies deficiency and problem.In order to solve such problem, China is with reference to external
Advanced construction experience, use Top-down Construction Technique, it is achieved that on the ground and underground structure synchronous construction, shorten the duration, fall
Low construction costs.Interim vertical supporting system during reverse construction typically uses steel column to insert the following stand column pile of base plate
Form, steel column is usually the column of angles, steel core concrete column etc., stand column pile can to use the form such as bored concrete pile or steel-pipe pile,
Reverse construction bears the vertical load such as superstructure and construction loads, and after construction terminates, as middle support column is another
As a part for underground structure post after external wrapping concrete, bear superstructure load, thus the location of middle support column and hang down
Straight degree must strictly meet requirement.General provision middle support column misalignment of axe controls in ± 10mm, absolute altitude control ±
In 10mm, degree control is within 1/300 ~ 1/600.Therefore, the construction of steel column must take special location and straightening,
At present, the vertical adjustment method of steel column mainly has air-bag method, machinery vertical adjustment method and fairlead tube method, achieves certain effect.On
Stating three kinds of methods and have certain practicality and limitation, the perpendicularity of support column is carried out by air-bag method by putting into the air bag in hole
Correcting and location, vertical adjustment is effective, but is restricted by stroke is big, it is impossible to vertical adjustment reaches apart from big steel column perpendicularity with hole wall
Design requirement, further, since air bag is filled with the annular space between conduit and stake holes, therefore, in follow-up concreting
Mud returns out in hole and causes certain obstruction to affect construction quality.Machinery vertical adjustment method is economical and practical, but is only used for rigidity relatively
The tone pitch of big steel column.Fairlead tube method tone pitch is easier to, and effect is also preferable, but owing to guide thimble is outside steel column, makes
Become aperture to become the problem such as big, rear two methods be all fixing steel pipe post top be not fine from stressing conditions.Accordingly, it would be desirable to send out
Bright a kind of tone pitch that can meet steel column and fixing, meanwhile, again can easy to operation, method that operating expenses is low.
Chinese Patent Application No. 201410222301.9, title: a kind of high accuracy vertical pillars stake method of construction, this is special
Profit is the perpendicularity regulating steel pipe post with the bottom of steel wire rope tractive steel pipe post, but due to steel wire rope only at the bottom of steel column
End is connected, not at the bottom of hole, other are fixed, therefore, although after steel pipe post has adjusted, still easily being sent out by other external influences
Raw mobile.
Chinese Patent Application No. 201320057678.4, title: a kind of rotation is dug a steel core concrete column contrary sequence method location and adjusted
Hang down device.The determination of this patent is only in ground secured adjusted, from the point of view of the steel pipe post of overlength, because bottom is not fixed, its
Overall stationary state is not fine, and therefore the scope of application is wide, is only used for steel pipe less, and it is vertical that length is shorter, rigidity is bigger
Stanchion.
Summary of the invention
It is an object of the invention to provide a kind of steel column location straightening method of stand column pile, solve in existing method hole
Deep steel pipe post does not has good control method to constrain the perpendicularity problem of more effectively regulation steel pipe post, and the method is grasped
Make convenient, location is reliable, the simple in construction of the device used, easily manufacture, reusable.
