CN209261322U - A kind of indirect dry cooling tower X-type rod structure - Google Patents
A kind of indirect dry cooling tower X-type rod structure Download PDFInfo
- Publication number
- CN209261322U CN209261322U CN201822017830.1U CN201822017830U CN209261322U CN 209261322 U CN209261322 U CN 209261322U CN 201822017830 U CN201822017830 U CN 201822017830U CN 209261322 U CN209261322 U CN 209261322U
- Authority
- CN
- China
- Prior art keywords
- rod structure
- cooling tower
- dry cooling
- column structure
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Foundations (AREA)
Abstract
本实用新型提供了一种间接空冷塔X型柱结构,涉及建筑施工技术领域,以解决现有技术中存在的钢筋混凝土结构X型柱施工时需要搭设大型的脚手架支撑体系导致工程量大,施工工期长,工程成本高,且使用的材料较多,工程造价高并且由于需要采用脚手架支撑体系,支撑刚度相对小,架体容易变形,不利于上部结构几何尺寸控制,并且脚手架体系杆件及节点多,整体性差,结构容易失稳,安全性差的技术问题,该装置包括呈“X”型设置的第一柱结构和第二柱结构,第一柱结构与第二柱结构均包括型钢构件和设置于型钢构件外侧的混凝土构件,型钢构件与混凝土构件通过第一连接件连接,本实用新型用于提高间接空冷塔X型柱结构的安全性、降低工程成本。
The utility model provides an X-shaped column structure of an indirect air-cooling tower, which relates to the technical field of building construction, and solves the problem that a large-scale scaffolding support system needs to be erected during the construction of an X-shaped column of a reinforced concrete structure in the prior art, resulting in a large amount of work and difficult construction. The construction period is long, the project cost is high, and there are many materials used. The project cost is high and due to the need to adopt a scaffolding support system, the support stiffness is relatively small, and the frame is easy to deform, which is not conducive to the control of the geometric size of the upper structure, and the scaffolding system rods and nodes Many, poor integrity, easy structural instability, and poor safety. The device includes the first column structure and the second column structure arranged in an "X" shape. The first column structure and the second column structure both include steel members and The concrete component arranged outside the steel component is connected with the concrete component through the first connecting piece. The utility model is used to improve the safety of the X-shaped column structure of the indirect air cooling tower and reduce the engineering cost.
Description
技术领域technical field
本实用新型涉及建筑施工技术领域,尤其是涉及一种间接空冷塔X型柱结构。The utility model relates to the technical field of building construction, in particular to an X-shaped column structure of an indirect air cooling tower.
背景技术Background technique
火力发电厂间接间接空冷塔是一种大型高耸构筑物,其结构复杂,施工工期长,施工的危险性大,X型柱用于支撑上部筒壁,需要承担上部结构的全部载荷。The indirect indirect air-cooling tower of a thermal power plant is a large-scale towering structure with complex structure, long construction period and high construction risk. X-shaped columns are used to support the upper wall and need to bear all the loads of the upper structure.
现有的X型柱结构采用钢筋混凝土X型柱,本申请人发现现有技术至少存在以下技术问题:The existing X-shaped column structure adopts reinforced concrete X-shaped column, and the applicant finds that there are at least the following technical problems in the prior art:
1.钢筋混凝土结构X型柱,施工时需要搭设大型的脚手架支撑体系,工程量大,准备工作较久,施工工期长,工程成本高;1. Reinforced concrete structure X-shaped column requires a large-scale scaffolding support system during construction, which requires a large amount of work, long preparation work, long construction period and high project cost;
2.钢筋混凝土结构X型柱,截面较大,使用的材料较多,工程造价高;2. The X-shaped column of reinforced concrete structure has a large cross-section, uses more materials, and the project cost is high;
3.由于需要采用脚手架支撑体系,支撑刚度相对小,架体容易变形,不利于上部结构几何尺寸控制,并且脚手架体系杆件及节点多,整体性差,结构容易失稳,易出安全事故,安全性差。3. Due to the need to adopt a scaffolding support system, the support rigidity is relatively small, and the frame body is easy to deform, which is not conducive to the control of the geometric size of the upper structure. In addition, the scaffolding system has many rods and nodes, and the integrity is poor. The structure is prone to instability and safety accidents. Poor sex.
实用新型内容Utility model content
本实用新型的目的在于提供一种间接空冷塔X型柱结构,以解决现有技术中存在的钢筋混凝土结构X型柱施工时需要搭设大型的脚手架支撑体系,工程量大,准备工作较久,施工工期长,工程成本高,且截面较大,使用的材料较多,工程造价高并且由于需要采用脚手架支撑体系,支撑刚度相对小,架体容易变形,不利于上部结构几何尺寸控制,并且脚手架体系杆件及节点多,整体性差,结构容易失稳,易出安全事故,安全性差的技术问题。本实用新型提供的诸多技术方案中的优选技术方案所能产生的诸多技术效果详见下文阐述。The purpose of this utility model is to provide an indirect air-cooling tower X-shaped column structure, to solve the existing technology existing in the reinforced concrete structure X-shaped column construction needs to set up a large-scale scaffolding support system, the amount of work is large, the preparation work is long, The construction period is long, the project cost is high, and the cross-section is large, the materials used are more, the project cost is high, and due to the need for a scaffold support system, the support rigidity is relatively small, and the frame is easy to deform, which is not conducive to the control of the geometric size of the upper structure, and the scaffold There are many rods and nodes in the system, the integrity is poor, the structure is prone to instability, safety accidents, and technical problems of poor safety. The many technical effects that can be produced by the preferred technical solutions among the many technical solutions provided by the utility model are described in detail below.
为实现上述目的,本实用新型提供了以下技术方案:In order to achieve the above object, the utility model provides the following technical solutions:
本实用新型提供的一种间接空冷塔X型柱结构,包括呈“X”型设置的第一柱结构和第二柱结构,所述第一柱结构与所述第二柱结构均包括型钢构件和设置于所述型钢构件外侧的混凝土构件,所述型钢构件与所述混凝土构件通过第一连接件连接。An X-shaped column structure of an indirect air cooling tower provided by the utility model includes a first column structure and a second column structure arranged in an "X" shape, and both the first column structure and the second column structure include steel members and a concrete member arranged outside the steel member, the steel member and the concrete member are connected through a first connecting piece.
优选地,所述型钢构件包括第一型钢和第二型钢,所述第一型钢与所述第二型钢交叉设置。Preferably, the shaped steel member includes a first shaped steel and a second shaped steel, and the first shaped steel and the second shaped steel are intersected.
优选地,所述第一型钢与所述第二型钢均为“H”型钢,且所述第一型钢与所述第二型钢垂直设置。Preferably, both the first steel shape and the second steel shape are "H" steel shape, and the first steel shape and the second steel shape are vertically arranged.
优选地,所述第一柱结构与所述第二柱结构的内部均包括设置于所述型钢构件与所述混凝土构件之间的若干纵向受力钢筋、以及设置于所述纵向受力钢筋一侧的箍筋,所述箍筋设置于靠近所述混凝土构件的一侧。Preferably, the inside of the first column structure and the second column structure both include a number of longitudinal stressed steel bars arranged between the steel member and the concrete member, and a number of longitudinal stressed steel bars arranged side stirrups, and the stirrups are arranged on one side close to the concrete member.
优选地,还包括与所述第一柱结构和所述第二柱结构分别成夹角设置的第一支撑组件和第二支撑组件。Preferably, it further includes a first support assembly and a second support assembly respectively arranged at angles to the first column structure and the second column structure.
优选地,所述第一支撑组件和所述第二支撑组件均包括固定于地面的支撑支墩,以及固定于所述支撑支墩上的支撑体,所述支撑体的一端固定于所述支撑支墩上,所述支撑体的另一端固定于柱结构的中心上。Preferably, both the first support assembly and the second support assembly include a support pier fixed to the ground, and a support body fixed on the support pier, one end of the support body is fixed to the support On the pier, the other end of the supporting body is fixed on the center of the column structure.
优选地,还包括杯口基础,所述第一柱结构与所述第二柱结构的型钢构件分别插入并嵌固在其所对应的杯口基础内。Preferably, a cup foundation is also included, and the shaped steel members of the first column structure and the second column structure are respectively inserted and embedded in their corresponding cup foundations.
优选地,所述型钢构件的底部设有柱脚,所述柱脚通过第二连接件嵌固于所述杯口基础内。Preferably, the bottom of the shaped steel member is provided with a column foot, and the column foot is embedded in the cup foundation through the second connecting piece.
优选地,所述第二连接件为地脚螺栓。Preferably, the second connecting member is an anchor bolt.
优选地,所述第一连接件为锚栓。Preferably, the first connecting member is an anchor bolt.