For achieving the above object, the technical solution used in the present invention is: the steel column location straightening side of a kind of stand column pile
Method, it is characterised in that it comprises the steps:
1) the steel column location machine straightening device of stand column pile is prepared: the steel column location machine straightening device of stand column pile includes that 2 groups are determined
Position bar straightening mechanism, the structure of 2 groups of location bar straightening mechanisms is identical, and mutually perpendicular direction is arranged;
Described location bar straightening mechanism include steel wire 2, annular air-pocket 3, steel pipe clip 4, ring-shaped clip the 5, first roller bearing 6,
Second roller bearing the 8, the 3rd roller bearing the 9, the 4th roller bearing 10, ratchet 11, directive wheel 12, the lateral part of ring-shaped clip 5 is wrapped in annular
In air bag 3, during use, to be enclosed within steel column 1 outer and be positioned at column stake holes 21 for ring-shaped clip 5, and steel pipe clip 4 is stuck in steel column 1
On, steel pipe clip 4 is between ring-shaped clip 5 and steel column 1;It is positioned on the ring-shaped clip 5 on the left of steel column 1 and is fixed with first
Roller bearing frame 7, the first roller bearing frame 7 is provided with the first roller bearing 6, is positioned on the steel pipe clip 4 on the left of steel column 1 and is fixed with the second roller bearing
Frame, the second roller bearing frame is provided with the second roller bearing 8, is positioned on the steel pipe clip 4 on the right side of steel column 1 and is fixed with the 3rd roller bearing frame, the
Three roller bearing framves are provided with the 3rd roller bearing 9, are positioned on the ring-shaped clip 5 on the right side of steel column 1 and are fixed with the 4th roller bearing frame, the 4th roller bearing
Frame is provided with the 4th roller bearing 10;Ratchet 11, directive wheel 12 are respectively provided at the left and right sides of steel column 1 upper end;Steel wire 2 is wound on ratchet 11
On, the left end of steel wire 2 is fixed on the second roller bearing frame after the right flank of the second roller bearing 8, the left surface of the first roller bearing 6, steel wire 2
Right-hand member be fixed on the 3rd roller bearing frame after the left surface of directive wheel the 12, the 3rd roller bearing 9, the right flank of the 4th roller bearing 10;
2) after column stake holes 21 completes, positioning action platform 22 is installed in aperture, will after positioning with transit survey
The reinforcing in place of positioning action platform;
3) steel reinforcement cage made, steel column are hung in column stake holes 21 from operating platform respectively;
In steel column 1 decentralization process, annular air-pocket 3, ring-shaped clip 5, steel pipe clip 4 are installed in the outside of steel column, Gu
The steel wire reserved, transfers with steel column, and the positioning action platform that steel column 1 is transferred to after design attitude on the ground is first solid
Determine the top of steel column 1, then to be allowed to be fully contacted with hole wall, by the bottom of steel column 1 to annular air-pocket 3 inflation by trachea
It is fixed on the preferable soil layer of stress;
4) terminal laying inclinometer or vertical reference, inclinometer or vertical reference on steel column 1 can be with computer
It is connected, by deviational survey data, artificial or computer controls top and the bottom of steel column 1 are adjusted, steel column 1 time
Portion is by the shifting about the steel wire of tensioning of four direction, front and back respectively of the pawl wheel of two groups of location bar straightening mechanisms on ground
Dynamic, thus the perpendicularity of adjusting post finally ensures the perpendicularity of column;
5) watering and smash concrete Lumen catheter, concrete has some strength (intensity of dismountable annular air-pocket) to remove gas afterwards
Pipe and annular air-pocket, backfill element soil or sandstone, remove positioning action platform.
Innovative point: use the air bag (annular air-pocket) of band annular, ring-shaped clip to be fixed on the hole wall in certain depth, use
Steel wire is connected and by buckling the assembly such as the steel pipe clip of steel pipe, ratchet, directive wheel (pulley) at steel column four direction
Carry out straightening and location.Meanwhile, positioning action platform on ground uses general measure to position and fix steel column (or to claim steel pipe
Column) top, have the requirement reaching to meet design accuracy that the steel column of upper and lower two fixing points is more reliable.
The invention has the beneficial effects as follows: solve deep steel pipe post in existing method hole there is no good control method and
Constraining the perpendicularity problem more effectively regulating steel pipe post, the method is easy to operate, location is reliable, the knot of the device used
Structure is simple, easily manufacture, reusable, low cost, effect is notable, beneficially popularization and application.
Accompanying drawing explanation
Fig. 1 is the structural representation of the steel column location machine straightening device of stand column pile of the present invention.
Fig. 2 is the enlarged drawing in A portion in Fig. 1.
Fig. 3 is the sectional view in Fig. 2 along line B-B.
Fig. 4 is the structural representation of steel pipe clip of the present invention.
Fig. 5 is the top view of steel pipe clip of the present invention.
Fig. 6 is the side view of ratchet of the present invention.
Fig. 7 be ratchet of the present invention structural representation.
Fig. 8 is the structural representation of positioning action platform of the present invention.
Fig. 9 is the enlarged drawing in C portion in Fig. 1.
In figure: 1-steel column, 2-steel wire, 3-annular air-pocket, 4-steel pipe clip, 5-ring-shaped clip, 6-the first roller bearing, 7-
One roller bearing frame, 8-the second roller bearing, 9-the 3rd roller bearing, 10-the 4th roller bearing, 11-ratchet, 12-directive wheel, 13-positioner, 14-
Sensor, 15-ground upper ground surface, 16-basement ground, absolute altitude at the bottom of 17-steel core concrete column, 18-socket cap peg, 19-sealing
Plate, 20-puts more energy into ring flat-plate, 21-column stake holes, 22-positioning action platform.
Detailed description of the invention
As shown in figs 1-9, a kind of steel column location straightening method of stand column pile, it comprises the steps:
1) the steel column location machine straightening device of stand column pile is prepared: the steel column location machine straightening device of stand column pile includes that 2 groups are determined
Position bar straightening mechanism, the structure of 2 groups of location bar straightening mechanisms is identical, and [first location bar straightening mechanism is arranged in the left and right sides of steel column
(left side in Fig. 2 is left, and the right is right), second location bar straightening mechanism is arranged in side before and after steel column], and be mutually perpendicular to
(as shown in Figure 3) is arranged in direction;
Described location bar straightening mechanism (first location bar straightening mechanism) include steel wire 2, annular air-pocket 3, steel pipe clip 4,
Ring-shaped clip the 5, first roller bearing the 6, second roller bearing the 8, the 3rd roller bearing the 9, the 4th roller bearing 10, ratchet 11, directive wheel 12, ring-shaped clip 5
Lateral part be wrapped in annular air-pocket 3 that (air bag, ring-shaped clip are annular, ring-shaped clip section approximation C-shaped, i.e. annular
Clip 5 is fixed on annular air-pocket 3, will not fall down), during use, ring-shaped clip 5 is enclosed within outer (near steel column 1 of steel column 1
Side is referred to as inner side) and (annular air-pocket 3 and ring-shaped clip 5 lean against the column stake holes 21 of certain depth to be positioned at column stake holes 21
On interior hole wall, depending on the degree of depth is according to soil property), steel pipe clip 4 is stuck on steel column 1 (being i.e. fixed on steel column), steel pipe strap
Hoop 4 is between ring-shaped clip 5 and steel column 1;It is positioned on the ring-shaped clip 5 on the left of steel column 1 and is fixed with the first roller bearing frame 7,
First roller bearing frame 7 is provided with first roller bearing 6(the first roller bearing and can roll), it is positioned on the steel pipe clip 4 on the left of steel column 1 and is fixed with
Second roller bearing frame, the second roller bearing frame is provided with second roller bearing 8(the second roller bearing and can roll), it is positioned at the steel pipe strap on the right side of steel column 1
Being fixed with the 3rd roller bearing frame on hoop 4, the 3rd roller bearing frame is provided with the 3rd roller bearing 9(the 3rd roller bearing and can roll), it is positioned at steel column 1 right
Being fixed with the 4th roller bearing frame on the ring-shaped clip 5 of side, the 4th roller bearing frame is provided with the 4th roller bearing 10(the 4th roller bearing and can roll);Spine
Wheel 11, directive wheel 12 are respectively provided at the left and right sides of steel column 1 upper end;Steel wire 2 is wound on ratchet 11, and the left end of steel wire 2 is through second
The right flank of roller bearing 8, the first roller bearing 6 left surface after be fixed on or on the second roller bearing frame, the right-hand member of steel wire 2 through directive wheel 12,
The left surface of the 3rd roller bearing 9, the 4th roller bearing 10 right flank after be fixed on the 3rd roller bearing frame;Left rotation and right rotation ratchet 11, adjustable
Joint ratchet 11 left side or the length of the right steel wire, from regulating between the first roller bearing 6 and the second roller bearing 8, the 3rd roller bearing 9 and the 4th rolling
The spacing (i.e. adjusting the left and right perpendicularity of steel column 1, second location bar straightening mechanism to adjust perpendicularity before and after steel column 1) of axle 10;
2) after column stake holes 21 completes, positioning action platform 22 is installed in aperture, will after positioning with transit survey
The reinforcing in place of positioning action platform;