本实用新型提供的一种间接空冷塔X型柱结构,极大地减少对脚手架支撑体系的依赖,减少脚手架的工程量,安全性高、有效地缩短工期,采用型钢混凝土结构X型柱,用于支撑上部筒壁,型钢骨架可以作为本身及上部结构的支撑骨架,支撑刚度大,容易控制几何尺寸,同时,X型柱截面相对于钢筋混凝土截面会减小,混凝土及钢材都会有所减少,从而降低工程造价,型钢骨架可以工厂化制作,便于模块化施工,并且型钢外侧的混凝土和上部筒壁结构的混凝土可以同步施工,缩短施工工期。The utility model provides an indirect air-cooling tower X-shaped column structure, which greatly reduces the dependence on the scaffolding support system, reduces the amount of scaffolding, has high safety, and effectively shortens the construction period. The X-shaped column of the steel concrete structure is used for Supporting the upper cylinder wall, the section steel skeleton can be used as the supporting skeleton of itself and the upper structure. The support rigidity is large, and the geometric size is easy to control. At the same time, the cross section of the X-shaped column will be reduced compared with the reinforced concrete cross section, and the concrete and steel will be reduced. To reduce the project cost, the section steel skeleton can be manufactured in a factory, which is convenient for modular construction, and the concrete on the outside of the section steel and the concrete on the upper wall structure can be constructed simultaneously, shortening the construction period.
附图说明Description of drawings
为了更清楚地说明本实用新型实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the following will briefly introduce the accompanying drawings that need to be used in the description of the embodiments or the prior art. Obviously, the accompanying drawings in the following description These are only some embodiments of the utility model, and those skilled in the art can also obtain other drawings based on these drawings without creative work.
图1是本实用新型一种间接空冷塔X型柱结构一实施例的结构示意图;Fig. 1 is a structural schematic diagram of an embodiment of an indirect air cooling tower X-shaped column structure of the utility model;
图2是图1的侧视结构示意图;Fig. 2 is a side view structural schematic diagram of Fig. 1;
图3是图2中A-A处的剖视结构示意图。Fig. 3 is a schematic cross-sectional structural diagram at A-A in Fig. 2 .
图中:1、箍筋;2、锚栓;3、纵向受力钢筋;4、混凝土构件;5、型钢构件;6、拉筋;7、地脚螺栓;8、支撑体;9、支撑支墩;10、杯口基础;11、第一柱结构;12、第二柱结构;13、柱脚;51、第一型钢;52、第二型钢。In the figure: 1. Stirrups; 2. Anchor bolts; 3. Longitudinal stressed steel bars; 4. Concrete members; 5. Steel members; 6. Tension bars; 7. Anchor bolts; pier; 10, cup foundation; 11, first column structure; 12, second column structure; 13, column foot; 51, first section steel; 52, second section steel.
具体实施方式Detailed ways
为使本实用新型的目的、技术方案和优点更加清楚,下面将对本实用新型的技术方案进行详细的描述。显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动的前提下所得到的所有其它实施方式,都属于本实用新型所保护的范围。In order to make the purpose, technical solution and advantages of the utility model clearer, the technical solution of the utility model will be described in detail below. Apparently, the described embodiments are only some of the embodiments of the present invention, not all of them. Based on the embodiments of the present utility model, all other implementations obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present utility model.
本实用新型提供了一种间接空冷塔X型柱结构,图1是本实施例的结构示意图,如图1所示,包括呈“X”型设置的第一柱结构11和第二柱结构12,第一柱结构11与第二柱结构12均包括型钢构件5和设置于型钢构件5外侧的混凝土构件4,型钢构件5与混凝土构件4通过第一连接件连接,第一连接件应为具有足够的强度,并且能够可靠的承担从一个构件传到另一个构件的内力,构造简单,使用方便,并且具有一定的锚固长度,例如,锚筋,锚栓等。其中,作为优选的实施方式,本实施例中,第一连接件为锚栓2,锚栓2至少设置为一个,均匀的分布在型钢构件5与混凝土构件4的连接处,锚栓2具有优良的抗弯、抗剪、抗拉的功能,是连接型钢构件5与混凝土构件4的优选方案。The utility model provides an X-shaped column structure of an indirect air cooling tower. Figure 1 is a schematic structural diagram of this embodiment, as shown in Figure 1, including a first column structure 11 and a second column structure 12 arranged in an "X" shape , the first column structure 11 and the second column structure 12 both include a steel member 5 and a concrete member 4 arranged outside the steel member 5, the steel member 5 and the concrete member 4 are connected by a first connecting piece, and the first connecting piece should have It has sufficient strength and can reliably bear the internal force transmitted from one component to another. It is simple in structure, easy to use, and has a certain anchoring length, such as anchor bars, anchor bolts, etc. Among them, as a preferred embodiment, in this embodiment, the first connecting piece is an anchor bolt 2, at least one anchor bolt 2 is arranged, and is evenly distributed at the joint between the steel member 5 and the concrete member 4, and the anchor bolt 2 has excellent The anti-bending, shearing and tensile functions are the optimal solution for connecting the steel member 5 and the concrete member 4.
通过设置此间接空冷塔X型柱结构,极大地减少对脚手架支撑体系的依赖,减少脚手架的工程量,安全性高、有效地缩短工期,采用型钢混凝土结构X型柱,用于支撑上部筒壁,型钢骨架可以作为本身及上部结构的支撑骨架,支撑刚度大,容易控制几何尺寸,同时,X型柱截面相对于钢筋混凝土截面会减小,混凝土及钢材都会有所减少,从而降低工程造价。By setting the X-shaped column structure of this indirect air cooling tower, the dependence on the scaffolding support system is greatly reduced, the amount of scaffolding is reduced, the safety is high, and the construction period is effectively shortened. The X-shaped column of steel concrete structure is used to support the upper wall. , The steel skeleton can be used as the supporting skeleton of itself and the upper structure. The supporting rigidity is large, and the geometric size is easy to control. At the same time, the cross section of the X-shaped column will be reduced compared with the reinforced concrete cross section, and the concrete and steel will be reduced, thereby reducing the project cost.
作为可选地实施方式,型钢构件5包括第一型钢51和第二型钢52,第一型钢51与第二型钢52交叉设置,通过采用第一型钢51和第二型钢52,采用型钢骨架,作为上部结构支撑体系的一部分,减少对脚手架体系的依赖,提高侧向的支撑刚度,提高柱子及上部结构尺寸的准确性和结构安全性;支撑体系由脚手架体系转移到型钢骨架支撑体系上,降低工程成本,提高施工的安全性。型钢骨架可以工厂化制作,提高制作质量,加快施工进度。型钢外侧的混凝土和上部筒壁结构的混凝土可以同步施工,缩短施工工期。As an optional embodiment, the shaped steel member 5 includes a first shaped steel 51 and a second shaped steel 52, the first shaped steel 51 and the second shaped steel 52 are intersected, and by using the first shaped steel 51 and the second shaped steel 52, a shaped steel skeleton is used as As part of the support system of the upper structure, it reduces the dependence on the scaffolding system, improves the lateral support stiffness, improves the accuracy and structural safety of the columns and upper structure dimensions; the support system is transferred from the scaffolding system to the steel skeleton support system, reducing engineering cost and improve construction safety. The steel skeleton can be manufactured in a factory, which improves the quality of the production and speeds up the construction progress. The concrete on the outer side of the section steel and the concrete on the upper wall structure can be constructed simultaneously, shortening the construction period.
其中,第一型钢51与第二型钢52均为“H”型钢,且第一型钢51与第二型钢52垂直设置,交点位于第一型钢51与第二型钢52的中心处,型钢骨架可作为X型柱受力的一部分,和外侧钢筋混凝土形成整体后,极大的提高了X型柱的承载力和耐久性。相同承载力的型钢-混凝土X型柱可缩小柱身截面,降低含钢量,降低工程造价。Wherein, the first section steel 51 and the second section steel 52 are both "H" section steel, and the first section steel 51 and the second section steel 52 are vertically arranged, and the intersection point is located at the center of the first section steel 51 and the second section steel 52, and the section steel skeleton can be used as A part of the X-shaped column is integrated with the outer reinforced concrete, which greatly improves the bearing capacity and durability of the X-shaped column. The steel-concrete X-shaped column with the same bearing capacity can reduce the section of the column body, reduce the steel content, and reduce the construction cost.
通过优化X型柱的截面及构造,最大限度发挥相关材料的性能,实现减轻结构自重,减少材料用量,降低建造成本。不再依赖于易出安全、质量问题的大型脚手架支撑体系,提高了施工的安全性。通过合理衔接施工工序,优化施工工期,降低工程成本。By optimizing the cross-section and structure of the X-shaped column, the performance of related materials can be brought into full play, so as to reduce the weight of the structure, reduce the amount of materials used, and reduce the construction cost. It no longer depends on the large-scale scaffolding support system that is prone to safety and quality problems, which improves the safety of construction. By rationally connecting the construction procedures, the construction period is optimized and the project cost is reduced.