3) steel reinforcement cage made, steel column are hung in column stake holes 21 from operating platform respectively (computer control is set
Make vertical watch-dog;Being surveyed by theodolite and vertically reset for vertical control, positioning action platform positions, by two vertical direction
Theodolite determines operating platform center and direction, and steel column hangs in hole through operating platform pilot hole, then by theodolite is
Operating platform is checked, and corrects operating platform if any deviation);
In steel column 1 decentralization process, simultaneously on four limits outside the post of steel column appropriate location at a depth below peace at 1/2
Dress annular air-pocket 3, ring-shaped clip 5, steel pipe clip 4, the steel wire temporarily fixed, to transfer with steel column, steel column 1 is transferred
After design attitude, the top of steel column 1 first fixed by positioning action platform on the ground, then by trachea to annular air-pocket 3
Inflation is allowed to be fully contacted with hole wall, and the bottom of steel column 1 is fixed on the preferable soil layer of stress;
4) terminal laying inclinometer or vertical reference, inclinometer or vertical reference on steel column 1 can be with computer
It is connected, by deviational survey data, artificial or computer controls top and the bottom of steel column 1 are adjusted, steel column 1 time
Portion is respectively by the group pawl wheel of two groups of location bar straightening mechanisms on ground about the steel wire of tensioning of four direction, front and back
Mobile (can also be connected with computer and be automatically adjusted), thus the perpendicularity of adjusting post finally ensures the perpendicularity of column, power
Strive its degree control within 1/600;
5) after disturbing concrete, Lumen catheter speed wants slow and light, must not clash into steel column and correct perpendicularity at any time;Water
Some strength (intensity of dismountable annular air-pocket) afterwards dismounting trachea and annular gas, backfill element soil is had until bored concrete pile after smashing concrete
Or sandstone, remove positioning action platform;Strengthen protection, prevent accidental impact from causing deformation.
Claims (1)
1. the steel column location straightening method of a stand column pile, it is characterised in that it comprises the steps:
1) the steel column location machine straightening device of stand column pile is prepared: the steel column location machine straightening device of stand column pile includes that 2 groups of location are adjusted
Straight mechanism, the structure of 2 groups of location bar straightening mechanisms is identical, and mutually perpendicular direction is arranged;
Described location bar straightening mechanism includes steel wire (2), annular air-pocket (3), steel pipe clip (4), ring-shaped clip (5), the first rolling
Axle (6), the second roller bearing (8), the 3rd roller bearing (9), the 4th roller bearing (10), ratchet (11) and directive wheel (12), ring-shaped clip (5)
In lateral part is wrapped in annular air-pocket (3), during use, ring-shaped clip (5) is enclosed within steel column (1) and outward and is positioned at column stake holes
(21), in, steel pipe clip (4) is stuck on steel column (1), and steel pipe clip (4) is positioned between ring-shaped clip (5) and steel column (1);
Being positioned on the ring-shaped clip (5) in steel column (1) left side and be fixed with the first roller bearing frame (7), the first roller bearing frame (7) is provided with the first rolling
Axle (6), is positioned on the steel pipe clip (4) in steel column (1) left side and is fixed with the second roller bearing frame, and the second roller bearing frame is provided with the second rolling
Axle (8), is positioned on the steel pipe clip (4) on steel column (1) right side and is fixed with the 3rd roller bearing frame, and the 3rd roller bearing frame is provided with the 3rd rolling
Axle (9), is positioned on the ring-shaped clip (5) on steel column (1) right side and is fixed with the 4th roller bearing frame, and the 4th roller bearing frame is provided with the 4th rolling
Axle (10);Ratchet (11) and directive wheel (12) are respectively provided at the left and right sides of steel column (1) upper end;Steel wire (2) is wound on ratchet (11)
On, the left end of steel wire (2) is fixed on the second roller bearing frame after the right flank of the second roller bearing (8), the left surface of the first roller bearing (6)