作为可选地实施方式,图3是第一柱结构11和第二柱结构12的剖视图,如图3所示,第一柱结构11和第二柱结构12的内部还包括设置于型钢构件5与混凝土构件4之间的若干纵向受力钢筋3、以及设置于纵向受力钢筋3一侧的箍筋1,箍筋1设置于靠近混凝土构件4的一侧,箍筋1采用封闭矩形箍筋,用来联结纵向受力钢筋和受压区的混凝土,使其共同工作,通过设置箍筋1用来满足斜截面抗剪强度。还包括拉筋6,具体地,拉筋6设置在第二型钢52的周围,用于提高第二型钢52一侧设置的纵向受力钢筋3的整体性,对若干纵向受力钢筋3起到拉结的作用,使整体结构更加稳定。As an optional embodiment, FIG. 3 is a cross-sectional view of the first column structure 11 and the second column structure 12. As shown in FIG. 3, the inside of the first column structure 11 and the second column structure 12 also includes A number of longitudinally stressed steel bars 3 between the concrete member 4 and a stirrup 1 arranged on one side of the longitudinally stressed steel bar 3, the stirrup 1 is arranged on the side close to the concrete member 4, and the stirrup 1 adopts a closed rectangular stirrup , which is used to connect the longitudinally stressed steel bars and the concrete in the compression zone to make them work together. The stirrup 1 is set to meet the shear strength of the oblique section. It also includes tie bars 6, specifically, the tie bars 6 are arranged around the second shaped steel 52, used to improve the integrity of the longitudinally stressed steel bars 3 arranged on one side of the second shaped steel 52, and play a role for several longitudinally stressed steel bars 3. The role of the knot makes the overall structure more stable.
作为可选地实施方式,图2是图1的侧视结构示意图,如图2所示,还包括与第一柱结构11和第二柱结构12分别成夹角设置的第一支撑组件和第二支撑组件,分别用于支撑第一柱结构11和第二柱结构12,从而增强整体结构的稳定性。As an optional embodiment, FIG. 2 is a schematic side view of the structure of FIG. 1, as shown in FIG. The two supporting components are respectively used to support the first column structure 11 and the second column structure 12, thereby enhancing the stability of the overall structure.
其中,第一支撑组件和第二支撑组件均包括固定于地面的支撑支墩9,以及固定于支撑支墩9上的支撑体8,支撑体8的一端固定于支撑支墩9上,支撑体8的另一端固定于柱结构的中心上,其中,支撑体8采用钢管,通过将钢管的一端固定在第一柱结构11和第二柱结构12的中心处,钢管可以与型钢焊接,或者通过其他连接方式固定在柱结构上,确保稳固。Wherein, the first support assembly and the second support assembly include a support pier 9 fixed on the ground, and a support body 8 fixed on the support pier 9, one end of the support body 8 is fixed on the support pier 9, and the support body The other end of 8 is fixed on the center of the column structure, wherein, the support body 8 adopts a steel pipe, and by fixing one end of the steel pipe at the center of the first column structure 11 and the second column structure 12, the steel pipe can be welded with the section steel, or by Other connection methods are fixed on the column structure to ensure stability.
作为可选地实施方式,还包括杯口基础10,第一柱结构11与第二柱结构12的型钢构件5分别插入并嵌固在其所对应的杯口基础10内。As an optional embodiment, a cup foundation 10 is also included, and the steel members 5 of the first column structure 11 and the second column structure 12 are respectively inserted and embedded in the corresponding cup foundations 10 .
具体地,型钢构件5的底部设有柱脚13,柱脚13通过第二连接件嵌固于杯口基础10内,第二连接件用于将柱结构的型钢构件5固定于浇筑的地基中,在实际的施工过程中,可以根据实际的生产需要选用合适的连接件,本实施例中,作为优选的实施方式,选用第二连接件为地脚螺栓7。Specifically, the bottom of the shaped steel member 5 is provided with a column foot 13, and the column foot 13 is embedded in the cup foundation 10 through a second connecting piece, and the second connecting piece is used to fix the shaped steel member 5 of the column structure in the poured foundation , in the actual construction process, an appropriate connector can be selected according to actual production needs. In this embodiment, as a preferred implementation mode, the second connector is selected as the anchor bolt 7 .
以上所述,仅为本实用新型的具体实施方式,但本实用新型的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本实用新型揭露的技术范围内,可轻易想到变化或替换,都应涵盖在本实用新型的保护范围之内。因此,本实用新型的保护范围应以所述权利要求的保护范围为准。The above is only a specific embodiment of the present utility model, but the scope of protection of the present utility model is not limited thereto. Anyone familiar with the technical field can easily think of changes or changes within the technical scope disclosed by the utility model Replacement should be covered within the protection scope of the present utility model. Therefore, the protection scope of the present utility model should be based on the protection scope of the claims.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201822017830.1U CN209261322U (en) | 2018-12-03 | 2018-12-03 | A kind of indirect dry cooling tower X-type rod structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201822017830.1U CN209261322U (en) | 2018-12-03 | 2018-12-03 | A kind of indirect dry cooling tower X-type rod structure |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN209261322U true CN209261322U (en) | 2019-08-16 |
Family
ID=67565588
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201822017830.1U Expired - Fee Related CN209261322U (en) | 2018-12-03 | 2018-12-03 | A kind of indirect dry cooling tower X-type rod structure |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN209261322U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113756619A (en) * | 2021-09-09 | 2021-12-07 | 浙江省二建建设集团有限公司 | Temporary support structure of cooling tower steel pipe concrete X-shaped oblique strut and construction method |
-
2018
- 2018-12-03 CN CN201822017830.1U patent/CN209261322U/en not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113756619A (en) * | 2021-09-09 | 2021-12-07 | 浙江省二建建设集团有限公司 | Temporary support structure of cooling tower steel pipe concrete X-shaped oblique strut and construction method |
| CN113756619B (en) * | 2021-09-09 | 2022-10-14 | 浙江省二建建设集团有限公司 | Temporary support structure of cooling tower steel pipe concrete X-shaped oblique strut and construction method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| WO2020181794A1 (en) | Fabricated self-restoration pitch point | |
| CN104389419A (en) | Cantilevered formwork platform installation structure and construction method | |
| CN208792508U (en) | A kind of square steel tube constrains the node structure of combined steel and concrete column and girder steel | |
| CN102071747A (en) | Joint of square steel tube concrete column and reinforced concrete floor and production method thereof | |
| CN102061742B (en) | Anti-seismic reinforced concrete antique building structure system | |
| CN106638265A (en) | Steel reinforced concrete beam rigid framework bridge | |
| CN209637112U (en) | A steel pipe concrete pouring body with tension bars | |
| CN103469735B (en) | The installation method of the formwork of the solid section of the pier top of the hollow column and slab pier with curved superelevation | |
| CN108755951A (en) | Prefabricated Prestressed Concrete Frame Energy Dissipation and Damping Beam-column Joints | |
| CN208105473U (en) | A kind of assembly node of upper and lower self-heat conserving external wall and floor | |
| CN110344332A (en) | A support for the construction of the beam on the main tower of the bridge | |
| CN212715350U (en) | Section steel concrete beam column structure | |
| CN209261322U (en) | A kind of indirect dry cooling tower X-type rod structure | |
| CN207944630U (en) | A kind of detached column | |
| CN207032943U (en) | Tilt the tree-shaped post platform canopy of concrete filled steel tube | |
| CN212957126U (en) | Drilling-free shear wall template construction structure | |
| CN204825660U (en) | Bent cap staple bolt device | |
| CN204715539U (en) | A kind of round steel pipe binding type steel concrete column and reinforced concrete beam node structure | |
| CN112127620A (en) | A silo cone shell support formwork platform and its erection method | |
| CN208105474U (en) | A kind of assembly node of upper and lower interior wall and floor | |
| CN202766974U (en) | Bent cap bearing frame without full framing | |
| CN218933127U (en) | Ultra-deep foundation pit permanent-facing combined supporting frame beam-ring frame plate construction device | |
| CN209261321U (en) | A kind of indirect dry cooling tower barrel support construction | |
| CN2385010Y (en) | External mounted square steel tube concrete beam and column connecting node | |
| CN205153121U (en) | Buckling restrained brace and concrete beam column angle steel anchor connected node |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CP03 | Change of name, title or address | ||
| CP03 | Change of name, title or address |
Address after: 200233 No. 7, Lane 888, Tianlin Road, Minhang District, Shanghai Patentee after: Shanghai Energy Technology Development Co.,Ltd. Address before: 201100 No.7, Lane 888, Tianlin Road, Minhang District, Shanghai Patentee before: CPI ELECTRIC POWER ENGINEERING CO.,LTD. |
|
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190816 |