On, the right-hand member of steel wire (2) is fixing after the right flank of directive wheel (12), the left surface of the 3rd roller bearing (9) and the 4th roller bearing (10)
On the 3rd roller bearing frame;
2) after column stake holes (21) completes, positioning action platform (22) is installed in aperture, will after positioning with transit survey
The reinforcing in place of positioning action platform;
3) steel reinforcement cage made, steel column are hung in column stake holes (21) from positioning action platform respectively;
In steel column (1) decentralization process, annular air-pocket (3), ring-shaped clip (5) and steel pipe clip are installed in the outside of steel column
(4), the steel wire fixed, to transfer with steel column, steel column (1) transfers to after design attitude positioning action on the ground
The top of steel column (1) first fixed by platform, then is allowed to contact with hole wall to annular air-pocket (3) inflation by trachea, is stood by steel
The preferable soil layer of stress is fixed in the bottom of post (1);
4) terminal laying inclinometer or vertical reference, inclinometer or vertical reference on steel column (1) is connected with computer
Connecing, by deviational survey data, by being manually adjusted top and the bottom of steel column (1), ground is passed through in the bottom of steel column (1)
The ratchet of upper two groups of location bar straightening mechanisms carries out left and right on the steel wire of tensioning of four direction and front and back rotates, thus regulates steel
The perpendicularity of column finally ensures the perpendicularity of steel column;
5) watering and smash concrete Lumen catheter, concrete removes trachea and annular air-pocket after having some strength;Backfill element soil or sand
Stone, removes positioning action platform.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201410823394.0A CN104532843B (en) | 2014-12-26 | 2014-12-26 | A kind of steel column location straightening method of stand column pile |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201410823394.0A CN104532843B (en) | 2014-12-26 | 2014-12-26 | A kind of steel column location straightening method of stand column pile |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN104532843A CN104532843A (en) | 2015-04-22 |
| CN104532843B true CN104532843B (en) | 2016-08-24 |
Family
ID=52848451
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201410823394.0A Active CN104532843B (en) | 2014-12-26 | 2014-12-26 | A kind of steel column location straightening method of stand column pile |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN104532843B (en) |
Families Citing this family (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105821887B (en) * | 2016-04-05 | 2017-09-26 | 东通岩土科技(杭州)有限公司 | A kind of stand column pile installation method constructed in boulder bed |
| CN105714825A (en) * | 2016-04-28 | 2016-06-29 | 山东省建筑科学研究院 | Core pile guide device suitable for cemented soil core inserting combination pile and core pile guide method |
| CN106759558B (en) * | 2017-01-22 | 2019-04-12 | 上海森信建设集团有限公司 | A kind of control is buried in the earth the construction method of stand column pile direction and verticality |
| CN109083211B (en) * | 2018-08-30 | 2020-08-28 | 南京江宁区上峰国银标准件厂 | Precise automatic cast-in-place pile righting equipment and use method thereof |
| CN110016910A (en) * | 2019-04-26 | 2019-07-16 | 重庆交通大学 | A recyclable airbag type high-precision positioning device and construction method for a steel pipe column pile |
| CN110080207A (en) * | 2019-04-29 | 2019-08-02 | 山东大学 | A kind of assembled steel tubular pole connector and application method |
| CN110258540B (en) * | 2019-06-25 | 2020-12-22 | 安徽皖宏建筑工程有限公司 | Construction method of cast-in-situ bored pile |
| CN113502806B (en) * | 2021-07-15 | 2022-09-06 | 江苏天力建设集团有限公司 | Concrete-filled steel tube stand column for weathered geological reverse construction method and construction method |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN202850027U (en) * | 2012-09-03 | 2013-04-03 | 湖北中南勘察基础工程有限公司 | Reverse building method pile foundation construction steel column location verticality adjustment device |
| CN203113336U (en) * | 2013-01-31 | 2013-08-07 | 广东省建筑设计研究院 | Locating and perpendicularity adjusting device of rotary-drilling pile concrete-filled steel tubular column reverse construction method |
| CN203160245U (en) * | 2013-04-03 | 2013-08-28 | 中铁十局集团第二工程有限公司 | Positioning device for temporary steel-pipe column pile |
| CN103993597A (en) * | 2014-05-23 | 2014-08-20 | 上海森信建设工程有限公司 | High-precision vertical column pile construction method |
| CN104110035A (en) * | 2013-04-16 | 2014-10-22 | 中冶天工上海十三冶建设有限公司 | Perpendicularity correcting device for concrete-filled steel tube columns constructed by top-down process and construction method implemented by perpendicularity correcting device |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2799778B2 (en) * | 1991-03-06 | 1998-09-21 | 清水建設株式会社 | Construction method of steel tube concrete pillar |
| JP3701648B2 (en) * | 2002-11-13 | 2005-10-05 | 株式会社竹中工務店 | Steel pipe construction |
-
2014
- 2014-12-26 CN CN201410823394.0A patent/CN104532843B/en active Active
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN202850027U (en) * | 2012-09-03 | 2013-04-03 | 湖北中南勘察基础工程有限公司 | Reverse building method pile foundation construction steel column location verticality adjustment device |
| CN203113336U (en) * | 2013-01-31 | 2013-08-07 | 广东省建筑设计研究院 | Locating and perpendicularity adjusting device of rotary-drilling pile concrete-filled steel tubular column reverse construction method |
| CN203160245U (en) * | 2013-04-03 | 2013-08-28 | 中铁十局集团第二工程有限公司 | Positioning device for temporary steel-pipe column pile |
| CN104110035A (en) * | 2013-04-16 | 2014-10-22 | 中冶天工上海十三冶建设有限公司 | Perpendicularity correcting device for concrete-filled steel tube columns constructed by top-down process and construction method implemented by perpendicularity correcting device |
| CN103993597A (en) * | 2014-05-23 | 2014-08-20 | 上海森信建设工程有限公司 | High-precision vertical column pile construction method |
Non-Patent Citations (2)
| Title |
|---|
| 半逆作法施工技术在旋流沉淀池工程中的应用;黎明中;《土工基础》;20031231;第17卷(第4期);第10-12页 * |
| 灌注桩钢立柱垂直度控制系统的设计和研制;仲葆文等;《华东理工大学学报》;20040630;第306-310页 * |
Also Published As
| Publication number | Publication date |
|---|---|
| CN104532843A (en) | 2015-04-22 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104532843B (en) | A kind of steel column location straightening method of stand column pile | |
| CN207048069U (en) | A kind of pipe gallery segmental timbering | |
| CN104264902B (en) | Steel pipe concrete column and pile foundation connection structure | |
| CN109944593B (en) | Reinforcing method for shield tunnel to penetrate existing building | |
| CN218150940U (en) | Adjustable tunnel is first to be propped up and two lining supporting devices | |
| CN102767182A (en) | Verticality adjustment system for lattice column correcting mount and construction method thereof | |
| CN212612036U (en) | Single arch rib framing and turning system of steel box arch bridge | |
| CN102859076B (en) | A method of laying a foundation | |
| CN107288663B (en) | A kind of tunnel arch is accurately positioned and fixed construction method and device | |
| CN106958244A (en) | The installation and locating method of ultra-deep and large diameter steel pipe column | |
| CN111455870B (en) | Whole-width single-side combined swivel structure of steel box arch bridge and construction method | |
| CN110016938A (en) | A kind of contrary sequence method foundation pit rectangle lattice column positioning and plumbing device | |
| CN210134427U (en) | Composite steel pipe pile rapping fine-adjustment guiding system | |
| CN106400784A (en) | Construction method for manufacturing cast-in-place pile through cast-in-place pile reinforcement cage | |
| CN102966254B (en) | Arrangement method for measuring tower used for construction of stub matching method | |
| CN105926637A (en) | Prestressing force support system for protecting existing subway and design and construction method | |
| CN110130923B (en) | A shaped steel supporting bow member structure for tunnel | |
| JP5032255B2 (en) | Rockfall protection and avalanche prevention facility | |
| CN111678007B (en) | Application method of fixing device for mounting and burying earth-rock dam piezometer tube and inclinometer tube | |
| CN207063007U (en) | A kind of walling crib ruggedized construction | |
| CN107190736A (en) | Suitable for the flexible shroud and its construction method of steel reinforcement cage under coral reef geology | |
| CN105155580B (en) | A kind of underground large-size spherical tank inside panel support meanss and construction method | |
| CN110777835A (en) | Construction method of formwork support system for supporting pile foundation with steel pipe piles | |
| CN202338107U (en) | Flexible sliding mold torsion-resisting construction device of silo | |
| CN205688443U (en) | It is applicable to the core stake guider of cement slotting built pile |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant |